Annexure V, THE INDIAN ELECTRICITY RULES, 1956: ANNEXURE V

THE INDIAN ELECTRICITY RULES, 1956 - Annexure V

Text of annexure V

ANNEXURE V

ANNEXURE V MODEL FORM OF ACCOUNTS [SEE SECTION 11 OF INDIAN ELECTRICITY ACT, 1910 AND RULES 26(3)] ELECTRIC LICENCE, 19...... DATE OF COMMENCEMENT OF LICENCE Name of Undertaking Year of Operation NO. I - STATEMENT OF SHARE AND LOAN CAPITAL FOR THE YEAR ENDED 31ST MARCH, 19..... (APPLICABLE TO LICENSEES OTHER THAN LOCAL AUTHORITY LICENSEES) Description of Capital Balance at the beginning of the year Receipt during the year Redeemed during the year Balance at the end of the year Remarks 1 2 3 4 5 6 A. Share Capital Authorised Capital .......... Ordinary Shares of………….. Rs each. .......... % Preference shares of Rs…….. each Issued Capital .......... Ordinary Shares of Rs……………… each .......... % Preference shares of Rs…………each Subscribed capital .......... Ordinary Shares of Rs…………each .......... % Preference shares of Rs……….each Called up capital: .......... Ordinary Shares of Rs……….each .......... % Preference shares of Rs……………each Less calls in arrears Paid-up Capital .......... Ordinary Shares of Rs………..each .......... % Preference shares of Rs……….each TOTAL PAID TO CAPITAL B. Capital Reserve Share Forfeiture a/c Share Premium a/c Other items (to be specified) TOTAL CAPITAL RESERVE C. Loan Capital-Loans from State Electricity Boards per cent debentures of Rs……………… each. Other Loans- (i) Secured (ii) Unsecured TOTAL LOANS CAPITAL D. Other Capital Contribution from consumer including local authorities for service-lines and public lighting after the commencement of the Electricity (Supply) Act, 1948. TOTAL OTHER CAPITAL TOTAL CAPITAL RAISED AND APPROPRIATED (A+B+C+D) Note: Capital invested by proprietor, partnership, co-operative society, company etc. licensee which is interest bearing should be shown under ‘C-Unsecured loans and advances’ and that which is interest-free should be shown under ‘D- Special items (to be specified)’. ELECTRIC LICENCE, 19........ DATE OF COMMENCEMENT OF LICENCE Name of Local Authority Year of Operation NO. I (AL)- STATEMENT OF LOANS RAISED AND REDEEMED FOR THE YEAR ENDED 31ST MARCH, 19.. (APPLICABLE TO LOCAL AUTHORITY LICENSEES) Description of loans raised from time to time Amount sanctioned Rate % Period of Payment Amount of Annual instalment From To 1 2 3 4 5 6 Amount of loan redeemed upto the beginning of the year Amount of loan redeemed during the year Total loan redeemed upto the end of the year Balance of loan outstanding at the end of the year Remarks 7 8 9 10 11 Total loans raised for the electrification scheme…………………………… NO. I (A2) -STATEMENT OF LOAN AND OTHER CAPITAL FOR THE YEAR ENDED 31ST MARCH, 19....... Particulars Balance at the beginning of the year Received during the year Redeemed during the year Balance at the end of the year Remarks 1 2 3 4 5 6 A. Capital Raised Amount of loans outstanding [as per col. 10 of statement I-A(I)] Grants and advances made from the general funds of the local authority Grants- in-aid from Government TOTAL CAPITAL RAISED B. Capital Reserve Loan redemption account [as per col. 9 of statement IA(l)] Other items (to be specified) TOTAL CAPITAL RESERVE C. Other Capital Consumer’s contributions for service lines after the commencement of the Electricity (Supply) Act, 1948. Special items (to be specified) TOTAL OTHER CAPITAL TOTAL CAPITAL RAISED AND APPROPRIATED (A+B+C) NO.II - STATEMENT OF CAPITAL EXPENDITURE FOR THE YEAR ENDED 31ST MARCH, 19........ Particulars Balance at the beginning of the year Additions during the year Requirements during the year vide col. 3 Statement II-A Balance at he end of the year Remarks A. Intangible Assets: 1. Preliminary & Promotional expenses 2. Cost of Licence 3. Other expenses e.g., expenses incidental to conversion from DC to AC change of frequency etc. TOTAL INTANGIBLE ASSETS B. Hydraulic Power Plant: 1. Land & Rights 2. Buildings and civil engineering works containing generating plant and equipment 3. Hydraulic works forming part of a hydroelectric system including (i) Dams, spillways, weirs, canals, reinforced concrete flumes and cyphons, (ii) reinforced concrete pipe lines and search tanks, steel pipe lines, sluice gates, steel surge tanks, hydraulic control valves and other hydraulic works 4. Water wheels, Generators and ancillary equipment including plant foundations 5. Switchgear including cable connections 6. Miscellaneous power plant equipment 7. Other civil works (to be specified) TOTAL HYDRAULIC POWER PLANT C. Steam Power Plant: 1. Land & Rights 2. Buildings and civil engineering works containing generating plant & equipment 3. Boiler plant and equipment including plant foundations 4. Engines, Turbines, generators and ancillary equipment including plant foundations 5. Water cooling system comprising cooling towers and circulating water systems 6. Switchgear including cable connections 7. Miscellaneous power plant and equipment 8. Other civil works (to be specified) TOTAL STEAM POWER PLANT D. Internal Combustion Power Plant: 1. Land and Rights 2. Building and civil engineering works containing generating plant and equipment 3. Engines, generators, and ancillary equipment including plant foundations 4. Water cooling system comprising cooling towers and circulating water systems 5. Switchgear including cable connections 6. Miscellaneous power plant and equipment 7. Other civil works (to be specified) TOTAL INTERNAL COMBUSTION POWER PLANT E. Transmission Plant (High or Extra-High Voltage): 1. Land and Rights 2. Buildings and structures including civil engineering works containing transmission plant and equipment 3. Sub-station transformers, transformer kiosks, sub-section equipment and other fixed apparatus including plant foundations:- (i) Transformers, including foundations having rating of ‘100 kilovolt amperes and over (ii) Others 4. Switchgear including cable connections 5. Towers, poles, fixures, overhead conductors and devices:- (i) Lines on steel or reinforced concrete supports operating at nominal voltages higher than 13.2 kilovolts (ii) Other lines on steel or reinforced concrete supports (iii) Lines on wood supports 6. (i) Underground cables and devices including joint boxes and disconnecting boxes (ii) Cable duct system 7. Miscellaneous equipments (to be specified) TOTAL TRANSMISSION PLANT F. Distribution Plant-High Voltage: 1. Land & Rights 2. Buildings and structures including civil engineering works containing distribution plant and equipment 3. Sub-station transformers, transformer kiosks, sub-station equipment and other fixed apparatus including plant foundations- (i) Transformers including foundations having a rating of 100 kilovolt amperes and over (ii) Others 4. Switchgear including cable connections 5. Towers, Poles, Fixtures, Overhead conductors and devices: (i) Lines on steel or reinforced concrete supports operating at nominal voltages, higher than 13.2 Kilo Volts (ii) Other lines on steel or reinforced concrete supports (iii) Lines on wood supports 6. (i) Underground cables and devices including joint boxes and disconnecting boxes (ii) Cable duct system 7. Service lines 8. Metering equipment 9. Miscellaneous equipments (to be specified): TOTAL DISTRIBUTION PLANT (HV) G. Distribution Plant-Medium and low voltage: 1. Land & Rights 2. Buildings and structures including civil engineering works containing distribution plant and equipment 3. Sub-station transformers, transformer kiosks, sub-station equipment and other fixed apparatus including plant foundations (i) Transformers including foundations having a rating of 100 kilo volt amperes and over (ii) Others 4. Switchgear including cable connections 5. Towers, Poles, Fixtures, Overhead conductors and devices: (i) Lines on steel or reinforced concrete supports (ii) Lines on wood supports 6. (i) Underground cables and devices including joint boxes and disconnecting boxes (ii) Cable duct system 7. Service lines 8. Metering equipment 9. Miscellaneous equipments (to be specified) TOTAL DISTRIBUTION (M&LV) H. Public Lighting: Street and Signal lighting system 1. General Equipment: (Not allocated to other sub-heads) 1. Land and Rights 2. Buildings and structures 3. Office furniture and equipment 4. Transportation equipment 5. Laboratory and meter testing equipment 6. Workshop plant and equipment 7. Tools and work equipment 8. Communication equipment 9. Miscellaneous equipment TOTAL GENERAL EQUIPMENT TOTAL CAPITAL ASSETS IN USE Note- (1) Capital expenditure on items F7 and G7 should include contributions made by consumers towards service line charges, (2) Where it is not possible to give segregation of capital expenditure in respect of certain items and where high, medium or low voltage distribution lines are carried on same supports, the combined figures for such items may be given. (3) Retirements during the year referred to in Col. 4 in respect of: (i) intangible assets relate to amounts written off during the year, (ii) tangible assets relate to the original cost of assets transferred to the special account under paragraph VII of the with Schedule to the Electricity (Supply) Act, 1948. NO. II-A - STATEMENT SHOWING THE WRITTEN DOWN COST OF FIXED ASSETS RETIRED ON ACCOUNT OF OBSOLESCENCE INADEQUACY, SUPERFLUITY, ETC. Particulars of the assets Written down cost of assets at the beginning of he year Written down cost of assets retired during the year vide Col. 4 St. II less Col. 8 Statement V Written down cost of assets sold during the year Amount realised during the year Excess of sale proceeds over written down cost transferred to contingencies Reserve Account vide Col. 4 of Statement VI Amount written off during the year vide col. 6 statement VI Balance of written down cost at the end of the year 1 2 3 4 5 6 7 8 NO. III STATEMENT OF OPERATING REVENUES FOR THE YEAR ENDED 31ST MARCH, 19......... Particulars of revenue Corresponding amount for the previous year of account Amount for the year of account Remarks 1 2 3 4 A. Net Revenue by sale of electricity for cash & credit: 1. Domestic or residential (a) Lights and Fans (b) Heating and small power 2. Commercial (a) Lights and Fans (b) Heating and small power 3. Industrial (a) Low and Medium voltage (b) High voltage 4. Public Lighting 5. Public Water works and Sewage pumping 6. Irrigation 7. Traction 8. Supplies in bulk to distributing licences TOTAL REVENUES BY SALE OF ELECTRICITY B. Miscellaneous Revenue from Consumers: 1. Rentals from (a) Meters (b) Electric motors, fittings, appliances & other apparatus hired to consumers 2. Service connection fees 3. Public Lighting Maintenance. TOTAL MISCELLANEOUS REVENUE FROM CONSUMERS C. Other Revenues: 1. Sale of Stores 2. Repairs of lamps and other apparatus 3. Commission for the collection of electricity duty 4. Other miscellaneous items (to be specified) TOTAL OTHER REVENUES TOTAL OPERATING REVENUES Deduct- Total Operating expenses as per St. IV Net surplus or deficit carried to the Net Revenue and Appropriations account-St. X NO. IV - STATEMENT OF OPERATING EXPENSES FOR THE YEAR ENDED 31ST MARCH, 19.... Particulars of expenses Corresponding amount for the previous year of account Amount for the year of account Remarks 1 2 3 4 A. HYDRAULIC POWER GENERATION (a) Operation 1. Water for power 2. Lubricants and other consumable stores 3. Station supplies and miscellaneous expenses 4. Proportion of salaries, allowances gratuities, etc. of Engineers, Superintendents, Officers, Supervisory and the staff 5. Wages and gratuities to labour 6. Contribution to Provident Fund, staff pension & apprentice & other training schemes 7. Bonus paid to the employees of the undertaking TOTAL OPERATION (b) Maintenance 1. Salaries for Supervisory staff 2. Buildings and civil engineering works containing generating plant and equipment 3. Hydraulic works forming part of a hydro electric system, including- (i) Dams, spillways, weirs, canals reinforced concrete flumes and syphons (ii) Reinforced concrete pipelines and surge tanks, steel pipelines, sluice gates, steel surge tanks, hydraulic control valves and other hydraulic works 4. Water wheels, generators and ancillary equipment including plant foundations 5. Switchgear including cable connections 6. Miscellaneous power plant and equipment 7. Other Civil works (to be specified) 8. Contributions to Provident Fund, staff pension and apprentice and other training schemes 9. Bonus paid to the employees of the undertaking TOTAL MAINTENANCE (c) Depreciation Depreciation to Hydraulic Power Generating Plant and Equipment (From Statement V) TOTAL HYDRAULIC POWER GENERATION EXPENSES B. STEAM POWER GENERATION (a) Operation 1. Fuel (excluding sale proceeds of steam ashes, etc.) 2. Lubricants and other consumable stores 3. Water (if purchased separately) 4. Station supplies and miscellaneous expenses 5. Proportion of salaries, allowances gratuities, etc. of Engineers, Superintendents, Officers, Supervisory and the staff 6. Wages and gratuities to labour 7. Contribution to Provident Fund, staff pension & apprentice & other training schemes 8. Bonus paid to the employees of the undertaking TOTAL OPERATION (b) Maintenance 1. Salaries for Supervisory staff 2. Building and civil engineering works containing generating plant and equipment 3. Boiler plant and equipment including plant foundations 4. Engines, turbines, generators and ancillary equipment including plant foundations 5. Water cooling system comprising cooling towers and circulating water systems 6. Switchgear including cable connections 7. Miscellaneous power plant and equipment 8. Other Civil works (to be specified) 9. Contributions to Provident Fund, staff pension and apprentice and other training schemes 10. Bonus paid to the employees of the undertaking TOTAL MAINTENANCE (c) Depreciation Depreciation on Steam Power Generating Plant and equipment (from Statement V) TOTAL STEAM POWER GENERATION EXPENSES C. INTERNAL COMBUSTION POWER GENERATION: (a) Operation 1. Fuel 2. Lubricants and other consumble stores 3. Water (if purchased separately) 4. Station supplies and miscellaneous expenses 5. Proportion of salaries, allowances, gratuities etc. of Engineers, Superintendents, Officers, supervisory and other staff 6. Wages and gratuities to labour 7. Contributions to Provident Fund, Staff pension and apprentice and other training schemes 8. Bonus paid to the employees of the undertaking TOTAL OPERATION (b)Maintenance 1. Salaries for supervisory staff. 2. Buildings and civil engineering works containing generating plant and equipment 3. Engines, generators and ancillary equipment including plant foundations 4. Water cooling system comprising cooling towers and circulating water system 5. Switchgear including cable connections 6. Miscellaneous power plant and equipment 7. Other civil works (to be specified) 8. Contributions to provident fund, staff pension and apprentice and other training schemes 9. Bonus paid to the employees of the undertaking TOTAL MAINTENANCE (c) Depreciation: Depreciation on Internal Combustion Power Generating Plant and Equipment (from Statement V) TOTAL INTERNAL COMBUSTION POWER GENERATION EXPENSES D. POWER PURCHASED: TOTAL PRODUCTION EXPENSES (A+B+C+D) E. TRANSMISSION (HIGH OR EXTRA-HIGH VOLTAGE): (a) Operation and Maintenance: 1. Proportion of salaries, allowances, gratuities, etc. of engineers, superintendents officers, supervisory and other staff 2. Wages and gratuities to sub-station labour 3. Wages and gratuities to labour on lines 4. Buildings and structures including civil engineering works containing transmission plant and equipment 5. Sub-station transformers, transformer kiosks, sub-station equipment and other fixed apparatus including plant foundations (i) Transformers including foundations having rating of 100 kilovolt amperes and over (ii) Others 6. Switchgear including cable connections 7. Towers, poles, fixtures, overhead conductors and devices (i) Lines on steel or reinforced concrete supports operating at nominal voltages higher than 13.2 kilovolts (ii) Other lines on steel or reinforced concrete supports (iii) Lines on wood supports. 8. (i) Underground cables and devices including joint boxes and disconnecting boxes (ii) Cable duct system 9. Contribution to Provident Fund or Staff Pension (b) Depreciation on Transmission Plant and equipment (from Statement V). TOTAL TRANSMISSION EXPENSES F. DISTRIBUTION (HIGH VOLTAGE): (a) Operation and Maintenance: 1. Proportion of salaries, allowances, gratuities, etc., of engineers, superintendents, officers, supervisory and other staff 2. Wages and gratuities of sub-station labour 3. Wages and gratuities to labour for mains 4. Buildings and structures including civil engineering works containing distribution plant and equipment 5. Sub-station transformers, transformer kiosks, sub-station equipment and other fixed apparatus including plant foundations (i) Transformers including foundations having a rating of 100 Kilovolt amperes and over (ii) Others 6. Switchgear including cable connections 7. Towers, poles, fixtures, overhead conductors and devices (i) Lines on steel or reinforced concrete supports operating at nominal voltages higher than 13.2 kilovolts (ii) Other lines on steel or reinforced concrete supports (iii) Lines on wood supports 8. (i) Underground cables and devices including joint boxes and disconnection boxes (ii) Cable duct system 9. Service Lines 10. Metering Equipment 11. Contributions to Provident Fund or Staff Pension. (b) Depreciation on Distribution Plant and equipment (from Statement V) TOTAL DISTRIBUTION (H.V) EXPENSES G. DISTRIBUTION MEDIUM AND LOW VOLTAGE: (a) Operation and Maintenance: 1. Proportion of salaries, allowances, gratuities, etc. of engineers, superintendents, officers, supervisory and other staff 2. Wage and Gratuities to labour 3. Buildings and structures including civil engineering works containing transmission plant and equipment 4. Sub-station transformers, transformer kiosks, sub-station equipment and other fixed apparatus including plant foundations (i) Transformers including foundations having rating of 100 kilovolt amperes and over (ii) Others 5. Switchgear including cable connections 6. Towers, poles, fixtures, overhead conductors and devices (i) Lines on steel or reinforced concrete supports (ii) Lines and wood supports 7. (i) Underground cables and devices including joint boxes and disconnecting boxes (ii) Cable duct system 8. Service lines 9. Metering equipment 10.Contributions to Provident Fund or staff person (b) Depreciation on Distribution Plant and equipment (from Statement V) TOTAL DISTRIBUTION (M.&L.V) EXPENSES H. PUBLIC LIGHTING: (a) Operation and maintenance 1. Operation and maintenance 2. Renewal of lamps (b) Depreciation PL. System and Equipment (from Statement V) TOTAL PUBLIC LIGHTING EXPENSES CONSUMERS’ SERVICING, METER READING, BILLING,COLLECTING, ACCOUNTING, SALES PROMOTING, ETC. 1. Proportion of salaries, allowances, gratuities, etc. of engineers, secretary, accountants, other officers etc. 2. Meter reading and inspection 3. Billing, collecting and accounting 4. Exhibition, demonstrations and advertisements 5. Merchandising, servicing and contract work 6. Miscellaneous expenses 7. Contributions to Provident Fund or Staff Pension 8. Depreciation on general assets and equipment, which are not allocated to other sub-heads (from Statement V) TOTAL CONSUMERS’ SERVICING, METER READING, ETC. EXPENSES K. GENERAL ESTABLISHMENT CHARGES: 1. Proportion of salaries, allowances, gratuities, etc. of general officers, executive, etc. 2. Salaries, wages, gratuities, etc. of general office staff 3. Contribution to local authority administration for supervision (applicable to local authority licensee only) 4. Travelling and other expenses of officers and staff 5. Rents and Way leaves 6. Rates and Taxes 7. General Office expenses and showroom maintenance and supplies 8. Repairs to office buildings, staff quarters, furniture and fixtures, office equipment etc., and maintenance 9. Depreciation on office and general buildings, furniture, etc. not allocated to other sub-heads (from Statement V) 10. Audit Services: (a) Auditor of company (b) Auditor appointed under the provisions of the Act 11. Legal services 12. Insurance expenses. 13. Contributions to Provident Fund, staff pension and apprentice and other training schemes 14. Bonus paid to the employees of the undertaking. TOTAL GENERAL ESTABLISHMENT CHARGES L. OTHER CHARGES: 1. Interest paid and accrued on: (a) Loans advanced by the State Electricity Board (b) Depreciation fund (c) Consumer’s Security deposit 2. Bad debts written off 3. Other items (to be specified) TOTAL OTHER CHARGES M. MANAGEMENT EXPENSES 1. Director’s fees and expenses and debenture Trustees’ fees; if any 2. Other Expenses TOTAL MANAGEMENT EXPENSES TOTAL OPERATING EXPENSES TRANSFERRED TO STATEMENT-III Note- (1) No appointment of expenses under sub-head ‘M’ be made to any of the salary items under A(a), 4, B-(a)5, C-(a)5, E-8(a)l, F(a)l, G(a)l, J-1 and K-1, which shall include the proportion of salaries and allowances of persons solely employed for the purpose of the undertaking and of the engineering staff employed by the Managing Agents under the provision of sub-para (3) of Para XIII of the Sixth Schedule to the E(S) Act, 1948. (2) Managing agent in this context refers to the managerial personnel as given in the explanation under Paragraph XIII of the Sixth Schedule to the Electricity (Supply) Act, 1948. NO. V - STATEMENT FOR PROVISION FOR DEPRECIATION FOR THE YEAR ENDED 31ST MARCH, 19 Balance of accured depreciation brought forward Balance of arrear of depreciation brought forward Additions during the year With- drawals during the year vide col.3 Balance of accrued depreciation carried over to next Balance of arrears of depreciation carried over to next from last account from last account statement II-A account account Interest @ 4% per annum on the balance at he beginning of the year under para VI(I) of the Sixth Schedule to the E(S) Act 1948 Depreciation provide for the year Arrears of deprecition written off during the year Total 2 3 4 5 6 7 8 9 10 aulic Power Plant: m Power-Plant: nal Combustion Plant: smission Plants High or Extra-High Voltage: ibution Plant High Voltage: ibution Plant Medium and Low Voltage: ic Lighting: eral Equipment: ………………………. Note- 1. Withdrawals from the depreciation account are permissible only to the extent of past provisions made in respect of asset withdrawn from use and transferred during the year to the special account under Para VIII of the sixth Schedule to the E(S) Act, 1948. 2. A sum of Rs...........................................................from the accruals in the depreciation account has been invested in securities in persuance of the provisions of paragraphs XVIII (i) (d) of the Sixth Schedule to the E (S) Act, 1948. NO. VI - STATEMENT OF CONTINGENCIES RESERVE FOR THE YEAR ENDED 31ST MARCH, 19 Particulars Balance at he beginning of the year Additions during the year Withdrawls during the year Balance at he end of the year Remarks Appropriations during the year Additions under paragraph IX of the sixth schedule to the E(S) Act, 1948, vide Col. 6 of statement II-A Total Amount written off under sub-para (2) of para VII of the Sixth Schedule to the E(s) Act, 1948 vide Col. 7 of Statement II-A Expenses and/or compensation under para V, sixth schedule of the E(S) Act, 1948 Total 1 2 3 4 5 6 7 8 9 10 Note- A sum of Rs.........................................................from the balance of the Contingencies Reserve has been invested under the provisions of paragraph IV(2) of the Sixth Schedule to the Electricity (Supply) Act, 1948. NO. VII - STATEMENT OF DEVELOPMENT RESERVE ACCOUNT FOR THE YEAR ENDED 31ST MARCH, 19……… ce the ning the Development rebate for the year permissible under the Indian Development reserve permissible for the year under the para VA(1) Actual appropriation made under the proviso to para VA (1) of the Unabsorbed development reserve to be appropriated in future years under paragraph VA (2) of the sixth schedule to the Electricity (Supply) Act, 1948 Balance at he end of the year Col. (1+2+8) Re Income Tax Act, 1961 (As per details attached) of the sixth schedule to the E(S) Act, 1948 being the amount of relief on Income Tax & super Tax on the amount of development rebate sixth schedule to the E(S) Act, 1948 Balance at he beginning of the year Current years balance Col. (3- ) Total Instalment appropriated during the year Balance awaited adjustment Col. (7-8) 2 3 4 5 6 7 8 9 10 NO. VIII - STATEMENT OF TARIFFS AND DIVIDENDS CONTROL RESERVE ACCOUNT FOR THE YEAR ENDED 31ST MARCH, 19.... Particulars Balance at the beginning of the year Distributed to consumers during the year under paragraph II(I) of the sixth schedule to the E(S) Act, 1948 Appropriated during the year Balance at the end of the year Remarks 1 2 3 4 5 6 NO. IX STATEMENT CONSUMER’S REBATE RESERVE ACCOUNT FOR THE YEAR ENDED 31ST MARCH, 19.... Particulars Balance at the beginning of the year Distributed to consumers during the year under paragraph II(I) of the sixth schedule to the E(S) Act, 1948 Appropriated during the year Balance at the end of the year Remarks 1 2 3 4 5 6 NO. X - STATEMENT OF SPECIAL APPROPRIATIONS PERMITTED BY STATE GOVERNMENT FOR THE YEAR ENDED 31ST MARCH, 19.... Particulars giving reference to the sanction of the State Government permitting the appropriation Balance at the beginning of the year Additions by may of appropriation during the year Transfer by way of re- appropriation during the year (details to be given in the remarks column) Balance at the end of the year Remarks 1 2 3 4 5 6 NO. XI - STATEMENT OF NET REVENUE AND APPROPRIATIONS ACCOUNT FOR THE YEAR ENDED 31ST MARCH, 19.... Corresponding figures of previous year Particulars Amount Corresponding figures of previous year Particulars Amount 1 2 3 4 5 6 1. To Balance of loss brought forward from last account. 2. To net operating deficit as per Statement III. 3. To appropriations (applicable to local Authority Licensee only):- (a) Interest on loan capital (b) Instalment of redemption of loan capital, as per (col 8 of St. 1.(A) (1). (c) General Rates. 1. By Balance of profit brought for- ward from last account. 2. By net operating surplus as per Statement-III. 3. By interest on securities investments. 4. By other receipts (non-operating rents) outgoing not other provided for transfer fee etc. specified.) 5. Adjustment in respect of excess provision of income-tax. 4. (a) Provision for taxes on Income and profit for the year Rs…………. 6. By Balance of loss carried over. (b) Additional short provision in respect of year 19... . ............ 5. To instalment of write-down in respect of intangible assets. 6. To instalment of contribution towards arrears of Depreciation as per Statement V-Column 6. 7. To contribution towards Contingencies Reserve as per Statement VI-Column 3. 8. To appropriation towards development Reserve as per Statement VII- Column 4 or 8 or 4+8. 9. To appropriation to Tariffs and Dividends Controls Reserve, as per Statement VIII-Column 3. 10. To appropriation to Consumers’ Rebate Reserve, as per Statement IX column 4. 11. To other special appropriation permitted No by the State Government, as per Statement X- Column 3. 12. To appropriation towards interest paid and accrued and dividends paid and payable:- (a) Interest on debentures. (b) Interest on loans borrowed from Organisation or Institution approved by the State Government. (c) Interest on other secured loans. (d) Interest on unsecured loans, advances, deposits, bank over-drafts, etc (e) Dividends on preference share capital. (f) Dividends on ordinary share capital. To balance of profit carried over. NO. XII - GENERAL BALANCE SHEET AS ON 31ST MARCH, 19 Corresponding figures of previous year Particulars Amount Corresponding figures of previous year Particulars Amount 1 2 3 4 5 6 1. Capital raised and appropriated vide Statement-I or I-A Reserve and Surplus. 1. Capital amount expended on works in use-Statement-II. Less-Accumulated provisions for depreciation-Statement V Net Block. 2. Non-statutory Reserve. 2. Balance of written down cost of obsolete, inadequate etc. assets- Statement IIA. Current Assets. (a) 3. Contingencies Reserve Fund as per Statement No. VI. 3. Capital Works in progress. 4. Development Reserve as per Statement VII. 4. Stores and materials in hand- (b) Fuel-Coal and/or etc. at cost. (c) General stores at or below cost. Note: - Contingent liabilities and outstanding commitments, if any, to be stated on the face of this balance sheet. 5. Tariffs & Dividends Control Reserve as per Statement VIII. 5. Debtors for amounts paid in advance on account of contracts. 6. Consumers’ Rebate Reserve as per Statement IX. 6. Sundry debtors for electricity supplied. 7. Special appropriations (as permitted by the State Government) reserve as per Statement X. 7. Other debtors (as per the Schedule attached). 8. Balance of Net Revenue and Appropriations Account as per Statement XI. Current Liabilities and Provisions. 8. Accounts receivable (to be specified). 9. Balances due on construction of Plant, Machinery, etc. 9. Investments in statutory securities of cost. (a) Contingencies Reserve Fund Investment. (Market value on closing date). (b) Depreciation Reserve Fund Investment. (Market value on closing date). (c) Other investments. (Market value on closing date). 10. Creditors of open accounts (as per schedule attached). 10. Special investments. (a) In respect of taxation. (b) Others (to be specified). 11. Consumers’ Security deposits: (i) In Cash Rs............................ (ii) In Securities Rs............................ 11. Balance at Bank: (a) Deposit account. (b) Current account and at call. 12. Accounts payable (to be specified). 12. Cash in hand Debits Balances. 13. Temporary accommodations, Bank overdrafts and other finances. 13. Net Revenue and Appropriations Account balance at debit thereof Statement XI. 14. Other current and accrued liabilities (to be specified). 14. Deferred payments. ANNUXURE VI (See Rule 27) MODEL FORM OF DRAFF CONDITIONS OF SUPPLY Name of undertaking............................................................................. PART - I 1. General- (a) “The Act” means the Indian Electricity Act, 1910 as in force from time to time. (b) “Licensee” means................ (c) “Consumer” means any person who is supplied with energy by the incensee or whose premises are for the time being connected for the purpose of supply of energy with the works of the licensee. (d) “Date of presentation” means the second day after the date of any bill rendered by the licensee. 2. Application and agreement for supply- (a) Application and agreement for supply of electrical energy shall be made in the form attached hereto (Appendix ‘A:) obtainable free of cost at the local office of the licensee. The application shall be signed by the owner or occupier of the premises for which supply is required. Any assistance and information required for filling up the form will be given to the applicant at the local office of licensee. (b) If the supply is required for motors the applicant shall state the purpose for which the motors are required. 3. Notice before connection- The intending consumer must give at least one month’s notice before the supply is required. 4. Notice for fixing the position of service, meter, etc.- Upon receipt of the requisition for supply seven clear days’ notice shall be sent by the licensee, to the applicant for supply or to the contractor action on his behalf, for his representative to meet the engineer of the licensee for the purpose of inspecting the premises and fixing the point of entry of supply mains and the position of the mains, cut-outs or circuit breakers and meters. The licensee will, in no case, fix meters and main cut-out, nor allow the same to remain in any position which entails entry of his employees into purdah or religious quarters. 5. Quotations, etc., for laying-Service lines- (a) The position for the service having been agreed upon as provided for in condition No. 4 above, the licensee shall thereafter submit to the applicant a quotation of the estimate of the cost of carrying out the work. The quotation having been accepted, the applicant shall be required to deposit the amount of the estimate with the licensee before the service is laid. The deposit having been duly paid, orders shall be issued for the work to be put in hand and the amount so deposited shall be subsequently adjusted, if necessary, or compilation of the figures of the actual cost of the service line. Other conditions being equal, service lines shall as far as possible be laid in the order of the dates or receipt of the deposit money. Note- The service line, notwithstanding that a portion of the cost has been paid for by the consumer, shall remain the property of the licensee by whom it is to be maintained. (b) If a consumer desires to have the position of the existing service line altered the licensee shall carry out the work and charge the consumer the cost of the additional material used and the labour employed plus 15 percent of the later as supervision charges (c) Service lines for temporary illumination shall be laid by the licensee where possible and the cost incurred in laying and removing such service lines as determined in the manner laid down in clause (b) above shall be paid by the consumer. (d) Where any difference or dispute arises as to the cost of fixing of the position of service lines, the matter shall be referred to the Electrical Inspector for and shall be decided by him. (e) A consumer requiring high voltage supply must provide and maintain at his expense a locked and weather proof enclosure of agreed design, for the purposes of housing the licensees metering equipment. Such an enclosure may be used by the consumer for his own similar metering equipment but for no other purposes. 6. Service Lines- The licensee shall lay free of charge 30 metres of service line from his nearest distribution main outside the limits of the property in respect of which the requisition is made. Any length in excess of 30 metres, as defined above and the whole of the service line within the limits of the property in respect of which application is made shall be paid for by the applicant. The cost mentioned above however, shall be exclusive of the proportionate cost of the first pole and fittings beyond 30 mts. aforesaid. The proportionate cost of such poles and fitting shall be in the same ratio as 30 metres is to the length of the line beyond 30 metres from the point of tap-off of the service and the second support of the service line. The main cut-outs or fuses shall be inserted and sealed by the licensee free of cost to the consumer. 7. Consumer not to interfere with the supply mains or apparatus- The meter boards, main cut-outs, etc. must on no account be handled or removed by any one who is not in the employ of the licensee. The seals which are fixed on the meters and the licensee’s apparatus must on no account be broken. 8. Writing on consumer’s premises- For the protection of the consumer and the public generally, it is necessary that the wiring on the consumer’s premises should conferm to the I.E. Rules and the Rules of the Fire Insurance Company in term of which the building is insured and be carried out by a licensed electrical contractor. The material used for wiring shall comply with the standards laid down in that behalf by the Indian Standards Institution or equivalent. As soon as the consumer’s installation is completed in all respects and tested by the consumer’s contractor, the consumer should submit to the licensee the wiring contractor’s completion and test report. A form for this purpose shall be supplied by the licensee. It is important that the conditions named herein are fully complied with as otherwise there will be delay in obtaining the supply. As required by rule 45 of the Indian Electricity Rules, 1956, no electrical installation work (including additions, alterations, repairs and adjustments to existing installations), except such replacement of lamps, fans, fuses, switches, low voltage domestic appliances and fittings as in no way alter the capacity and the character of the installation, shall be carried out upon the premises on behalf of any consumer or owner for the purposes of supply of energy to such consumer or owner, except by an electrical contractor licensed by the in this behalf and under the direct supervision of a person holding a certificate of competency issued or recognised by the ... Any person committing a breach of rule 45 shall render himself liable to punishment under rule 139 of the said rules. 9. Apparatus on consumer’s premises- (a) All transformers, switch gear and other electrical equipment belonging to the consumer and connected to the mains of the licensee shall be maintained to the reasonable satisfaction of the licensee. (b) In the case of high voltage consumers, suitable protective devices approved by the licensee shall be used so as to afford full protection to the licensee’s apparatus placed on the consumer’s premises. 10. Procedure for testing installation by licensee and fee- (a) Upon receipt of the test report the licensee shall notify to the applicant the time and the day when the licensee’s representative proposes to inspect and test the installation. It will then be the duty of the applicant to arrange that representative of the wiring contractor employed by him is present at the inspection to give the licensee’s representative any information that may be required by him concerning the installation. (b) No connection shall be made until the consumer’s installation has been inspected and tested by the licensee and found satisfactory No charge shall be made for the first test made by the licensee but subsequent tests due to faults disclosed at the initial test shall be charged for in accordance with part III of these conditions. Periodical tests of the installation will also be undertaken by the licensee at rates that may be ascertained from his local office. (c) Before taking the insulation test of the installation the wiring must be completed in all respects. All fittings, whether incandescent lamps, fans, motors, heating, cooking or other apparatus, must be connected to the conductors and all fuses must be in place and all switches switched in the ‘on’ position before the tests are carried out. Temporary wires or fittings or dead ends should not be included in the installation and no part of the work should be left incomplete. (d) A pressure of 500 volts will be applied between installation and “earth” and the insulation resistance to earth after one minute’s electrification shall be such as will not cause a leakage from the installation exceeding one five thousand part of the maximum current demanded. (e) The test between the poles should give at least half the result of that to “earth”. (o Manufacturer’s test certificates in respect of all high voltage apparatus shall be produced if required by the licensee. 11. Extensions and alterations- Should the consumer, at any time after the supply of energy has been commenced increase the number or size of lights, fans or motors, etc. on his premises or in any way alter the position of his writing therein, notice thereof must be sent in writing to the licensee whose representative will call and inspect the alteration and, if necessary, change the meters and fuses and alter the service line. Failure to give such notice may derange the supply system and render the supply liable to be summarily discontinued. During such time as alterations, additions or repairs are being executed, the supply to the circuit which is being altered, added to or repaired must be entirely disconnected and it shall remain disconnected until the alterations, additions or repairs have been tested and passed by the licensee. 12. Failure of supply- (a) Should at any time the licensee’s service fuse or fuses fail, notice thereof should be sent to the licensee’s local office or if there are sub-stations, to the nearest sub-station. Only authorised employees bearing the badge of the licensee are permitted to replace these fuses in the licensee’s cut-outs. Consumers are not allowed to replace these fuses and they will render themselves liable to a heavy penalty if the licensee’s seals placed to protect his apparatus are broken. The licensee does not allow his employees to carry out any repair except replacement of fuses in the consumer’s installation. (b) The licensee shall not be liable for any claims for loss, damage or compensation whatsoever arising out of failure of supply when such failure is due either directly or indirectly to war, mutiny, civil commotion, riot, strike, lock-out, fire, tempest lightning, 13. Access to premises and apparatus- The licensee’s servant possessing a written authority signed by the engineer or manager or the licensee are entitled at all reasonable time and on informing the occupier to enter the premises to which the energy is supplied for the purpose of inspecting meters and for other purposes connected with the apparatus belonging to the licensee. 14. Security Deposit- The licensee may require any consumer to deposit security for the payment of his monthly bills for energy supplied and for the value of the meter and other apparatus installed in his premises. No interest will be allowed in deposits upto Rs. 25. Interest at the rate of............. per cent per annum will be paid by the licensee oil deposits exceeding Rs. 25. The licensee shall be at liberty at any time to apply any security deposited towards payment or satisfaction of any money which shall become due or owing by the consumer. The licensee shall also be at liberty to demand enhanced security deposit from consumers at any time during the life of the contract. The balance of the security deposit will be returned to the consumer on the termination of the contract. The consumer may at any time, with the previous consent of the licensee transfer the contract and its liabilities to any other person approved by the licensee. 15. Method of charging for current- (a) The prince and method of charging for current supplied shall be such as may be fixed by the licensee from time to time subject to the provisions of the Electricity (Supply) Act, 1948. (b) Unless specified otherwise all rates refer to one point supply 16. Payment of bills- (a) Bills should be paid at the licensees local office within 15 days from the date of their presentation. (b) Any complaints with regard to the accuracy of the bills shall be made in writing to the licensee and the amounts of such bills shall be paid under protest within the said period of 15 days. The amounts of bills paid under protest will be regarded as advance to the credit of the consumer’s account until such time as the bills in dispute have been fully settled. (c) If the consumer fails to pay any bills presented to him within the said period of 15 days, the licensee shall be at liberty to take action under sub-section (1) of section 24 of the Act and to cut-off the supply after giving such consumer not less than 7 clear days’ notice in writing without prejudice to his right to recover the amount of the bill by suit. Where, however, any difference or dispute has been referred under the Act to the Electrical Inspector for... before notice aforesaid has been given by the licensee, the licensee shall not be at liberty to cut-off the supply for failure to pay the bill except where the licensee has made a request in writing to the consumer that the amount in dispute should be deposited with the said Electrical Inspector and the consumer has failed to comply with such request. 17. Notice of removal- (a) Consumers about to vacate or sublet their premises should give to the licensee a seven clear days’ notice in writing, together with an opportunity for disconnecting the premises, otherwise the licensee cannot guarantee that the meter readings will be taken on the required date. Failing such notice, the consumer will be held responsible for energy consumed on the premises in respect of which the licensee holds agreement for the supply of energy until the expiration of seven days from the day on which the notice of removal in writing has been received at his office. (b) Consumers leaving the station for a period exceeding two months and closing their houses while away, or those houses remain closed and unoccupied owing to non-tenancy for the same period are requested to inform the licensee before-hand so that the meters installed at the premises may be read, installations disconnected and the licensee’s property removed if agreed to between the licensee and the consumer or otherwise to notify the licensee where the key can be obtained to enable the licensee’s engineer to remove, the fuses whenever it is desired to test the distribution mains in the consumer’s district. In such cases consumers will not be charged the monthly minimum provided that: - (i) The rental of meter or meters of the licensee shall be paid so long as they remain on the consumer’s premises if the meters are removed, the charges as provided for in Part III will be payable for removing and re-fixing the meters; (ii) The consumer agrees to the extension of the term of the agreement by the period by which the monthly minimum charge has been waived if the period, of his contract had not expired; (iii) A reconnection fee as provided in part III is paid before reconnection. Should the consumer require reconnection before the expiry of two months, both the reconnection fee and the monthly minimum charge will have, to be paid by the consumer. The life of the contract will not be extended in such cases. (c) When a consumer, leaves his installation connected to the licensee’s mains, but locks up the meter or otherwise makes it inaccessible for reading by the employees of the licensee, for the first month of such inaccessibility the consumer will be charged the monthly minimum. If in the next month the meter is accessible for reading, the consumer will be charged the actual consumption less the above minimum, but subject to the monthly minimum. If on the other hand the meter remains inaccessible in the second month also the consumer will be served with 24 hours’ notice (section 20 of the Act) to open his premises for the reading of the meter by any employee of the licensee at a fixed time and date; the meter is now made available for reading, the consumer will be charged the actual consumption less the minimum charged or paid for the first month of inaccessibility subject to monthly minimum. If the meter remains inaccessible even after 24 hours’ notice, the premises will be disconnected. For that month also the monthly minimum charge will be charged to the consumer. If the meter is made accessible subsequent to the disconnection for purposes of reading the meter and settling accounts or for reconnection of the service, as the case may be the consumer will be charged the actual consumption less the two minima or paid for the two months of inaccessibility subject to the proportionate minimum for the period of inaccessibility of the meter upto the time of disconnection. If the consumer applies for reconnection, fees under clause B.I of part III of these conditions will be collected before reconnection 18. Accuracy of meters- Should the consumer dispute the accuracy of any meter which is not his own property, he may, upon giving notice and paying the prescribed fee, have the meter tested by the licensee or the Electrical Inspector, in accordance with section 26 of the Act. In the event of the meter being tested by the licensee and found to be beyond the limits of accuracy as prescribed in the Indian Electricity Rules, in force from time to time, the testing fee shall be returned and the amount of the bill adjusted in accordance with the result of the test taken with respect to the meter readings of the three months prior to the month in which the dispute has arisen, due regard being paid to conditions of occupancy during the months. In the event of the test being undertaken by the Electrical Inspector for.….and the meter being found to be incorrect, the period during which the meter shall be deemed to have been incorrect, and the amount of energy supplied to the consumer during this period shall be decided by the Electrical Inspector for................where................ decision shall be final. Rent for the meter for the period it is found inaccurate will not be charged by the licensee. 19. Discontinuance of Supply- (a) If any consumer adopts any electrical appliance which is likely to affect injuriously the supply to other consumers or uses the energy supplied or deals with it in any manner so as to unduly or improperly to interfere with the efficient supply of energy to any other person by the licensee or fails to keep in proper order any meter belonging to him by which the supply is registered, the licensee may discontinue the supply so long as such an appliance is so adopted or the energy is so used or dealt with or the meter is not kept in proper order, and as the case may be. (b) The licensee shall not be bound to give or continue the supply if the Electrical Inspector for................ or other competent person appointed by the................ Government is satisfied that the electric supply-lines, fittings, works or any other apparatus within the said premises are not in good order and condition and are likely to effect injuriously the use of energy by the licensee or by other persons. (c) Any consumer who after having been duly notified, refuses to permit or fails to give an authorised representative of the licensee, reasonable facilities to enter any premises to which energy is, or has been supplied for the purpose of testing or inspecting the installation of the consumer, shall be liable to have the electricity supply discontinued after the expiry of 24 hours’ notice in writing in accordance with section 20 of the Act. 20. System of supply- Supply of energy shall be given by the licensee on the following systems, namely: - (i) Low voltage Direct current two wire or Alternating current single phase 50 cycles; (ii) Medium voltage- Direct current three wire or Alternating current three phase 50 cycles; (iii) High voltage- Alternating current three phase 50 cycles. 21. Classification of installations- A.C. System- (a) Two wire single phase, 230 volts- (i) General supply not exceeding 10 amperes. (ii) Motive power installations upto I BHP in aggregate. (b) Four-wire, three phase, 230 volts between phase wires and neutral general supply exceeding 10 amperes. (c) Three-wire, three phase, 400 volts between phases- Motive general supply exceeding 10 amperes. D.C. system- (a) Two-wire 130 volts- (i) General supply not exceeding 10 amperes. (ii) Motive power installations upto I BHP in aggregate. (b) Three-wire 460 volts between outers- Motive power installations of over 1 BHP. 22. General Wiring Conditions- (a) Mains- The consumer’s mains shall in all cases be brought back to the licensee’s point of supply and sufficient cable shall be provided for connecting up with the licensee’s apparatus. (b) Switches and Fuses- The consumer shall provide linked quick break main switches and a single pole fuse on each conductor except the neutral conductor which shall be fixed as near as possible to the licensee’ meter board. (c) Balance of installation- If the connected load of any installation exceeds 10 amperes at 230 volts, the installation shall be wired on the group system separate neutral wires being brought back in each case to the licensee’s point of supply An approved type of double pole linked switch shall control each main circuit. The lamps, fans or any other apparatus of which the installation consists shall be so grouped that under normal working conditions the current will be balanced and no current will be following in the neutral wire. (d) Medium voltage supply- With medium voltage supply, i.e., above 250 volts and upto 650 volts, the licensee’s meter and service cut-outs shall be enclosed in a strong teakwood box suitably ventilated and provided with a hasp staple and lock. All wires between which a difference of potential of over 250 volts exists shall be made inaccessible to unauthorised persons or enclosed in an earthed metallic casing or conduit. A “Caution” Board printed in Hindi and the local language of the district shall be fixed thereto. (e) Overhead Mains- In order to save the expense of a long underground service on private property, a consumer may, with the licensee’s approval erect a pillar on that portion of his property which is nearest to the licensee’s supply mains into which the service shall be laid and from which the consumer shall run overhead mains to his premises. These overhead mains shall constitute a portion of his installation and shall be laid in compliance with the Indian Electricity Rules in force from time to time. An efficient chocking coil and lightning arrestor maybe fixed at the commencement of the overhead line at the consumer’s cost should be desire the same, as an additional protection for his installation. (f) Earthing- Gas pipes shall on no account be used for earthing purposes. (g) Domestic heating and cooking- A special circuit for heating and cooking shall be run from the licensee’s point of supply Wall plugs used on these circuits shall be of the three pin type, the third pin being an earth connection. Two pin plugs or lighting sockets shall not be allowed. All appliances used in the bathroom for heating or washing purposes or in any damp location must be effectively earthed. (h) Plugs- All plugs shall be switched on the live wire and not on the neutral. (i) Wiring- Single leads shall not be allowed to be run separately in iron conduit. (j) A.C. Motor installation- Motors shall be provide with control gear so as to prevent satisfactorily the maximum current demand from the consumer’s installation exceeding the limits given in the following schedule at any time under all possible conditions. Failure to comply with these regulations will render the consumer liable to disconnection from the supply on account of interference with the supply to other consumers: - Nature of supply Size of installation Limit of maximum current demanded Single phase Three Phase Size of installation Upto and including 1 BHP Above 1 BHP and upto and including 10 BHP Above 10 BHP and upto and including 15 BHP Above 15 BHP Six times full load current. Three times full load current. Twice full load current. One and a half time full load current. Motor circuits shall be controlled by a triple pole linked switch protected by a no volt release and T.P fuses (or over load releases). It is important that the release should be maintained in thorough working order. Wiring for motors shall be run with all three phase wires bunched in a single metallic conduit, which shall be efficiently earthed throughout and connected to the frame of the motor from which two separate earth wires shall be run. The minimum size of the earth-wire permitted is No. 14 S.W.G. All motors shall comply in every respect with the Indian Electricity Rules, in force from time to time. Motors above 1 BHP shall be wound for three-phase, 400 volts between phases. (k) Power Factor of Apparatus- The apparatus shall have a power factor of not less than 85 per cent at normal working load. Intending consumers are advised to consult the Engineer of the licensee before ordering their motors, as in some cases it may be practicable to relax the starting current limit dependent on the location and conditions of working. 23. Saving rights- Nothing in these conditions shall abridge or prejudice the rights of the licensee and the consumer under the Indian Electricity Act, 1910, or any rules thereunder and Electricity (Supply) Act, 1948. PART - II SCHEDULE OF RULES (TO BE FILLED IN BY THE LICENSEE) PART - III SCHEDULE OF SERVICE & MISCELLANEOUS CHARGES A. Charges for service line- 30 metres of service line from distributing mains, but not on the property for which a requisition for supply of electrical energy is received shall be laid free of charge. The charges for the rest of the service line shall be recovered on the basis of the actual cost in accordance with condition No.6 of the conditions of supply plus 14 per centum of the labour charges to cover supervision charges. Extension for additions to service lines to meet increased maximum demand will be charged for on the same basis. B. Miscellaneous Charges: - Item No. Name of charges Amount of charges 1 2 3 1. Re-connection fees- (a) For installations upto 11 KW- (i) At cut outs, (ii) At overhead mains, (iii) At underground mains. (b) For installations over 10 KW 25 per cent added to the charges under item A above. (c) If the same consumer is reconnected within 12 months of the date of last reconnection, 50 per cent will be added to the charges under items (a) and (b) above. 2. Meters- (a) Hire of meter, where it is the property of licensee, per meter per-mensem- (i) A.C. Single phase meter (ii) A.C. Polyphase meter (iii) Demand for special type meter. (b) Removing of meter at consumer’s request. (c) Re-fixing of meter at consumer’s request. (d) Changing meter for one of higher capacity only at the request of the consumer. 3. Testing- (a) Installations- (i) The first test and inspection will be carried out free of charge but should any further test or inspection be necessitated by faults in the installation or by non-compliance with the conditions of supply per extra test or inspection. (ii) Periodical testing at consumer’s request, per test. (b) Meters- (i) A.C. Single phase meter (ii) A.C. polyphase meter (iii) Demand or special type meter. 4. Replacements of- (i) Licensees’s fuse. (ii) Consumer’s fuse. Note- For the first month of service connection or on re-connection the meter rent will be 50 per cent only if the period is 15 days or less, and full if more than 15 days. For the month in which meter is removed the rent will be calculated on similar basis. Note- (i) All charges except those under items 2(a) and 4 are payable in advance. (ii) The dispute between the consumer and the licensee regarding accuracy of meter or any other indicator maybe referred by either party to the Electrical Inspector for settlement.

Previous and next

All provisions of THE INDIAN ELECTRICITY RULES, 1956

Questions people ask

Is annexure V of THE INDIAN ELECTRICITY RULES, 1956 still in force?

No repeal of the INDIAN ELECTRICITY RULES, 1956 is recorded.