Rule 49, THE UTTAR PRADESH BOILER RULES,1969: Penalty for breach of rules
THE UTTAR PRADESH BOILER RULES,1969 - Rule 49
Text of rule 49
Penalty for breach of rules
49. Penalty for breach of rules. —A
person contravening
the provision of these rules shall be punishable, in the
case of a
f i r s t o f f en ce , w i t h f i n e w h i ch m a y e x t e n d
t o o n e h u n d r ed
rupees and in the case of any subsequent offence,
with a fine
which may extend to one thousand rupees.
INSTRUCTIONS FOR THE ADMINISTRATION
OF THE INDIAN
BOILERS ACT, 1923
I GENERAL
1. (a) The Chief Inspector shall work under the
administrative control of the Labour Commissioner, Uttar
Pradesh and shall submit to him
(i) an annual report on the administraion of the
Act;
(ii) such other reports and returns as may be called
for.
(b) The Deputy Chief Inspector shall be subordinate
to
and shall work under the administrative control of the Chief
Inspector.
(c) An Inspector shall be subordinate to and shall
work
under the administrative control of the Chief Inspector.
They
shall ordinarily be appointed to take charge of specific
areas.
2. The Chief Inspector shall be the controlling and
countersigning
authority for all contingent bills and all travelling allowance
bills of all officers subordinate to him.
3. The Chief Inspector shall from time to time prepare
and submit for the sanction of the State Government a
schedule of the establishment and salaries which he
considers necessary for carrying out the purposes of the
Act.
4. The Chief Inspector shall prepare the budget
estimates for carrying out the purposes of the Act.
5. The Chief Inspector shall approve the programme of
inspection of all Deputy Chief Inspectors and Inspectors
subordinate to him with due regard to the convenience of
owners generally.
6. The Chief Inspector shall examine and pass orders on
the diaries and returns of the Deputy Chief Inspectors.
7. The Deputy Chief Inspector and Inspector shall
prepare a programme of inspection having due regard to the
convenience of owners generally and submit them to the
Chief
Inspector or Deputy Chief Itrispector, respectively for
approval
at such period as may be fixed by the Chief Inspector.
8. The Deputy Chief Inspector and Inspectors shall
keep
a diary for monthly submission to the Chief Inspector and
Deputy Chief Inspector, respectively, showing the place
visited,
boilers registered or inspected, variations from the
programme and any other important particulars and action
taken under the various sections of the Act.
II-INSTRUCTIONS FOR REGISTRATION OF BOILERS
9. Importance of registration. Technical guidance
for
the registration of boilers and scale of fees for registration
are
prescribed in the regulations. The details of measurements
recorded at the time of registration constitute a permanent
record for the boiler and determine the original pressure at
which the boiler is allowed to wort It is accordingly
essential
that the work should be done with the greatest care and
precision.
10. Necessity of avoiding delay.-It is essential that
no
delay should occur in registration. The Inspector shall fix a
date for the examination of the boiler as required under sub-
section (2) of section 7 and proceed to take action under
sub-
section (3) of section 7 on the date so fixed and submit his
report to the Chief Inspector as early as practicable.
The Chief Inspector shall issue orders under sub-section
(4) of section 7 without delay.
III INSTRUCTIONS FOR INSPECTION OF BOILERS
11. Internal Inspection. —Detailed instructions for the
inspection
of boilers are contained in the regulations. The Following
general procedure at inspection should be observed .
At each inspection for the grant or renewal of a certificate
the Inspector should wherever the size and construction of
the
boiler permit, go inside it and make and inspection of all its
internal parts. But before doing so he should satisfy himself
that proper provision has been made for effective
disconnection of the boiler from any boiler under steam.
Should he find that the boiler has not been eftbctiveti
disconnected
or that the boiler has not been properly cleaned or descaled
or that it is unreasonably hot, he should decline to proceed
with inspection and should report the facts to the Chief
inspector for orders under sub-section ( 2 ) of section 14 of
the
Act.
When a boiler is of such size or its construction is such
that the Inspector cannot go inside it., there must be
sufficient
sight holes or hand holes provided to enable him to see and
assess the condition of the principal internal parts. If any
importaht part, of a boiler is so constructed that the
Inspector
cannot examine it, he should report the fact to the Chief
Inspector for orders.
12. External Inspection.-Boilers must be examined
externally
as well as enternally. Particular attention should be paid to
the
external parts of the boiler in contact with seating blocks
and
brick-work especially when the situation is damp. Having
regard to many serious defects discovered, Inspector should
take care in order to ensure. , proper inspection, that boilers
of which the whole of the outside cannot be readily
examined,
are cleared of any concealing covering, supports
or fittings
whenever they consider it necessary.
Saddle , tanks and engine f i t t ings of
l ocomot ive type
boilers should be removed for inspection of the
parts under-
n e a t h a t f i r s t i n s p e c t i o n a n d a t a n y
r e a s o n a b l e p e r i o d
afterwards whenever the Inspector considers it
necessary. If
the owner in any special case has any good reasons
for not
w i s h i n g t h e c l e a r t h e c o v e r e d p a r t s , t h e
c a s e s h o u l d b e
submitted to the Chief Inspector for orders. The
Inspector
must keep in hi s mind that he is not to cer t i fy as
safe any boi ler
regarding the condition of which he cannot thoroughly
satisfy
himself
Previous to an inspection the Inspector shall
scrutinise
the memorandum of inspec t ion book an d sha l l
note any
entries that may have been made at the last inspection.
13. Casual inspection.—At t h e i n s p e c t i o n o f o n e o f
a
battery of boilers the Inspector should take the opportunity
of
examining other boilers under steam with special reference
to
boiler mountings and boiler attendance.
14. Entries in certificates.—In addition to the
entries
required to be made under Regulation 389 in a certificate for the
use ofa boiler, the Inspector should state in the remarks column
his requirements, if any, with regard to the
hydraulic test,
removal of lagging brick-work or other concealing parts for the
next inspection to enable the owner to have the same
properly
prepared at that time. He should also state in the same
place
his requirements regardingthe repair or renewal of any part that
may be considered fit only for the period of the certificate.
In the repairs column he should enter the year of
repair,
description of repairs e f f e c t e d . O n l y i m p o r t a n t
r e p a i r s s h o u l d
be noted. In the absence of remarks on the condition of boiler,
the boiler will be considered to be in good condition.
15. Issue of certificate and provisional order.-In cases
in which the Inspector is empowered to issue a certificate
under sub-section (5) of section 8 without ffirther reference
the certificate should ordinarily be issued within 72 hours of
the completion of the inspection. When an Inspector issues a
provisional order under section 9, he must report immediately
to the Chief Inspector that he has done so.
Iv -INSTRUCTIONS FOR EXAMINATION OF BOILERS
STEAM PIPES ECONOMISERS
OR PARTS THEREOF UNDER CONSTRUCTION
16. While examining materials the Inspecting Officer
shall verly the acceptability of the materials from original test
reports from steel makers in accordance with the
requirements of the regulations before stamping these
materials.
17. (a) When steel makers' certificates in Form IV of
the
Regulations issued by well known steel makers or a
recognised Inspecting Authority are available, the materials
may be stamped by him for use in the construction of boilers
provided they are found to be in sound condition.
(b) When materials used in construction of boilers or
parts thereof are offered for tests, he shall record the test
results.
18. After each stage examination of a boiler or parts
thereof or of steam receivers, separators, etc., he shall advise
the makers on the spot to proceed on to the next stage in
their construction provided he is satisfied that the standard of
construction does not fall short of the requirements of the
regulations.
1 9 . W h e n r a d i o g r a p h i c e x a m i n a t i o n s a r e c a r r i ed
o u t t o
p a r t s w h i c h r e q u i r e s u c h e x a m i n a t i o n u n d e r t h e
r e g u l a t i o n s
t h e I n s p e c t i n g O f f i c e r i n ch a r g e o f r a d i o g ra p h i c
ex a mi n a t i o n
s h a l l p e r s o n a l l y c h e c k u p t h e
i d e n t i f i c a t i o n o f t h e f i l m
e x p o s e d , t o t h e p a r t u n d e r e x a m i n a t i o n a n d
r e c o r d t h e s e i n
his diary.
2 0 . H e s h a l l a l s o m a i n t a i n a r e c o r d o f a l l
r e c t i f i c a t i o n s
a n d rep a i r s ca rr i ed ou t b y th e ma n u f a c t u re r t o
we l d ed s ea ms
after radiographic examinations.
2 1 . O n c o m p l e t i o n o f a c o n s t r u c t i o n o f a
b o i l e r p a r t s
t h e r e o f s t e a m r e c e i v e r s o r s e p a r a t o r s , e t c . h e
s h a l l c h e c k u p
all details and enter particulars in Forms II, III , III -A,
III-B or
I I I - C o f t h e r e g u l a t i o n s b e f o r e t h e
s i g n a t u r e o r c o u n t e r -
signature by the Inspecting Authority :