Rule 37, The Karnataka Planning Authority Rules, 1965.: Manner of inquiry under 4[Section 15(4) or 17(4)]
The Karnataka Planning Authority Rules, 1965. - Rule 37
Text of rule 37
Manner of inquiry under 4[Section 15(4) or 17(4)]
37. Manner of inquiry under 4[Section 15(4) or 17(4)].- (1) An inquiry under
5[sub-section (4) of Section 15 or] sub-section (4) of Section 17 shall be conducted in
the manner specified in this rule.
(2) The Planning Authority shall serve a notice in writing upon the person
concerned calling upon him to show cause why he should not be directed:-
(a) to remove or pull down the work; or
(b) to restore the land to its original condition, as the case may be
The notice shall specify a date not earlier than seven days from the date of its
service for hearing the case.
(3) The Planning Authority, if it considers it expedient to do so, may appoint a
Committee of not less than three of its members to hear such cases.
(4) Any representation which may be made by or on behalf of the person served
with the notice on the date specified under sub-rule (1) or which may be received on
or before such date, shall be considered. Minutes shall be kept of the inquiry so held
and the decisions arrived at in such inquiry shall be reduced to writing together with
reasons for the same. Reasons for the decision shall be signed by all the persons
giving such decision.
6[37-A. Fee to be levied in certain cases of permission for change in the use or
development of land or building- 7[(1) For the purpose of sub-section (1) of Section
18 the fee leviable by the Planning Authority shall be:-
1. Sub –rule (2-A) inserted by GSR 356, dated 21-10-1976.
2. Substituted for the Table by GSR 291, dated 8-9-1977.
3. Substituted for the entry under Column 2 against item 1 by GSR 172, dated 12-6-1980.
4. Substituted for the word, figures and brackets section 17(4) by GSR 356, dated 21-10-1976.
5. Inserted by GSR 356, dated 21-10-1976.
6. Rules 37-A inserted by GSR 356, dated 21-10-1976.
7. Sub-rule (1) substituted by GSR 47, dated 24-2-1989.
(a) At the rates specified in the table below in the case of grant of permission
for change in the use of land namely:-
1[TABLE
In the local Planning Area of
Fee per square meter of total land
Residential Industrial Commercial
Rs. Rs. Rs.
1 A city or town with a
population of ten lakhs
and above
20.00 40.00 75.00
2 A city or town with a
population of one lakh
and above but less than
ten lakhs
4.00 8.00 12.00
3 A city or town with a
population of fifty
thousand and above but
less than one lakh.
3.00 5.00 6.00
4 A city or town with a
population of twenty
thousand and above but
less than fifty thousand.
1.50 2.00 4.00
5 A city or town with a
population of less than
twenty thousand.
0.60 1.00 2.00
(b) At the rates specified in the table below in the case of grant of permission
for development involving carrying out of building on the plot approved by
the Planning Authority, namely:-
TABLE
In the local Planning Area of
Fee per square meter of floor area of all the floors
of the building Floor sanctioned.
Residential
Industrial Commercial
Rs. Rs. Rs.
1 A city or town with a
population of ten lakhs
and above.
2.0 4.0 10.00
2 A city or town with a
population of one lakh and
above but less than ten
lakhs.
1.50 2.50 4.00
1. Table substituted by notification no.HUD 507 TTP 93, dated 19-11-1993
In the local Planning Area of
Fee per square meter of floor area of all the
floors of the building Floor sanctioned.
Residential
Industrial Commercial
Rs. Rs. Rs.
3 A city or town with a
population of fifty
thousand and above but
less than one lakh.
1.00 2.00 2.00
4 A city or town with a
population of twenty
thousand and above but
less than fifty thousand.
0.50 1.00 2.00
5 A city or town with a
population of less than
twenty thousand.
0.25 0.50 1.00
Provided that in the case of grant of permission for development involving
addition to any existing building, fees under this clause shall be levied only in respect
of the floor area proposed to be added.]
1[(2) The Planning Authority shall serve a notice in Form VIII by registered
post due acknowledgement to the applicant indicating the amount of fee payable by
him which shall be paid within ninety days from the date of receipt of the said notice.
Provided that the Planning Authority may, on application made in this behalf, for
reasons to be recorded in writing extend the period of payment to such further period
not exceeding nine months, as it considers necessary. The Planning Authority may,
with the previous approval of the Government, further extend the period of payment
upto 24months, from the date of such approval, subject to collection of interest at the
rate of the prime lending rate of the SBI and a penalty of 2% for the first twelve
months and 3% for the next twelve months compounded quarterly. If the applicant
fails to remit the fees within the extended period as prescribed above, the grant of
permission stands cancelled.]
(3) An appeal under sub-section (2) of Section 18 may be filed within ninety
days from the date of receipt of notice under sub-rule (2).
(4)Increase in the value of the land or building for the purpose of sub-section
(1) of Section 18 shall be estimated taking into consideration the increase in the
market value of and increase in the income from the land building as a result of the
change in the use or development thereof. For the purpose of determining the market
value of and income from the land or building, the value and income from similar
lands and buildings with similar environmental conditions and use in the
neighbourhood shall be taken into consideration]
1. Sub-rule (2) substituted by notification no.UDD 98 My Aa Pra 2012, dated 17-5-2012, w.e.f. 7-6-2012.
¹[37-B, fees levied in case of permission for change in land use in case of
infrastructure project: Notwithstanding anything contained in Rule 37-A, the fee
leviable under sub-section (1) of Section 18 by the Planning Authority for permission
for a change in the use of land in the case of any infrastructure project notified by the
State Government, shall be rupees ten thousand per acre]
CHAPTER VI
Qualifications of Director of Town Planning Officer
Previous and next
All provisions of The Karnataka Planning Authority Rules, 1965.