Rule 37, The Maharashtra Boiler Rules, 1962: Forms of provisional orders and certificates
The Maharashtra Boiler Rules, 1962 - Rule 37
Text of rule 37
Forms of provisional orders and certificates
37. Forms of provisional orders and certificates. – Provisional orders and
certificates are prescribed in Forms V and VI, respectively, of the Regulations.
The period specified in any Provisional order or certificate shall begin on the
day on which the enabling thorough inspection or hydraulic test is made.
Where a certificate supersedes a Provisional order during the period of its
currency, the period of the certificate shall be retrospective and shall being
from the same time as that of the Provisional order.
38.Duplicate certificates. A duplicate of any certificate granted under section 7
or 8 which is at the time in force shall be granted by the Director on the
application of the owner of the boiler if the Director is satisfied that the
duplicate is required for a bonafide purpose and the fee prescribed under
Rule 45 is paid.
The Maharashtra Boiler Rules, 1962 16
38-A Fees for approval of and renewal – The fees for the approval of
following firms and renewal of its approval shall be calculated on the basis of
rates levied in accordance with the following scale, namely :-
(a) (i) for approval of firm for pipe fabrication .. Rs.1500
(ii) for renewal of approval as pipe fabrication firm.. Rs.750
(b) (i) for approval of firm as Boiler Repairer/erector.. Rs.1500
(ii) for renewal of approval as Boilers repairing firm Rs.750
(c) (i)for approval of firms for manufacture of boilers economizers Rs.7500
Pipes, tubes, pressure vessels and heat exchangers.
(ii) for renewal of firms for manufacture of boilers economizers Rs.3750
Pipes, tubes, pressure vessels and heat exchangers.
(d) (i)for approval of firms for manufacture of castings, forgings, Rs.4500
Forged-flanges and such other fittings.
(ii)for renewal of firms for manufacture of castings, forgings, Rs.2250
Forged-flanges and such other fittings.
(e) (i)for approval of firms for manufacture of plate flanges Rs.3000
(ii)for renewal of approval of firms for manufacture of plate Rs.1500
flanges
(f) (i) for approval of testing laboratory .. Rs.3000
(ii) for renewal of approval of testing laboratory .. Rs.1500
(g) (i) for approval of electrode manufacturer .. Rs.1500
(initial qualification)
(ii) for renewal of approval of electrode manufacturer .. Rs.750
Previous and next
Questions people ask
Is rule 37 of the Maharashtra Boiler Rules, 1962 still in force?
No repeal of the Maharashtra Boiler Rules, 1962 is recorded.