Rule 2, Rajasthan Water Supply Rules 01-07-1967: Definitions
Rajasthan Water Supply Rules 01-07-1967 - Rule 2
Text of rule 2
Definitions
2. Definitions.-(a) The Government shall mean the Government of
Rajasthan.
(b) The Chief Engineer shall mean the Chief Engineer, Public Health
Engineering Department.
(c) The Superintending Engineer, Shall mean the Superintending
Engineer, Health of the Division concerned.
(d) The Executive Engineer, shall mean the Engineer I/C of the
Division and Assistant Engineer I/C of the P.H.E. Sub-Division.
(e) The Overseer shall mean the Officer working under the Assistant
Engineer, in the P.H.E. Sub-Division.
(f) The contractor shall mean the Licensed Plumber or a contractor
enlisted in the Division as per rules.
(g) Department shall mean the water works department (Public Health
Engineering Department)
(h) Consumer shall mean all individuals, private concerns or Public
institutions, local bodies, Government Departments or all those who purchase
water through Water Works mains under the foregoing rules.
3. Public Supply,-Whoever bathes or washes clothes or other articles
at a public stand post or tempers with or damages a public stand post draws or
attempts to draw water from a public stand post except by the proper method or
willfully wastes water from a public stand post shall be liable to pay damages
by the Executive Engineer, Water Works concerned.
(2) No person shall commence to draw or cause or permit to draw
through his servants or labour, water from a public stand post for the
construction of a building unless he has obtained a written permission from the
department in Form W. I. The permit shall be kept by the holder thereof at the
place where water is being used for the aforesaid purpose and it shall be open to
inspection by such officers of the department as may be authorized by the
Executive Engineer in this behalf. Without the written permission of the
department no water shall be drawn for the aforesaid purpose beyond the date
given in the permit. Any person wishing to draw water from a public stand post
for building purpose or for consolidation of roads shall make an application in
form W. 2 appended to these Rules to be obtained from the Water Works
department (See Article 17). Alongwith the application in form W.2 be shall
also submit a plan showing the building proposed to be constructed to enable
the department to calculate the cubical content of the building for which water
is proposed to be marked on the plan in red. All persons unless the department
thinks fit to exempt any one by an order in writing shall deposit by way of
security with the application a sum of Rs. 50/-. He shall also be liable to deposit
on demand such additional security up to Rs. 250/- which may be determined
by the Department in each case, after taking into consideration the size of the
building and the total estimated demand for water charges. Water charges for
water drawn for such purpose shall be payable by all such persons within seven
days of the receipt of the bill in accordance with the rates fixed by the
Department from time to time under rule 14 and 15 of these rules.
(3) Whoever without the written permission of the department draws
or uses or cause or permits to draw through his servants or lebour water from a
public stand post for other than domestic purpose shall be liable for the amount
for which he would have been liable had he obtained permission for such use of
water from a public stand post.
A supply of water for domestic purpose shall not be deemed to include a
supply –
(a) for animals or for washing vehicles when such animals or vehicles
are kept for sale or hire;
(b) for any trade, manufacture or business;
(c) for fountains, swimming baths or for any ornamental or
mechanical purpose;
(d) for gardens or for purpose of irrigation;
(e) for watering roads or paths;
(f) for building purpose.
PART II- Private supply
(4) No connection with the Water Works mains for a private water
supply, and no alteration or extension of any such existing connection shall be
made in any private permission except on the application of the owner of such
premises or of his recognized agent. Who shall be registered as the consumer
and shall be responsible for the observance of the Rules so far as the
connections on his property are concerned. Provided that the Department may,
if it thinks fit itself alter the position of any existing connections.
Note:-Such connections shall be for domestic purpose only, but the
Department may permit them to be used for other purpose on
such conditions as it may fix.
(5) Every application for a connection with the mains for a private
water supply, or for the alteration or extension of any such existing connection
shall be addressed to the Assistant Engineer in charge and shall be made on a
printed form to be obtained from the department (See Rule 8).
(6) New connections shall be sanctioned or refused by an officer so
authorized by the Superintending Engineer, extensions and alterations to
existing connections shall also be allowed or disallowed by the authority.
(7) The department on its discretion may allow or disallow a water
connection or cause any water connection so given to be metered or any meter
so fixed to be removed at any time. Before changing the method of supply the
department shall give the owner or consumer a notice of not less than a
fortnight. In case a metered connection is given for the first time the owner or
consumer shall forthwith deposit a cash security amounting to twenty-five
rupees in respect of each meter provided by the department for his premises
before the supply of water can be allowed.
(8) Procedure for giving connection.-Any person, which also includes
a corporate body, being owner of the premises may apply to the
Assistant/Executive Engineer, Water Works concerned for supply of water for
purpose to be specified in the application which shall be on a prescribed form
obtainable on payment of Re. 1/- only either from the Executive Engineer`s
office or from the Assistant Engineer Water Works concerned, Sub-Divisions.
(9) In case the applicant is not the owner of premises in which be
requires a water connection and is a tenant in the said building or land, he
should get the application endorsed by the owner of the premises giving “No
Objection” certificate for the water connection in the names of the tenant. The
tenant then shall be required to furnish a deposit as detailed below which will
be refunded to him when be leaves the premises without any arrears pertaining
to water supply against him.
Rs. 50/- for ½” Water Connection.
Rs. 75/- for ¾” Water Connection.
Rs. 100/- for 1” and above.
Rs. 200/- for commercial concerns viz, hotel, cinemas etc.
(10) Applications for new connections shall be forwarded by the
Assistant Engineer, Water Works concerned to the Officer concerned (as per
rule 6) whose decision as to whether the connections shall be sanctioned or not
shall be final.
(11) After sanction to the proposed connection, applicant will be
informed by letter and shall within 15 days deposit with the Executive
Engineer, concerned an amount of Rs. 10/- as connection fee. The cost of Meter
Box and ferrule fixed by the Department from time to time will. Also have to be
deposited by him alongwith the connections fee in case be cannot procure his
own Meter Box and ferrule as per department specification.
(12) The applicant shall have to make his own arrangement for pipe
fittings at his own cost.
(13) (i) It will be the sole responsibility of the consumer for the
maintenance of the service line from the Water Works main or sub-main. But
its maintenance (repairs and replacement) will have to be carried out through
the Water Works Department and charges shall have to be borne by the
consumer. If the consumer fails to deposit the cost of maintenance, repair or
replacement his connection will be liable to be cut off after a due notice and
amount so incurred will be recovered as per P.D.R. Act, 1952
(ii) Installation and extension of pipe line beyond the Meter and inside
the premises shall be carried out by the applicant through a licenced plumber or
approved contractor of the Water Works Department but the same will be open
to inspection by technical representative of the department as and when desired
and directed by the Department.
(iii) The consumer shall not connect with his pipe line any cistern of
respectable used for the storage of rains or well water or other water from the
Water Works mains and no supply shall directly be connected to any water
closet, urinal, steam boiler or any hol water system or any apparatus used for
heating or trade purposes or any close vessel otherwise than through the supply
cistern thereof or any mechanical equipment like pumps etc.(see Rule 36)
(14) The connection will not be made until the full amount is paid and
all the necessary formalities are completed and the licensed plumber or the
approved contractor of Water Works has submitted the form W. 3.
(15) Before the estimated cost for providing the connection is
deposited, the applicant will also have to produce the permission of the local
Municipal authority or the Urban Improvement Trust as the case may be in case
there is no pucca arrangement for disposal of waste water. If there is paving of
pucca road which would require dismantling the applicant would have to
deposit necessary charges which will be provided in the estimate.
(16) Metered connections.-(i) All meters and other apparaius pertaining
thereto and incidental to the supply of water to any building or land shall except
as otherwise provided in these rules and so far as may be supplied, repaired
extended, shifted or altered as may be considered necessary by the department
at the expense of the owner or the consumer as the case may be but shall be
under the control of the Department.
(ii) For metered connections, the meter shall ordinarily be supplied by
the Water Works Department. But it is not obligatory A consumer may however
be permitted to have his own meter subject to the following conditions:-
(a) The meter must be of a type approved by the Department and in
proper working order.
(b) It shall be fixed after being tested by the Water Works Department at
the expenses of the consumer.
(c) A fee of Rs. 5/- will be charged for testing the meter.
(d) No meter, whether owned by the consumer shall be tampered with in
any way.
(e) Consumer shall be solely responsible for the safety of the meter, if
meter is tempered with, stolen or lost from the site, the consumer shall
have to get it repaired or replaced as the case may be, at his own cost
failing which connection is liable to be disconnected and recovery be
made from him under the Public Demand Recovery Act, 1952.
(f) If meter seal is broken it will be replaced at a cost of Re. 1/- in the
first instance and it “if the Executive Engineer is satisfied that
breaking of the seal was with bad intention” the consumer is liable to
pay for damages subject to maximum of Rs. 50/-
(17) Water Charges.- The charges will be levied as per rates fixed by
the Water Works Department from time to time. Rebate fixed in the schedule
shall be allowed if payment is made within due date indicated on each water
supply Bill.
(18) In addition to the charges specified in rule 17 there shall be
following charges :-
Meter Rent.- In the case of meters owned by the Department a
meter rent shall be charged at the rates fixed by the Department from time to
time. These charges shall include the cost of all alteration, repairs and renewal.
(19) (i) The registered consumer in respect of any metered connection
may challenge the correctness of meter on payment of a fee of Rs. 5/- If on
examination the meter is found to record 5 percent less or more than the actual
consumption the fee shall be returned. In case if it is found as a result of a test
that there was no defect in the meter the deposit shall be forfeited.
(ii) The charges for meter rent shall be paid for any period during which
the connection remains open even if the meter fails correctly to record amount
of water consumed.
(20) Unmetered Connections.- Whenever in any house to which an
unmetered connection has been fitted any operation in the nature of building or
rebuilding is to be undertaken by the owner, the registered consumer or other
person responsible for such operation shall before the building operations are
commenced, make an application to the department. In form No. W.2 for
permission to use water for building purpose and no water shall be used for
such purpose unless sanction in Form W.1 appended to these Rules has been
obtained. The Permit shall be kept by the holder thereof at the place when water
is used for the aforesaid purpose and shall be open to inspection by the such
officers of the Department as may be authorized by the Department in the
behalf.
Without the written permission of the Department no water shall be
drawn for the aforesaid purpose beyond the date given in the permit. Along
with the application in form W.2 be shall also submit a plan showing the
building proposed to be constructed to enable the department to calculate the
cubical contents of the building All such persons unless the Department thinks
fit to exempt any one by an order in writing shall deposit by way of security a
sum of Rs. 50/-. He shall also be liable to deposit an additional security deposit
up to Rs. 250/- according to the size of the building and estimated demand for
water charges. It will be on the discretion of the Department to meter the
connection and make charges on the basis of the actual consumption in
accordance with the rates in force from time to time for metered connections for
domestic supply or not to meter the connection in which case water charges for
water drawn for building purpose shall be payable in accordance with rates
fixed by the Department from time to time under rules 17 and 18 with the
sanction of the Superintending Engineer. All the demands of the Department
referred to in this rule shall be payable within 15 days of the receipt of the bill.
If any of the provision of this rule is violated or is not fulfilled the water
connection will be liable to be cut off and will be reopened only on payment of
reconnection fee of Rs. 10/-.
(21) (1) No fountain or cistern shall be connected with any unmetered
connection except with the written permission of the Department.
(ii) A special rate shall be fixed by the Department for such fountain or
cistern.
(22) Calculation and payment of Charges:- (1) For the purpose of
calculating the charges detailed in rules (17) and (18) 15 days or less shall be
considered as half a month and over 15 days but less than one month as one
month.
(2) Ordinarily the consumption through a water meter is prima facie
record for all purposes.
(a) But in case meter is reported to be or is out of order or under
repairs or is not repairable due to non-availability of spare parts. The water
consumption shall be computed on any one or more of the following basis:-
(i) On actual consumption recorded by the meter if the same is found
on test to register less than 5% slow or fast.
(ii) On the average of the immediately preceding month and average fo
preceding 3 months.
(iii) On the consumption of the corresponding period of the previous
year.
(iv) On such reliable date as may be considered reasonable the
Executive Engineer, water works Department.
(b) For the purpose of these rules a meter shall be deemed to be out of
order.
(i) If on testing it is found to be registering more than 5% slow or fast.
(ii) If it is on inspection found to have been tampered of damaged.
(iii) If it has stopped or failed to register consumption of water drawn
through it.
(c) If a private meter is suspected to be working slow or out of order,
the same shall be removed and tested by the Department and if found correct it
shall be sealed and refixed at departments cost. But if found out of order the
owner of such meter shall arrange to get it repaired within a month and get it
tested by this department on payment of testing fee of Rs. 5/-.The cost of spare
parts etc. will have to be paid by the consumer in advance if the meter could be
repaired by this Department.
(23) The registered consumer of any connection shall be bound to pay
all charges made under these rules. But if in the course of any quarter a meter
shall have been examined and found to be registering in excess of five percent
the consumer shall be entitled to have the charges made to him for excess
consumption reduced proportionately for the period from the first day of that
quarter to the date in which the meter was examined.
If in any quarter the meter of any connection ceases to register, the
Department shall be entitled to charge for the quarter an amount for excess
consumption not exceeding the average of the past three quarters of full usage.
WATER SUPPLY BILLS
(21) (a) A bill for the water consumption charges and the meter rent will be
sent to each consumer every month in accordance with the rates as may be
prescribed by the Government from time to time.
(b) The dates of payment will be spread over the month and
preparation delivery of the bills will be so arranged that all bills for water will
be paid within 15 days of the issue of the bill. If payment of the bill is not made
by the specified date the consumer would lose the advantage of rebate and will
have to pay normal rate given in the bill.
(c) The excuse of bill not having been received will not be entertained.
(d) Consumers should always quote bill No. while communicating
with the office.
(e) In case of dispute the bill must be paid in full under protest within
time to avail of rebate. Any excess charge admitted will be adjusted in the
subsequent bills.
(f) If for some reasons the bill is amended, it can be paid within
fifteen days from the date for presentation of the bill.
(25) In case the bill is lost a duplicate copy may be obtained from the
office on payment of Re. 0.12 P. only. If bill is sent by post an extra charge of
Re. 0.15 P. only will be made.
(26) The bill will be prepared in the name of the owner of the
connection and will be delivered at the site where the connection exists.
Exception may be made under special circumstances.
(27) All outstandings on account of any charges under these rules shall
be realised by the Water Works Department as per public Demand Recovery
Act, 1952.
(28) All complaints should be addressed to the Executive Engineer
concerned. An appeal against his order shall be to the Superintending Engineer.
Health of the Division Concerned.
TEMPORARY CONNECTIONS
(29) (a) Temporary water connections will be allowed for special
occasions such as marriages, fairs, exhibition etc. for a limited period.
(b) Temporary water supply will also be metered.
(c) The meter rent will be charged as usual as from permanent
consumer.
(d) The water charges will be recovered at one and half time of the
normal rate in force.
(e) Necessary deposit of the estimated amount will have to be made in
advance by the applicant as security to safeguard the Department dues and at
the time of removing the temporary connection the expenditure will be adjusted
accordingly.
(f) Temporary connections to seasonal piyaoos, sabils, cattle troughs
etc. will also be covered by these rules.
(30) Notwithstanding the provisions of rules (17), (18), (22) and (29)
the Department may allow any water connection free for any public or any
charitable purpose provided that if the person who is the registered consumer in
respect of such free connection allows water to be washed or to be used for any
purpose other than that for which such free connection was granted, the
Department may cancel the grant of that free connection.
GENERAL PROVISION AS TO PRIVATE CONNECTIONS
(31) No House shall be supplied with water from the service connection
of any adjoining house or premises provided that a connection of over “inch
may be used by more than the house on application to the Department on terms
to be fixed by the Department.
(32) No connection shall be granted unless drainage arrangements have
been made for the disposal of waste water to the satisfaction of the Department
or Municipality.
(33) No Portion of any private connection or of the pipe or main leading
to it shall be tempered with in any way whatsoever whether for the purpose of
repair alteration or any other purpose.
(34) Every registered consumer shall be bound immediately if he has
knowledge of it, to report the Department any defect in his connection whereby
water runs to waste.
(35) The Department shall affix at a suitable and easily accessible place
in every house fitted with an unmetered water connection enameled plate of the
size of 3 inches, 2 inches with the number of water connection written on it. In
case the plate is at any time, lost, broken or defaced its price, not exceeding Re.
1/- as may from time to time be fixed by Department shall be recoverable from
registered consumer in the same manner as arrears of water rate.
(36) No Pumps plants or devices would be allowed to be attached to his
water supply system without obtaining previous sanction from the water Works
Department.
CLOSING AND REOPENING OF PRIVATE CONNECTIONS
(37) If any registered consumer who wished to close his connection
shall give fifteen days notice in writing to the Department after the expiry of
which water rate shall not be charged.
(38) If any person other than the owner or the duly authorized agent of
the owner of the premises in which a connection has been fitted wishes to have
reopened or kept open a connection which would otherwise be closed, he shall
execute an agreement undertaking the responsibilities of a registered consumer
and shall have all the liabilities of a registered consumer. All such persons
unless the Department thinks fit to exempt them by an order in writing, shall
deposit a sum of thirty rupees or more as may be determined by the Department
for the due payment of water charges in addition to the ordinary charges which
are payable in advance. The security shall be kept intact and shall not be set off
against any money due from such registered consumer until he shall have
applied to have the connection closed, when it shall either be returned to him
after the payment by him of all charges assessed under these rules or, after
efforts to collect such charges by the department have failed used by the
Department to liquidate the payment of charges and the cost of their collections.
(39) All applications to open or re-open a connection shall be in form
W-4 and shall be accompanied by a fee of Rs. 10/- as opening fee together with
all dues payable in advance.
(40) (I) Any connection may be cut off by order of the Department
in the following cases :-
(a) for breach of any of the provisions of the foregoing rules.
(b) where through defect in a connection water is running to
waste.
(c) where the use of a water tap causes premises to become
insanitary in the opinion of a Sanitary official.
(d) where in the opinion of the Department adequate drainage
arrangement have not been made for the disposal of waste water.
(e) in the case of a metered connection where meter requires
repair;
(f) in case the owner or consumer refuses to pay the cash
security as prescribed under rules 3(2);
(II) In any case where a connection has been cut off in accordance with
Rule (40) (i) (a) and (f) the Department may require payment of damages up to
a maximum of Rs. 50/- which shall be paid before the connection is reopened.
(III) In any case where a connection has been cut off under rule (40) (i)
(b) (c) (d) and (e) it shall not be reopened except on payment of a fee of Rs. 10/-
.
GENERAL POWERS
(41) The Department may from time to time regulate and limit the hours
of water supply with reference to connections, localities. Demand of public as
far as possible and season of the year.
(42) The Department does not hold itself responsible for non supply of
water caused by accident such as failure or electric powers supply, leakage or
bursting of the mains or these obstructions or low pressure in the mains in
summer season or strike by labourers. The Department retains the right to
suspend water supply at any time and for as long a period as may be found
necessary for repairs or for laying new lines etc.
PLUMBING LICENCE
(43) A plumbing licence may be granted to a Contractor or trade
dealing with pipe fittings etc.
(44) Applications for such licences should be sent to the Executive
Engineer concerned who will verify and ascertain the necessary requirements
for the purpose.
(45) The firm or the trader must have a qualified technician (Overseer
or Mistry) for carrying out the plumbing work and should produce a certificate
to the department.
(46) The applicant must possess necessary tools and equipments for the
purpose, such as dies, pipes, fittings wrenches etc.
(47) The applicant will have to produce Income Tax Clearance
Certificate and also a certificate from the Bank clarifying his financial status.
(48) The applicant will have to pay a sum of Rs. 75/- as licence fee in
the first instance for obtaining the licence. The amount will be deposited in
Executive Engineer`s office.
(49) The livence will have to be renewed every year in April and a sum
of Rs. 20/- will have to be paid as renewal charges by the 15
th
April, failing
which penalty shall be charged @10/- p.m. If the licence is not renewed before
April Next the licence will stand as cancelled and a fresh licence will have to be
taken on payment of full licence fee.
(50) The licence holder will be responsible for the work done through
him or his agency.
(51) Any harassment caused to the consumers or applicant through him
or his agency shall make him liable for cancellation of the licence.
(52) Any person who commits a breach of any of the provisions of
these rules shall be liable to make payment of damages assessed by the
Department.
ds- ,u- HkkxZo
Additional Secretary to Government
FORM W- 1
Mr./Messrs…………………………………….having paid
Rs………………. On account of security vide receipt No. ………………..
Dated……………………..and No……………………..dated…………
Permission is hereby granted to draw water from public stand post No.
……………. Situalte in …………………………./from private unmetered
water connection No. ……………….affixed to house No……………………..
in street……………………………..
Period of permit
From………………………………… to ……………………….
Executive Engineer
Water Works
FORM W- 2
The Executive Engineer, water Works.
……………………………….
Sir,
I beg to state that I intend to draw water from my unmetered/stand post
No. ……………………. Water connection/situated near No. …………………..
affixed house No. ……………building/rebuilding in ………………street in
area for building/rebuilding house No. …………….
A plan showing the building proposed to be built/rebuilt is enclosed The
portions to be built/rebuilt have been marked red.
The cubical contents of the building proposed to be built/rebuilt are
……………… cft.
Rs………………./- on account of security have been deposited in your
office vide receipt No………..dated ……………… additional security will be
paid on demand by the Department.
The water will be drawn by me from……………..to ………………. In
case I require water after this date, I will make an application to the Department
and obtain the Permission in advance.
I agree to pay water charged according to the rates fixed by the Water
Works Department from time to time within one week of the receipt of the bill
from the Department.
Your faithfully;
Signature……………
Address…………….
(TO BE FILLED BY THE ASSISTANT ENGINEER)
1. Cubical contents of the building to be built/rebuilt according to
plan for purpose of assessment of water charges are………………….. cft.
2. Meter is not available and will be provided against payment of Rs.
……………by the applicant.
3. Meter is not available charges may be made on basis of cubical
contents of the building.
4. The time required for carrying out the building work is
approved/not approved. It should be upto………………………….only.
(clause not applicable to be struck off)
Assistant Engineer
(TO BE FILLED IN EXECUTIVE ENGINEER`S OFFICE)
1. The applicant may be asked to deposit Rs. …….. ……………for
providing a meter.
2. Estimates demand for water charges calculated on the cubical
contents comes to ………………………
3. Additional Security of Rs. …………………may be demanded.
SD/- Water Rate Supdt.
(Executive Engineer`s Orders.)
FORM W-3
To
The Executive Engineer
Water Works
……………………………………
I have carried out the installation work in the House/ premises belonging
to Shri………………………………. Which is taken on rent by Shri
………………………….and remit herewith the amount as detailed under:-
Estimated amount Rs.
Connection Fee Rs.
Security Rs.
The details of installation carried out in the above premises are as follows
:-
Taps No.
Showers No.
……….. No.
Kindly issue necessary order for connection.
Signature of the Plumber
Address…………………….
FORM W-1
To
The Executive Engineer,
Water Works
Sir
I hereby apply to have connection No. ……………….. to the house No.
………………belonging to Shri………………………….situated in Ward No.
…………………….Street……………………………opened for ………………
I undertake to pay for the said supply of water according to the rates now
in force or that may be changed from time to time by Water Works Department.
I also agree to pay water charges in advance as long as the connection
stands in my name and before ceasing to occupy the premises I shall give notice
to the Department to have the connection cut off.
I also agree to comply with the provision of Water Supply rules.
Your faithfully;
Signature of applicant………………..
Address………………….
S/o…………………. Caste……………
(To be filled in by the Accountant)
Credited sum of Rs. ………………….. on account of Water charges for
the months ending …………in advance by receipt No.
……………dated…………….
Accountant
Orders of the Executive Engineer
Open the Connection
Executive Engineer
Date………….
Order No. ………………….For opening connection No.
Issued on ……………………
jktLFkku ljdkj
tu LokLF; vfHk;akf=d foHkkx
Øekad%&fo-l- ,oa eq-ys-v-@jk-t-iz- ,oa lh-iz-ea-@fe’ku@07&08@10664&10784t;iqj 05 vxLr]
1987
vf/klwpuk
vf/klwpuk la[;k ,Q@,Q , ,.M lh , vks@vkj MCY;w,l,l,ech@fe’ku@84&85@
1672&1772 fnuakd 30-04-85 esa vkaf’kd :ikUrj.k djrs gq,] jktLFkku] jktLFkku ds uxjh; {ks= eas
miHkksDrkvksa ls flrEcj ekg] 1987 ls olwyh dh tkus okyh tyiznk; dh njksa] tks uhps fofuZfn"V
fd, x, vuqlkj fu/kkZfjr djrs gSa A
Ø0la0 miHkksDrkvksa dh Js.kh dqy njsa izfr
1000 yhVj
;fn Hkqxrku fu/kkZfjr
fu;r rkjh[k ij fd;k
tkrk gS rks 20 izfr’kr
NwV nsus ds ckn izfr
1000 yhVj dh 'kq} njsa
A
1 ?kjsyw njsa
¼ehVj }kjk iznk;½
¼d½ izFke 15000 yhVj rd ds miHkksx ds fy, 1-25 1-00
¼[k½ 15000 yhVj ls vf/kd fdUrq 10]000 yhVj
rd ds vxys miHkksx ds fy,
1-50 1-20
¼x½ 1]00]000 yhVj ls vf/kd ij 2-00 1-60
2 ¶ysV njsa
¼ehVj ds fcuk iznk;½
¼d½ 15 fe0yh0 izfr ifjokj nks VksaVh rd ds fy, 19-25 15-40
¼[k½ izR;sd vfrfjDr VksaVh ds fy, 5-50 4-40
fVIi.kh%& dsoy ?kjsyw iznk; ds fy, 15 fe0fe0 lfoZl esUl ¶ysV nj dusD’ku fn, tkosxsa
A
3 okf.kfT;d nj
¼d½ izFke 15000 yhVj rd ds miHkksx ds fy, 2-50 2-00
¼[k½ 15000 yhVj ls vf/kd ,oa 50]000 yhVj rd
ds vxys miHkksx ds fy,
3-00 2-40
¼x½ 50000 yhVj ls vf/kd ,oa ,d yk[k yhVj
rd ds vxys miHkksx ds fy,
3-37 2-70
¼?k½ 100000 yhVj ls vf/kd miHkksx ds fy, 4-50 3-60
4 nj
¼d½ izFke 15000 yhVj rd ds miHkksx ds fy, 5-00 4-00
¼[k½ 15000 yhVj ls vf/kd ,oa 50000 yhVj rd
ds fy, vxys miHkksx ds fy,
6-00 4-00
¼x½ 1]00]000 yhVj ls vf/kd vxys miHkksx ds
fy,
9-00 7-20
5 U;wure nj
leLr Jsf.k;ksa ij vFkkZ ?kjsyw okf.kfT;d ,oa vkS|ksfxd Jsf.k;ksa ij miHkksx
¼d½ 15 fe-fe- ;k de dh lfoZl esUl ds fy, 19-25 15-40
¼[k½ 20 fe-fe- rd dh lfoZl esUl ds fy, 55-00 44-00
¼x½ 25 fe-fe- dh lfoZl esUl ds fy, 165-00 132-00
¼?k½ 25 fe-fe- ls vf/kd fdUrq 40 fe-fe- rd dh
lfoZl esUl ds fy,
440-00 352-00
¼M½ 40 fe-fe- ls vf/kd fdUrq 50 fe-fe- rd dh
lfoZl esUl ds fy,
550-00 440-00
¼p½ 50 fe-fe- ls vf/kd fdUrq 80 fe-fe- rd dh
lfoZl esUl ds fy,
1100-00 880-00
¼p½ 80 fe-fe- ls vf/kd fdUrq 100 fe-fe- rd dh
lfoZl esUl ds fy,
2200-00 1760-00
¼p½ 50 fe-fe- ls vf/kd fdUrq 80 fe-fe- rd dh
lfoZl esUl ds fy,
5500-00 4400-00
6 dusD’ku 'kqYd
lacaf/kr lk>k ds lfoZl esUl ds fy, ,d ckj
ds U;wure izHkkj¼'kq}½ ds cjkcj
7 izfrHkwfr fu{ksi lacaf/kr lk/ku ds lfoZlesUl ds
fy, nks ekg ds U;wure izHkkj ¼’kq}½ ds cjkcj
8 ifCyd LVs.M iksLVpktsZt& ogha dqy njsa tks
?kjsyq dusD’ku ds fy, iz;ksT; gS
9 vU; izHkkj
d miHkksDrkvksa ds fuosnu ij vuqorhZ ehVj ijh{k.k 'kqYd
1- 25 fe-fe- rd ds dusD’ku ds fy, 10-00
2- 25 fe-fe- ls vf/kd ds dusD’ku ds fy, 50-00
[k dusD’ku nsus dk 'kqYd
1- 25 fe-fe- rd ds dusD’ku ds fy, 10-00
2- 25 fe-fe- ls vf/kd ds dusD’ku ds fy, 50-00
x miHkksDrk ds fuosnu ij MqIyhdsV fcy tkjh
djus ds fy, izHkkj
IyEcj dks ykbZlsal nsus dk 'kqYd 1-00
izFke ykbZlsal 200-00 :
dsoy
100@&
;fn vkosnd fdlh O;olk; esa
vkbZ0Vh0vkbZ0 dk;Z esa ls izfr’kr izkIr gS
2- vuqorhZ o"kksZ esa uohuhdj.k 20-00 izfr o"kZ 10-00 :0 izfrekg foyEc
'kqYd jkf’k
3- ehVj fdjk;k 2-00 izfr’kr lHkh Jsf.k;ksa ds fy,
d flojst pktsZt& tgka dgha flojst okgu fo|eku gS ;k mlds i'pkr~ dh tk,xh ;gka
mij mfYyf[kr ty njksa ds 20 izfr’kr dh nj ij fdUrq bl ij lkef;d Hkqxrku ds fy,
iz;ksT; lkekU; NwV nh tk,xh A
[k flojst VªhVesUV IykUV pktsZt tgka dgka flojst okgu fo|eku gS ;k mlds i'pkr dh
tk,xh ogka mij mfYyf[kr ty njksa ds 13 izfr’kr dh nj ij fdUrq ml ij lkef;d
Hkqxrku ds fy, iz;ksT; lkekU; NwV nh tk,xh A
xzkeh.k {ks=ksa ds fy, njsa vf/klwpuk la[;k ,Q@,Q , ,.M lh , vks@vkj MCY;w
,l ,l ,e ch@fe’ku@84&85@1672&1772 fnuakd 30-04-85 }kjk fu/kkZfjr njsa dh ykxw jgsaxha A
bls foRr foHkkx¼O;;½ dh muds vkbZ Mh la[;k 1502 fnukad 04-08-87 }kjk lgefr izkIr gS
vkKk ls
¼ch0 ,y0 'kekZ½
'kklu lfpo
la[;k ,Q@,Q , ,.M lh , vks@vkj MCY;w ,l ,l ,e ch@fe’ku@87&88@ 10664&10784
fnuakd 7-8-87
1- eq[; lfpo] jktLFkku] t;iqj A
2- foRr lfpo] jktLFkku] t;iqj A
3- lfpo] eq[; ea=h] jktLFkku] t;iqj A
4- fuft lfpo] ea=h] tu LokLF; vfHk;kaf=dh foHkkx]jkt0] t;iqj A
5- egkys[kkdkj] jktLFkku] t;iqj A
6- rduhdh lnL;]vkj-MCY;w-,l-,l-,e-ch-] t;iqj A
7- lfpo] vkj-MCY;w-,l-,l-,e-ch-] t;iqj A
8- foRr lykgdkj ,oa eq[; ys[kkf/kdkjh]t;iqj A
9- eq[; vfHk;ark] tu Lok0 vfHk0 foHkkx]jkt0] t;iqj@tks/kiqj@vfrfjDr izfr;ksa lfgr A
10- vij eq[; vfHk;ark] tu Lok0 vfHk0 foHkkx¼leLr½
11- v/kh{k.k vfHk;ark] tu Lok0 vfHk0 foHkkx¼leLr½
12- vf/k’kk"kh vfHk;ark]tu Lok0 vfHk0 foHkkx]¼leLr½ 7 vfrfjDr izfr;ksa A
13- funsZ’kd] tu laidZ foHkkx]t;iqj A
'kklu lfpo
GOVERNMENT OF RAJASTHAN
DEPARTMENT OF PUBLIC HEALTH ENGINEERING
No.F./FA&CAO/RWSSMB/Mission/XIX/94-95 Jaipur, dated:12.09.94
NOTIFICATION
In partial modification of Notification No.F./FA&CAO/RWSSMB/
Mission/XIX/84-85/1672-1772 dated 30-4-85 and No. 10664-784 dated 7-8-87,
the governor is pleased to prescribe the Water Supply Rates to be charged
from the consumers of the following categories in Urban and Rural areas of
Rajasthan with effect from the billing month of Octomber 1994, as specified
below:-
S.no. Category of Consumers Gross Rate per
1000 litrs. (Rs.)
Net Rate Per 1000
Liters after allowing
20% rebate if
payment is made by
the prescribed due
date (Rs.)
1 2 3 4
01. COMMERCIAL RATES:-
(a) For consumption upto first
15,000 Litres
3.75 3.00
(b) For next consumption exceeding
15,000 ltrs. &upto40,000 Ltrs.
6.25 5.00
(c) For next consumption above
40,000 Ltrs.
10.00 8.00
02. INDUSTRIAL RATES:-
(a) For consumption upto first
15,000 Litres
10.00 8.00
(b) For next consumption exceeding
15,000 ltrs. &upto 40,000 Ltrs.
12.50 10.00
(c) For next consumption above
40,000 Ltrs.
15.00 12.00
Previous and next
Questions people ask
Is rule 2 of Rajasthan Water Supply Rules 01-07-1967 still in force?
No repeal of Rajasthan Water Supply Rules 01-07-1967 is recorded.