HARYANA GOVERNMENT HOUSING DEPARTMENT NOTIFICATION The 25th July, 1975
Notification - The Haryana Housing Board Act, 1971 (20 of 1971)
- Kind: Notification
- Under: The Haryana Housing Board Act, 1971 (20 of 1971)
Text of this notification
(Published in the Haryana Government Gazette, Legislative
Supplement, dated the 29th July, 1975)
PART-III
HARYANA GOVERNMENT
HOUSING DEPARTMENT
NOTIFICATION
The 25th July, 1975
No. G.S.R. 90/ H.A. 20 / 71/ S.73 / 75- In exercise of the powers conferred by sub-section (1) of section 73 of the Haryana Housing
Board Act, 1971 and with reference to Haryana Government, Housing Department, notification No. G.S.R. 12 / H.A. 20 / 71/ S. 73 / 75,
dated the 31st January, 1975, the Governor of Haryana makes the following rules, namely:-
1. These rules may be called the Housing Board, Haryana (Execution of Agreement) Rules, 1975.
2. In these rules, unless the context otherwise requires:-
(a) ‘Act’ means the Haryana Housing Board Act, 1971;
(b) ‘Form’ means a form appended to these rules;
(c) ‘Government’ mean the Government of State of Haryana;
(d) ‘Section’ means a section of the Act.
3. The powers of the Board to auction contracts may be delegated to the Chairman or any other officer subject to the following
limits, namely:-
(a) The maximum limit of twenty lakhs rupees for any cont rac t where de legat ion o f power i s to the
Cha i rman;
(b) The maximum limit of ten lakhs rupees for any contract where delegation of power is to be
Superintending Engineer:-
(c) The maximum limit of one lakh rupees where delegation of power is to an Executive Engineer; and
(d) The maximum limit of ten thousand rupees for any contract where delegation of power is to an Assistant
Engineer, and three thousand rupees for any contract where delegation of power is to an officiating
Assistant Engineer.
4. (1) Every contract for the execution of any work of the supply of any materials or goods, which involves an
expenditure exceeding one thousand rupees shall be in writing and shall be sealed.
(2) The contracts shall be entered in form F.
(3) In inviting tender and entering into contracts for the execution of its works, the Board shall follow the
principles laid down in Appendix to these rules.
Short Title
Definitions
Delegation of
power to sanction
contracts.
Sanction 18.
Manner and form of
contract.
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com
http://www.pdffactory.com
FORM F
[See Rule 4(2)]
HOUSING BOARD, HARYANA.
________________________ DIVISON
District
________________________________ Sub Division
PERCENTAGE RATE TENDER AND CONTRACT FOR WORKS
GENERAL RULES AND DIRECTIONS FOR THE GUIDANCE OF CONTRACTORS
1. All work proposed for execution by contract will be notified in a form of invitation to tender posted on a board hung up in the
office of and signed by the Sub-Divisional Engineer / Executive Engineer.
This form will state the work to be carried out, as well as the date for submitting and opening tenders and the time allowed for
carrying out the work, also the amount of earnest money to be deposited with tender, and the amount of the security deposit
to be deposited by the successful tenderer and the percentage, if any, to be deducted from bills. Copies of the specification,
designs and drawings Estimated rates / Common Schedule rates and any other documents required in connection with the
work, signed for the purpose of identification by the Sub-Divisional Engineer / Executive Engineer shall also be open for
inspection by the contractors at the office of the Sub-Divisional Engineer / Executive Engineer during office hours.
2. In the event of the tender being submitted by a firm, it must be signed separately by each member thereof, or, in the event of
the absence of any partner, it must be signed on his behalf by a person holding a power of attorney authorising him to do so.
3. Any person who submits a tender shall fill up the printed form, stating at how much percent above or below the rates
specified in Rule 1 he is willing to undertake the work. Only one rate of percentage more or less on all the Estimates rates /
Common Schedule rate shall be named. Tender which proposes any alternation in the work specified in the said form of
invitation to tender, or in time allowed for carrying out the work, or which contain any other conditions of any sort, will be liable
to rejection. No single tender shall include more than one work, but contractors who wish to tender for two or more works
shall submit a separate tender for each. Tenders shall have the name and number of the work to which they refer written
outside the envelop.
4. The Executive Engineer or his duly authorized assistant will open tender in the presence of any intending contractors or their
Authorized Agents who may be present at the time, and will enter the amount of the several tenders in a Comparative
Statement in a suitable form. In the event of a tender being accepted a receipt for the earnest money forwarded therewith
shall thereupon be given to the contractors who shall thereupon for the purpose of identification sign copies of the
specification and other documents mentioned in Rule 1. In the event of a tender being rejected, the earnest money forwarded
with such unaccepted tender shall thereupon be returned to the Contractor making the same.
5. The Executive Engineer shall have the right of rejecting all or any of the tenders.
6. The Board may refuse or suspend payments on account of a work when executed by a firm or by contractors described in
their tender as a firm, unless receipts are signed by all the partners, or one of the partners, or some other person produces
written authority enabling him to give effectual receipts on behalf of the firm.
7. The receipt of an accountant or clerk for any money paid by the contractor will not be considered as any acknowledgement of
payment to the Sub-Divisional Engineer, Executive Engineer and the contractor shall be responsible for seeing that he
procures receipt signed by the Sub-Divisional Engineer / Executive Engineer.
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com
http://www.pdffactory.com
8. The memorandum of work tendered for and the memorandum of materials to be supplied by the Housing Board, Haryana
and their issue rates shall be filled in and completed in the office of the Sub-Divisional Engineer / Executive Engineer before
the tender form is issued. If a form is issued to an intending tenderer without having been so filled in and completed, he shall
request the office to have this done before he completes and delivers his tender.
TENDER FOR WORKS
I / we hereby tender for the execution for the Chairman of the Housing Board, Haryana hereinafter referred to as Board of the
work specified in the underwritten memorandum within the time specified in such memorandum at * percent below / above
the rates entered in the estimate / interim common scheduled rates mentioned in Rule 1 and in accordance in all respects
with the specification drawings, and instructions in writing referred to in rule I hereof and in clause 2 of the annexed
conditions and with such materials as are provided for and by in all other respects in accordance with such conditions so far
as applicable.
MEMORANDUM
(a) General description ..
(b) Estimated cost .. Rs.
(c) Earnest money .. Rs.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------
* In figures as well as in words.
(a) If several sub-works are included they should be detailed in a separate list.
(b) This deposit will vary from 1 percent to 10 percent of the estimated cost of the work according to the requirements
of the case.
(c) This percentage, where no security deposit is taken will vary from 4 percent to 10 percent the requirements of the
case. Where security deposit is taken, see note to clause 1 of conditions of contract.
(d) Security deposit (including earnest money) .. Rs.
(e) Percentage, if any, to be deducted from bills .. Rs.
(Rupees percent)
(f) Time allowed for the work from date of
written order to commence .. Months
Shall this tender be accepted I / we hereby agree to abide by and fulfill all the terms and provisions of the said conditions of
contract annexed hereto so far as applicable or in default thereof to forfeit and pay to the Board or its successors in office the
sums of money mentioned in the said conditions.
The sum of Rs. * Deposited- vide Board Receipt number ________ dated ___________ as earnest
money the full value of which is to be absolutely forfeited to the Board or its successors in office, without pre-judice to any
other right or remedies of the said Board or its successors in office, should I / we fail to commence the work specified in the
above memorandum otherwise the said sum of Rs. __________________ shall be retained by Board on account of the
security deposit specified in clause 1 (B) of the said conditions of the contract.
Dated the ___________________ day of __________________ 19
Witness:
Address:
Occupation:
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com
http://www.pdffactory.com
The above tender is hereby accepted by me on behalf of Board.
Dated the __________________ day of ___________________ 19
Executive Engineer,
______________ Division
*Give particulars and number.
Strike out (a) if no cash security deposit is to be taken.
Strike out (b) if any cash security deposit is taken.
** Signatures of contractor before submission of tender.
Signature of witness to contractor’s signature.
** Signature of the officer by whom accepted.
CONDITION OF CONTRACT
Clause1. The person / persons whose tender may be accepted (hereinafter called the contractor) shall permit Board at the
time of making any payment to him for work done under the contract to deduct such sum as will (with the earnest
money deposited by him) amount to *10 percent of all moneys so payable. Such deductions to be held by Boards
by way of security deposit. All compensation or other sums of money payable by the contractor to Board under the
terms of his contract may be deducted from the security deposit or from any sums which may be due or may
become due to the contractor by Board on any account whatsoever, and in the event of his security deposit being
reduced by reason of any such deduction the contractor shall within ten days thereafter make good in cash or
Government securities endorsed as aforesaid any sum or sums which may have been deducted from or raised by
sale of his security deposit or any part thereof.
Clause 2. The time allowed for carrying out the work as entered in the tender shall be strictly observed by the contractor and
shall be reckoned from the date on which the order to commence work is given to the contractor. The work shall
throughout the stipulated period of the contract be proceeded with all due diligence (time being deemed to be the
essence of the contract on part of the contractor) and the contractor shall pay as compensation an amount equal to
one percent which the Executive Engineer-in-charge may levy on the amount of the estimated cost of the whole
work as shown by the tenderer for every day that the work remains uncommenced or unfinished, after the proper
dates. And further, to ensure good progress during the execution of the work the contractor shall be bound in all
cases in which the time allowed for any work exceeds one month to complete one-fourth of the whole of the work
before one-forth of the whole time allowed under the contract has lapsed; one-half of the work before one of such
time has elapsed and three-fourth of the work before three fourth of such time has elapsed. In the event of the
contractor failing to comply with this condition he shall be liable to pay as compensation an amount equal to one
percent which the Executive Engineer-in-charge may levy on the said estimated cost of the whole work for every
day that the due quantity of work remains incomplete provided always that the entire amount of compensation to be
paid under the provisions of his clause shall not exceed ten percent on the estimated cost of work as shown in the
tender. The ……………… ……………… may on representation from the contractor reduce the amount of
compensation and his decision in writing shall be final.
Security Deposit
Compensation for
delay
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com
http://www.pdffactory.com
Clause 3. In any case in which under any clause or clauses in this contract the contractor shall have rendered himself liable to
pay compensation amounting to the whole of his security deposit (whether paid in one sum or deducted by
installments), the Executive Engineer on behalf of the Board shall have power to adopt any of the following
courses, as he may deem best suited to the interests of Board:-
(a) To rescind the contract (of which rescission notice in writing to the contractor under the hand of the
Executive Engineer shall be conclusive evidence) and in which case the security deposit of the contractor
shall stand forfeited, and be absolutely at the disposal of the Government.
(b) To employ labour paid by the Housing Board and to supply material to carry out the work, or any part of
the work debiting the contractor with the cost of the labour and the price of the material (of the amount of
which cost and price a certificate of the Executive Engineer shall be final and conclusive against the
contractor) and crediting him with the value of the work done, in all respects in the same manner and at
the same rates as if it had been carried by the contractor under terms of his contract; the certificate of the
Executive Engineer as to the value of the work done shall be final and conclusive against the contractor.
(c) To measure up the work of the contractor and to take such part thereof as shall be unexecuted out of his
hands, and to give to another contractor to complete, in which case any expenses which may be incurred
in excess of the sum which would have been (paid to the original contractor of the whole work had been
executed by him) of the amount to which excess the certificate in writing of the Executive Engineer shall
be final and conclusive) shall be borne and paid by the original contractor and may be deducted from any
money due to him by the Board under the contract or otherwise or from his security deposit or the
proceeds of sale thereof or sufficient part thereof.
In the event of any of the above courses being adopted by the _________________
Executive
Engineer, the contractor shall have no claim to compensation for any loss sustained by reason of his
having purchased or procured any material or entered into any engagement or made any advances on
account of or with a view to the execution of the work of the performance of the contract. And in case the
contract shall be rescinded under the provision aforesaid, the contractor shall not be entitled to recover or
be paid any sum for any work therefore actually performed under this contract, unless and until the
Executive Engineer will have certified in writing the performance of such work and the value payable in
respect thereof, and he shall only be entitled to be paid the value so certified.
Clause 4. In any case in which any of the power, conferred up on the _________________
Executive
Engineer by clause 3 thereof shall have become exercisable and the same shall not be exercised, the non-
exercised thereof shall not constitute a waiver of any of the conditions hereof and such powers shall not with
standing be exercisable in the event of any future case of default by the contractor for which by any clause or
clauses hereof he is declared liable to pay compensation amounting to the whole of his security deposit, and the
liability of the contractor for past and future compensation shall remain unaffected in the event of the ___________
Executive Engineer putting
* This will be the same percentage as that in the tender at (c).
Action when whole of
Security deposit is
forfeited
Contractor remains liable to pay
compensation if action not taken
under clasue3.
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com
http://www.pdffactory.com
in force either of the power (a) or (c) vested in him under the preceding clause, he may, if he so desires, take
possession of all or any tools, materials and stores in or upon the works, or the site thereof or belonging to the
contractor or procured by him and intended to be used for the execution of the work any part hereof, paying or
allowing for the same in account at the contract rates, or incase of these not being applicable at the current market
rates to be certified by the Executive Engineer whose certificate hereof shall be final, otherwise the Executive
Engineer may by notice in writing to the contractor or his clerk of the works foreman or other authorized agent
required him to remove such tools, plant material or stores from the premises within a time to be specified in such
notice, and in the event of the contractor failing to comply with any such requisition, the Executive Engineer may
remove them at the contractor’s expense or sell them by auction or private sale on account of the contractor and at
his risk in all respect and the certificate of the Executive Engineer as to the expense for any such removal and the
amount of the proceeds and expense of any such sale shall be final and conclusive against the contractor.
Clause 5 If the contractor shall desire an extension of the time for completion of the work on the ground of his having
unavoidably hindered in its execution or on and other ground, he shall apply in writing to the ________________
Executive
Engineer with in 30 days of the date of the hindrance on account of which he desires such extension as aforesaid
and the _________________ Engineer shall, if in his opinion (which shall be final) reasonable grounds be shown
Executive
therefore authorize such extension of time, if any, as may, in his opinion be necessary or proper.
Clause 6 The contractor shall deliver in the office of the Executive Engineer, on or before the 10 th day of every month
during the continuance of the work covered by this contract a return showing details of any work as claimed by the
contractor, which value shall be based upon the rates and prices mentioned in the contract or in the Scheduled of
rates in force, in the *District for the time being. The contractor shall include in such monthly return particulars of all
claims of whatever kind and however arising, which at the date thereof he has or may claim or have
against the Executive Engineer under or in respect of, or in any manner arising out of the execution of work and
the contractor shall be deemed to have waived all claims not included in such return and will have no right to
enforce any such claims not included whatsoever be the circumstances.
Clause 7 Without prejudice to the rights of Board under any clause hereinafter contained on completion of the work,
the contractor shall be furnished with a certificate by the Execution Engineer (hereinafter called the
Engineer-in-charge) of such completion; but no such certificate shall be given nor shall the work be
considered to complete until the contractor shall have removed from the premises on which the work shall
be executed all scaffolding, surplus materials and rubbish, and clean off the dirt from all wood work, walls, floors, or
other parts of any building in upon or about which the work is to be executed, or of which he may have had
possession for the purpose, of the execution thereof and the measurements in the said certificate shall be
b ind ing and conc lus ive aga ins t the cont rac tor , i f t he contractor shall fail to comply with the
requirements of this clauses as to removal of scaffolding surplus materials and rubbish and
cleaning off dir t on or before the date f ixed fo r the comple t i on o f the work , t he Eng ineer - in -
charge may at the expense of the contractor remove such scaffolding, surplus materials and
rubbish and dispose of the same as he thinks fit and clean off such dirt as aforesaid, and the contractor
shall forthwith play amount of all expense so incurred, and shall have no claim in respect of any such
scaffolding or surplus materials as aforesaid except for any sum actually realized by the sale thereof.
Power to take possession of
or require removal of or sell,
contractor’s plant
Extension of time
Contractor to submit a return every
month for any works claimed as
extra.
Final Certificate
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com
http://www.pdffactory.com
Clause 8 No payments shall be made for works estimated to cost less than rupees one thousand, till after the whole
of the works shall have been completed and a certificate of completion given. But in the case of works
estimated to cost more than rupees one thousand the contractor shall on submitting bill, thereof be entitled
to receive a monthly payment proportionate to the part thereof than approved and passed by the Engineer-in-
Charge whose certificate of such approval and passing of the sum so payable shall be final and conclusive
against the contractor. But al l such intermediate payments shall be regarded as payments by way of
advance against the final payment only and not as payments for work actually done and completed and
shal l not preclude the requir ing of bad, u n s o u n d e d , an d i m p e r f e c t o r u n s k i l l f u l w o r k t o b e
removed and taken away and reconstructed or re-erected, or be considered as an admission of the due
performance of the contract or any part thereof in any respect, or the accruing of any claim nor shall it conclude
d e t e r m i n e , o r a f f e c t i n a n y w a y t h e p o w e r s o f t h e E n g i n e e r - i n - C h a r g e u n d e r t h e
conditions, or any of them as to the final settlement and adjustment of the accounts or otherwise, or in any
other way vary or affect the contract. The final bill shall be submitted by the contractor within one month of the
date fixed for completion of the work otherwise the Engineer-in-charge certificate of the measurement
and of the total amount payable for the work accordingly shall be final and binding on all parties.
Clause 9 A bill shall be submitted by the contractor each month on or before the date fixed by the Engineer-in-
charge for all work executed in the previous months, and the Engineer in charge shall take or cause to be taken
the requisite measurement for the purpose of having the same verified and the claim, as for as admissible,
adjusted if possible, before the expiry of ten days from the presentation of the bill. If the contractor does not
submit the bill within the time fixed as aforesaid, the Engineer-in-charge may depute a subordinate to measure up
the said work in the presence of the contractor, whose countersignature to the measurement list will be sufficient
warrant; and the Engineer-in- charge may prepare a bill from such list which shall be binding on the contractor in all
respect.
Clause 10 The contractor shall submit all bills on printed forms to be had on application at the office of the Engineer-in-
charge, and the charge in the bill shall always be entered at the rates specified in the tender or in the case of any
extra work ordered in pursuance of these conditions, and not mentioned or provided for in the tender at the
rates hereinafter provided for such work.
Clause 11 If the specification of estimate of the work provides for the use of any special description of materials to be
supplied from the Engineer-in-charge’s store or if it required that the contractor shall use certain stores to be
provided by the Engineer-in-charge such material and store and the price to be charged therefore as
hereinafter mentioned being so far as practicable for the convenience of the contractor, but not so in any
way to control the meaning or effect of this control specified in the schedule or memorandum hereto
annexed, the contractor , shal l be supplied with such materials and stores required from time to time to be
used by him for the purpose of the contract only, and the value of the full quantity of materials and
stores so supplied at the rates speci f ied in the said schedule or memorandum may be said of or
deducted f rom any sums then due, or thereaf te r to become due to the contractor under the
contract or therewise against or from the security deposit. All materials supplied to the contractor shall remain the
property of the contractor, but shall not on any account be removed from the site of the work without the
written permission of the Engineer-in-charge, and shall at all times be open to inspection by him. Any
District rates mean the Haryana P.W.D. Building and Roads Branch, rates for that District.
Payment on intermediate
certificates to be regarded
as advances
Bills to be submitted
monthly
Bills to be on printed
forms.
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com
http://www.pdffactory.com
such materials unused and in perfectly good condition at the time of the completion of the contract, shall be
returned to the Engineer-in-charge store, if by a notice in writing under his and he shall so require, but the
contractor shall not be entitled to return any such material unless with such consent , and shall have
no c laims for compensat ion on account of any such materials so supplied to him as aforesaid being unused
by him, or for any wastage in or damage to any such materials.
Clause 12 The contractor shall execute the whole and every part of the work in the most substantial and workman like
manner, and both as regards material and otherwise in every respect in strict accordance with the specification.
The contractor shall also confirm exactly, fully and faithfully to the designs, drawings and instructions in writing
relating to the work signed by the Engineer-in-charge and lodged in the office and to which the contractor, shall be
entitled to have excess at such office, or on the site of the work for the purpose of inspection during office hours,
and the contractor shall, if he so require, be entitled at his own expense to make or cause to be made copies of the
specification and of all such designs, drawings and instructions as aforesaid.
Clause 13 The Engineer-in-charge shall have full power at all times to object to the employment of any workman, foreman or
other employee on the works by the contractor and if the contractor shall receive notice in writing from the
Engineer-in-charge requesting the removal of any such man or men from the work the contractor to
comply with the request forthwith.
No such workman, foreman or other employee after his removal from the works by request of the
Engineer-in-charge shall be re-employed or reinstated on the works by the contractor at any time except
with the previous approval in writing or the Engineer-in-charge. The contractor shall not be entitled to
demand the reason from the Engineer-in-charge for requiring the removal of any such workman, foreman or other
employee.
Clause 14 The Engineer-in-charge shall have power to make any alterations in or omissions from addi t ions to or
subst itut ions for the orig inal specifications drawings, designs and instructions that may appear to him to be
necessary or advisable during the progress of the work and the contractor shall be bound to carry out the work in
accordance with any instructions which may be given to him in writing, signed by the Engineer-in-charge and such
alterations, additions or substitutions shall not invalidate the contract; and any altered additional or substituted
work which the contractor may be directed to do in the manner above specified as part of the work shall be carried
out by the contractor on same conditions in all respects on which be agreed to do the main work and at the same
rates as are specified in the tender for main work. The time for the completion of the work shall be extended in
the propor t ion that the a l tered addi t ional or substituted work bears to the original contract
work and the certificate of the Engineer-in-charge shall be conclusive as t o s u c h p r o p o r t i o n . A n d
i f t h e a l t e r e d , a d d i t i o n a l o r substituted work includes any class of work for which no rate is
specified in the contract than such class of work shall be carried out at the rates entered in the schedule of
rates or the district, subject to the same percentage above or below as included in the contract and if such
class of work is not entered in the schedule of rates of the district than the contractor shall within 7 days of the date
of his receipt or the order to be carried out the work inform the Engineer-in-charge of the rate which it is his
intention to charge for such class of work and if the Engineer-in-charge does not agree to this rate he shall, by
notice in writing, be at liberty to cancel his order to carry out such class of work and arrange to carry it out in such
manner as he may consider advisable, provided always that in the contractor shall commence work or
incur any expenditure in regard there to before the rates shall have been determined lastly herein
Works to be executed in
accordance with
specifications, drawings,
orders etc.
Removal of employed
workman and foreman.
Alterations in
specifications and
designs.
Do not invalidate contracts.
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com
http://www.pdffactory.com
before mentioned, than and in such case he shall be entitled to be paid in respect of the work carried
out or expenditure incurred by him prior to the date of the determination of the rate as aforesaid according to
such rate or rates as shall be fixed by the Engineer-in-charge. In the event of a dispute the decision of the
____________________ Executive Engineer shall be final.
Clause 15 If at any time after the commencement of the work the Board shall for any reason whatsoever not require the
whole work thereof as speci f ied in the tender to be carr ied out the Engineer-in-charge shall give
no t i ce i n wr i t i ng o f t he f a c t t o t he co n t rac t o r who s ha l l ha ve no c la im to a ny paymen t o r
compensation whatsoever on account of any profit or advantage which he might have derived from execution
of the work in full that which he did not derive in consequence of the full that amount of the work not having
been carried out, neither shall he have any claim for compensation by reason of any alteration having
been made in the original specifications drawing, designs and instruction which shall involve any
curtailment of the work originally contemplated.
Clause 16 If it shall appear to the Engineer-in-charge or his subordinate in charge of the work, that any work has been
executed with unsound, imperfect or unskillful workmanship, or with materials of any inferior description or that
any ma ter ia ls o r a r t ic les p rov ided by h im fo r the execu t ion o f the work a re unsound , o r o f
a quality in fer ior to that contrac ted for or o therwise no t in accordance with the contract the contractor
shall on demand in writing from the Engineer-in-change specifying the work materials or articles complained
of not with standing that the same may have been inadvertently passed, certified and paid for forthwith rectify, or
remove and reconstruct the work so specified in whole or in part as the case may require, or as the case may be,
remove the materials or articles so specified and provide other proper and suitable materials or articles at his own
proper charge and cost; and in the event of his failing to do so within a period to be specified by the Engineer-in-
charge in his demand aforesaid then the contractor shall be liable to pay compensation at the rate of one
percent on the amount of the estimate for every day not exceeding ten days while his failure to do so shall
continue and in the case of any such failure the Engineer-in-charge may rectify or remove and re-execute the work
or remove and replace with others materials or articles complained of, as the case may be, at the risk and expense
in all respects of the contractor.
Clause 17 All work under or in course of execution or executed in pursuance of the contract shall at all times to
be open to the inspection and supervision of the Engineer-in-charge and his subordinates and the contractor
shall at all times, during the usual working hours, and at all other times at which reasonable not ice of the
in tent ion of the Engineer- in-charge or h is subordinate to orders and instructions, or have a responsible
agent duly accredited in writing present for that purpose. Orders given to the contractor’s agent shall
be considered to have the same force as if they had been given to the contractor himself.
Clause 18 The contractor shall give not less than five day’s notice in writing to the Engineer-in-charge or his subordinate-
in-charge of the work before covering up or otherwise placing beyond the reach of measurement any work in
order that the same may be measured and correct dimensions thereof be taken before the same is so
covered up or p laced beyond the reach of measurement and shall not cover up or place beyond the reach
of measurement, and work without the consent in writing of the Engineer-in-charge or his subordinate-in-charge
of the work and if any work shall be covered up or placed beyond the reach of measurement such notice
having been given or consent obtained, the same shall be uncovered at the contractor’s expense, or in default
thereof no payment or allowance shall be made for such work or the materials with which the same was executed.
No compensation for
alteration in or
restrication of work to
be carried out.
Rates of works not in
estimate or schedule of
rates of the district.
Compensation
payable in case of
bad work.
Works to be open to
inspection.
Notice to be given
before work is
covered up.
Contractor or
responsible agent to
be present.
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com
http://www.pdffactory.com
Clause 19 If the contractor or his work people, or servants shall break, deface, injure or destroy any part of a building, if
they may be working on any building, road, fence, enclosure, or grass land, cultivated ground contiguous to
the premises on which the work or any part or any part of it is being executed, or if any damage shall happen, to the
work, while in progress, from any cause whatever other of its completion shall have been given by the Engineer-in-
charge as aforesaid, the contractor shall make the same good at his own expense, or in default the Engineer-in-
charge may cause the same to be made good by other workman, and deduct the expense (of which the certificate
of the Engineer-in-charge shall be final) from the sums that may be then, or at any time thereafter may become due
to the contractor, or from his security deposit.
Clause 20 The contractor shall supply at his own cost all materials except such special materials, if as may in accordance with
the contract be supplied from the Engineer-in-charge’s stores, plants, tools, appliances, implements,
ladders, cordage, tackle, scaffolding and temporary works requisite or proper for the proper execution of
the work, whether original, altered or substituted, and whether included in the specification or other
documents forming part of the contract or referred to in these cond i t ions or no t , or wh ich may be
necessary for the purpose of satisfying or complying with the requirements of the Engineer-in-charge as to
any matter to which under these conditions he is entitled to be satisfied or which he is entitled to require
together with carriage therefore to and from the work. The contractors shall also supply without charge
the requisite number of persons with means and materials necessary for the purpose of setting out works and
counting weighing and assisting in the measurement or examination at any time and from time to time of the work
or materials. Failing his so doing the same may be provided by the Engineer-in-charge at the expense of the
contractor and the expenses may be deducted from the money due to the contractor under the contract or from
his security deposit. The contractor shall also provide all necessary fencing and lights required to protect the
public from accident and shall be bound to bear the expenses of defence of every suit, action or other proceedings
at law that may be brought by any person for injury sustained owing to neglect of the above precautions, and to pay
any damages and cost which may be awarded in any such suit, action or proceedings to any such persons or which
may with the consent of the contractor be paid to compromise any claim by any such person.
Clause 21 No female labourer shall be employed within the limits of a Cantonment.
Clause 22 No labourer below the age of twelve years shall be employed on the work.
Clause 23 The contractor shall pay his labourer not less than the wages paid for similar work in the neighborhood.
Clause24 No work shall be done on Sunday without the sanction in writing of the Engineer-in-charge.
Clause 25 In every case in which by virtue of the provision of sub-section (1) of section 12 of the Workman’s Compensation
Act, 1923, Board is obliged to pay compensation to a Workman employed by the contractor in execution of
the works, Board will recover from the contractor the amount of the compensation so paid; and without
prejudice to the rights of Board under sub-section (2) of section 12 of the said Act, Board shall be at liberty to
recover such amount or any part thereof by deducting it from the secur i ty deposi t or from any sum
due by Board to the contractor whether under his contract or otherwise.
Board shall not be bound to contest any claim made against it under sub-section (1) of section 12 of the said act
except on the written request of the contractor and upon his giving to Board full security for all costs for which
Board might become liable in consequence of contesting claim.
Contractor liable for
damage done and for
imperfection for
months after
certificate.
Contractor to supply
plant ladder,
scaffoldings, etc.
And be liable for
damages, arising
from non-
provisions of light
fencing etc.
Female Labour.
Work on Sunday.
Contractor liable for
payment of
compensation to
injured workman or
injured workman or in
case or death, to his
relation.
Contract may be
rescinded and security
deposit forfeited fro
subletting, bribing or if
contractor becomes
insolvent.
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com
http://www.pdffactory.com
Clause 26 The contract shall not be assigned or sublet without the written approval of the Executive Engineer. And if the
contractor shall assign or sublet his contract; or attempt so to do or become insolvent or commence any
insolvency proceedings or make any composition with his creditors or attempts so to do, or if any bribe,
gratuity, gift, loan, perquisite; reward or advantage, pecuniary or otherwise, shall either directly or
indirectly be given, promised or offered by the contractor, or any of his servants or agents to any public officer
or person in the employee of the Board in any way relating to his office or employment, or if any such officer shall
become in any way directly or indirectly in terested in the contract the Execut ive Engineer may
thereupon by notice in writing rescind the contract and the security deposit of the contract shall thereupon
stand forfeited and be absolutely at the disposal of Board and the same consequence shall ensure as the
contract had been rescinded under clause 3 hereof and in addition the contractor shall not be entitled to recover
or be paid for any work therefore actually performed under the contract.
Clause 27 All sums payable by way of compensation under any of these conditions shall be considered as reasonable
compensation to be applied to the use of Board without reference to the actual loss or damages sustained and
whether or not any damages shall have been sustained.
Clause 28 Any excess payment made to the contractor inadvertently or otherwise under this contract or any account
whatever and any other sum found to be due to Board by the contractor in respect of his contract or any other
contract, or work-order or on any account whatever, may be deducted from any sum whatsoever payable by
board to the contractor either in respect of this contract or any work order or contract or on any other account
by any other department of the Government.
Clause 29 In the case of a tender partners any change in the constitution of the firm shall be forthwith notified by the
contractor to the Engineer-in-charge for his information.
Clause 30 All works to be executed under the contract shall be executed under the directions of and subject to the approval in
all respects of the Executive Engineer of the Board for the time being who shall be entitled to direct at what point
or points and in what manner they are to be commenced and from time to time carried on.
Clause 31 No claims for payment of an extraordinary nature, such as claims for a bonus for an extra labour, employed in
completing the work before the expiry of the contractual period at the request to the Engineer-in-charge or claims
for compensation where work has been temporarily brought to a stand still through no fault of the contractor, shall
be allowed unless and extent that the same shall have been expressly sanctioned by the Board.
Clause 32 If any question, difference or objection whatsoever shall arise in any way connected with arising out of this
instrument or the meaning of or operation of any part thereof or the rights, duties or liabilities of either party, then
same in so as the decision of and such matter is herein before provided for and has been so decided, every
such matter including whether its decision has been otherwise provided and or whether it has been finally decided
accordingly or whether the contract should be terminated or has been rightly terminated and as regards the
rights and obligations of the parties as the results of such termination shall be referred for arbitration to the
authority nominated by the Chairman within one hundred and eighty day or six months from the payment of final bill
to contractor or from the date registered notice is sent to the contractor and his decision shall be final and binding
and where the matter involves claim for or the payment or recovery or deduction of money, only the amount, if any
awarded arbitration shall be recoverable in respect of the matter so referred.
Work not to be
sublet.
Sum payable by way
of compensation to be
considered as
responsible
compensation without
reference to actual
loss.
Deductions of
amount due to
Government on any
account whatsoever
to be permissible
from sums payable
to a contractor.
Charges in
constitution of firm.
Work to be under
direction of
Executive Engineer.
Claim for payment
of an extra
ordinary nature to
be referred to
Board for
decision.
Arbitration clause.
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com
http://www.pdffactory.com
“If the matter is no referred to arbitrator within the specified period, all the rights and claims under the contract shall
be deemed to have been forfeited and absolutely time barred.”
Clause 33 Any fluctuation in Railway rates which may occur during the subsistence of, and affecting freights of any
material to be supplied under this contractor shall be brought to the notice of the Engineer-in-charge by the
contractor within ______________ days from _______________________ without prejudice to the rights of
Board should the contractor had to comply with the above requirement any excess or charge on account of such
increase or decrease shall be credited to or recovered from the contractor. No alterat ion in contract rate
shall be admissible inconsequence of fluctuation in railway freight when such railway freight is on account of
material which is required by a contractor in the manufacture of an article to be supplied under this
contract, that is, fluctuation of railway freight on coal required for burning bricks will not be taken into
consideration, or for an article which form part of a finished work, for purposes of this clause. Similarly no
alternation in rates will be allowed when a manufactured article is transported by rail from place A to place B to form
part of a finished work.
Clause 34 When the estimate on which a tender is made includes lump sums in respect of parts of the work the
contractor shall be entitled to payment in respect of the times of work involved or the part of the work in
question at the same rates as are payable under this contract for such items, or if the part of the work in
question is not, in the opinion of the Engineer-in-charge capable of measurement, the Engineer-in-charge may at
his discretion or pay the lump sum amount entered in the estimate, and the certificate in writing of the
Engineer-in-charge shall be final and conclusive against the contractor with regard to any sum or sums payable to
him under the provisions of this clause.
Clause 35 In the case of any class of work for which there is no such specification as is mentioned in Rule 1; such
work shall be carried out in accordance with the district specification, and in the event of there being no district
specification, then in such case the work shall be carried out in all respects in accordance with the
instructions and requirements of the incharge.
Clause 36 The expression “work” or “works” where used in these conditions shall unless there be something either in the
subject or context repugnant to such construction be constructed and taken to taken to mean by or by virtue of
the contract contracted to be executed whether temporary or permanent and whether original, altered, substituted
or additional.
Clause 37 The percentage referred to in the tender will be calculated on the gross amount (value of f in ished work
including cost of materials whether purchased from the Board or direct) of (1) the items of work to which the
rates in the tender apply and also (2) the items of work for which rates exist in the Schedule of the district.
Clause 38 The terms and conditions of the agreement have been explained to me/ us and I / we clearly understand them.
-----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
* Here insert the official designation of the officer to be appointed as arbitrator.
Schedule showing approximately material to be supplied from the Boards Store for works contracted to be
executed and the rates at which they are to be charged for:-
----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Fluctuation in
Railway freight.
Lump sum Estimate.
Action where no
specification.
Definition of
works.
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com
http://www.pdffactory.com
Rates at which the material
Particulars will be charged to the Contractor Place of delivery
-------------------------------------------------------------------------------------------------------------------------------------------------------------
Unit Rs. P.
-------------------------------------------------------------------------------------------------------------------------------------------------------------
Note:- The person or firm submitting the tender should see that the rates in the above schedule are filled up by the Engineer-in-
charge on the issue of the form prior to submission of the tender,
Sub-Divisional Engineer
(Signature of Contractor) Signature of ___________________________
Executive Engineer-in-Charge
FAIR WAGE CLAUSE
(a) The contractor shall pay not less than fair wage to labourers engaged by him on the work.
Explanation- Fair wage means wage whether, for time or piece work notified at the time of inviting tenders for the
work and where such wages have not been so notified the wages prescribed by the Public Works Department,
Building and Roads Branch, Haryana, for the district in which the work is done.
(b) The contractor shall, not with standing the provisions of any agreement to the contrary cause to be paid fair wage to
labour indirectly engaged on the work including any labour engaged by his sub-contractors in connection with the
said work, as if the labourers had been directly employed by him.
(c) In respect of all labour directly or indirectly employed on the work for the performance of the contractor’s part of this
agreement, the contractor shall comply with or cause to be complied with the Public Works Department, Haryana
Contractor’s Labour Regulations made by the Government from time to time in regard to payment of wages, wage
period deductions from wages, recovery of wages not paid and deductions unauthorizedly made, maintenance of
wage register, wage cards, publication of wages and other terms of employment, inspection and submission of
periodical returns and all other matters of a like nature.
(d) The Executive Engineer or the Sub-Divisional Engineer concerned shall have the right to deduct from the money
due to the contractor any sum required or estimated to be required for making good the loss suffered by a worker or
workers by reason of non-fulfillment of the conditions of the contract for the benefit of the workers, non-payment of
wages which are not justified by the terms of contract or for non-observance of the regulations referred to in clause
(c) above.
(e) Vis-avis Housing Board Haryana, the contractor shall primarily be liable for all payments to be made under and for
the observance of the regulations aforesaid without prejudice to his right to claim indemnity from his sub-
contractors.
PDF created with pdfFactory trial version www.pdffactory.com
http://www.pdffactory.com
http://www.pdffactory.com
(f) The regulations aforesaid shall be deemed to be apart of this contract and any breach thereof shall be deemed to
be a breach of this contract.
Contractor Witness Executive Engineer