Amendment-in bye laws 2017 Order
Order - The Uttar Pradesh Urban Planning & Development Act,- 1973
- Kind: Order
- Under: The Uttar Pradesh Urban Planning & Development Act,- 1973
Text of this order
NO.:1241/8-3-17-34Misc./2008
From,
Amitabh Prakash
Specil Secretary
Govt. of Uttar Pradesh
To,
1. The Housing Commissioner
U.P. Housing & department Board.
Lucknow
2. Vice-Chairman
All Development Authorities
Uttar Pradesh
3. Chairman,
All Special Area Development Authorities
Uttar Pradesh
Housing &Urban Sector-3 Lucknow Dated 31 Oct, 2017
Sub: Regarding Amendment in Building constructions and Development Bye-Laws 2008 (as amended 2011 and 2016)
for implementation of Business Reform Action Plan 2017 under AMRUT Scheme and Ease of Doing Business.
Sir,
1. In regard to the subject mentioned above, it is to be informed that certain amendments are require in the
Building constructions and Development Bye-Laws 2008 (as amended 2011 and 2016) for implementations of
model Building bye laws-2016 issued by Government of India for Urban reforms under AMRUT Scheme and
Business Reform Action Plan 2017 of Government of India under Ease of Doing Business.
2. In this regard I have been directed to state that it has been decided, after due consideration, to amend Building
constructions and Development Bye-Laws 2008 (as amended 2011 and 2016), as per the Enclosure, for
requirements and implementation of Model Building Bye- laws 2016 issued by Government of India for urban
reforms under AMRUT Scheme and Business Reform Action Plan 2017 of Government of India under Ease of
Doing Business, under Section -57 of Uttar Pradesh Urban Planning and Development Act- 1973.
Please ensure strict compliance of the above after obtaining approval of the Board and adopting the same.
Encls: As above
Your faithfully,
Sd-1-
(Amitabh Prakash)
Special Secretary
No. 1241(1)/8-3-17-34 Misc/2008-even dated.
Copy Forwarded to following for information and necessary action:-
1. Chief Town and Country planner, Town and Country Planning Deptt, U.P., Lucknow
2. The Director, Awas Bandhu, U.P. Lucknow
3. Shri Anil Tiwari, Asstt Director, Systems, Awas Bandhu, U.P. with the purpose that it may be served on all
concerned and uploaded on the website of the development.
4. Guard File
By order,
(Sanjay Kumar Singh)
Under Secretary
Enclosure of G.O No. 1241/8-3-17-34 misc/2008, dated 31 October,2017
1. In view of Model Building Bye- laws 2016 ( water re-use and recycling) issued by Government of India under
AMRUT Scheme, Clause 3.1.2.3(xvi), as below, will be added to Building constructions and Development Bye-
Laws 2008 (as amended 2011 and 2016):-
Clause-3.1.2.3.(xvi)
“in plots of all uses, having minimum 10 thousand liters water discharge per day, utilization of waste water
Recycling System/ recycled water shall be ensured”
2. In view of Model Building Bye- laws 2016(Sustainable Waste Management) issued by Government of India
under AMRUT Scheme, Clause 3.1.2.3(xvii), as below , will be added to Building constructions and Development
Bye-Laws 2008 (as amended 2011 and 2016):-
Clause 3.1.2.3(xvii)
“For waste management in residential buildings(including Group housing) of the area of more than 500 sq
meters and in all non- residential buildings, arrangement of two types of dust bins( biodegradable and Non-
biodegradable) shall be made on the ground floor near the entrance so that it is easy to prepare fuel cake,
manure, paper etc. by processing at ward or sector level after collecting garbage from the dust bin everyday by
the Local Body.”
3. In view of Model Building Bye- laws 2016( climate Resilient Contraction-Integration of Environmental Clearance
with Sanction) issued by Government Of India under AMRUT Scheme, Clause 3.11.10, as below, will be added to
Building constructions and Development Bye-Laws 2008 (as amended 2011 and 2016):-
New Clause 3.11.10
“In Buildings of built-up area of 5000 square meter to 150000 square meter, keeping in view the environmental
protection, environmental terms and conditions, mentioned in appendix-15 to appendix-17 shall be complied
with compulsorily.
4. In view of stipulate that building plan approval is provided within 30 days for implementation of Business
Reform Action Plan 2017 under Ease of Doing Business, in to Building constructions and Development Bye-
Laws 2008 (as amended 2011 and 2016), Column-1 below is substituted by Provision of column -2:-
1 2
Clause-3.1.3.3 Other Buildings Clause 3.1.3.3
(i) The plans of Commercial, office, Group Housing
and others (except industrial) will be submitted
for permission of construction; however, in case
of the same not being disposed of finally with in a
period of 90 days, the Building Plan shall be
deemed as automatically approved, if the
applicant has not given consent for extension of
time, provided the plan is in accordance with
Master Plan/ Sectoral Plan and Building Bye-laws.
In cases of automatic approval, concerned
builders shall themselves be responsible.
The plans of Commercial, office, Group Housing and
others will be submitted for permission of
construction; however, in the event of the same not
being disposed of finally with in a period of 30 days
and if the consent for extension of time has not been
given by the applicant himself, the Building Plan shall
be deemed as automatically approved, provided that it
is verified by the Permitted Technical Person on the
Building Plan that the Plan is in accordance with
Master Plan/ Sectoral Plan and building Bye-laws.
(ii) Even if no objection Certificate is not received
within the prescribed period, the plans will be
approved within 90 days with the condition that
the builder can start construction, on his own risk,
after 10 days of serving written notice to
Development Authority and such departments,
whose No objection/ Objection has not been
received, but he will have to obtain No objection
Certificate for no objection from remaining
departments. It will be the responsibility of the
Builders to obtain No objection Certificate and
perform constructions as per conditions imposed
in the same.
Even if no objection Certificate is not received within
the prescribed period, the plans will be approved
within 30 days with the condition that the builder can
start construction, on his own risk, after 10 days of
serving written notice to Development Authority and
such departments, whose No objection/ Objection has
not been received, but he will have to obtain No
objection Certificate for no objection from remaining
departments. It will be the responsibility of the
Builders to obtain No objection Certificate and
perform constructions as per conditions imposed in
the same.
5. In view stipulate that plinth inspection in done within 7 days of intimation for implementation of business
Reform Action plan 2017 under ease of Doing Business, in Building constructions and Development Bye-Laws
2008 (as amended 2011 and 2016) Clause- 3.1.6(A), as under, will be added:-
New Clause – 3.1.6(A) Inspection/Examination of Construction work
In order to ensure construction work at the site in accordance with the plan approved at the time of
construction of the building, except the Schemes of development authority and Schemes approved by the
authority/ all residential plots under plotted development in lay-out plan, building owners/ builder after
completion of the construction work of rest of the buildings of all categories upto the plinth level, will submit by
uploading digital photographs with G.P.S Coordinates of the site, date and time to Government Agency, along
with which an affidavit (appendix-18) to the effect that the construction work at the site has been done only as
per the photographs will have to be submitted. In case it is found that the owner of the building/builders has
done any construction beyond approved plan, work covered by permit mentioned under Clause-3.1.1 of
Building constructions and Development Bye-Laws and the construction permissible under Section-52 of Uttar
Pradesh Urban Planning and Development Act, 1973, he will have no objection to the sealing by the government
agency and he will not claim any damages of any work for the same.
On receipt of photographs, after site inspection by Engineer- in- charge in 48 working hours in the event of any
deviation /error /discrepancy found viz-a-viz details submitted by owner of the building/builder, a notice will be
served on him immediately (Appendix-19). Besides the Engineer- in- charge will also submit his report to the
vice-Chairman, Development Authority. The deviation/error at the site in relation to the said report will be
assessed by the Vice-Chairman , Development Authority and in case of deviation being found, the construction
work will be sealed . This action will be ensured in a maximum of 07 working days.
6. In view of the stipulate that Final completion Occupancy certificate is provided within 8 days for
implementation of Business Reform Action plan 2017 under Ease of Doing Business, in of Building
constructions and Development Bye-Laws-2008( as amended 2011 and 2016) Column -1 below is substituted
by provision of column-2:-
1 2
Clause-3 of Annexure-2 Clause-3 of Annexure-2
On receipt of notice of completion the notices selected
on random basis, will be examined by the vice-
Chairman or the officer authorized by him, as per the
procedure prescribed from time-to-time for various
categories of buildings. However, the notices of all
buildings of Commercial and Group Housing will be
inquired/ examined and inquiry/ examination of other
building, except commercial and Group Housing, will
not be done till the percentage and process of random
selection are decided by the Authority.
On receipt of application for Completion Certificate,
the notices selected on random basis, will be
examined by the vice-Chairman or the officer
authorized by him, as per the procedure prescribed
from time-to-time for various categories of buildings.
However, the notices of all buildings of Commercial,
multi storey and Group Housing will be inquired/
examined. Inquiry/Examination of other buildings, ,
except commercial and Group Housing, will not be
done till the percentage and process of random
selection are decided by the Authority.
Clause -4 Of Annexure-2 Clause -4 Of Annexure-2
In case of development work being found as per the
approved plan on the basis of report of Permitted
person/Architect or inquiry, completion Certificate at
the prescribed place in the Form will be issued by the
Vice-Chairman or officer authorized by him.
In case of development work being found as per the
approved plan on the basis of report of Permitted
person/Architect or inquiry, completion Certificate at
the prescribed place in the Form will be issued in the
01 working day by the Vice-Chairman or officer
authorized by him.
Clause -5 of Annexure-2 Clause -5 of Annexure-2
In case of development/construction not found in
accordance with development with approved or,
mitigated plain Inquiry/Examination, the approval of
completion Certificate will be rejected by the Vice-
Chairman or Officer authorized by him and the
applicant will be in formed of the same with reason
there for within 60 days of the application. In case of
failure to dispose of by The Authority with in the said
period, the applicant will be require to give a 15 days
notice the Authority to issue the complication
Certificate. In case of non –disposal of Completion
Certificate by the Authority after this period, the
Completion Certificate will be deemed approved by
authority
In case of development/construction not found in
accordance with development with approved or,
mitigated plain Inquiry/ Examination within the
maximum period 7 days from receipt of application for
Completion Certificate, the applicant will be informed
of the rejection of his application along with required
amendments by the Vice-Chairman or Officer
authorities by him in 08 working days from making the
application. In case of non –disposal of Completion
Certificate by the Authority after this period, the
Completion Certificate will be deemed approved by
Authority.
7. In order to implement Business Reform Action Plan2017 under Ease of Doing Business, for operation of software
prepared for Online building map sanction in Building constructions and Development Bye-Laws 2008 (as
amended 2011 and 2016) provision of column -2 is substituted in place of column -1 below:-
1 2
Clause-3.1.3.1 Clause-3.1.3.1
(i) Under the schemes of Development Authorities
and schemes approved by Authorities / lay-out
Plan, on being submitted, for construction,
reconstruction and renovation of residential
buildings of area upto 300 square meter will be
deemed automatically approved, if the plan is
prepared by permitted technical person and a
certificate to the effect that proposed
construction/ reconstruction is as per Master plan
and Building Bye-Law is recorded on it. However,
it will be necessary to deposit required charges in
various heads such as Debris Charge, Supervision
Charge etc.
(i) In the schemes of Development Authorities and
schemes approved Authorities / lay-out Plan, on
being submitted, for construction, reconstruction
and renovation of residential buildings will be
deemed automatically approved and the
document regarding approval will be made
available in 02 working days. The said Building
Plans will be acceptable on being in accordance
with standard design downloaded from the
website provided and authorized by the Authority
or on being prepared by permitted technical
person and a certificate to the effect that
proposed construction/ reconstruction is as per
Master plan and Building Bye-Law is recorded on
it. For this purpose, , it will be necessary to deposit
required charges in various heads such as Debris
Charge, Supervision Charge etc.
(iii) It will be compulsory to obtain approval on the
plans of residential plots of the area of more than
300 square meters. In the event of the submitted
plans not being disposed of finally in the 30 days
period, the same will be deemed automatically
approved provided they are as per Master Plan/
Sectoral Plan and Building Bye laws and No
objection Certificate from all concerned
departments, as necessary , such as Fire Fighting
department, Pollution Control Board, A.S.I , etc
have been obtained . In the matters of automatic
approval, the builders concerned will themselves
be responsible.
Except in case of building plans of plotted
development in Schemes of Development Authorities
and Schemes approved by Authorities / Lay-out plan, it
will be compulsory to obtain approval on the plans of
the all other residential plots. In the event of the
submitted plans not being disposed of finally in the 30
days period, the same will be deemed automatically
approved provided the certificate by the permitted
technical person to the effect that the plan is as per
Master Plan/ Sectoral Plan and Building Bye laws and
No objection Certificate from all concerned
departments, as necessary , such as Fire Fighting
department, Pollution Control Board, A.S.I , etc have
been obtained.
APPENDIX-15
Environmental Conditions For Building and Construction
(Category “A”: 5000 sqmt-20000 sqmt)
S
No.
Medium Environmental Conditions
1. Natural drainage The inlet and outlet point of natural drain system should be maintained with
adequate size of channel if ensuring unrestricted water flow of water.
2. Water
Conservations
-
Rain Water
Harvesting and
ground Water
recharge
A rain water harvesting plan needs to be designed where the recharge bores
(minimum one per 5000 sqmt of built –up area) shall be provided. The rain
water harvested should be stored in a tank of reuse in household through a
provision of separate water tank and pipelines to avoid mixing with potable
municipal water supply. The excess rain water harvested be linked to the tube
well bore in the premise through a pipeline after filtration in the installed filers.
2(a)
The unpaved area shall be more than or equal to 20% of the recreational open
spaces.
3. Solid waste
management
Separate wet and dry bins must be provided at the ground level for facilitating
segregation waste.
4. Energy In common areas, LED/ solar lights must be provided.
5. Air quality and
Noise
Dust, smoke and debris prevention measures such as screens, barricading shall
be installed at the site of during construction. Plastic/ tarpaulin sheet covers
must be used for trucks bringing in sand and material at the site.
5(a)
The exhaust pipe of the DG set, if installed, must be minimum 10m away from
the building. In case it is less than 10m away, the exhaust pipe shall be taken
up to 3m above the building.
6. Green Cover A minimum of 1 tree for every 80 sqmt of land shall be planted and
maintained. The existing trees will be counted for this purpose. Preference
should be given to planting native species.
6(a)
Where the trees need to be cut, compensatory plantation in the ratio of 1:3
(i.e. planting of 3 trees for every 1 tree that is cut) shall be done with the
obl igation to provide continued maintained for such plantations.
APPENDIX-16
Environmental Conditions For Building and Construction
(Category “B”: 20000 sqmt-50000 sqmt)
S No. Medium Environmental Conditions
1. Natural
drainage
The inlet and outlet point of natural drain system should be maintained with
adequate size of channel if ensuring unrestricted water flow of water.
2. Water
Conservations
-
Rain Water
Harvesting
and ground
Water
recharge
A rain water harvesting plan needs to be designed where the recharge bores
(minimum one per 5000 sqmt of built –up area) shall be provided. The rain
water harvested should be stored in a tank of reuse in household through a
provision of separate water tank and pipelines to avoid mixing with potable
municipal water supply. The excess rain water harvested be linked to the
tube well bore in the premise through a pipeline after filtration in the
installed filers.
2(a)
The unpaved area shall be more than or equal to 20% of the recreational
open spaces.
3. Solid waste
management
Separate wet and dry bins must be provided at the ground level for
facilitating segregation waste.
4. Energy In common areas, LED/ solar lights must be provided.
4(a) At least 1% of connected applied load generated from renewable energy
source such as photovoltaic cells or wind mills or hybrid should be provided.
4(b) As per the provisions of the Ministry of New and Renewable energy solar
water heater of minimum capacity 10liters/4 persons (2.5 litres per capita)
shall be installed.
4(c) Use of fly ash bricks: Fly ash should be used as building material in the
construction as per the provisions of fly ash Notification of September, 1999
and as amended from time to time.
5. Air quality
and Noise
Dust, smoke and debris prevention measures such as screens, barricading
shall be installed at the site of during construction. Plastic/ tarpaulin sheet
covers must be used for trucks bringing in sand and material at the site.
5(a)
The exhaust pipe of the DG set, if installed, must be minimum 10m away
from the building. In case it is less than 10m away, the exhaust pipe shall be
taken up to 3m above the building.
6. Green Cover A minimum of 1 tree for every 80 sqmt. of land shall be planted and
maintained. The existing trees will be counted for this purpose.
Preference should be given to planting native species.
6(a)
Where the trees need to be cut, compensatory plantation in the ratio of 1:3
(i.e. planting of 3 trees for every 1 tree that is cut) shall be done with
the obligation to provide continued maintenance for such plantations.
APPENDIX-17
Environmental Conditions For Building and Construction
(Category “C”: 50000 sqmt-150000 sqmt)
S No. Medium Environmental Conditions
Natural drainage The inlet and outlet point of natural drain system should be maintained with adequate
size of channel if ensuring unrestricted water flow of water.
Water
Conservations
-
Rain Water
Harvesting and
ground Water
recharge
A rain water harvesting plan needs to be designed where the recharge bores (minimum
one per 5000 sq mt of built –up area) shall be provided. The rain water harvested
should be stored in a tank of reuse in household through a provision of separate water
tank and pipelines to avoid mixing with potable municipal water supply. The excess rain
water harvested be linked to the tube well bore in the premise through a pipeline after
filtration in the installed filers.
2(a) The unpaved area shall be more than or equal to 20% of the recreational open spaces.
2(b) The ground water shall not be withdrawn without approval from the competent
authority.
2(c) Use of potable water in construction should be minimized.
2(d) Low flow fixtures and sensors must be used to promote water conservation.
2(e) Separation of grey and black water should be done by the use of dual pluming system.
3. Solid waste
management
Separate wet and dry bins must be provided at the ground level for facilitating
segregation waste.
3(a) All non- biodegradable waste shall be handed over to authorized recyclers for which a
written tie-up must be done with the authorized recyclers.
3(b) Organic waste composter/ vermiculture pit with a minimum capacity of 0.3 kg/
tenement/ day must be installed wherein the STP sludge may be used to be converted
to manure which could be used at the site or handed over to authorized recyclers for
which a written tie-up must be done with the authorized recyclers.
4. Energy In common areas, LED/ solar lights must be provided.
4(a) At least 1% of connected applied load generated from renewable energy source such as
photovoltaic cells or wind mills or hybrid should be provided.
4(b) As per the provisions of the Ministry of New and Renewable energy solar water heater
of minimum capacity 10liters/4 persons (2.5 liters per capita) shall be installed.
4(c) Use of flyash bricks: Fly ash should be used as building material in the construction as
per the provisions of fly ash Notification of September, 1999 and as amended from
time to time.
4(d) Use of concept of passive solar design of buildings using architectural design
approaches that minimize energy consumption in buildings by integrating conventional
energy-efficient devices, such a mechanical and electrical pumps, fans, lighting fixtures
and other equipment with the passive design elements, such as building orientations,
landscaping, efficient building envelope, appropriate fenestration, increased day
lighting design and thermal mass.
4(e) Optimize use of energy systems in buildings that should maintain a specific indoor
environment conductive to the functional requirements of the building by following
mandatory compliance measures(for all applicable buildings)as recommended in the
energy Conservation Building Code (ECBC) 2007 of the Bureau of Energy Efficiency,
Government of India.
5. Air quality and
Noise
Dust, smoke and debris prevention measures such as screens, barricading shall be
installed at the site of during construction. Plastic/ tarpaulin sheet covers must be used
for trucks bringing in sand and material at the site.
5(a) The exhaust pipe of the DG set, if installed, must be minimum 10m away from the
building. In case it is less than 10m away, the exhaust pipe shall be taken up to 3m
above the building.
6. Green Cover A minimum of 1 tree for every 80 sqm of land shall be planted and maintained. The
existing trees will be counted for this purpose. Preference should be given to
planting native species.
6(a) Where the trees need to be cut, compensatory plantation in the ratio of 1:3 (i.e.
planting of 3 trees for every 1 tree that is cut) shall be done with the obligation
to provide continued maintainance for such plantations.
7. Sewage Treatment
Plant
Sewage treatment plant with capacity of treating 100% waste water shall be installed.
Treated water must be recycled for gardening and flushing.
8. Environment
Management Plan
The environment infrastructure like Sewage Treatment Plants, Landscaping, Rain water
harvesting. Power backup for environment, Infrastructure, Environment monitoring,
Solid Waste Management and Solar and Energy Conservation, should be kept
operational through Environment monitoring Committee with defined functions and
responsibility.
APPENDIX-18
Affidavit
(On Non- Judicial Stamp Paper of Rupess One Hundred)
Before Vice- Chairman, Development Authority
I son of Shri Aged about years,
designation , Name and Address of the firm…………………….. depose on the oath as
under:-
1. That the deponent is posted on the post of in the firm ……………………..
and is authorized to sign on behalf of the firm in respect of (details of
plot/ name of the scheme).
2. That the buildings in (details of the plot/ name of the Scheme) have
been construction upto plinth in proof of which digital photographs of the site along with G.P.S Co-
ordinates date and time, signed by me , are being enclosed.
3. That in case it is found that the land owner/builder has done any construction beyond approved plan
work covered by the permit mentioned under clause-3.1.1 of Building constructions and Development
Bye-Laws and construction permissible under Seection-52 of Uttar Pradesh Urban Planning and
Development Act, 1973, they will have no objection to sealing by the Government Agency and he will
not claim damages for any work for the same.
The deponent declares that all statements, as above, are true to his personal knowledge and no fact has
been concealed in it.
(Signatures of Deponent)
Name:
Address:
Verification
I, the deponent, verify that Section-1 including upto-3 are true to my personal knowledge and reformation,
nothing has been concealed in it and I affirm the same.
(Signatures of Deponent)
Name:
Address:
APPENDIX-19
To,
Name of Developers
Address
Subject-:Notice subsequent to inspection on………………………………. (date) of ……………………………….. (description of Plot/
name of Scheme.)
Sir,
The photographs regarding construction done on site submitted by you on…………………
(date) along with the affidavit were matched with construction existing on the site on (date). On
the basis of spot inspection, the details submitted by you were found correct/ following deviation(s)/ error(s) was/were
found:-
1.
2.
3.
4.
Yours faithfully,
(Engineer-in-Charge)
(with Stamp)
CC: The Vice-Chairman Development Authority for information / with the request that
the orders for sealing the construction done on the site may please be passed. (Strike out which is not applicable)
(Engineer-in-Charge)
(with Stamp)
All of The Uttar Pradesh Urban Planning & Development Act,- 1973