Amendment in Building Construction and Development Bye-laws
Order - The Uttar Pradesh Urban Planning & Development Act,- 1973
- Kind: Order
- Under: The Uttar Pradesh Urban Planning & Development Act,- 1973
Text of this order
No. 1668/8-3-13-04 LUC/2010
From,
Rajeev Agarwal,
Secretary,
Government of Uttar Pradesh
To,
Vice Chairman,
All Development Authorities
Uttar Pradesh.
Housing and Urban Planning Section-3 Lucknow: Dated: July 20, 2013
Subject: Regarding amendment in the Building Construction and Development Bye-laws prevalent
in the Authorities for the development of bus stations to be developed on the basis of
"Public-Private Partnership (PPP)" in Uttar Pradesh.
Sir,
Please refer to the proposal provided by the Uttar Pradesh State Road Transport Corporation
regarding the permissibility of activities and amendment in FAR under the bus stations to be
developed on the basis of "Public-Private Partnership (PPP)".
2- In this regard, I have been directed to state that in pursuance of the proposal received from the
Uttar Pradesh State Road Transport Corporation, with a view to determining the provision of facilities
related to buses and passengers and commercial uses under the bus stations to be developed on the
basis of "Public-Private Partnership (PPP)", the procedural arrangements as per the enclosed list are
being substituted in the building construction and development bye-laws of the concerned authorities
in the light of Section 57 of the Uttar Pradesh Urban Planning and Development Act, 1973.
3- In this regard, please obtain the approval of the Authority Board on the procedural arrangements
substituted by the enclosed list and adopt the same. Further, if any refinement is required in view of
local specific requirements, please provide the proposal with the recommendation of the Board to the
Government so that the proposal can be considered at the government level.
Enclosure: As above.
Yours faithfully,
(Rajeev Agarwal)
Secretary
Building Construction and Development Bye-laws
Government Order No. 1668 8-3-2013 dated 20/07/13, Annexed List:
Procedural arrangements for the construction and development of bus stations to be developed by
Uttar Pradesh State Road Transport Corporation on PPP model:
1. Bus Station
Minimum Area
4000 square meters
2. Access Road Minimum 18 meter wide road for Built/Developed area
Minimum 24 meter wide road for New/undeveloped area
3. Ground Coverage
and FAR
Maximum ground coverage of 30 percent will be permissible. Maximum
FAR up to 2.5 will be permissible subject to the condition that the width
of the access road, availability of infrastructure facilities, set-back,
parking and fire fighting requirements, etc., should be fulfilled as per
rules in relation to the proposed FAR. Purchasable FAR will be permissible
under the rules of the applicable building construction and development
bye-laws.
4. Ratio of Activities Minimum 55 percent of the permissible basic FAR for the bus station will
be allowed for bus and passenger-related facilities and a maximum of 45
percent for commercial use.
5. Permissibility The permissibility of activities under bus station and commercial use will
be as per zoning regulations.
6. (For buildings up
to 18 meters
height)
Plot Area Set-back (meters)
(square meters) Front Rear Side – 1 Side - 2
4000 or more than 4000 12 6 6 6
Note: In case the building height is proposed to be more than 18 meters, the set-back will be
determined as per the provisions given in paragraph 3.4.5 (I) of the Building Construction and
Development Bye-laws - 2008.
7. Parking • Parking provisions must be made for the proposed activities within the
bus station, such as retail/multiplex, offices, hotels, restaurants,
commercial shops, etc., according to the standards prescribed in the
applicable building and development bylaws. In addition to the
circulation area and parking required for the bus station as per
regulations, separate parking arrangements must be made for the
above-mentioned activities.
Along with parking for buses at the bus station, arrangements must
also be made for taxis, auto-rickshaws, bicycles, cycle rickshaws,
motorcycles, etc., for the movement of passengers.
The area for bus parking will be determined based on the
estimated/proposed number of buses during the peak hour of the bus
station.
8. Other
Requirements
• The planning and design of the bus station and the circulation plan will
be prepared in such a way that the entry and exit for commercial
activities do not conflict with bus traffic.
Fire safety, structural safety, and other requirements, such as facilities
for physically challenged persons, etc., will be as per the applicable
building and development bylaws.
The planning, design, construction, and installation of water supply,
drainage, sanitation system, and waste disposal will be done as per the
requirements of the National Building Code.
(Rajeev Agarwal)
Secretary
All of The Uttar Pradesh Urban Planning & Development Act,- 1973