Rule 27, The Punjab Scheduled Roads and Controlled Areas Restriction of Unregulated Development Rules, 1965: Application for permission under section 8 for lying out means of access to a road in a controlled area [Section 3,8, and 25(2)(e)]
The Punjab Scheduled Roads and Controlled Areas Restriction of Unregulated Development Rules, 1965 - Rule 27
Text of rule 27
Application for permission under section 8 for lying out means of access to a road in a controlled area [Section 3,8, and 25(2)(e)]
27. Application for permission under section 8 for lying out means of
access to a road in a controlled area [Section 3,8, and 25(2)(e)].– (1) Every
person requiring permission of the Director for laying out means of the access
to a road within a controlled area shall submit an application in Form AC-I.
(2) The site plan mentioned in Form AC-1 shall be drawn to a scale of
not less than 1” to 40’ and indicate:-
(i) the name of the road to which access is desired indicating the
number of milestone or furlong stone, and
(ii)the details of the proposed junction.
(3) The cross-section of the proposed access shall be drawn to a scale
1” to 1’ and shall show all elements constituting the road e.g. the metalled
portion, footpaths, position of electric poles, green verges, etc.
***
28. Restriction governing the grant of permission for laying out
means of access in a controlled area [Sections 3,8(1) and 25(2)(f)].-No
permission for application made under rule 27 shall be granted, unless-
(a) the proposed means of access are in conformity with the
provisions of the development plan, and
(b) the applicant undertakes to construct the proposed access in the
manner specified in the order granting permission.
***
Previous and next
Questions people ask
Is rule 27 of the Punjab Scheduled Roads and Controlled Areas Restriction of Unregulated Development Rules, 1965 still in force?
No repeal of the Punjab Scheduled Roads and Controlled Areas Restriction of Unregulated Development Rules, 1965 is recorded.