Rule 12, Water (Prevention and Control of Pollution) (Consent) Madhya Pradesh Rules, 1975: Provision for Electric Power Failure
Water (Prevention and Control of Pollution) (Consent) Madhya Pradesh Rules, 1975 - Rule 12
Text of rule 12
Provision for Electric Power Failure
12. Provision for Electric Power Failure.- The applicant shall either,
(a) no later than.................certify in writing to the consent issuing authority
that the applicant has installed or provided for an alternatic electric power
sources sufficient to operate all facilities utilized by the applicant to
maintain compliance with the terms and conditions of the Consent; or
Water (Prevention and Control of Pollution)(Consent) Madhya Pradesh, Rules 1975
Madhya Pradesh Pollution Control Board, Bhopal
(b) no later than 30 days after the effective date of this Consent, certify in writing to the
consent issuing authority that upon the reduction, loss or failure of one or more of the
primary sources of electric power to any facilities utilised by the applicant to maintain
compliance with the terms and conditions of this consent, the applicant shall halt
reduce or otherwise Control production and/or all discharges in order to maintain
compliance with the terms and conditions of this Consent.
Previous and next
← Rule 10Non-compliance with Effluent LimitationsRule 13 →Prohibition of By-pass of Treatment Facilities
All provisions of Water (Prevention and Control of Pollution) (Consent) Madhya Pradesh Rules, 1975
Questions people ask
Is rule 12 of Water (Prevention and Control of Pollution) (Consent) Madhya Pradesh Rules, 1975 still in force?
No repeal of Water (Prevention and Control of Pollution) (Consent) Madhya Pradesh Rules, 1975 is recorded.