Rule 2, Uttar Pradesh Land Revenue (Survey and Record Operations) Rules,1978: Definitions
Uttar Pradesh Land Revenue (Survey and Record Operations) Rules,1978 - Rule 2
Text of rule 2
Definitions
2.Definitions.-In these rules:
(a) “Act” means the U.P. Land Revenue Act, 1901;
(b) “form”means any one or more of the forms appended to these
rules;
(c) “section”means a section of the Act;
(d) words and expression used in these rules and defined or used in the
Act shall have the meanings assigned to them in the Act.
3. The operations connected with the general correction of maps and
revision of records may be undertaken either as a preliminary to settlement
operations or as an administrative measure.
4. (1) In respect of an area where revision of maps and of record of rights
is considered necessary, the Collector shall cause investigations to be made
and the information relating to condition of land records in such area
collected in Survey Form I.
(2) Where the fields entered in Survey Form I for more than 50 percent of
the total number of fields, further inquiry into the condition of records may
be made with a view to examine the advisability of revsing the map and
record of rights.
(3) Where on the basis of the investigations and inquiries made under
sub-rules (1) and (2), the Collector is of the opinion that maps and records
of any of the villages should be revised, he shall cause such villages,
together with the information relating to the condition of records, to be
entered in Survey Form II.
(4) The collector shall thereafter send to the Board a detailed report
about the condition of maps and records together with the informations
contained in Survey Form II.
5. (1) The Board may on receipt of the report under sub-rule (4) of rule 4,
or on its own motion arrange to depute to any district an Assitant Director
of Land Records or any other officer to examine the proposal of the
Collector or to give further instructions for the collection of material for
report regarding the condition of maps and records.
(2) The Officer so deputed shall make local inspection and specially
scrutinise the area proposed for resurvey. He shall submit the report to the
Board wherein he will also suggest, if necessary, the order in which the
parganas of the district should be taken up for revision of maps and
records.
6. After being satisfied from the report under rule 4 or rule 5, the Board
may submit to the State Government the proposal for issuing notification
under section 48.
7. Upon the receipt of the proposal from the Board, if the State
Government thinks that in any district or other local area, a general or
partial revision of record or resurvey, or both, should be made, it shall
publish a notification under section 48 in Survey FormIII. Upon the issue of
the said notification, the Revenue Records in the custody of regular Lekhpal
shall be transferred to Survey Lekhpal.
Boundary Disputes
8. (1) Before actually commencing map correction or survey work of the
village the boundaries of contiguous villages should be tallied and if there is
any overlapping or gap in the boundaries, tracing of the relevant portions
from the maps of the villages should be taken by the survey Kanungo and
the matter be reported for decision through the Survey Naib-Tahsildar . This
procedure shall be followed even if any contiguous village is not under
record operations.
(2) The Survey Naib- Tahsildar shall make inquiries on the spot after giving
sufficient notice to the Pradhans and members of the Land Management
Committees and also the general public of the villages involved in dispute
and submit his report to the Assistant Record Officer.
(3) The Assistant Record Officer shall soon after the receipt of any such
report make inquiries on the spot in the presence of the persons referred to
in sub-rule(2) and pass suitable orders revising maps of the villages
concerned .
Map correction
9. The village map of the area under Survey or Record Operations may
be revised either-
(1) by Ordinary method of map correction, or
(2) by survey or resurvey.
(2) The Assistant Record Officer after examining the condition of maps
shall decide which of the two methods specified in sub-rule (1) should be
adopted.
10. For revision of map by survey or resurvey the instructions contained
in the book, entitled, “Rules and instructions for Survey of Villages”, shall be
followed. This work shall initially be done by Survey Kanungo with the
Assistance of Survey Lekhpals.
11. Where the map is to be corrected by ordinary method, it shall be
done by the Survey Kanungo with the assistance of Survey Lekhpals and the
following procedure may, as far as possible be followed:
(a) The map to be used for correction shall be the tracing cloth copy of
either the map prepared when the village was surveyed for the last time or
the map prepared by correction at the time of the last revision of maps and
records, which-ever is later.
(b) The Survey Kanungo shall first go round the boundaries of the
village to find out whether all the trijunctions and othe boundary marks do
exist on the spot at the proper place/s and are shown in the map correctly;
and whether the boundary as shown in the map tallies with the position on
the spot. If he finds any discrepancy he will report the matter to the Survey
Naib-Tahsildar, who will examine the position with the help of the maps of
the neighbouring villages and report the matter to the assistant Record
Officer for prompt action under section-50. The Assistant Record Officer
shall then decide the matter in accordance with rule 8(3).
(C) The Survey Kanungo shall take up each of the sheets separately and
proceed to correct them from the north-west corner.
(d) The Survey Kanungo shall measure the boundaries of all the plots
and record them in the field book in Survey Form IV. The measurements
may be carried out either by a measuring rod or by a chain or by internal
survey by quadrilaterals using chain and optical squares where necessary.
(e) The corrections shall be made by taking convenient areas the shapes
of which in the map tally with those on the spot. Where the measurements
in the map and on the ground do not correspond, it wil be necessary to
distribute the error, if any, in the plots of the block proportionately without
distributing the relative shapes and position of contiguous-plots.
(f) In cases of difference of less than one gattha (10 links) Where
relative position of neighbouring plots, appear on the map to tally with the
spot no correction shall actually be made.
(g) In cases of difficulty in which the plot or group of plots cannot be
shown in the existing maps correctly , which may be due to error being so
large that its distribution in the map would give disproportionate idea of
the relative position of different polts or which may be due to the fact that
the fields are divided so minutely that their ploting within the map would
make it clumsy or indistinct, the area involved should be plotted separately
in the margin of the map on the same scale or on a larger scale, if
necessary and the portions so ploted should be left blank in the main map
with a note showing where it could be seen;
(h) As a rule only boundaries existing on the ground will be shown in
the map and Survey Kanungo will not enter private partition among
cultivators where there is no physical boundary;
(i) A list of objects along with signs for them with which they will be
marked on the village maps where such objects exist are indicated in Survey
Form V. Objects like roads masonry wells canals guls etc, will be marked
after actual measurement while those like kachcha wells, trees, abadi etc.
will be shown in the map at their approximate places.
(j) The correction in the map will be indicated in pencil in the first
instance by the Survey Kanungo. They survey Naib-Tahsildar will check 25
percent of the corrected plots taking precaution to spread the checking
through-out the area of the village. The Assistant Record Officer shall also
check some corrected plots in every village with a view to ensure the
accuracy of corrections made in the maps. The corrections shall be inked
after the checking has been done by the survey Naib-Tahsildar and the
assistant Record Officer.
12. Where during the course of revision of map, both by resurvey or
ordinary method, it is discovered that area of a plot entered in the record of
rights is prima facie in correct or these is a boundary dispute between two
plots, it will be entered in the list of mistakes and disputes in Survey Form
VI and it shall be disposed of in the manner laid down in rule 19.
13. Renumbering – After the revision of map, all the plots on a newly
surveyed or corrected map will be renumbered by the Survey Kanungo. The
procedure laid down below may, as far as possible be followed:
(a) The renumbering of plots will be done sheetwise where the map of a
village consists of more than one sheet.
(b) The numbering will start from the north-west corner, go generally in
blocks to the east, come back again to the west taking the plots just below
and so on finishing at the end in the south east corner.
(c) Where the fields situated in the same village have been plotted on
the margin of a map, the numbering will be made in the same continuation
as is the main map.
(d) Kudan number should be avoided but if there are any, a note about
them will be made in the margin of the map.
(e) If any plot or plots are left out by an oversight in renumbering, they
will be given the number in the same serial starting after the last number of
the village as numberater and the number of adjoining plot as enominater
so as to trace it out easily.
(f) If fields or areas of one village lie within the boundaries of another
village, they will be shown in their actual position in the map of the latter
village but no numbers will be assigned to them. Their limits will be marked
by a thick line and the name of the village to which they pertain will be
written across them.
(g) In case of tracts containing very small plots which cannot
accommodate the number within them, blocks will be marked of by a thick
line, the first one of 99 plots and the latter of 100 plots each and the
number of the block will be noted in the centre in a thickly written figure
surrounded by a circle, without abscuring any of the field boundaries. The
first block in the north-west will be numbered 0 and the field numbers will
run from 1 to 99 the second block will be number 1 and the fields in it
00,01, 02, 03,…………to………..99, the third block will be numbered 2 and so
on. Thus if a field is numbered 45 in block no. 2 its full number will be 245
which will be entered in all the Revenue papers. If some of the fields in the
block are large enough they should contain the full numbers.
(h) The re-numbering will first be in pencil and will be inked only after it
has been checked thoroughly by the survey Naib-Tahsildar.
14. Area Extraction-(1) The area of fields blocks and villages the maps of
which are revised, will be calculated by the following methods-
(a) in case of map revised by Survey or Resurvey, by area comb;and
(b) in case of map revised by ordinary method, by chaumeda system
for regular four-cornered plots and by diogonal system for all other plots.
(2) The area of various plots or blocks in a village will be added up to
find out the total area of the village.
Previous and next
All provisions of Uttar Pradesh Land Revenue (Survey and Record Operations) Rules,1978
Questions people ask
Is rule 2 of Uttar Pradesh Land Revenue (Survey and Record Operations) Rules,1978 still in force?
No repeal of Uttar Pradesh Land Revenue (Survey and Record Operations) Rules,1978 is recorded.