Rule 112, Rajasthan Factories Rules,1951: @[Repeal and savings.]
Rajasthan Factories Rules,1951 - Rule 112
Text of rule 112
@[Repeal and savings.]
112. @[Repeal and savings.] — All corresponding rules in force in Abu, Ajmer or Sunel
area are hereby superseded.[
------------------------------------------------------------------------------------------------------------------------
@. Inserted vide Notification No. F. 2(58)/L&E/64. dated 25.3.1968; Rajasthan Gazette Part
IV(Ga dated 11.7.68.
@[ “FORM No. 1
(See Rule3A)
Application for permission to construct, extend or take into use any building or
premises as a factory
1. Details of Occupier
(a) Name:
(b) Address (office):
(c) Address (residential):
(d) Contact number, if any:
2. Details of factory
(a) Full name:
(b) Address with pin code:
(c) District:
(d) Town or village:
(e) Nearest railway station
(f) Nearest Police Station
(g) Phone number, if any:
3. Particulars of plant to be
installed & Manufacturing
process
4. Maximum number of
Workers
Male Female
(To be employed)
5. Details of
(a)Raw material
(b) Intermediate product/by product
(c) Final Product
6. Use of Chemicals in the manufacturing process, if any
S. No. Trade name: Chemical name: Maximum storage
at any time:
7. NOTE
a. In case of any change in the above information, Department shall be informed in
writing within 30 days.
b. Seal bearing “ authorized signatory “ shall not be used on any document
Place:
Date:
Signature of occupier with seal:
( Name )
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
---------------------------------------------------------------------------------------------------------------
@. Substituted vide notification No.F3(1)legal/F&B/2013/942 dated 31.7.2013
CHECKLIST
NOTE: This application shall be accompanied by the following documents:-
1. A flow chart of the manufacturing process supplemented by a brief description of
the process in its various stage.
2. Plans, in triplicate, drawn to scale as per rule 3A, showing:
(i) the site of the factory and immediate surroundings including adjacent
buildings and other structures, roads, drains, etc.; and
(ii) the building & machinery layout plan, elevation and necessary cross-
sections of the various buildings indicating all relevant details relating to
natural lighting, ventilation, means of escape in case of fire (see rule 63)and
any other provisions as mentioned in Chapter III “Health”, Chapter IV
“Safety” and Chapter V “Welfare” of the Factories Act, 1948 and rules made
there under. The plans shall also clearly indicate the position of the plant
and machinery, aisles and passage-ways.
3. Documents related to the ownership of the land:
(i) RIICO lease deed / Land use conversion document (in case land is not in
RIICO industrial area); and
(ii) Rent deed / lease deed
4. Safety & Health Policy:
(i) in case of factory covered under clause (cb) of section 2 of the Factories
Act, 1948; or
(ii) in case of factories covered under Rajasthan Control of Industrial Major
Accident Hazards Rules, 1991 (RCIMAH), Submission of additional
information / documents required under rule 7 of these rules.
5. Photo ID and address proof of the Occupier.
6. Such other particulars as the Chief Inspector may require.
7. Every page of the Documents submitted along with the Form should be self
attested by the Occupier along with date.
8. Any correction made in the Form should be duly signed by the Occupier.”]
@[“FORM No. 1A
(See Rule3A)
Application for factories carrying out non hazardous process and employing upto 50
workers
(To be filled by the occupier on a non-judicial stamp paper of Rs 10/-)
I _____________________________ S/o ______________________________________
R/o_____________________________________________________ and Occupier of M/s
________________________________________________ hereby state as under:-
1. That I have applied for registration of my factory in the name of M/s
_______________________________ situated at (Complete address of the factory)
____________________________________________.
2. That I have gone through the Factories Act, 1948 &rules made thereunder and have
fully understood the contents of the Act & Rules and undertake to abide by the same.
3. That I shall employ upto 50 workers.
4. That I shall inform and submit relevant necessary documents as per Act and Rules, in case
of :
(i) change of building & machinery layout;
(ii) change in manufacturing process;
(iii) addition of any manufacturing process, covered under clause (cb) of section 2 or
section 87 of the Factories Act, 1948 or Rajasthan Control of Industrial Major
Accident Hazards Rules,1991; or
(iv) employment of more than 50 workers.
Place:
Date:
Signature ofOccupier: ………..………
VERIFICATION
I the above named Occupier do hereby further solemnly affirm that the contents given above are
true to the best of my knowledge.
Place:
Date:
Signature of Occupier ………………….”]
----------------------------------------------------------------------------------------------------------------------
@. Added vide notification No.F3(1)legal/F&B/2013/942 dated 31.7.2013
@[“FORM No. 2
(See Rule 4, 5, 6, 7, 8)
Application for registration / renewal /amendment/transfer of licence andnotice of occupation as
specified in section 6 and 7
(To be submitted in triplicate)
1. Period of licence:
1. YEAR (s) for which licence is applied for
From To
2. General Information:
2a. Full name of the factory
2b. Factory registration number
(if already registered )
RJ -
3. Address and contact information:
3a. Full postal address along with pin code and
telephone Number of the factory
3b. Full postal address along with pin code for
communications (if differ from above)
4. Nature of manufacturing processes:
4a. Date of start of production (for registration)
4b. Manufacturing process carried on in the factory in
the last twelve months
4c. Manufacturing process to be carried on in the
factory during the next twelve months
4d. Details of product (s)manufactured during the last
twelve months
5. Workers employed:
5a. Maximum number of workers proposed to be
employed during the year
Male Female Total
5b. Maximum number of workers employed during
the last twelve months on any day
5c. Number of workers ordinarily employed in the
factory
6. Power installed:
6a. Total rated horse power ( installed or to be
installed) (attach sanction load and first electricity
bill)
6b. Maximum amount of Power (H.P) proposed to be
used
---------------------------------------------------------------------------------------------------------------
@. Substituted vide notification No. F3(1)legal/F&B/2013/942 dated 31.7.2013
7. Particulars of Factory Manager:
7. Name and address of the person who shall be the
Factory Manager (if appointed) of the factory for
the purposes of the Act
Name
Residential
address
Contact No.
(if any)
8. Particulars of Occupier:
8a. Name and address of the occupier
(in case of a private firm.)
Attach list of partners with complete details, (in
case of partnership firm)
Name
Residential
Address
Contact No.
(if any)
8b. Name and address of the Director in case of a
private/ public limited company
( attach list of Director with details)
Name
Residential
Address
Contact No.
(if any)
8c.
Full name and residential address of the Managing
Agent in case where a managing agent is
appointed by the Central Government / State
Government / Local authority as Occupier
Name
Address
Contact No.
(if any)
9. Land & Building:
9a. Full name and address of the owner of the
premises or building (including the precincts
thereof) (referred to in section 93 of the Act)
Name
Address
Contact No.
(if any)
9b. Reference number and date of approval of the
plans for site, whether for old or new building and
for construction or extension of factory by the
State Government / Chief Inspector
10. Disposal of wastes and effluents:
10. Reference number and date of approval of the
arrangements, if any made for the disposal of
trade waste and effluents and the name of the
authority granting such approval.
11. Fees Details:
11. Total amount of fees paid Rs.
11a. In case of payment in treasury
(Original Challan to be enclosed)
Name of Bank
& Branch
Challan
number
Date
11b. In case of payment by Demand Draft
(Demand Draft shall be in favour of the Chief
Inspector of Factories & Boilers, payable at
Jaipur )
Name of Bank
Demand Draft
number
Date of
Demand Draft
11c. In case of online payment, details thereof
12. NOTE
a. In case of any change in the above information, Department shall be informed in writing.
b. Seal bearing “ authorized signatory “ shall not be used on any document.
Place:
Date:
Signature of Factory Manager with seal: ______
( Name)
Signature of occupier with seal:
( Name )
VERIFICATION
I the above named Occupier do hereby further solemnly affirm that the contents given above
are true to the best of my knowledge.
Place: __________________
Date: __________________
Signature of Occupier …………………………….…….
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
CHECKLIST
NOTE: This application shall be accompanied by the following documents:-
1. This form should be completed in block letters or typed.
2. Every page of the form should be signed by the Occupier.
3. If power proposed is not used at the time of filling up this form, but is introduced later, the fact
should be communicated to the Chief Inspector of Factories and Boilers immediately.
4. If any of the persons named against items 7(a) and 7(b) is minor, the fact should be clearly
stated along with documents.
5. Any correction made in the Form should be duly signed by the Occupier or the Factory Manager.
6. List of documents to be enclosed :
(i) Latest List of partners / Latest List of Directors.
(ii) In case of change of Directors submit Form No. 32 of the Companies Act,
1956.
(iii) Partnership deed / Memorandum of Articles of Association.
(iv) Land ownership documents.
(v) RIICO lease deed .
(vi) Land use conversion document (in case land is not in RIICO industrial
area).
(vii) Rent deed / lease deed.
(viii) Load sanction copy & First electricity bill for registration.
(ix) latest electricity bill for renewal.
(x) Photo ID and address proof of the Occupier and the Factory Manager.
7. Every page of the Documents submitted along with the Form should be self attested
by the Occupier or the Factory Manager along with date.]