Rule 31, THE UTTAR PRADESH BHOOMI EVAM JAL SANRAKSHAN NIYAMAVALI , 1963: Service of notice
THE UTTAR PRADESH BHOOMI EVAM JAL SANRAKSHAN NIYAMAVALI , 1963 - Rule 31
Text of rule 31
Service of notice
31. Service of notice—Any notice under the Act may be served on the person
to
-
whom it is to be given either personally or by sending it by registered post.
21
S. C. Form 1 [See Rule 9 (i)]
Location, extent, nature and existing land use of the problem area
Proposed name of the plan………………….Block………………….,Tahsil………………District………………….
S.L Name
of the
village
Area under cultivation
including orchards
Tree growth (with 50 % or
more coverage)
Waste (with less than 50%
tree growth)
Total
Total
area
Area
requiring
soil
conservatio
n measures
Nature
of
defect
Total
Area
Area
requiring
soil
conservatio
n measures
Nature
of
defect
Total
Area
Area
requiring
soil
conservat-
ion
measures
Nature
of
defect
Total
Area
Area
requiring
soil
conserva
tion
measure
s
Remarks
1 2 3 4 5 6 7 8 9 10 12 13
22
S. C. Form 2A [See Rule 9 (ii)]
Soil conservation Survey and plan (Mechanical Measures)
Plan………………….,Village………………………….,Block………………….,District………………….
S.
L.
Land
capabil
ity
class
land use Khasra
numbers
falling in the
class
Defects from
which land
is suffering
Area
in
acres
Recommended land use Mechanical
soil
conservation
Remarks
land use Khasra
numbers
1 2 3 4 5 6 7 8 9 10
1 A Waste (with less than 50 per cent
tree growth) tree growth (with 50
percent or more coverage)
Agriculture
Pasture
Afforestation
Agriculture
2 B1 Waste/ tree growth/ Agriculture Pasture
Afforestation
Agriculture
3 B2 Waste/ tree growth/ Agriculture Pasture
Afforestation
Agriculture
4 C Waste/ tree growth/ Agriculture Pasture
Afforestation
Agriculture
5 D Waste/ tree growth/ Agriculture Pasture
Afforestation
Agriculture
6 E Waste/ tree growth/ Agriculture Pasture
Afforestation
Agriculture
23
S. C. Form 2B [See Rule 9 (ii)]
Soil conservation Survey and plan (Agronomic measures in Agricultural Land)
Plan……………………………….,Block……………………………….,District………………….………….
S.L. Land
capability
class
Khasra
number
of fields
Interval
within
which
green
manuring
should be
done
Interval and
dose of
application
of farm
yard
manure of
compost
Crops
recommended
to be grown
Fertilser
schedule
Contour
farming
Strip
cropping
and mixed
cropping
Hot
weather
cultivation
Interculture
and
mulching
Other
practices
1 2 3 4 5 6 7 8 9 10 11 12
S. C. Form 3 [See Rule 9 (iii)]
Estimate of quantity and cost of “Works’’
Soil conservation Survey and plan (Agronomic measures in Agricultural Land)
Plan………………………….,Viilage…………………..Block……………Tahsil .................. ,District
………..………..
Note – Work will be recorded category-wise, e.g., leveling, bunding, etc, and totaled separately, with a grand total for the plan as a whole
S.L. Name
of work
Area to
be
benefited
Khasra
numbers of
fields in
which work
is to be
constructed
or done
Specification
Cross Section
Quantity Rate Total
cost
Subsidy Remarks
Length width Height Area Rate Amount
1 2 3 4 5 6 7 8 9 10 11 12 13 14
Total B.F.
Total C.F.
24
S. c. Form 4 [See Rule 9 (iv)]
Statement showing the details of work along with estimate cost to be executed by individual beneficiaries
Plan……………………Village……..………….,Block…………………Tahsil….…………….,District…………….…
S.L. Name of beneficiary with
parentage and residence
Khasra number
of fields which
work
Area Nature
of
work
Reference
Serial
number in farm
3
Tota estimate
cost of work
Deduct
Subsidy of any
Net esitimated
cost of work to
the beneficiary
Remark
1 2 3 4 5 6 7 8 9 10
S. c. Form 5 [See Rule 22 and 9 (v)]
Statement of works to be carried out depatmentally
Plan……………………Village……..………….,Block…………………Tahsil….…………….,District…………….…
S.L Nature
of work
Reference to
Serial
number in
S.C. From 3
Esitima
ted
cost of
work
Subsicid
y (if any)
admissi
ble
Net cost to be
recovered from
benefiray
benefits after
deducting
subsidy
Land to
benefits
Name of
beneficiary
with
parcentage
and address
Fraction of work
in his share
Fraction
of work
in his
share
Estimated
propottionate
net cost be
recoverd
Remarks
Khasra
no
Area Khasra
no
Area
1 2 3 4 5 6 7 8 9 10 11 12 13 14
25
S.C.Form 6 [See Rule 13 (1)]
Notice for the inspection of the draft plan and filling of objection
In the Office of th Bhoomi Sanrakshan Adhikari
No…………………………………………………………..
Dated……………………………………………………
WHEREAS the draft Soil Conservation Plan………………………………………………, in respect of village
villages…………………,block………………………….,.tahsil……………………,District……………………......,has been prepared, it is
hereby proclaimed that the aforesaid draft plan is available for inspection free of charge in the under-mentioned
places on any working day between 10 a.m and 4 p.m.
(1) Office of th Bhoomi Sanrakshan Adhikari .......................................................... or
(2) Office of the Khand Viakas Adhikari ................................................................... or
(3) Office of the Gram Sabha………………………………………………………………………
Those interested may file objection, if any. Upon the said draft plan within a period of 30 (Thirty) days
from ...............................The objections addressed to the Bhoomi Sanrakshan Adhikari may be filed in the office of any
of the following officials:
(1) Bhoomi Sanrakhsan Adhikari…………………………………..
(2) Khand Vikas Adhikari…………………………………………….
(3) Pradhan, Gram Sabha………………………………………..
Bhoomi Sarankshan Adhikari,
………………………………
S.C.Form 7 [See Rule 15 (1)]
Notice for the appearance of objectors before the Bhoomi Sanrakshan Adhikari
In the Office of the Bhoomi Sanrakshan Adhikari
No……………………………………….
Dated……………………………………
To
Sri……………………………………….S/o…………………………………….
Resident of……………………………..
Khasra numbers………………………
Village……………………,Block………………….,Tahsil…………………………….
WHEREAS you have raised objection to the draft Soil and Water Conservation
Plan ............................ ,.prepared for your village, you are hereby directed to appear personally or through your agent
(along with such documents and witnesses, as you deem necessary in support of your case) before the undersigned
on……………………………………..at (village/office)………………………….., at (time ........................ ), filing which your objection
shall be decided ex parte.
Bhoomi Sanrakshan Adhikari.
……………………………….
26
S.C.Form 7-A [See Rule 15 (1)]
Notice for the appearance of persons who are affected by the proposals submitted
by the Objectors under rule 12 (2) of the rules main under U.P.Bhoomi
Evam Jal Sanrakshan Adhiniyam,1963
In the office of the Bhoomi Sanrakshan Adhikari
No…………………………………………………………..
Dated……………………………………………………
To
Sri……………………………………….,Sonof ……………………………………………………………………………………………
Resident of……………………………..
WHEREAS, Sri……………………………………..,sonof…………………………….,resident of…………………………..
has filed an objection against the draft plan ............................. ,which affects your land, you are hereby directed to
appear personally or through your agent before the undersigned on…………………………, at village/office ....................... ,
at (time and date ................................................ ),failing which the case shall be decided ex parte.
A copy of he aforesaid objection is enclosed.
Bhoomi Sarankshan Adhikari,
………………………………
S. C. Form 7-B (See Rule 7)
[Notice for the filling objections on the revision of the Plan]
In the Office of the Director of Agriculture, U.P.
No……………………………………….
Dated……………………………………
To
Sri…………………………………………………………,Son of…………………………………….,resident of……………………………..
Village……………………,Block………………….,Tahsil…………………………….
WHEREAS the following revision has become necessary in the Soil and Water Conservation
Plan……………………………………………, prepared for your village and made final under section 10(5) on ................ ,you are
directed to file objection, if any, within a period 15 (fifteen) days from the date of this notice.
The objections addressed to the undersigned shall be received on any working day between 10 a.m. and 4
p.m. at any of the following places:
(1) Office of the Bhoomi Sanarkshan Adhikari…………………………………………
(2) Office of the Khand Vikas Adhikari…………………………………………………….
(3) Pradhan, Gram Sabha………………………………………………………………………..
Director of Agriculture..
……………………………….
27
S.C. Form 8 {See Rule 15(3)}
Statement of Objections received and the report of the Bhoomi Sanrakhan Adhikari
Date/Dates of hearing……………………..
Plan…………………. Village………………………………… Block …………………. Tahsil……………… District……………..
Serial Name of the
bjector
address and
parentage
Khasra number of
field/fields in
respect of which
objection has
been raised
Area Nature
of
objection
Likely or consequential changes required, if
the objection is sustained with details of
persons and land so affected
Report of Bhoomi Sanrakshan
Adhikari
Likely
change
Khasra no. Owner with
parentage and
address
1 2 3 4 5 6 7 8 9
28
S.C.Form 9 [See Rule 16]
Notice regarding the finalization of the plan
In the office of the Bhoomi Sanrakshan Adhikari………………….
No…………………………………………………………..
Dated……………………………………………………
It is HEREBY notified for the information of all concerned that the draft Soil Conservation Plan ................. in
respect of Village/Villages………………………….Block……………………..,Tehsil……………………….,District ............................ ,has
become final under sub-section 5/7 of section 10n of Uttar Pradesh Bhoomi Evam Jal Sanrakshan Adhiniyam,1963.
The plan referred to above is available for inspection in the following places on any working day between 10
a.m. and 4 p.m.
Office of the undersigned,…………………………………..
Office of the Block Development officer………………………...................
Office of the Gram Sabha,……………………………………………..
Bhoomi Sarankshan Adhikari,
………………………………
S.C.Form 10 (See Rule 18)
ORDER
In the Office of the Collector…………………………………………………………………………………………………………………………….
No……………………………………….
Dated……………………………………
To
Bhoomi Sarankshan Adhikari……………………………………………..
WHEREAS the underdesigned is satisfied that the temporary possession of land with Khasra numbers
……………………….,in village …………………………,block………………………………..tehsil………………………,district…………………, has
become necessary to execute the Soil and Water Conservation Plan ................................................ for reasons given
below…………………………………………………………………………………………………………………….
U.P.Bhoomi Evam Jal Sanarakshan Adhiniyam, 1963. You are hereby ordered to take possession of land (after giving
due notice to interested parties as pro vided under section 15) for a period of .................................. from the date of
taking possession.
Collector,
……………………………….
29
S.C.Form 10-A [See Rule 19]
Notice for taking temporary possession of land under section 14(1) of the
Uttar Pradesh Bhoomi Jal Sanrakshan Adhiniyam,1963
In the office of the Bhoomi Sanrakshan Adhikari……………………………………………………………………………………
No…………………………………………………………..
Dated……………………………………………………
WHEREAS the collector…………………….., vide his order no...................................................................,
.possession for…………………….years,……………………….months of land with Khasra numbers………………………….
Rakshan Adhiniyam,1963, has ordered the taking over of the temporary possession
for……………………years,…………………….months of land with khasra’ numbers ......................... in
village………………………………block…………………………….tehsil ................................................. for the purpose
of………………..
You………………………………………..Son of …………………….resident of village………….………………….
tehsil………………… are notified this day ........................... that the temporary possession of the land satisfied
above will be taken over on………………………………at .......................... by the undersigned.
Bhoomi Sarankshan Adhikari,
………………………………
-
S.C.Form 11 (See Rule 20)
Notice for preferring claims for compensation in respect of taking over temporary possession of land under section
14(1) of the Uttar Pradesh Bhoomi Evam Jal Sanrakshan Adhiniyam,1963.
In the Office of the Collector……………………………………………………………………………
No……………………………………….
Dated……………………………………
To
Sri………………………………………..son of…………………………., resident of village…………………………
Block…………………………tahsil…………………………….,District…………………………...
WHEREAS the temporary possession of land with Khasra numbers ..................... In
village…………….,block…………..,tahsil ................... has been taken by Bhoomi Sanrakshan Adhikari/Officer authorized by
him as per notice no…………………………….,dated .............................you may within 30(Thirty) days from the date of this
notice prefer your claim for compensation supported by such on any working day between 10 a.m. and
4 p.m. in his office. A date for hearing your claims shall be fixed and communicated to you, when you will also be
allowed to produce witness in support of your claims
Collector,
……………………………….
30
S.C.Form 12 [See Rule 21(1)]
Notice for the execution of the Plan
In the Office of the Bhoomi Sanrakshan Adhikari,……………………………………………………………………………………………….
No…………………………………………………………..
Dated……………………………………………………
To
Sri………………………………………,Son of………………………………………….residen of village……………………………………..
block………………………………….. tahsil………………………………….. district……………………………………..
WHEREAS the Plan………………………..under section 10(5)/(7) of the U.P.Bhoomi Evam Jal Sanrakshan
Adhiniyam,1963, has become final on ............................................. You are directed to do/desist from the following
acts:
Serial no. Khasra no. Areas of the
field
Works to be
executed
Cost &
Funding
Acts not to be
done
Last date by
which the work
should be
completed
1 2 3 4 5 6 7
If you do not comply within the period given above, the undersigned shall get the work done and recover the cost
from you as arrears of Land Revenue in such manner as is provided in Rule.............. made under the Uttar Pradesh
Bhoomi Evam Jal Sanrakhan Adhiniyam 1963
Bhoomi Sarankshan Adhikari,
………………………………
31
S.C.Form 12 [See Rule 21(2)]
Reply Form
Dated……………………………………………………
To
SIR,
Bhoomi Sarankshan Adhikari,
…………………………………………
I/We………………………………………,Son(s) of……………………………resident of village……………………………………..
block………………………………….. tahsil………………………………….. district…………………………………….. ,am/are the
beneficiary/beneficiaries in respect of the land detailed below for which Plan ................................................ has been
made final
under the
Uttar Pradesh
Bhoomi Evam
Jal
Sanrakshan
Adhiniyam,19
63.
account of reasons given
On
in column 9 above, I and/We are unable to execute works detailed in col.
8………………………………………………………………..
It is. therefore, requested that these works may be got executed on my/our behalf and cost recovered from
me/us in such manner as prescribed.
Signature of applicants.
S.C.Form 12-B (See Rule 27)
Notice for prohibiting acts prejudicial to soil and water conservation
In the Office of the Collector,……………………………..
No……………………………………….
Dated……………………………………
To
Sri………………………………………..son of………………………….,resident of village…………………………
Block…………………………tahsil…………………………….
WHEREAS I have reasons to believe that you are doing the following act/acts in a land (to be
opecified)………………………………………………………………………………..which is/are prejudicial to the interest of soil and
water conservation in (place to be specified)……………………………………………………..
You are directed to show cause under sub-section 1 of section 22 of U.P.Bhoomi Evam Jal Snarakshan
Adhiniyam, 1968, as to why orders prohibiting you from doing this act should not be passed.
Collector,
……………………………….
Serial
no.
Khasr
a no.
Areas of
the field
Works to
be
executed
Acts not
to be
done
Last date
by which
the work
should be
completed
Works
which
the
applican
t will
execute
in time
Works
which the
applicant
is unable
to execute
Reasons
for the
inability
to
execute
works
1 2 3 4 5 6 7 8 9
32
S.C. Form 13 {See Rule 25(i)}
Works Progress Register
Date of which the plan became
final…………………………….
Plan…………………, Village………………………………….,Block ............................. ,
Tahsil…………………………..,District………………………………………………
*All the works provided in the Plan (S.C.Form 3) shall be copied down. Other details shall be filled in as the work
goes on being completed, Work done by Beneficiary /Government.
*Individual works shall be recorded category-wise,e.g.levelling, bunding,etc. and totalled separately with a grand total for the Plan
as a whole,
S.C. Form 14 [See Rule 25(1)(ii)]
Block Progress of Work Register
Block………………………. Tahsil………………………………….District……………………………………………..Month…………………………………………………….
Work done by Beneficary/Government.
Seria
l no.
Name of
the work
including
survey
Name of
plan
Date on
which the
Plan
became
final
Area
benefit
ed
Quantity
of work
done
Rate Total
cost
incurred
Subsidy
admissible
Remarks
Rate Amount
1 2 3 4 5 6 7 8 9 10 11
*Only toatls of various works will be lifted from progress of work register (S.C.Form13) and recorded here. Work woll be recorded category.
Wise with totals for each category of work.
Seria
l no
Name of
the work
including
beneficia
ry
Name/Per
centage
and
address of
beneficiary
Khasra
number of
fields which
work is
constructed
or done
Area of
benefit
Specification Quantity
of work
done
Rate Total
cost
incur
red
Date
of
compl
etion
Subsidy
admissible
Rate
Amount
Remarks
Rate Amount
cross section
Length Width Height Area
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
33
S.C. Form 14 [See Rule 25(1)(ii)]
District Progress of Work Register
District………………………………………………., Month………………………………….., Quarter……………………………………………
Work done by Beneficiary Government.
Serial no. Name of
the
work
includin
g survey
Block/District Area
benefite
d
Quantity
of work
done
Rate Total
cost
incurred
Subsidy admissible Remark
s
Rate
Amount
1 2 3 4 5 6 7 8 9 10
`
S.C. Form 15 [See Rules 25(1)(iii) and 25(1)(iv)]
Report for the quarter ending………………………………………………………………….
District………………………………………………………………………………………………………
Seria
l no.
Block Target
for the
year
Area
surve
yed
Number
of Plans
made
final
Total of new work provided
Balance of previous work
Total
Work done during the
quarter
Balance left
District Name
of
work
Quantity Area Name
of
work
Quantity Area Name
of
work
Quantity Area Name
of
work
Quantity Area Name
of
work
Quantit
y
Area
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20
Previous and next
All provisions of THE UTTAR PRADESH BHOOMI EVAM JAL SANRAKSHAN NIYAMAVALI , 1963
Questions people ask
Is rule 31 of THE UTTAR PRADESH BHOOMI EVAM JAL SANRAKSHAN NIYAMAVALI , 1963 still in force?
No repeal of the UTTAR PRADESH BHOOMI EVAM JAL SANRAKSHAN NIYAMAVALI , 1963 is recorded.