Rule 20, The Karnataka HIghways Rules, 1965: Procedure for collection I realisation of amount handling etc
The Karnataka HIghways Rules, 1965 - Rule 20
Text of rule 20
Procedure for collection I realisation of amount handling etc
20. Procedure for collection I realisation of amount handling etc.- (1 )
All tolls levied under these rules shall be collected by the Highway Authority
concerned departmentally on behalf of the State Government and for this
purpose necessary arrangements shall be made by the Highway Authority
concerned for putting up adequate number of collection booths operated
manually or by automatic arrangement or by combination of boath as may
be considered suitable by the Highway Authority including improvement and
widening of approach roads to serve the collection booths so set up.
(2) There shall be posted at either end of the bridge, causeway and
tunnel, a Toll Inspector (with necessary police guard to assist) who shall
be authorised to collect toll in respect of any motor vehicle crossing the said
bridge, causeway and tunnel at the rates specified in the Second Schedule.
(3) There shall be provided at either end of the bridge, causeway or a
tunnel, a cross bar of securing the stoppage of motor vehicles.
(4) The Toll Inspector shall ensure at the cross bar that passage is not
allowed to motor vehicles unless the toll leviable in respect thereof has been
paid.
Previous and next
Questions people ask
Is rule 20 of the Karnataka HIghways Rules, 1965 still in force?
No repeal of the Karnataka HIghways Rules, 1965 is recorded.