9. Restrictions on buildings between highway boundary and building line and
between building and control lines.— (1) Notwithstanding anything contained in any
law, custom, agreement or instrument for the time being in force, on and after the
appointed day, the following restrictions shall, subject to the provisions of this Act, be in
force, that is to say,— No person shall, without the previous permission in writing of the
Highway Authority,—
(a) upon any land lying between the highway boundary and the building line
proposed to be fixed under sub-section (2), or fixed under sub-section (1) of section 7,
as the case may be,
(i) construct, form or layout any means of access to, or from, a highway, or
(ii) erect any building, or
(iii) materially alter any existing building, or
(iv) make or extend any excavation, or
(v) construct, form or layout any works; or
---6---
(b) upon any land lying between the building line and the control line proposed to
be fixed under sub-section (2), or fixed under sub-section (1) of section 7, as the case
may be,
(i) construct, form or layout any means of access to, or from, a highway, or
(ii) erect any building, or
(iii) materially alter any existing building;
(c) use any building or alter the use of any building already erected in a manner
which, in the opinion of the Highway Authority, will, in any manner whatsoever,
infringe any of the provisions of this Act or interfere with the use of a Highway
adjoining the land on which such building is erected.
(2) Every person desiring to obtain such permission under sub-section (1) shall make
an application in writing to the Highway Authority in such form and containing such
information as may be prescribed in respect of the building, alteration, excavation, works
or means of access, as the case may be, to which the application, relates.
(3) On receipt of such application, the Highway Authority, after making such enquiries
as it may consider necessary, shall, by order in writing, either—
(a) grant the permission, subject to such conditions, if any, as may be specified in
the order, or
(b) refuse to grant such permission
Provided that—
(i) permission under clause (a) of sub-section (1) to the making of any excavation
or construction, formation or laying out of works in land for the purpose of
repairing, renewing, enlarging or maintaining any underground sewer, drain, electric
line, pipe, duct or other apparatus shall not be withheld nor be made subject to any
conditions save such as may be necessary for securing that the sewer, drain, electric
line, pipe, duct, or other apparatus shall be laid in such a manner and at such levels
that the construction, maintenance, development or improvement of a road thereover
will not be prevented or prejudicially affected thereby;
(ii) permission under clause (b) of sub-section (1) to the erection or alteration of a
building or laying out any means of access to a highway which conforms to the
requirements of public health, and welfare and of safety and convenience of traffic
on the adjoining road shall neither be withheld nor made subject to unreasonable
conditions:
Provided that in the case of means of access required for agricultural purposes such
permission shall neither be withheld nor be made subject to any conditions save such as
may be necessary for securing that the means of access shall be used for agricultural
purposes only;
(iii) permission under clause (b) of sub-section (1) to the re-erection or alteration of
a building which was in existence before the appointed day shall neither be withheld
nor made subject to restrictions unless such re-erection or alteration involves any
material alteration to the outside appearance of the building.
(4) When the Highway Authority refuses permission, the reasons therefor shall be
recorded and communicated to the applicant:
---7---
Provided that nothing herein contained shall debar a person from making a fresh
application after omitting therefrom the objectionable features communicated to him as
aforesaid on account of which such permission was refused.
(5) If at the expiration of a period of three months after an application for such
permission specifying the name and address of the applicant has been made to the
Highway Authority, or such further period, not exceeding three months, as may have
been notified by the Highway Authority, has elapsed and no decision has been notified in
writing, posted or delivered to the applicant at that address, then (except as may otherwise
be agreed in writing between the Highway Authority and the applicant) permission shall
be deemed to have been given without the imposition by the Highway Authority of any
conditions.
(6) The Highway Authority shall maintain a register with sufficient particulars of all
permissions given or refused by it under this section and the register shall be available for
inspection free of charge by all persons interested and such persons shall be entitled to
take extracts therefrom.
Explanation— For the purpose of this section, “appointed day” shall, with reference
to any highway boundary, building line or control line, mean,—
(1) the day on which a notification is published in the Official Gazette under sub-
-section (2) of section 7 proposing to fix such highway boundary, building line or control
line, and
(2) if any modification is made in such highway boundary, building line or control
line, the day on which the notification is published under sub-section (1) of section 7,
fixing such highway boundary, building line or control line.
Previous and next
Questions people ask
Is section 9 of the Goa Highways Act, 1974 still in force?
No repeal of the Goa Highways Act, 1974 is recorded.