Rule 12, Water (Prevention and Control of Pollution) (Consent) Madhya Pradesh Rules, 1975.: Provision for Electric Power Failure

Water (Prevention and Control of Pollution) (Consent) Madhya Pradesh Rules, 1975. - Rule 12

Text of rule 12

Provision for Electric Power Failure

12. Provision for Electric Power Failure.- The applicant shall either, (a) no later than.................certify in writing to the consent issuing authority that the applicant has installed or provided for an alternatic electric power sources sufficient to operate all facilities utilized by the applicant to maintain compliance with the terms and conditions of the Consent; or Water (Prevention and Control of Pollution)(Consent) Madhya Pradesh, Rules 1975 Madhya Pradesh Pollution Control Board, Bhopal (b) no later than 30 days after the effective date of this Consent, certify in writing to the consent issuing authority that upon the reduction, loss or failure of one or more of the primary sources of electric power to any facilities utilised by the applicant to maintain compliance with the terms and conditions of this consent, the applicant shall halt reduce or otherwise Control production and/or all discharges in order to maintain compliance with the terms and conditions of this Consent.

Previous and next

All provisions of Water (Prevention and Control of Pollution) (Consent) Madhya Pradesh Rules, 1975.

Questions people ask

Is rule 12 of Water (Prevention and Control of Pollution) (Consent) Madhya Pradesh Rules, 1975. still in force?

No repeal of Water (Prevention and Control of Pollution) (Consent) Madhya Pradesh Rules, 1975. is recorded.