Rule 14, UP ELECTRICITY DUTY RULES 1952: Testing of meter for correctness and estimation’ of - consumption
UP ELECTRICITY DUTY RULES 1952 - Rule 14
Text of rule 14
Testing of meter for correctness and estimation’ of - consumption
14. Testing of meter for correctness and estimation’ of
- consumption.—(1) If in case of doubt the inspecting officer appointed
under Section 6 of the Act considers it necessary to get the correctness of
any meter examined by the Electrical Inspector, which shall normally’
not be required more than-once in a year, except when the meter stops to
register, or on being referred, the Deputy Electrical Inspector, or the
Electrical Inspector is satisfled that its accuracy is doubtful, the licensee,
appointed authority or other.person, shall within one month of the ordeg
of the inspecting office replace that meter with another suitab}e axtl’
correct meter, deposit the fee for testing of meter as prescribed by
Government under Rule 7 of the Indian Electrical rules, 1956, and deliver
at his own expense the meter along with a recetpted copy of the tre:g
challan on account of the testing fee tp;the Electrical Inspector
office for test. ) s ly
(2) The result of such test, which shall be final and bindng- 12}2:3::1
fntimated in writing to the inspecting officer, Dep“tghei_ person
Inspector and the licensee, appointed authority or o i view the
concerned and the Deputy Electrical Inspector, keepll]llg catimate the
recommendations thereon of the inspecting officer. ::l‘:d 1ot €XC
amount of energy supplied or consumed during such p uspected, as the
six months prior to the date on which ite accuracy wasdfim:’ duty for-that
meter shall not, in his opinion, have been corrected an!
period shall be levied accordingly on that basis.
& 181 ' U.P. ELECTRICITY (DUTY) RULES, 1952 28
(3) On receipt of the test result, the licensee, aj ority ¥ J 3 i
other person concerned shall arrange to obtain fiogzgra:fh his bl
expense from the office of the Electrical Inspector and in case the mx
js found to be correct he shall be entitled f
him for such test. d for refund of the fee deposited by
Previous and next
Questions people ask
Is rule 14 of UP ELECTRICITY DUTY RULES 1952 still in force?
No repeal of UP ELECTRICITY DUTY RULES 1952 is recorded.