Section 5, The Himachal Pradesh Aerial Ropeways Act, 1968: Preliminary investigations
The Himachal Pradesh Aerial Ropeways Act, 1968 (7 of 1969) - Section 5
Text of section 5
Preliminary investigations
5. Preliminary investigations.- Subject to the provisions of this Act
and 1[the Right to Fair Compensation and Transparency in Land Acquisition,
Rehabilitation and Resettlement Act, 2013 (30 of 2013)], the State
Government may accord sanction to the promoter to make such surveys, as
may be necessary and require him to submit such detailed estimates, plans,
sanctions, specifications and such further information as it may deem
necessary for the full consideration of the proposal. The promoter shall not in
any event be entitled to claim any compensation from the Government for any
expense incurred under this section:
2[Provided that the estimates, plans, specifications relating to the
structural designs, quality of material, factors of safety, method of computing
stresses shall be in conformity with those as laid down by the Bureau of
Indian Standards and shall be duly certified by a qualified structural Engineer.
Explanation.-For the purposes of this section a “qualified structural
Engineer” means a graduate Engineer having such qualifications and
experience as may be prescribed.]
CHAPTER III
ORDERS AUTHORISING THE CONSTRUCTION OF AERIAL
ROPEWAYS
Previous and next
All sections of The Himachal Pradesh Aerial Ropeways Act, 1968
Questions people ask
Is section 5 of the Himachal Pradesh Aerial Ropeways Act, 1968 still in force?
No repeal of the Himachal Pradesh Aerial Ropeways Act, 1968 is recorded.