LawGrids logoLAWGRIDS.ORG

Annexure II, THE INDIAN ELECTRICITY RULES, 1956: ANNEXURE II

THE INDIAN ELECTRICITY RULES, 1956 - Annexure II

Text of annexure II

ANNEXURE II

ANNEXURE II [SEE SUB-RULE (1) OF RULE 7] SCALE OF FEES FOR COMPARISON WITH THE GOVERNMENT OF INDIASTANDARDS REFERRED TO IN SUB-RULE (1) OF RULE 2 Rs. For an instrument intended to be used as a sub-standard and submitted for special examination and testing 80 If required to be kept under observation for a period longer than one month, for each additional month or part of a month 40 For determining a resistance of standard form to highest accuracy obtainable at one temperature 20 For determining the E.M.F. of a standard cell to highest accuracy obtainable at one temperature 15 Note 1: - The instruments and apparatus under test are to be delivered and removed from the Government Electrical Laboratory, Bhowanipore, Calcutta, free of cost to Government. Note 2: - In tests requiring the expenditure of a considerable amount of power, a charge to cover the actual cost of the energy used may be made.

Previous and next

All provisions of THE INDIAN ELECTRICITY RULES, 1956

Questions people ask

Is annexure II of THE INDIAN ELECTRICITY RULES, 1956 still in force?

No repeal of the INDIAN ELECTRICITY RULES, 1956 is recorded.