LawGrids logoLAWGRIDS.ORG

Rule 7, Water (Prevention and Control of Pollution) (Consent) Madhya Pradesh Rules, 1975.: Emergencies

Water (Prevention and Control of Pollution) (Consent) Madhya Pradesh Rules, 1975. - Rule 7

Text of rule 7

Emergencies

7. Emergencies. - In case of emergencies when the water quality of the stream suddenly deteriorates the applicant shall co-operate with the Board and if necessary close down certain operations to prevent undue pollution in the streams as a temporary measure. 1.As substituted vide Notification No F-5-l21132/90 dated 27/12/97 2. As inserted vide Notification No. 13-117/32/90 dated 4-4-91 Water (Prevention and Control of Pollution)(Consent) Madhya Pradesh, Rules 1975 Madhya Pradesh Pollution Control Board, Bhopal SCHEDULE [See ruI4(Viii)] OFFICE OF THE MADHYA PRADESH STATE PREVENTION AND CONTROL OF WATERPOLLUTION BOARD. 87 MALVIYA NAGAR, BHOPAL-3 CONSENT FORM No. /WPCB/ Bhopal, Dated the ................................................ Subject.- Consent to………………………………………………………………. for the discharge of effluent under section 25/26 of the Water (Prevention and Control of Pollution) Act 1974. Reference.-Application No............................................................................................. ......................................................................of………………………………………… ……….……… dated (expiry date................................................................................... With reference to the above application for Consent to discharge effluent in to the natural water courses under the Water (Prevention and Control of Pollution) Act; 1974. here in after referred to as the Act is authorised by the State Board to discharge its industrial and other effluents arising out of their premises into the local stream/river/well in accordance with the general, and special conditions as mentioned in the Annexure. 2. This Consent shall be valid for a period of 12 months only commencing from......................Dated this…………………………..day of………….19 For and on behalf of the Madhya Pradesh State Prevention and Control of Water Pollution Board: Seal Member-Secretary enclosure: Annexure Water (Prevention and Control of Pollution)(Consent) Madhya Pradesh, Rules 1975 Madhya Pradesh Pollution Control Board, Bhopal ANNEXERE ENCLOSURE TO REFERENCE LETTER ISSUED TO M/s………………………………………………………………………………… VIDE CONSENT No...................... ................................. /WPCBI7 5, Dated…… A- GENERAL CONDITIONS: All discharges, authorised shall be consistent with the terms and conditions of this Consent. Facility expansions, production increases, or process modifications which result in new or increased discharges of pollutants must be reported by submission of a new Consent application or if such new or increased discharges does not violate the effluent limitations specified in this Consent, by submission to the Board details of such new or increased discharges of pollutants in which case the Consent may he modified to specify effluent limitations for any pollutants not identified and limited herein. The discharge of any pollutant more frequently than or at a level in excess of that identified and authorised by this Consent shall constitute a violation of the terms and conditions of this Consent. 2. After notice and opportunity for the hearing, this consent may be modified, suspended or…….)ked by the Board in whole or in part during its term for calise including, but not limited to, the following (a) Violation of any terms and conditions of this Consent; (b) Obtaining this Consent by misrepresentation or failure to disclose fully all relevant facts; (c) A change in any condition that requires temporary or permanent reduction or elimination of the authorised discharge. 3. Notwithstanding para (2) above, if a toxic eft1uent standard or prohibition (including any schedule of compliance specit1ed in such effluent standard or prohibition) is established for a toxic pollutant which is present in the discharge authorised herein and such standard or prohibition is more stringent that any limitation upon such pollutant in this consent, the Consent shall be revised or modified in accordance with the toxic effluent standard or prohibition that the Board may consider and the applicant shall be so notified. 4. The applicant shall allow the staff of the Madhya Pradesh State Prevention and Control of Water Pollution Board, and/or their authorised representatives, upon the representation of credentials; (a) To enter upon the applicant's premises where an eft1uent source is located or in which any records are required to be kept under he terms and conditions of this Consent; (b) To have access to and copy at reasonable times any records required to be kept under the terms and conditions of this Consent; (c) To inspect at reasonable times any monitoring equipment or monitoring method required in this Consent; or, (d) To sample at reasonable times any discharge or pollutants. 5. The applicant shall at all times maintain in good working order and operate as efficiently as possible all treatment or control facilities/or systems installed or used by Water (Prevention and Control of Pollution)(Consent) Madhya Pradesh, Rules 1975 Madhya Pradesh Pollution Control Board, Bhopal him to achieve compliance with the terms and conditions of this Consent. 6. The issuance of this Consent does not convey any property rights in either real or personal property, or any exclusive privileges, nor does it authorise any injury to private property or any invasion of personal rights, nor any infringement of Central, State of local laws or regulations. 7. This Consent does not authorise or approve the construction of any physical structures or facilities or the undertaking of any work in any natural water course. 8. The specit1c effluent limitations and other pollution controls applicable to the discharge permitted herein are set forth below in specific conditions. Also set forth below are self-monitoring and reporting requirements. Unless otherwise specified, the applicant shall submit duplicate original copies of all reports to the Madhya Pradesh State Prevention and Control of Water Pollution Board. Except for data determined to be confidential, all such report shall be available for public inspection at the office of the Madhya Pradesh State Prevention and Control of Water Pollution Board. Knowingly making any false statement on any such report may result in the imposition of criminal penalties as provided for in section 42 of the Act. B. SPECIAL CONDITIONS: 1. Initial Effluent limitations.- During the period beginning on the effective date of his consent and lasting until ………………………………..discharge from outfalls shall be limited and monitored by the applicant as specified below: (a) The following shall be limited and monitored by the applicant as specified: _____________________________________________________________________ EFFLUENT DISCHARGE LIMITATION MONITORING REQUIREMENT CHARACTERI STI CS ___________________________________________________________ AVERAGE MAXIMUM Frequency Type of Mg/l kgs/day Mg/l kgs/day *measurement sample _____________________________________________________________________ *Daily//weekly/Monthly/ Trimonthly +Grab/24 Hpur. Composite. In addition to above, discharge shall be limited and monitored as specified below; _____________________________________________________________________ EFFLUENT DISCHARGE LIMITATION MONITORING CHARACTERI STI CS REQIOREMEN AVERAGE MAXIMUM Frequency Type of Mg/l kgs/day Mg/l Kgs/day _____________________________________________________________________ *daily/Weekly /Monthly /Trimonthly +Grabl24 hour. Composite. _____________________________________________________________________ For the purpose of this sub-section, the daily average discharge is the total discharge by weight during the calendar month divided by the number of days in a month the production or commercial facility' was operating.' For the purpose of this sub-section the daily maximum discharge means the total discharge by. weight during Water (Prevention and Control of Pollution)(Consent) Madhya Pradesh, Rules 1975 Madhya Pradesh Pollution Control Board, Bhopal any calendar day. (b) The pH shall not be less than 5.5 or greater than 9.0 2. Final Eft1uent Limitation.-During the period beginning ................and lasting until the date of expiration of this Consent ,discharge from the outfalls shall be limited and monitored by the applicant as specified below:.........................................................…………………….. (a) The following shall be limited' and monitored by the applicant as specified. ____________________________________________________________________ EFFLUEMENT DISCHARGE LIMITATION MONITORING CHARACTERISTICS REQUIREMENT AVERAGE MAXIMUM Frequency type of -7 Mg/l Kgs/day Mg/l Kgs/day *Measurement Sample ____________________________________________________________________ ____________________________________________________________________ * dailyWeekl¥/Monthy/Trimonthly +Grab/24 Hour. Composite. ____________________________________________________________________ Water (Prevention and Control of Pollution)(Consent) Madhya Pradesh, Rules 1975 Madhya Pradesh Pollution Control Board, Bhopal Additionally, outfall shall be monitored as follows: (i) Flow, Temperature and Total solids-one per month; Grab samples, Maximum discharge Temperature above upsteam receiving water shall be in accordance with the standard of ISI at 4()0 F.Uniform as per ISI 40° F.The temperature shall be monitored once per month on each outfall. For the purposes of this subsection, the daily average discharge is the total discharge by weight during the calendar month divided by the number of days in the month that the production or commercial facility was operating. For the purpose of this sub-section, the daily maximum discharge, means the total discharge by weight during any calendar day. (b) The pH shall not be less than 5.5 or greater than 9.0 for out falls. The samples are taken as monthly, grab samples. 3.Schedule of Compliance for Effluent Limitations. The applicant shall achieve compliance with the effluent limitations specified above for discharge from outfalls in accordance with the following schedule.- . (i) Report of Progress; (ii) Completion of final plans by; (iii) Award of contract or other commitment of financing; (iv) Commencement of construction by; (v) Report of construction progress; (vi) Completion of construction by; (vii) Attainment of operational level by; (b) The applicant shall submit to the Consent Issuing Authority the required report of progress or where a specified action is required in Ca) above to be taken by a certain date, a written notice Qf compliance or non-compliance with each of the above scheduled dates, post marked on later than.14 days following each elapsed date. Each notice of non-compliance shall include the following information:- . (1) A short description of the non-compliance; (2) A description of any action taken or proposed by the applicant to comply with the elapsed scheduled requirement without further delay; (3) A description of any factors which tend to explain or mitigate the non compliance; and (4) An estimate of the date, the applicant will comply with the elapsed schedule requirement. and, assessment of the possibility that the applicant will meet the next scheduled requirement in time. (4) Compilation of Monitoring Data.-(a) Samples and measurement taken to meet the monitoring requirements specified above shall be representative of the volume and nature of monitored discharge. (b) Following promulgation of guidelines establishing test procedures for the analysis of pollutants, all sampling and analytical methods used to meet the monitoring requirements specified above shall conform to such guidelines. Unless otherwise specified sampling and analytical methods shall conform to the latest edition of the Indian Standard specifications and where it is not specified the guidelines as per standard methods for the examination of Water and Waste Waters 18th Edition of the American Public Health Association, New York. U.S.A. shall be used. (c) The applicant take samples and measurement to meet the monthly requirements specified above at the location indicated below; Water (Prevention and Control of Pollution)(Consent) Madhya Pradesh, Rules 1975 Madhya Pradesh Pollution Control Board, Bhopal Point of sampling: (i) Outfalls of waste. (ii) 100 meters from point of confluence, down stream river or lake. 5. Recording of Monitoring activities and Results.-(a) The applicant shall make and maintain records of all information resulting from monitoring activities required by this Consent. (b) The applicant shall record for each measurement or samples taken pursuant to the requirements of this consent the following information: (I) the date, exact place and time of sampling; (2) the dates on which analysis were performed; (3) who performed the analysis; (4) the analytical techniques or methods used ; and (5) the results of all required analysis. (c) If the applicant monitors any pollutant more frequently as is required by this Consent he shall include the results of such monitoring in the calculation and reporting, of values required in the discharge monitoring reports which may be prescribed by the Board. Such increased frequency shall be indicated on the discharge Monitoring Report form. (d) The applicant shall retain for a minimum of 3 years all records of monitoring activities and results including all records of calibration and maintenance of instrumentation and original strip chart regarding from continuous monitoring instrumentation. This period of retention shall be extended during the course of any unresolved litigation regarding the discharge of pollutants by the applicant or when requested by the Central or State Board. 6.Reportion of Monitoring Results.(a) Monitoring information required by this Consent shall be summerised and reported by submitting a Discharge Monitoring Report Form duly filled in and signed, to the Board's office at the following address: "Madhya Pradesh State Prevention and Control of Water Pollution Board, 87, Malviya Nagar, Bhopal-3 (Pin No. 462 003)" (b) Each submitted Discharge Monitoring Report shall be signed as follows:-. (i) If submitted by Corporation-by a Principal Executive Officer of at least the level of VicePresident or his duly authorised representative, if such representative is responsible for the overall operation of the facility from which in discharge described in the discharge Monitoring Report originates. (ii) If submitted by a partnership, by a general partner. (iii) If submitted by a sole proprietor, by the proprietor, (iv) If submitted by a Municipal. State or Central Government or other public enterprise, by a principal Executive officer, ranking elected official, Commanding officer, or other duly authorised employee. (c) All information submitted on the Discharge Monitoring Form shall be based upon measurements and sampling carried out during the three previous calendar months. The first Discharge Monitoring Report shall be submitted for a period ending 60 days from issuance. Thereafter, reporting periods shall end on the last date of each month. The applicant shall submit a discharge Monitoring Report post marked no later than 28th day of the month following each completed reporting period. 7. Limitation of Discharge of Oil and Hazardous Substances in harmful quantities:- The applicant shall not discharge oil in quantities defined as harmful in regulations. In addition, the applicant shall not discharge hazardous substances into natural water Water (Prevention and Control of Pollution)(Consent) Madhya Pradesh, Rules 1975 Madhya Pradesh Pollution Control Board, Bhopal course in quantities defined as harmful in regulations promulgated by the Board. Nothing in this Consent shall be deemed to preclude the institution of any legal action-nor relieve the applicant from any responsibilities, liabilities or penalties to which the applicant is or may be subject to clauses.

Previous and next

All provisions of Water (Prevention and Control of Pollution) (Consent) Madhya Pradesh Rules, 1975.

Questions people ask

Is rule 7 of Water (Prevention and Control of Pollution) (Consent) Madhya Pradesh Rules, 1975. still in force?

No repeal of Water (Prevention and Control of Pollution) (Consent) Madhya Pradesh Rules, 1975. is recorded.