Form FOR REPORTING ELECTRICAL ACCIDENTS, THE INDIAN ELECTRICITY RULES, 1956: FORM FOR REPORTING ELECTRICAL ACCIDENTS

THE INDIAN ELECTRICITY RULES, 1956 - Form FOR REPORTING ELECTRICAL ACCIDENTS

Text of form FOR REPORTING ELECTRICAL ACCIDENTS

FORM FOR REPORTING ELECTRICAL ACCIDENTS

FORM FOR REPORTING ELECTRICAL ACCIDENTS (See rule 44-A) 1. Subs. by GSR 425, dt. 27.4.1985. 1. Date and time of accident. 2. Place of accident (Village/Town, Tehsil/Thana, District and State). 3. System and voltage of supply, (Whether EHV/HV/LV Line, sub- station/generating station/consumer’s installations/service lines/other installations). 4. Designation of the Officer-in-charge of the supplier in whose jurisdiction the accident occurred. 5. Name of owner/user of energy in whose premises the accident occurred. 6. Details of victim(s): - (a) Human: Sl. No. Name Father’s Sex of victim Full Postal Address Approximate age Fatal/non- fatal 1 2 3 4 5 6 7 (b) Animal Sl. No. Discription Number(s) Name(s) of Address(es) of owner(s) Fatal/non-fatal owner(s) 7. In case the victim(s) is/are employee(s) of supplier:- (a) Designation of such person(s). (b) Brief description of the job undertaken, if any (c) Whether such person/persons was/were allowed to work on the job. 8. In case the victim(s) is/are employees) of a licensed contractor:- (a) Did the victim(s) possess any electric workman’s permit(s), supervisor’s certificate of competency issued under rule 45? If yes give number and date of issue and the name of issuing authority. (b) Name and designation of the person who assigned the duties of the victim(s). 9. In case of accident in the supplier’s system, was the permit to work (PTW) taken? 10. (a) Describe fully the nature and extent of injuries, e.g. fatal/disablement (permanent or temporary) of any portion of the body or bums or other injuries. (b) In case of fatal accident, was the post mortem performed? 11. Detailed causes leading to the accident. (To be given in a separate sheet annexed to this form). 12. Action taken regarding first-aid, medical attendance etc. immediately after the occurrence of the accident (give details). 13. Whether the District Magistrate and Police Station concerned have been notified of the accident (if so, give details). 14. Steps taken to preserve the evidence in connection with the accident to extent possible. 15. Name and designations of the person(s) assisting, supervising the person(s) killed or injured. 16. What safety equipments were given to and used by the person(s) who met with this accident (e.g. rubber gloves, rubber mats, safety belts and ladders etc.)? 17. Whether isolating switches and other sectionalising devices were employed to deaden the sections for working on the same? Whether working section was earthed at the site of work? 18. Whether the work on the live lines was undertaken by authorised person(s)? If so, the name and the designation of such person(s) may be given. 19. Whether artificial resuscitation treatment was given to the person(s) who met with the electric accident? If yes, how long was it continued before its abandonment? 20. Names and designations of persons present at and witnessed the accident. 21. Any other information remarks. Place:…………….. Time:…………….. Date:…………….. Signature …………….. Name ……………… Designation……………… Address of the person reporting……. 1[ANNEXURE XIV] [See rate 3(2A)] GUIDELINES FOR PROVIDING TRAINING AS REQUIRED UNDER RULE 3(2A) 1. Ins. GSR 461, dt. 9.5.1981 . 1. The owner of every generating station of capacity of 100MW and above shall arrange for training of personnel, engaged in the operation and maintenance of his generating station, in the manner specified below: - (1) (a) The training may be arranged in his own institute or any other institute established for this purpose. (b) Any institute where such training is arranged shall have been recognised by the Central Electricity Authority. (2) There shall be separate training courses for the persons to be engaged in operation and maintenance of thermal power stations and hydro power stations together with associated sub-stations. In respect of thermal stations, separate course may be arranged for the operating and supervisory staff and other skilled persons who are to assist them. (3) Refresher courses shall be arranged periodically for the persons who have already undergone training under para (2) above and those who have already sufficient experience in the operation and maintenance of a generating station and are engaged in its operation and maintenance under clause (b) of sub-rule 2(A) of rule 3 to familiarise with modern practices of operation and maintenance. 2. Duration and content of training shall be as specified below: - (1) Thermal Power Stations- The duration of the training courses for the operating supervisory staff (both electrical and mechanical) shall not be less than 12 months. This shall include 186 hours of lectures as specified in Appendix-I to this Annexure followed by specialised lectures as specified in Appendix-II to this Annexure for the mechanical and electrical fields. The lectures may be arranged during the half day and the other half day shall be spent on observation by the trainees in the power stations to get familiarised with different sections of the power station- After the lecture course is completed the trainees should be taken on visits to a few modern power stations and factories manufacturing turbines, generators, switchgear, instrumentation and auxiliary equipments. The remaining period will be spent on in-plant training where the candidates will be given an opportunity to operate or maintain the machinery by themselves under close supervision of the regular operating staff as well as the training supervisors. Arrangements shall be made for familiarising the trainees with the operation of power stations, through simulator facilities. (2) The duration of the training course for the skilled person to assist the operators and supervisory staff in a thermal power stations shall not be less than nine months. This shall include 82 hours of lectures as specified in Appendix-Ill to this Annexure followed by specialised lectures as specified in Appendix IV. The lectures may be arranged during the half day and the other half day being spent on observation by the trainees in the power stations so that they get familiarized with different sections of the power station. After the later course is completed; the trainee shall be taken on visits to study a few modern power stations and factories manufacturing turbines, Generators, switch gear, instrumentation and auxiliary equipments. The remaining period will be spent on in-plant training under close supervision. (3) The duration of the training course for the operation and supervisory staff to work in hydro power stations shall not be less than nine months. This shall include 124 hours of lectures as specified in Appendix-V to this Annexure. The procedure for familiarization visits and in-plant training shall be similar to that which has been specified in respect of thermal power stations. (4) Those who are expected to be engaged in the operation and maintenance of the sub-station associated with the generating station shall be given a training of duration of not less than six months as specified in Appendix-VI to this Annexure. This shall be followed by visits and in-plant training. (5) The duration and contents of the refresher course shall be determined jointly by the owner of the generating station and the training institute. 3. Qualifications The minimum qualification for the operating and supervisory staff shall preferably be a high second class diploma in mechanical or electrical engineering or a degree from a recognized institute or university The minimum qualifications for the persons to assist the operating and supervisory staff shall be certificate from a recognised Industrial Training Institute in appropriate trade. 4. Creation of the Institute (1) Every training institute shall be established adjacent to a power station so as to facilitate familiarization and provide in-plant training. (2) The training institute shall preferably be of residential type and shall have a full me Principal and adequate number of teaching staff. The training institute shall have facilities for demonstrations by models, simulators and for exhibition of slides and movies. (3) The institute shall have a systematised scheme of evaluation and assessment of performance of the candidates by conducting oral and written tests at adequate intervals. The assessment forms shall be specified in Appendix-VII to this Annexure. (4) The number of trainees in any one batch shall not normally exceed 25 so as to maintain a good-teacher-trainees relationship. (5) The institute shall have facilities to arrange refresher courses for those personnel have already experience in the operation and maintenance of a generating station. The staff of the training institute shall be properly qualified and preferably undergone a specialised training course in the art of imparting training.

Previous and next

All provisions of THE INDIAN ELECTRICITY RULES, 1956

Questions people ask

Is form FOR REPORTING ELECTRICAL ACCIDENTS of THE INDIAN ELECTRICITY RULES, 1956 still in force?

No repeal of the INDIAN ELECTRICITY RULES, 1956 is recorded.