LawGrids logoLAWGRIDS.ORG

Form 8-B, Punjab Factories Rules 1952: FORM No. 8-B

Punjab Factories Rules 1952 - Form 8-B

Text of form 8-B

FORM No. 8-B

FORM No. 8-B (See rule 67-H) APPLICATION FOR THE SITE APPRAISAL COMMITTEE 1. Name and address of the applicant. 2. Site Ownership Data: 2.1, Revenue details of the site such a Survey No., Plot No. 2.2. Whether the proposed site attracts the provisions of section 3 of Environments Protection Act, 1986, if so the nature of the restrictions: and 2.3. Local authority under whose jurisdiction the site is located. 3. Site Plan : 3.1. Site plan with clear identification of boundries and total area proposed to be occupied and showing details nearby the proposed site (a) Name of adjoining manufacturing units and human habits, educational and training institutions, petrol installa- tions, storages liquified Petroleum Gas and other hazardous substances, if any, within one kilometer from the proposed unit. (b) Water sources (crivers, streams, canal dams, water filteration plants) in the vicinity. (c) Nearest hospitals, Fire-stations, Civil Defence Stations and Police Station and their distances. (d) Details of high tension electrical transmission lines, pipe lines for oil, gas sewerage, if any, passing through the site, and (e) Location of railway stations, railway lines, Scheduled road, byepass,, if any near the site. 3.2. Plot Plan of the factory, showing entry and, exit points, roads. 4 Project Report. 4.1 A summary of the salient features of Project. 4.2. Maximum number of persons like be working in the factory. 4.3. Maximum amount of power and requirements and source of supply. 4.4. Block diagrams of the buildings installations, in the proposeds and 4.5. Details of housing colony, hospital, school and other infrastructural facilities proposed. 5. Organisation structure of the proposed manufacturing unit/factory : 5.1. Person responsible far protection of safety, health and environment. 5.2. Proposed health and safety policy of the proposed enterprise. 6. Manufacturing Process Information : 6.1. Process flow diagrams. 6.2 Brief write up on process and technology. 6.3 Critical Process parameters such as pressure build- up, temperature rise and run-away reaction. 6.4 Other external effections critical to the process having safety implications such as ingrass of moisture or water, contact with incompatiable substances sudden power failure ; and 6.5 High lights of the built-in-safety/pollution control devices or measures incorporated in the manufacturing technology. 7. Information of Hazardous Materials : 7.1 Raw materials, intermediates, products and bye- products and their quantities (enclosed Material Safety Data Sheet in respect of each hazardous substances). 7.2 Main and intermediate storages proposed far raw material /intermediates/products/Bye Products (maximum quantities to be stored at any time) 7.3 Transportation methods to be used for materials in flow and out flow, their quantities to be stored at any time ; and 7.4 Safety measures proposed for : -----handing of materials. -----internal and external transportation, and -----disposal (packing and forwarding of finished products). 8. Information ort Dispersal/Disposal of wastes and pollutants ; 8.1 Major Pollutants (gas, liquids, solid)their characteristics and quantities (average and at peak loads). 8.2. Quality. And quantity of solid wastes generated, methods of their treatment and disposal. 8.3. Air, Water and Soil Pollution problems anticipated and the proposed measures to control .the same, including treatment and disposal of effluents. 9. Process Hazards Information : 9.1. Enclose a copy of the report on environmental impact assessment. 9.2. Enclosed a copy of the report an Risk Assessment Study : and 9.3. Published (open or classified) reports if any, on accident situation/occupational health hazards or similar plants (within or outside the country). 10. Information of proposed Safety and Occupational Health Measure ; 10.1. Details of fire fighting facilities and minimum quantity of water cartaoridi- oxide and other fire fighting measures needed to meet the emergencies ; and 10.2. Details of in-house medical facilities Proposed. 11. Information on Emergency preparedness : 11.1. On Site Emergency Plan : and 11.2. Proposed arrangements, if any for mutual aid scheme with the group of neighbouring factories. I certify that the information furnished above is correct to the best of my knowledge and nothing has been concealed while furnishing it. Signature Date Designation

Previous and next

All provisions of Punjab Factories Rules 1952

Questions people ask

Is form 8-B of Punjab Factories Rules 1952 still in force?

No repeal of Punjab Factories Rules 1952 is recorded.