Rule 10, The Rajasthan Water (Prevention and Control of Pollution) Rules 1975: Appointment of Consulting Engineer
The Rajasthan Water (Prevention and Control of Pollution) Rules 1975 - Rule 10
Text of rule 10
Appointment of Consulting Engineer
10. Appointment of Consulting Engineer. – For the purpose of assisting
the Board in the performance of its functions the Board may appoint a
Consulting Engineer to the Board for a specified period not exceeding four
months :
Provided that the Board may with the prior approval of the State
Government extend the period of the appointment from time to time :
Provided further that if at the time of the initial appointment the Board had
reason to believe that the services of the Consulting Engineer would be
required for a period of more than four months, the State Board shall not
make the appointment without the prior approval of the State Government.
11. Powers to Terminate Appointment – Notwithstanding the appointment
of a consulting Engineer for a specified period under rule 10 the State
Board shall have the right to terminate the services of the Consulting
Engineer before the expiry of the specified period, if in the opinion of the
Board, the Consulting Engineer is not discharging his duties properly or to
the satisfaction of the Board or such a course of action is necessary in the
public interest.
Previous and next
← Rule 9Manner and Purpose of Association of Persons with State BoardRule 12 →Emoluments of the Consulting Engineer
All provisions of The Rajasthan Water (Prevention and Control of Pollution) Rules 1975
Questions people ask
Is rule 10 of the Rajasthan Water (Prevention and Control of Pollution) Rules 1975 still in force?
No repeal of the Rajasthan Water (Prevention and Control of Pollution) Rules 1975 is recorded.