Form 1, The Factory rules 1962: [Form 1]
The Factory rules 1962 - Form 1
Text of form 1
[Form 1]
[Form 1]
Application to the Site Appraisal Committee
(Under Rule 3)
1. Name and address of the applicant :
2. Site Ownership Date :
2 (1). Revenue details of site such as survey No., Plot No. etc.
2 (2). Whether the site is classified as forest and if so, whether approval of the Central
Government under Section 5 of the Indian Forests Act, 1927 has been taken.
2 (3). Whether the proposed site attracts the provisions of Section 3 (2)(v) of the E.P.
Act, 1986, if so, the nature of the restrictions.
2 (4). Local authority under whose jurisdiction the site is located.
3. Site Plan :
3 (1). Site Plan with clear identification of boundaries and total area proposed to be
occupied and showing the following details nearby the proposed site :
(a) Historical monument, if any, in the vicinity.
(b) Names of neighbouring manufacturing units and human habitats, educational and
training institutions, petrol installations, storages of LPG and other hazardous
substances in the vicinity and their distances from the proposed units.
(c) Water sources (rivers, streams, canals, dams, water filtration plants, etc.) in the
vicinity.
(d) Nearest hospitals, fire-stations, civil defence stations and police stations and their
distances.
(e) High tension electrical transmission lines, pipe lines for water, oil, gas or sewerage,
railway lines, roads, stations, jetties and other similar installations.
3 (2). Details of soil conditions and depth at which hard strata obtained.
3 (3). Contour map of the area showing nearby hillocks and difference in levels.
3 (4). Plot Plan of the factory showing the entry and exit points, roads, within, water
drains etc.
4. Project Report :
(1) A summary of the salient features of the Project.
(2) Status of the organisation (Government, Semi-Government, Public or Private etc.).
(3) Maximum number of persons likely to be working in the factory.
(4) Maximum amount of power and water requirements and source of their supply.
(5) Block diagram of the buildings and installations, in the proposed supply.
(6) Details of housing colony, hospital, school and other infrastructural facilities
proposed.
5. Organisation structure of the proposed manufacturing Unit/factory :
(1) Organisation diagrams of :
- Proposed enterprise in general.
- Health, safety and environment protection departments and their linkage to
operation and technical departments.
(2) Proposed Health and Safety Policy.
(3) Area allocated for treatment of wastes and effluent.
(4) Percentage outlay on safety, health and environment protection measures.
6. Meteorological data relating to the site :
(1) Average, minimum and maximum of-
- Temperature;
- Humidity;
- Wind velocities during the previous ten years.
(2) Seasonal variations of wind direction.
(3) Highest water level reached during the floods in the area recorded so far.
(4) Lightening and scigemic data of the area.
7. Communication links :
7(1). Availability of telephone/telex/wireless and other communication facilities for
outside communication.
7(2). Internal communication facilities proposed.
8. Manufacturing Process Information :
(1) Process flow diagram.
(2) Brief write up on process and technology.
(3) Critical process parameters such pressure build-up, temperature rise and
run-away reactions.
(4) Other external effects critical to the process having safety implications, such as
ingress of moisture or water, contact with incompatible substances, sudden power
failure.
(5) Highlights of the build-in safety/pollution control devices or measures/incorporated
in the manufacturing technology.
9. Information of Hazardous Materials :
(1) Raw materials, intermediates, products and by-products and their quantities
(Enclose Material Safety Data Sheet in respect of each hazardous substance).
(2) Main and intermediate storages proposed for raw materials/
intermediates/products/by products (maximum quantities to be stored at any time).
(3) Transportation methods to be used for materials inflow and outlow, their quantities
and likely routes to be followed.
(4) Safety measures proposed for-
- handling or materials;
- internal and external transportation, and
- disposal (packing forwarding of finished products).
10. Information on Disposal/Disposal of Wastes and Pollutions :
(1) Major pollutions (Gas, liquid, Solid) their characteristics and quantities (average
and at peak loads).
(2) Quality and quantity of solid wastes generated method of their treatment and
disposal.
(3) Air, water and soil pollution problems anticipated and the proposed measures to
control the same, including treatment and disposal of effluent.
11. Process Hazards Information :
(1) Enclose a copy of the report on environmental impact assessment.
(2) Enclose a copy of the report on Risk Assessment study.
(3) Published (open or classified) reports, if any, on accident situations occupational
health hazards or similar plants elsewhere (within or outside the country).
12. Information of proposed Safety and Occupational Health Measures :
(1) Details of fire fighting facilities and minimum quantity of water. CO2 and or other
fire fighting measures needed to meet the emergencies.
(2) Details of in-house medical facilities proposed.
13. Information on Emergency Preparedness :
(1) Onsite emergency plan.
(2) Proposed arrangements, if any, for mutual aid scheme with the group of
neighbouring factories.
14. Any other relevant information.
I certify that the information furnished above is correct to the best of my knowledge
and nothing of importance has been concealed while furnishing it.
.......................................
Name and signature of the applicant.