Rule 29, The Maharashtra Boiler Rules, 1962: Proposals for reduction of pressure
The Maharashtra Boiler Rules, 1962 - Rule 29
Text of rule 29
Proposals for reduction of pressure
29. Proposals for reduction of pressure:- When the Deputy Director decides
that a boiler in one or more of its parts is no longer fit for the pressure
approved for it, he should, without delay, report his proposals for reducing
the pressure to the Director and at the same time submit this calculations for
the wasted parts for check and approval of pressure. With regard to fitting
and wasting of shell plates the Deputy Director must bear in mind that shell
plates ordinarily are considerably stronger in the body of the plate, owing to
being unpierced, that at the seams and consequently may become reduced in
thickness to an appreciable extent in the body of the plate, i.e., elsewhere
than at the seams, and still be stronger than the seam.
Previous and next
Questions people ask
Is rule 29 of the Maharashtra Boiler Rules, 1962 still in force?
No repeal of the Maharashtra Boiler Rules, 1962 is recorded.