Annexure V, THE INDIAN ELECTRICITY RULES, 1956: ANNEXURE V
THE INDIAN ELECTRICITY RULES, 1956 - Annexure V
Text of annexure V
ANNEXURE V
ANNEXURE V
MODEL FORM OF ACCOUNTS
[SEE SECTION 11 OF INDIAN ELECTRICITY ACT, 1910 AND
RULES 26(3)]
ELECTRIC LICENCE, 19......
DATE OF COMMENCEMENT OF LICENCE
Name of Undertaking Year of Operation
NO. I - STATEMENT OF SHARE AND LOAN CAPITAL FOR THE YEAR ENDED
31ST MARCH, 19.....
(APPLICABLE TO LICENSEES OTHER THAN LOCAL AUTHORITY
LICENSEES)
Description
of Capital
Balance at
the
beginning
of the year
Receipt
during the
year
Redeemed
during the
year
Balance at
the end of
the year
Remarks
1 2 3 4 5 6
A. Share Capital Authorised Capital
.......... Ordinary Shares of………….. Rs each.
.......... % Preference shares of Rs…….. each
Issued Capital
.......... Ordinary Shares of Rs……………… each
.......... % Preference shares of Rs…………each
Subscribed capital
.......... Ordinary Shares of Rs…………each
.......... % Preference shares of Rs……….each
Called up capital:
.......... Ordinary Shares of Rs……….each
.......... % Preference shares of Rs……………each
Less calls in arrears
Paid-up Capital
.......... Ordinary Shares of Rs………..each
.......... % Preference shares of Rs……….each
TOTAL PAID TO CAPITAL
B. Capital Reserve
Share Forfeiture a/c
Share Premium a/c
Other items (to be specified)
TOTAL CAPITAL RESERVE
C. Loan Capital-Loans from State Electricity Boards per cent debentures of
Rs……………… each.
Other Loans-
(i) Secured
(ii) Unsecured
TOTAL LOANS CAPITAL
D. Other Capital
Contribution from consumer including local authorities for service-lines and public
lighting after the commencement of the Electricity (Supply) Act, 1948.
TOTAL OTHER CAPITAL
TOTAL CAPITAL RAISED AND APPROPRIATED
(A+B+C+D)
Note: Capital invested by proprietor, partnership, co-operative society, company
etc. licensee which is interest bearing should be shown under ‘C-Unsecured
loans and advances’ and that which is interest-free should be shown under ‘D-
Special items (to be specified)’.
ELECTRIC LICENCE, 19........
DATE OF COMMENCEMENT OF LICENCE
Name of Local Authority Year of Operation
NO. I (AL)- STATEMENT OF LOANS RAISED AND REDEEMED
FOR THE YEAR ENDED 31ST MARCH, 19..
(APPLICABLE TO LOCAL AUTHORITY LICENSEES)
Description
of loans
raised from
time to time
Amount
sanctioned
Rate % Period of
Payment
Amount of
Annual
instalment
From To
1 2 3 4 5 6
Amount of
loan
redeemed
upto the
beginning
of the year
Amount of
loan
redeemed
during the
year
Total loan
redeemed upto
the end of the
year
Balance of
loan
outstanding
at the end
of the year
Remarks
7 8 9 10 11
Total loans raised for the electrification scheme……………………………
NO. I (A2) -STATEMENT OF LOAN AND OTHER CAPITAL FOR
THE YEAR
ENDED 31ST MARCH, 19.......
Particulars Balance at
the
beginning of
the year
Received
during the
year
Redeemed
during the
year
Balance at
the end of
the year
Remarks
1 2 3 4 5 6
A. Capital Raised
Amount of loans outstanding [as per col. 10 of statement I-A(I)]
Grants and advances made from the general funds of the local authority Grants-
in-aid from Government
TOTAL CAPITAL RAISED
B. Capital Reserve
Loan redemption account [as per col. 9 of statement IA(l)] Other items (to be
specified)
TOTAL CAPITAL RESERVE
C. Other Capital
Consumer’s contributions for service lines after the commencement of the
Electricity (Supply) Act, 1948.
Special items (to be specified)
TOTAL OTHER CAPITAL
TOTAL CAPITAL RAISED AND APPROPRIATED
(A+B+C)
NO.II - STATEMENT OF CAPITAL EXPENDITURE FOR THE YEAR
ENDED 31ST MARCH, 19........
Particulars Balance at
the
beginning
of the year
Additions
during the
year
Requirements
during the
year vide col.
3 Statement
II-A
Balance at
he end of
the year
Remarks
A. Intangible Assets:
1. Preliminary & Promotional expenses
2. Cost of Licence
3. Other expenses e.g., expenses incidental to conversion from DC to AC
change of frequency etc.
TOTAL INTANGIBLE ASSETS
B. Hydraulic Power Plant:
1. Land & Rights
2. Buildings and civil engineering works containing generating plant and
equipment
3. Hydraulic works forming part of a hydroelectric system including
(i) Dams, spillways, weirs, canals, reinforced concrete flumes and cyphons,
(ii) reinforced concrete pipe lines and search tanks, steel pipe lines, sluice gates,
steel surge tanks, hydraulic control valves and other hydraulic works
4. Water wheels, Generators and ancillary equipment including plant
foundations
5. Switchgear including cable connections
6. Miscellaneous power plant equipment
7. Other civil works (to be specified)
TOTAL HYDRAULIC POWER PLANT
C. Steam Power Plant:
1. Land & Rights
2. Buildings and civil engineering works containing generating plant &
equipment
3. Boiler plant and equipment including plant foundations
4. Engines, Turbines, generators and ancillary equipment including plant
foundations
5. Water cooling system comprising cooling towers and circulating water
systems
6. Switchgear including cable connections
7. Miscellaneous power plant and equipment
8. Other civil works (to be specified)
TOTAL STEAM POWER PLANT
D. Internal Combustion Power Plant:
1. Land and Rights
2. Building and civil engineering works containing generating plant and
equipment
3. Engines, generators, and ancillary equipment including plant foundations
4. Water cooling system comprising cooling towers and circulating water
systems
5. Switchgear including cable connections
6. Miscellaneous power plant and equipment
7. Other civil works (to be specified)
TOTAL INTERNAL COMBUSTION POWER PLANT
E. Transmission Plant (High or Extra-High Voltage):
1. Land and Rights
2. Buildings and structures including civil engineering works containing
transmission plant and equipment
3. Sub-station transformers, transformer kiosks, sub-section equipment and
other fixed apparatus including plant foundations:-
(i) Transformers, including foundations having rating of ‘100 kilovolt amperes
and over
(ii) Others
4. Switchgear including cable connections
5. Towers, poles, fixures, overhead conductors and devices:-
(i) Lines on steel or reinforced concrete supports operating at nominal
voltages higher than 13.2 kilovolts
(ii) Other lines on steel or reinforced concrete supports
(iii) Lines on wood supports
6. (i) Underground cables and devices including joint boxes and
disconnecting boxes
(ii) Cable duct system
7. Miscellaneous equipments (to be specified)
TOTAL TRANSMISSION PLANT
F. Distribution Plant-High Voltage:
1. Land & Rights
2. Buildings and structures including civil engineering works containing
distribution plant and equipment
3. Sub-station transformers, transformer kiosks, sub-station equipment and
other fixed apparatus including plant foundations-
(i) Transformers including foundations having a rating of 100 kilovolt
amperes and over
(ii) Others
4. Switchgear including cable connections
5. Towers, Poles, Fixtures, Overhead conductors and devices:
(i) Lines on steel or reinforced concrete supports operating at nominal
voltages, higher than 13.2 Kilo Volts
(ii) Other lines on steel or reinforced concrete supports
(iii) Lines on wood supports
6. (i) Underground cables and devices including joint boxes and
disconnecting boxes
(ii) Cable duct system
7. Service lines
8. Metering equipment
9. Miscellaneous equipments (to be specified):
TOTAL DISTRIBUTION PLANT (HV)
G. Distribution Plant-Medium and low voltage:
1. Land & Rights
2. Buildings and structures including civil engineering works containing
distribution plant and equipment
3. Sub-station transformers, transformer kiosks, sub-station equipment and
other fixed apparatus including plant foundations
(i) Transformers including foundations having a rating of 100 kilo volt
amperes and over
(ii) Others
4. Switchgear including cable connections
5. Towers, Poles, Fixtures, Overhead conductors and devices:
(i) Lines on steel or reinforced concrete supports
(ii) Lines on wood supports
6. (i) Underground cables and devices including joint boxes and
disconnecting boxes
(ii) Cable duct system
7. Service lines
8. Metering equipment
9. Miscellaneous equipments (to be specified)
TOTAL DISTRIBUTION (M&LV)
H. Public Lighting:
Street and Signal lighting system
1. General Equipment:
(Not allocated to other sub-heads)
1. Land and Rights
2. Buildings and structures
3. Office furniture and equipment
4. Transportation equipment
5. Laboratory and meter testing equipment
6. Workshop plant and equipment
7. Tools and work equipment
8. Communication equipment
9. Miscellaneous equipment
TOTAL GENERAL EQUIPMENT
TOTAL CAPITAL ASSETS IN USE
Note- (1) Capital expenditure on items F7 and G7 should include
contributions made by consumers towards service line charges,
(2) Where it is not possible to give segregation of capital expenditure in
respect of certain items and where high, medium or low voltage distribution lines
are carried on same supports, the combined figures for such items may be given.
(3) Retirements during the year referred to in Col. 4 in respect of: (i) intangible
assets relate to amounts written off during the year, (ii) tangible assets relate to
the original cost of assets transferred to the special account under paragraph VII
of the with Schedule to the Electricity (Supply) Act, 1948.
NO. II-A - STATEMENT SHOWING THE WRITTEN DOWN COST
OF FIXED ASSETS RETIRED ON ACCOUNT OF OBSOLESCENCE
INADEQUACY, SUPERFLUITY, ETC.
Particulars
of the
assets
Written
down
cost of
assets at
the
beginning
of he
year
Written
down cost
of assets
retired
during the
year vide
Col. 4 St.
II less
Col. 8
Statement
V
Written
down
cost of
assets
sold
during
the
year
Amount
realised
during
the
year
Excess of
sale
proceeds
over written
down cost
transferred to
contingencies
Reserve
Account vide
Col. 4 of
Statement VI
Amount
written off
during
the year
vide col.
6
statement
VI
Balance
of
written
down
cost at
the end
of the
year
1 2 3 4 5 6 7 8
NO. III STATEMENT OF OPERATING REVENUES FOR THE
YEAR ENDED 31ST MARCH, 19.........
Particulars of revenue Corresponding
amount for the
previous year
of account
Amount
for the
year of
account
Remarks
1 2 3 4
A. Net Revenue by sale of electricity
for cash & credit:
1. Domestic or residential
(a) Lights and Fans
(b) Heating and small power
2. Commercial
(a) Lights and Fans
(b) Heating and small power
3. Industrial
(a) Low and Medium voltage
(b) High voltage
4. Public Lighting
5. Public Water works and Sewage
pumping
6. Irrigation
7. Traction
8. Supplies in bulk to distributing
licences
TOTAL REVENUES BY SALE OF
ELECTRICITY
B. Miscellaneous Revenue from
Consumers:
1. Rentals from
(a) Meters
(b) Electric motors, fittings, appliances
& other apparatus hired to consumers
2. Service connection fees
3. Public Lighting Maintenance.
TOTAL MISCELLANEOUS REVENUE
FROM CONSUMERS
C. Other Revenues:
1. Sale of Stores
2. Repairs of lamps and other
apparatus
3. Commission for the collection of
electricity duty
4. Other miscellaneous items (to be
specified)
TOTAL OTHER REVENUES
TOTAL OPERATING REVENUES
Deduct-
Total Operating expenses as per St. IV
Net surplus or deficit carried to the Net
Revenue and
Appropriations account-St. X
NO. IV - STATEMENT OF OPERATING EXPENSES FOR THE
YEAR ENDED 31ST MARCH, 19....
Particulars of expenses Corresponding
amount for the
previous year
of account
Amount
for the
year of
account
Remarks
1 2 3 4
A. HYDRAULIC POWER
GENERATION
(a) Operation
1. Water for power
2. Lubricants and other consumable
stores
3. Station supplies and miscellaneous
expenses
4. Proportion of salaries, allowances
gratuities, etc. of Engineers,
Superintendents, Officers, Supervisory and
the staff
5. Wages and gratuities to labour
6. Contribution to Provident Fund, staff
pension & apprentice & other training
schemes
7. Bonus paid to the employees of the
undertaking
TOTAL OPERATION
(b) Maintenance
1. Salaries for Supervisory staff
2. Buildings and civil engineering
works containing generating plant and
equipment
3. Hydraulic works forming part of a
hydro electric system, including-
(i) Dams, spillways, weirs, canals
reinforced concrete flumes and syphons
(ii) Reinforced concrete pipelines and
surge tanks, steel pipelines, sluice gates,
steel surge tanks, hydraulic control valves
and other hydraulic works
4. Water wheels, generators and
ancillary equipment including plant
foundations
5. Switchgear including cable
connections
6. Miscellaneous power plant and
equipment
7. Other Civil works (to be specified)
8. Contributions to Provident Fund,
staff pension and apprentice and other
training schemes
9. Bonus paid to the employees of the
undertaking
TOTAL MAINTENANCE
(c) Depreciation
Depreciation to Hydraulic Power
Generating Plant and Equipment (From
Statement V)
TOTAL HYDRAULIC POWER
GENERATION EXPENSES
B. STEAM POWER GENERATION
(a) Operation
1. Fuel (excluding sale proceeds of
steam ashes, etc.)
2. Lubricants and other consumable
stores
3. Water (if purchased separately)
4. Station supplies and miscellaneous
expenses
5. Proportion of salaries, allowances
gratuities, etc. of Engineers,
Superintendents, Officers, Supervisory and
the staff
6. Wages and gratuities to labour
7. Contribution to Provident Fund, staff
pension & apprentice & other training
schemes
8. Bonus paid to the employees of the
undertaking
TOTAL OPERATION
(b) Maintenance
1. Salaries for Supervisory staff
2. Building and civil engineering works
containing generating plant and equipment
3. Boiler plant and equipment
including plant foundations
4. Engines, turbines, generators and
ancillary equipment including plant
foundations
5. Water cooling system comprising
cooling towers and circulating water
systems
6. Switchgear including cable
connections
7. Miscellaneous power plant and
equipment
8. Other Civil works (to be specified)
9. Contributions to Provident Fund,
staff pension and apprentice and other
training schemes
10. Bonus paid to the employees of the
undertaking
TOTAL MAINTENANCE
(c) Depreciation
Depreciation on Steam Power Generating
Plant and equipment (from Statement V)
TOTAL STEAM POWER GENERATION
EXPENSES
C. INTERNAL COMBUSTION POWER
GENERATION:
(a) Operation
1. Fuel
2. Lubricants and other consumble
stores
3. Water (if purchased separately)
4. Station supplies and miscellaneous
expenses
5. Proportion of salaries, allowances,
gratuities etc. of Engineers,
Superintendents, Officers, supervisory and
other staff
6. Wages and gratuities to labour
7. Contributions to Provident Fund,
Staff pension and apprentice and other
training schemes
8. Bonus paid to the employees of the
undertaking
TOTAL OPERATION
(b)Maintenance
1. Salaries for supervisory staff.
2. Buildings and civil engineering
works containing generating plant and
equipment
3. Engines, generators and ancillary
equipment including plant foundations
4. Water cooling system comprising
cooling towers and circulating water
system
5. Switchgear including cable
connections
6. Miscellaneous power plant and
equipment
7. Other civil works (to be specified)
8. Contributions to provident fund, staff
pension and apprentice and other training
schemes
9. Bonus paid to the employees of the
undertaking
TOTAL MAINTENANCE
(c) Depreciation:
Depreciation on Internal Combustion
Power Generating Plant and Equipment
(from Statement V)
TOTAL INTERNAL COMBUSTION
POWER GENERATION EXPENSES
D. POWER PURCHASED:
TOTAL PRODUCTION EXPENSES
(A+B+C+D)
E. TRANSMISSION (HIGH OR
EXTRA-HIGH VOLTAGE):
(a) Operation and Maintenance:
1. Proportion of salaries, allowances,
gratuities, etc. of engineers,
superintendents officers, supervisory and
other staff
2. Wages and gratuities to sub-station
labour
3. Wages and gratuities to labour on
lines
4. Buildings and structures including
civil engineering works containing
transmission plant and equipment
5. Sub-station transformers,
transformer kiosks, sub-station equipment
and other fixed apparatus including plant
foundations
(i) Transformers including foundations
having rating of 100 kilovolt amperes and
over
(ii) Others
6. Switchgear including cable
connections
7. Towers, poles, fixtures, overhead
conductors and devices
(i) Lines on steel or reinforced
concrete supports operating at nominal
voltages higher than 13.2 kilovolts
(ii) Other lines on steel or reinforced
concrete supports
(iii) Lines on wood supports.
8. (i) Underground cables and devices
including joint boxes and disconnecting
boxes
(ii) Cable duct system
9. Contribution to Provident Fund or
Staff Pension
(b) Depreciation on Transmission Plant
and equipment (from Statement V).
TOTAL TRANSMISSION EXPENSES
F. DISTRIBUTION (HIGH VOLTAGE):
(a) Operation and Maintenance:
1. Proportion of salaries, allowances,
gratuities, etc., of engineers,
superintendents, officers, supervisory and
other staff
2. Wages and gratuities of sub-station
labour
3. Wages and gratuities to labour for
mains
4. Buildings and structures including
civil engineering works containing
distribution plant and equipment
5. Sub-station transformers,
transformer kiosks, sub-station equipment
and other fixed apparatus including plant
foundations
(i) Transformers including foundations
having a rating of 100 Kilovolt amperes
and over
(ii) Others
6. Switchgear including cable
connections
7. Towers, poles, fixtures, overhead
conductors and devices
(i) Lines on steel or reinforced
concrete supports operating at nominal
voltages higher than 13.2 kilovolts
(ii) Other lines on steel or reinforced
concrete supports
(iii) Lines on wood supports
8. (i) Underground cables and devices
including joint boxes and disconnection
boxes
(ii) Cable duct system
9. Service Lines
10. Metering Equipment
11. Contributions to Provident Fund or
Staff Pension.
(b) Depreciation on Distribution Plant
and equipment (from Statement V)
TOTAL DISTRIBUTION (H.V) EXPENSES
G. DISTRIBUTION MEDIUM AND
LOW VOLTAGE:
(a) Operation and Maintenance:
1. Proportion of salaries, allowances,
gratuities, etc. of engineers,
superintendents, officers, supervisory and
other staff
2. Wage and Gratuities to labour
3. Buildings and structures including
civil engineering works containing
transmission plant and equipment
4. Sub-station transformers,
transformer kiosks, sub-station equipment
and other fixed apparatus including plant
foundations
(i) Transformers including foundations
having rating of 100 kilovolt amperes and
over
(ii) Others
5. Switchgear including cable
connections
6. Towers, poles, fixtures, overhead
conductors and devices
(i) Lines on steel or reinforced
concrete supports
(ii) Lines and wood supports
7. (i) Underground cables and devices
including joint boxes and disconnecting
boxes
(ii) Cable duct system
8. Service lines
9. Metering equipment
10.Contributions to Provident Fund or staff
person
(b) Depreciation on Distribution Plant
and equipment (from Statement V)
TOTAL DISTRIBUTION (M.&L.V)
EXPENSES
H. PUBLIC LIGHTING:
(a) Operation and maintenance
1. Operation and maintenance
2. Renewal of lamps
(b) Depreciation PL. System and
Equipment (from Statement V)
TOTAL PUBLIC LIGHTING EXPENSES
CONSUMERS’ SERVICING, METER
READING, BILLING,COLLECTING,
ACCOUNTING, SALES PROMOTING,
ETC.
1. Proportion of salaries, allowances,
gratuities, etc. of engineers, secretary,
accountants, other officers etc.
2. Meter reading and inspection
3. Billing, collecting and accounting
4. Exhibition, demonstrations and
advertisements
5. Merchandising, servicing and
contract work
6. Miscellaneous expenses
7. Contributions to Provident Fund or
Staff Pension
8. Depreciation on general assets and
equipment, which are not allocated to
other sub-heads (from Statement V)
TOTAL CONSUMERS’ SERVICING,
METER READING, ETC. EXPENSES
K. GENERAL ESTABLISHMENT
CHARGES:
1. Proportion of salaries, allowances,
gratuities, etc. of general officers,
executive, etc.
2. Salaries, wages, gratuities, etc. of
general office staff
3. Contribution to local authority
administration for supervision (applicable
to local authority licensee only)
4. Travelling and other expenses of
officers and staff
5. Rents and Way leaves
6. Rates and Taxes
7. General Office expenses and
showroom maintenance and supplies
8. Repairs to office buildings, staff
quarters, furniture and fixtures, office
equipment etc., and maintenance
9. Depreciation on office and general
buildings, furniture, etc. not allocated to
other sub-heads (from Statement V)
10. Audit Services:
(a) Auditor of company
(b) Auditor appointed under the
provisions of the Act
11. Legal services
12. Insurance expenses.
13. Contributions to Provident Fund,
staff pension and apprentice and other
training schemes
14. Bonus paid to the employees of the
undertaking.
TOTAL GENERAL ESTABLISHMENT
CHARGES
L. OTHER CHARGES:
1. Interest paid and accrued on:
(a) Loans advanced by the State
Electricity Board
(b) Depreciation fund
(c) Consumer’s Security deposit
2. Bad debts written off
3. Other items (to be specified)
TOTAL OTHER CHARGES
M. MANAGEMENT EXPENSES
1. Director’s fees and expenses and
debenture Trustees’ fees; if any
2. Other Expenses
TOTAL MANAGEMENT EXPENSES
TOTAL OPERATING EXPENSES
TRANSFERRED TO STATEMENT-III
Note- (1) No appointment of expenses under sub-head ‘M’ be made to any of
the salary items under A(a), 4, B-(a)5, C-(a)5, E-8(a)l, F(a)l, G(a)l, J-1 and K-1,
which shall include the proportion of salaries and allowances of persons solely
employed for the purpose of the undertaking and of the engineering staff
employed by the Managing Agents under the provision of sub-para (3) of Para
XIII of the Sixth Schedule to the E(S) Act, 1948.
(2) Managing agent in this context refers to the managerial personnel as
given in the explanation under Paragraph XIII of the Sixth Schedule to the
Electricity (Supply) Act, 1948.
NO. V - STATEMENT FOR PROVISION FOR DEPRECIATION FOR
THE YEAR ENDED 31ST MARCH, 19
Balance of
accured
depreciation
brought
forward
Balance of
arrear of
depreciation
brought
forward
Additions during the year With-
drawals
during
the year
vide col.3
Balance of
accrued
depreciation
carried over
to next
Balance of
arrears of
depreciation
carried over
to next
from last
account
from last
account
statement
II-A
account account
Interest
@ 4%
per
annum
on the
balance
at he
beginning
of the
year
under
para VI(I)
of the
Sixth
Schedule
to the
E(S) Act
1948
Depreciation
provide for
the year
Arrears of
deprecition
written off
during the
year
Total
2 3 4 5 6 7 8 9 10
aulic Power Plant:
m Power-Plant:
nal Combustion Plant:
smission Plants High or Extra-High Voltage:
ibution Plant High Voltage:
ibution Plant Medium and Low Voltage:
ic Lighting:
eral Equipment:
……………………….
Note- 1. Withdrawals from the depreciation account are permissible only to
the extent of past provisions made in respect of asset withdrawn from use and
transferred during the year to the special account under Para VIII of the sixth
Schedule to the E(S) Act, 1948.
2. A sum of Rs...........................................................from the accruals in the
depreciation account has been invested in securities in persuance of the
provisions of paragraphs XVIII (i) (d) of the Sixth Schedule to the E (S) Act, 1948.
NO. VI - STATEMENT OF CONTINGENCIES RESERVE FOR THE YEAR
ENDED 31ST MARCH, 19
Particulars Balance
at he
beginning
of the
year
Additions during the year Withdrawls during the year Balance
at he
end of
the year
Remarks
Appropriations
during the
year
Additions
under
paragraph
IX of the
sixth
schedule
to the
E(S) Act,
1948,
vide Col.
6 of
statement
II-A
Total Amount
written off
under
sub-para
(2) of
para VII
of the
Sixth
Schedule
to the
E(s) Act,
1948 vide
Col. 7 of
Statement
II-A
Expenses
and/or
compensation
under para V,
sixth
schedule of
the E(S) Act,
1948
Total
1 2 3 4 5 6 7 8 9 10
Note- A sum of Rs.........................................................from the balance of the
Contingencies Reserve has been invested under the provisions of paragraph
IV(2) of the Sixth Schedule to the Electricity (Supply) Act, 1948.
NO. VII - STATEMENT OF DEVELOPMENT RESERVE ACCOUNT
FOR THE YEAR ENDED 31ST MARCH, 19………
ce
the
ning
the
Development
rebate for
the year
permissible
under the
Indian
Development
reserve
permissible
for the year
under the
para VA(1)
Actual
appropriation
made under
the proviso
to para VA
(1) of the
Unabsorbed development reserve to be
appropriated in future years under paragraph
VA (2) of the sixth schedule to the Electricity
(Supply) Act, 1948
Balance
at he
end of
the year
Col.
(1+2+8)
Re
Income Tax
Act, 1961
(As per
details
attached)
of the sixth
schedule to
the E(S) Act,
1948 being
the amount
of relief on
Income Tax
& super Tax
on the
amount of
development
rebate
sixth
schedule to
the E(S) Act,
1948
Balance
at he
beginning
of the
year
Current
years
balance
Col. (3-
)
Total Instalment
appropriated
during the
year
Balance
awaited
adjustment
Col. (7-8)
2 3 4 5 6 7 8 9 10
NO. VIII - STATEMENT OF TARIFFS AND DIVIDENDS CONTROL RESERVE
ACCOUNT FOR THE YEAR ENDED 31ST MARCH, 19....
Particulars Balance at
the
beginning
of the year
Distributed to
consumers
during the year
under
paragraph II(I)
of the sixth
schedule to the
E(S) Act, 1948
Appropriated
during the
year
Balance
at the end
of the
year
Remarks
1 2 3 4 5 6
NO. IX STATEMENT CONSUMER’S REBATE RESERVE ACCOUNT FOR THE
YEAR ENDED 31ST MARCH, 19....
Particulars Balance at
the
beginning of
the year
Distributed to
consumers
during the year
under
paragraph II(I)
of the sixth
schedule to the
E(S) Act, 1948
Appropriated
during the
year
Balance
at the end
of the
year
Remarks
1 2 3 4 5 6
NO. X - STATEMENT OF SPECIAL APPROPRIATIONS PERMITTED BY
STATE GOVERNMENT FOR THE YEAR ENDED 31ST MARCH, 19....
Particulars
giving
reference to
the sanction
of the State
Government
permitting
the
appropriation
Balance at
the
beginning
of the year
Additions by
may of
appropriation
during the
year
Transfer by
way of re-
appropriation
during the
year (details
to be given
in the
remarks
column)
Balance
at the end
of the
year
Remarks
1 2 3 4 5 6
NO. XI - STATEMENT OF NET REVENUE AND APPROPRIATIONS
ACCOUNT FOR THE YEAR ENDED 31ST MARCH, 19....
Corresponding
figures of
previous year
Particulars Amount Corresponding
figures of
previous year
Particulars Amount
1 2 3 4 5 6
1. To Balance of loss brought
forward from last account.
2. To net operating deficit as per
Statement III.
3. To appropriations (applicable to
local
Authority Licensee only):-
(a) Interest on loan capital
(b) Instalment of redemption of loan
capital, as per (col 8 of St. 1.(A) (1).
(c) General Rates.
1. By Balance of profit brought for-
ward
from last account.
2. By net operating surplus as per
Statement-III.
3. By interest on securities
investments.
4. By other receipts (non-operating
rents) outgoing not other
provided for transfer fee etc. specified.)
5. Adjustment in respect of excess
provision of income-tax.
4. (a) Provision for taxes on
Income and profit for the year
Rs………….
6. By Balance of loss carried over.
(b) Additional short provision in
respect of year 19... . ............
5. To instalment of write-down in
respect of intangible assets.
6. To instalment of contribution
towards arrears of Depreciation as per
Statement V-Column 6.
7. To contribution towards
Contingencies Reserve as per
Statement VI-Column 3.
8. To appropriation towards
development Reserve as per
Statement VII- Column 4 or 8 or 4+8.
9. To appropriation to Tariffs and
Dividends Controls Reserve, as per
Statement VIII-Column 3.
10. To appropriation to Consumers’
Rebate Reserve, as per Statement IX
column 4.
11. To other special appropriation
permitted
No by the State Government, as per
Statement X- Column 3.
12. To appropriation towards
interest paid and accrued and
dividends paid and payable:-
(a) Interest on debentures.
(b) Interest on loans borrowed from
Organisation or Institution approved by
the State Government.
(c) Interest on other secured loans.
(d) Interest on unsecured loans,
advances, deposits, bank over-drafts,
etc
(e) Dividends on preference share
capital.
(f) Dividends on ordinary share
capital. To balance of profit carried
over.
NO. XII - GENERAL BALANCE SHEET AS ON 31ST MARCH, 19
Corresponding
figures of
previous year
Particulars Amount Corresponding
figures of
previous year
Particulars Amount
1 2 3 4 5 6
1. Capital raised and
appropriated vide Statement-I or
I-A
Reserve and Surplus.
1. Capital amount expended on
works in use-Statement-II.
Less-Accumulated provisions for
depreciation-Statement V
Net Block.
2. Non-statutory Reserve.
2. Balance of written down cost of
obsolete, inadequate etc. assets-
Statement IIA. Current Assets.
(a)
3. Contingencies Reserve Fund as per
Statement No. VI.
3. Capital Works in progress.
4. Development Reserve as per
Statement VII.
4. Stores and materials in hand-
(b) Fuel-Coal and/or etc. at cost.
(c) General stores at or below cost.
Note: - Contingent liabilities and outstanding commitments, if any, to be
stated on the face of this balance sheet.
5. Tariffs & Dividends Control
Reserve as per Statement VIII.
5. Debtors for amounts paid in
advance on account of contracts.
6. Consumers’ Rebate Reserve as
per Statement IX.
6. Sundry debtors for electricity
supplied.
7. Special appropriations (as
permitted by the State Government)
reserve as per Statement X.
7. Other debtors (as per the
Schedule attached).
8. Balance of Net Revenue and
Appropriations Account as per
Statement XI.
Current Liabilities and Provisions.
8. Accounts receivable (to be
specified).
9. Balances due on construction of
Plant, Machinery, etc.
9. Investments in statutory
securities of
cost.
(a) Contingencies Reserve Fund
Investment. (Market value on closing
date).
(b) Depreciation Reserve Fund
Investment. (Market value on closing
date).
(c) Other investments.
(Market value on closing date).
10. Creditors of open accounts (as
per schedule attached).
10. Special investments.
(a) In respect of taxation.
(b) Others (to be specified).
11. Consumers’ Security deposits:
(i) In Cash Rs............................
(ii) In Securities Rs............................
11. Balance at Bank:
(a) Deposit account.
(b) Current account and at call.
12. Accounts payable (to be
specified).
12. Cash in hand Debits Balances.
13. Temporary accommodations,
Bank overdrafts and other finances.
13. Net Revenue and Appropriations
Account balance at debit thereof
Statement XI.
14. Other current and accrued
liabilities (to be specified).
14. Deferred payments.
ANNUXURE VI
(See Rule 27)
MODEL FORM OF DRAFF CONDITIONS OF SUPPLY
Name of undertaking.............................................................................
PART - I
1. General-
(a) “The Act” means the Indian Electricity Act, 1910 as in force from time to
time.
(b) “Licensee” means................
(c) “Consumer” means any person who is supplied with energy by the
incensee or whose premises are for the time being connected for the purpose of
supply of energy with the works of the licensee.
(d) “Date of presentation” means the second day after the date of any bill
rendered by the licensee.
2. Application and agreement for supply-
(a) Application and agreement for supply of electrical energy shall be made in
the form attached hereto (Appendix ‘A:) obtainable free of cost at the local office
of the licensee. The application shall be signed by the owner or occupier of the
premises for which supply is required. Any assistance and information required
for filling up the form will be given to the applicant at the local office of licensee.
(b) If the supply is required for motors the applicant shall state the purpose for
which the motors are required.
3. Notice before connection- The intending consumer must give at least one
month’s notice before the supply is required.
4. Notice for fixing the position of service, meter, etc.- Upon receipt of the
requisition for supply seven clear days’ notice shall be sent by the licensee, to
the applicant for supply or to the contractor action on his behalf, for his
representative to meet the engineer of the licensee for the purpose of inspecting
the premises and fixing the point of entry of supply mains and the position of the
mains, cut-outs or circuit breakers and meters. The licensee will, in no case, fix
meters and main cut-out, nor allow the same to remain in any position which
entails entry of his employees into purdah or religious quarters.
5. Quotations, etc., for laying-Service lines-
(a) The position for the service having been agreed upon as provided for in
condition No. 4 above, the licensee shall thereafter submit to the applicant a
quotation of the estimate of the cost of carrying out the work. The quotation
having been accepted, the applicant shall be required to deposit the amount of
the estimate with the licensee before the service is laid. The deposit having been
duly paid, orders shall be issued for the work to be put in hand and the amount
so deposited shall be subsequently adjusted, if necessary, or compilation of the
figures of the actual cost of the service line. Other conditions being equal,
service lines shall as far as possible be laid in the order of the dates or receipt of
the deposit money.
Note- The service line, notwithstanding that a portion of the cost has been paid
for by the consumer, shall remain the property of the licensee by whom it is to be
maintained.
(b) If a consumer desires to have the position of the existing service line
altered the licensee shall carry out the work and charge the consumer the cost of
the additional material used and the labour employed plus 15 percent of the later
as supervision charges
(c) Service lines for temporary illumination shall be laid by the licensee where
possible and the cost incurred in laying and removing such service lines as
determined in the manner laid down in clause (b) above shall be paid by the
consumer.
(d) Where any difference or dispute arises as to the cost of fixing of the
position of service lines, the matter shall be referred to the Electrical Inspector for
and shall be decided by him.
(e) A consumer requiring high voltage supply must provide and maintain at
his expense a locked and weather proof enclosure of agreed design, for the
purposes of housing the licensees metering equipment. Such an enclosure may
be used by the consumer for his own similar metering equipment but for no other
purposes.
6. Service Lines- The licensee shall lay free of charge 30 metres of service
line from his nearest distribution main outside the limits of the property in respect
of which the requisition is made. Any length in excess of 30 metres, as defined
above and the whole of the service line within the limits of the property in respect
of which application is made shall be paid for by the applicant. The cost
mentioned above however, shall be exclusive of the proportionate cost of the first
pole and fittings beyond 30 mts. aforesaid. The proportionate cost of such poles
and fitting shall be in the same ratio as 30 metres is to the length of the line
beyond 30 metres from the point of tap-off of the service and the second support
of the service line.
The main cut-outs or fuses shall be inserted and sealed by the licensee free of
cost to the consumer.
7. Consumer not to interfere with the supply mains or apparatus- The meter
boards, main cut-outs, etc. must on no account be handled or removed by any
one who is not in the employ of the licensee. The seals which are fixed on the
meters and the licensee’s apparatus must on no account be broken.
8. Writing on consumer’s premises- For the protection of the consumer and
the public generally, it is necessary that the wiring on the consumer’s premises
should conferm to the I.E. Rules and the Rules of the Fire Insurance Company in
term of which the building is insured and be carried out by a licensed electrical
contractor. The material used for wiring shall comply with the standards laid
down in that behalf by the Indian Standards Institution or equivalent. As soon as
the consumer’s installation is completed in all respects and tested by the
consumer’s contractor, the consumer should submit to the licensee the wiring
contractor’s completion and test report. A form for this purpose shall be supplied
by the licensee. It is important that the conditions named herein are fully
complied with as otherwise there will be delay in obtaining the supply.
As required by rule 45 of the Indian Electricity Rules, 1956, no electrical
installation work (including additions, alterations, repairs and adjustments to
existing installations), except such replacement of lamps, fans, fuses, switches,
low voltage domestic appliances and fittings as in no way alter the capacity and
the character of the installation, shall be carried out upon the premises on behalf
of any consumer or owner for the purposes of supply of energy to such consumer
or owner, except by an electrical contractor licensed by the in this behalf and
under the direct supervision of a person holding a certificate of competency
issued or recognised by the ... Any person committing a breach of rule 45 shall
render himself liable to punishment under rule 139 of the said rules.
9. Apparatus on consumer’s premises-
(a) All transformers, switch gear and other electrical equipment belonging to
the consumer and connected to the mains of the licensee shall be maintained to
the reasonable satisfaction of the licensee.
(b) In the case of high voltage consumers, suitable protective devices
approved by the licensee shall be used so as to afford full protection to the
licensee’s apparatus placed on the consumer’s premises.
10. Procedure for testing installation by licensee and fee-
(a) Upon receipt of the test report the licensee shall notify to the applicant the
time and the day when the licensee’s representative proposes to inspect and test
the installation. It will then be the duty of the applicant to arrange that
representative of the wiring contractor employed by him is present at the
inspection to give the licensee’s representative any information that may be
required by him concerning the installation.
(b) No connection shall be made until the consumer’s installation has been
inspected and tested by the licensee and found satisfactory No charge shall be
made for the first test made by the licensee but subsequent tests due to faults
disclosed at the initial test shall be charged for in accordance with part III of these
conditions. Periodical tests of the installation will also be undertaken by the
licensee at rates that may be ascertained from his local office.
(c) Before taking the insulation test of the installation the wiring must be
completed in all respects. All fittings, whether incandescent lamps, fans, motors,
heating, cooking or other apparatus, must be connected to the conductors and all
fuses must be in place and all switches switched in the ‘on’ position before the
tests are carried out. Temporary wires or fittings or dead ends should not be
included in the installation and no part of the work should be left incomplete.
(d) A pressure of 500 volts will be applied between installation and “earth” and
the insulation resistance to earth after one minute’s electrification shall be such
as will not cause a leakage from the installation exceeding one five thousand part
of the maximum current demanded.
(e) The test between the poles should give at least half the result of that to
“earth”. (o Manufacturer’s test certificates in respect of all high voltage apparatus
shall be produced if required by the licensee.
11. Extensions and alterations- Should the consumer, at any time after the
supply of energy has been commenced increase the number or size of lights,
fans or motors, etc. on his premises or in any way alter the position of his writing
therein, notice thereof must be sent in writing to the licensee whose
representative will call and inspect the alteration and, if necessary, change the
meters and fuses and alter the service line. Failure to give such notice may
derange the supply system and render the supply liable to be summarily
discontinued. During such time as alterations, additions or repairs are being
executed, the supply to the circuit which is being altered, added to or repaired
must be entirely disconnected and it shall remain disconnected until the
alterations, additions or repairs have been tested and passed by the licensee.
12. Failure of supply-
(a) Should at any time the licensee’s service fuse or fuses fail, notice thereof
should be sent to the licensee’s local office or if there are sub-stations, to the
nearest sub-station. Only authorised employees bearing the badge of the
licensee are permitted to replace these fuses in the licensee’s cut-outs.
Consumers are not allowed to replace these fuses and they will render
themselves liable to a heavy penalty if the licensee’s seals placed to protect his
apparatus are broken. The licensee does not allow his employees to carry out
any repair except replacement of fuses in the consumer’s installation.
(b) The licensee shall not be liable for any claims for loss, damage or
compensation whatsoever arising out of failure of supply when such failure is due
either directly or indirectly to war, mutiny, civil commotion, riot, strike, lock-out,
fire, tempest lightning,
13. Access to premises and apparatus- The licensee’s servant possessing a
written authority signed by the engineer or manager or the licensee are entitled at
all reasonable time and on informing the occupier to enter the premises to which
the energy is supplied for the purpose of inspecting meters and for other
purposes connected with the apparatus belonging to the licensee.
14. Security Deposit- The licensee may require any consumer to deposit
security for the payment of his monthly bills for energy supplied and for the value
of the meter and other apparatus installed in his premises. No interest will be
allowed in deposits upto Rs. 25. Interest at the rate of............. per cent per
annum will be paid by the licensee oil deposits exceeding Rs. 25.
The licensee shall be at liberty at any time to apply any security deposited
towards payment or satisfaction of any money which shall become due or owing
by the consumer. The licensee shall also be at liberty to demand enhanced
security deposit from consumers at any time during the life of the contract. The
balance of the security deposit will be returned to the consumer on the
termination of the contract.
The consumer may at any time, with the previous consent of the licensee transfer
the contract and its liabilities to any other person approved by the licensee.
15. Method of charging for current-
(a) The prince and method of charging for current supplied shall be such as
may be fixed by the licensee from time to time subject to the provisions of the
Electricity (Supply) Act, 1948.
(b) Unless specified otherwise all rates refer to one point supply
16. Payment of bills-
(a) Bills should be paid at the licensees local office within 15 days from the
date of their presentation.
(b) Any complaints with regard to the accuracy of the bills shall be made in
writing to the licensee and the amounts of such bills shall be paid under protest
within the said period of 15 days. The amounts of bills paid under protest will be
regarded as advance to the credit of the consumer’s account until such time as
the bills in dispute have been fully settled.
(c) If the consumer fails to pay any bills presented to him within the said
period of 15 days, the licensee shall be at liberty to take action under sub-section
(1) of section 24 of the Act and to cut-off the supply after giving such consumer
not less than 7 clear days’ notice in writing without prejudice to his right to
recover the amount of the bill by suit. Where, however, any difference or dispute
has been referred under the Act to the Electrical Inspector for... before notice
aforesaid has been given by the licensee, the licensee shall not be at liberty to
cut-off the supply for failure to pay the bill except where the licensee has made a
request in writing to the consumer that the amount in dispute should be
deposited with the said Electrical Inspector and the consumer has failed to
comply with such request.
17. Notice of removal-
(a) Consumers about to vacate or sublet their premises should give to the
licensee a seven clear days’ notice in writing, together with an opportunity for
disconnecting the premises, otherwise the licensee cannot guarantee that the
meter readings will be taken on the required date. Failing such notice, the
consumer will be held responsible for energy consumed on the premises in
respect of which the licensee holds agreement for the supply of energy until the
expiration of seven days from the day on which the notice of removal in writing
has been received at his office.
(b) Consumers leaving the station for a period exceeding two months and
closing their houses while away, or those houses remain closed and unoccupied
owing to non-tenancy for the same period are requested to inform the licensee
before-hand so that the meters installed at the premises may be read,
installations disconnected and the licensee’s property removed if agreed to
between the licensee and the consumer or otherwise to notify the licensee where
the key can be obtained to enable the licensee’s engineer to remove, the fuses
whenever it is desired to test the distribution mains in the consumer’s district. In
such cases consumers will not be charged the monthly minimum provided that: -
(i) The rental of meter or meters of the licensee shall be paid so long as they
remain on the consumer’s premises if the meters are removed, the charges as
provided for in Part III will be payable for removing and re-fixing the meters;
(ii) The consumer agrees to the extension of the term of the agreement by the
period by which the monthly minimum charge has been waived if the period, of
his contract had not expired;
(iii) A reconnection fee as provided in part III is paid before reconnection.
Should the consumer require reconnection before the expiry of two months, both
the reconnection fee and the monthly minimum charge will have, to be paid by
the consumer. The life of the contract will not be extended in such cases.
(c) When a consumer, leaves his installation connected to the licensee’s
mains, but locks up the meter or otherwise makes it inaccessible for reading by
the employees of the licensee, for the first month of such inaccessibility the
consumer will be charged the monthly minimum. If in the next month the meter is
accessible for reading, the consumer will be charged the actual consumption less
the above minimum, but subject to the monthly minimum. If on the other hand
the meter remains inaccessible in the second month also the consumer will be
served with 24 hours’ notice (section 20 of the Act) to open his premises for the
reading of the meter by any employee of the licensee at a fixed time and date;
the meter is now made available for reading, the consumer will be charged the
actual consumption less the minimum charged or paid for the first month of
inaccessibility subject to monthly minimum. If the meter remains inaccessible
even after 24 hours’ notice, the premises will be disconnected. For that month
also the monthly minimum charge will be charged to the consumer. If the meter
is made accessible subsequent to the disconnection for purposes of reading the
meter and settling accounts or for reconnection of the service, as the case may
be the consumer will be charged the actual consumption less the two minima or
paid for the two months of inaccessibility subject to the proportionate minimum
for the period of inaccessibility of the meter upto the time of disconnection. If the
consumer applies for reconnection, fees under clause B.I of part III of these
conditions will be collected before reconnection
18. Accuracy of meters- Should the consumer dispute the accuracy of any
meter which is not his own property, he may, upon giving notice and paying the
prescribed fee, have the meter tested by the licensee or the Electrical Inspector,
in accordance with section 26 of the Act. In the event of the meter being tested
by the licensee and found to be beyond the limits of accuracy as prescribed in
the Indian Electricity Rules, in force from time to time, the testing fee shall be
returned and the amount of the bill adjusted in accordance with the result of the
test taken with respect to the meter readings of the three months prior to the
month in which the dispute has arisen, due regard being paid to conditions of
occupancy during the months. In the event of the test being undertaken by the
Electrical Inspector for.….and the meter being found to be incorrect, the period
during which the meter shall be deemed to have been incorrect, and the amount
of energy supplied to the consumer during this period shall be decided by the
Electrical Inspector for................where................ decision shall be final. Rent for
the meter for the period it is found inaccurate will not be charged by the licensee.
19. Discontinuance of Supply-
(a) If any consumer adopts any electrical appliance which is likely to affect
injuriously the supply to other consumers or uses the energy supplied or deals
with it in any manner so as to unduly or improperly to interfere with the efficient
supply of energy to any other person by the licensee or fails to keep in proper
order any meter belonging to him by which the supply is registered, the licensee
may discontinue the supply so long as such an appliance is so adopted or the
energy is so used or dealt with or the meter is not kept in proper order, and as
the case may be.
(b) The licensee shall not be bound to give or continue the supply if the
Electrical Inspector for................ or other competent person appointed by
the................ Government is satisfied that the electric supply-lines, fittings, works
or any other apparatus within the said premises are not in good order and
condition and are likely to effect injuriously the use of energy by the licensee or
by other persons.
(c) Any consumer who after having been duly notified, refuses to permit or
fails to give an authorised representative of the licensee, reasonable facilities to
enter any premises to which energy is, or has been supplied for the purpose of
testing or inspecting the installation of the consumer, shall be liable to have the
electricity supply discontinued after the expiry of 24 hours’ notice in writing in
accordance with section 20 of the Act.
20. System of supply- Supply of energy shall be given by the licensee on the
following systems, namely: -
(i) Low voltage Direct current
two wire or Alternating current single
phase
50 cycles;
(ii) Medium voltage- Direct current
three wire
or Alternating current
three phase
50 cycles;
(iii) High voltage- Alternating current
three phase
50 cycles.
21. Classification of installations- A.C. System-
(a) Two wire single phase, 230 volts-
(i) General supply not exceeding 10 amperes.
(ii) Motive power installations upto I BHP in aggregate.
(b) Four-wire, three phase, 230 volts between phase wires and neutral
general supply exceeding 10 amperes.
(c) Three-wire, three phase, 400 volts between phases- Motive general
supply exceeding 10 amperes.
D.C. system-
(a) Two-wire 130 volts-
(i) General supply not exceeding 10 amperes.
(ii) Motive power installations upto I BHP in aggregate.
(b) Three-wire 460 volts between outers- Motive power installations of over 1
BHP.
22. General Wiring Conditions-
(a) Mains- The consumer’s mains shall in all cases be brought back to the
licensee’s point of supply and sufficient cable shall be provided for connecting up
with the licensee’s apparatus.
(b) Switches and Fuses- The consumer shall provide linked quick break main
switches and a single pole fuse on each conductor except the neutral conductor
which shall be fixed as near as possible to the licensee’ meter board.
(c) Balance of installation- If the connected load of any installation exceeds
10 amperes at 230 volts, the installation shall be wired on the group system
separate neutral wires being brought back in each case to the licensee’s point of
supply An approved type of double pole linked switch shall control each main
circuit. The lamps, fans or any other apparatus of which the installation consists
shall be so grouped that under normal working conditions the current will be
balanced and no current will be following in the neutral wire.
(d) Medium voltage supply- With medium voltage supply, i.e., above 250 volts
and upto 650 volts, the licensee’s meter and service cut-outs shall be enclosed in
a strong teakwood box suitably ventilated and provided with a hasp staple and
lock. All wires between which a difference of potential of over 250 volts exists
shall be made inaccessible to unauthorised persons or enclosed in an earthed
metallic casing or conduit. A “Caution” Board printed in Hindi and the local
language of the district shall be fixed thereto.
(e) Overhead Mains- In order to save the expense of a long underground
service on private property, a consumer may, with the licensee’s approval erect a
pillar on that portion of his property which is nearest to the licensee’s supply
mains into which the service shall be laid and from which the consumer shall run
overhead mains to his premises. These overhead mains shall constitute a
portion of his installation and shall be laid in compliance with the Indian Electricity
Rules in force from time to time. An efficient chocking coil and lightning arrestor
maybe fixed at the commencement of the overhead line at the consumer’s cost
should be desire the same, as an additional protection for his installation.
(f) Earthing- Gas pipes shall on no account be used for earthing purposes.
(g) Domestic heating and cooking- A special circuit for heating and cooking
shall be run from the licensee’s point of supply Wall plugs used on these circuits
shall be of the three pin type, the third pin being an earth connection. Two pin
plugs or lighting sockets shall not be allowed. All appliances used in the
bathroom for heating or washing purposes or in any damp location must be
effectively earthed.
(h) Plugs- All plugs shall be switched on the live wire and not on the neutral.
(i) Wiring- Single leads shall not be allowed to be run separately in iron
conduit.
(j) A.C. Motor installation- Motors shall be provide with control gear so as to
prevent satisfactorily the maximum current demand from the consumer’s
installation exceeding the limits given in the following schedule at any time under
all possible conditions. Failure to comply with these regulations will render the
consumer liable to disconnection from the supply on account of interference with
the supply to other consumers: -
Nature of
supply
Size of installation Limit of maximum current
demanded
Single phase
Three Phase
Size of installation Upto and
including 1 BHP
Above 1 BHP and upto and
including 10 BHP
Above 10 BHP and upto and
including 15 BHP
Above 15 BHP
Six times full load current.
Three times full load current.
Twice full load current.
One and a half time full load
current.
Motor circuits shall be controlled by a triple pole linked switch protected by a no
volt release and T.P fuses (or over load releases). It is important that the release
should be maintained in thorough working order. Wiring for motors shall be run
with all three phase wires bunched in a single metallic conduit, which shall be
efficiently earthed throughout and connected to the frame of the motor from
which two separate earth wires shall be run. The minimum size of the earth-wire
permitted is No. 14 S.W.G. All motors shall comply in every respect with the
Indian Electricity Rules, in force from time to time.
Motors above 1 BHP shall be wound for three-phase, 400 volts between phases.
(k) Power Factor of Apparatus- The apparatus shall have a power factor of
not less than 85 per cent at normal working load.
Intending consumers are advised to consult the Engineer of the licensee before
ordering their motors, as in some cases it may be practicable to relax the starting
current limit dependent on the location and conditions of working.
23. Saving rights- Nothing in these conditions shall abridge or prejudice the
rights of the licensee and the consumer under the Indian Electricity Act, 1910, or
any rules thereunder and Electricity (Supply) Act, 1948.
PART - II
SCHEDULE OF RULES
(TO BE FILLED IN BY THE LICENSEE)
PART - III
SCHEDULE OF SERVICE & MISCELLANEOUS CHARGES
A. Charges for service line- 30 metres of service line from distributing mains,
but not on the property for which a requisition for supply of electrical energy is
received shall be laid free of charge. The charges for the rest of the service line
shall be recovered on the basis of the actual cost in accordance with condition
No.6 of the conditions of supply plus 14 per centum of the labour charges to
cover supervision charges.
Extension for additions to service lines to meet increased maximum demand will
be charged for on the same basis.
B. Miscellaneous Charges: -
Item No. Name of charges Amount of charges
1 2 3
1. Re-connection fees-
(a) For installations upto 11 KW-
(i) At cut outs,
(ii) At overhead mains,
(iii) At underground mains.
(b) For installations over 10 KW 25 per cent added to the charges under item
A above.
(c) If the same consumer is reconnected within 12 months of the date of last
reconnection, 50 per cent will be added to the charges under items (a) and (b)
above.
2. Meters-
(a) Hire of meter, where it is the property of licensee, per meter per-mensem-
(i) A.C. Single phase meter
(ii) A.C. Polyphase meter
(iii) Demand for special type meter.
(b) Removing of meter at consumer’s request.
(c) Re-fixing of meter at consumer’s request.
(d) Changing meter for one of higher capacity only at the request of the
consumer.
3. Testing-
(a) Installations-
(i) The first test and inspection will be carried out free of charge but should
any further test or inspection be necessitated by faults in the installation or by
non-compliance with the conditions of supply per extra test or inspection.
(ii) Periodical testing at consumer’s request, per test.
(b) Meters-
(i) A.C. Single phase meter
(ii) A.C. polyphase meter
(iii) Demand or special type meter.
4. Replacements of-
(i) Licensees’s fuse.
(ii) Consumer’s fuse.
Note- For the first month of service connection or on re-connection the meter
rent will be 50 per cent only if the period is 15 days or less, and full if more than
15 days. For the month in which meter is removed the rent will be calculated on
similar basis.
Note- (i) All charges except those under items 2(a) and 4 are payable in
advance.
(ii) The dispute between the consumer and the licensee regarding accuracy
of meter or any other indicator maybe referred by either party to the Electrical
Inspector for settlement.
Previous and next
Questions people ask
Is annexure V of THE INDIAN ELECTRICITY RULES, 1956 still in force?
No repeal of the INDIAN ELECTRICITY RULES, 1956 is recorded.