LawGrids logoLAWGRIDS.ORG

Rule 112, Rajasthan Factories Rules,1951: @[Repeal and savings.]

Rajasthan Factories Rules,1951 - Rule 112

Text of rule 112

@[Repeal and savings.]

112. @[Repeal and savings.] — All corresponding rules in force in Abu, Ajmer or Sunel area are hereby superseded.[ ------------------------------------------------------------------------------------------------------------------------ @. Inserted vide Notification No. F. 2(58)/L&E/64. dated 25.3.1968; Rajasthan Gazette Part IV(Ga dated 11.7.68. @[ “FORM No. 1 (See Rule3A) Application for permission to construct, extend or take into use any building or premises as a factory 1. Details of Occupier (a) Name: (b) Address (office): (c) Address (residential): (d) Contact number, if any: 2. Details of factory (a) Full name: (b) Address with pin code: (c) District: (d) Town or village: (e) Nearest railway station (f) Nearest Police Station (g) Phone number, if any: 3. Particulars of plant to be installed & Manufacturing process 4. Maximum number of Workers Male Female (To be employed) 5. Details of (a)Raw material (b) Intermediate product/by product (c) Final Product 6. Use of Chemicals in the manufacturing process, if any S. No. Trade name: Chemical name: Maximum storage at any time: 7. NOTE a. In case of any change in the above information, Department shall be informed in writing within 30 days. b. Seal bearing “ authorized signatory “ shall not be used on any document Place: Date: Signature of occupier with seal: ( Name ) ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ --------------------------------------------------------------------------------------------------------------- @. Substituted vide notification No.F3(1)legal/F&B/2013/942 dated 31.7.2013 CHECKLIST NOTE: This application shall be accompanied by the following documents:- 1. A flow chart of the manufacturing process supplemented by a brief description of the process in its various stage. 2. Plans, in triplicate, drawn to scale as per rule 3A, showing: (i) the site of the factory and immediate surroundings including adjacent buildings and other structures, roads, drains, etc.; and (ii) the building & machinery layout plan, elevation and necessary cross- sections of the various buildings indicating all relevant details relating to natural lighting, ventilation, means of escape in case of fire (see rule 63)and any other provisions as mentioned in Chapter III “Health”, Chapter IV “Safety” and Chapter V “Welfare” of the Factories Act, 1948 and rules made there under. The plans shall also clearly indicate the position of the plant and machinery, aisles and passage-ways. 3. Documents related to the ownership of the land: (i) RIICO lease deed / Land use conversion document (in case land is not in RIICO industrial area); and (ii) Rent deed / lease deed 4. Safety & Health Policy: (i) in case of factory covered under clause (cb) of section 2 of the Factories Act, 1948; or (ii) in case of factories covered under Rajasthan Control of Industrial Major Accident Hazards Rules, 1991 (RCIMAH), Submission of additional information / documents required under rule 7 of these rules. 5. Photo ID and address proof of the Occupier. 6. Such other particulars as the Chief Inspector may require. 7. Every page of the Documents submitted along with the Form should be self attested by the Occupier along with date. 8. Any correction made in the Form should be duly signed by the Occupier.”] @[“FORM No. 1A (See Rule3A) Application for factories carrying out non hazardous process and employing upto 50 workers (To be filled by the occupier on a non-judicial stamp paper of Rs 10/-) I _____________________________ S/o ______________________________________ R/o_____________________________________________________ and Occupier of M/s ________________________________________________ hereby state as under:- 1. That I have applied for registration of my factory in the name of M/s _______________________________ situated at (Complete address of the factory) ____________________________________________. 2. That I have gone through the Factories Act, 1948 &rules made thereunder and have fully understood the contents of the Act & Rules and undertake to abide by the same. 3. That I shall employ upto 50 workers. 4. That I shall inform and submit relevant necessary documents as per Act and Rules, in case of : (i) change of building & machinery layout; (ii) change in manufacturing process; (iii) addition of any manufacturing process, covered under clause (cb) of section 2 or section 87 of the Factories Act, 1948 or Rajasthan Control of Industrial Major Accident Hazards Rules,1991; or (iv) employment of more than 50 workers. Place: Date: Signature ofOccupier: ………..……… VERIFICATION I the above named Occupier do hereby further solemnly affirm that the contents given above are true to the best of my knowledge. Place: Date: Signature of Occupier ………………….”] ---------------------------------------------------------------------------------------------------------------------- @. Added vide notification No.F3(1)legal/F&B/2013/942 dated 31.7.2013 @[“FORM No. 2 (See Rule 4, 5, 6, 7, 8) Application for registration / renewal /amendment/transfer of licence andnotice of occupation as specified in section 6 and 7 (To be submitted in triplicate) 1. Period of licence: 1. YEAR (s) for which licence is applied for From To 2. General Information: 2a. Full name of the factory 2b. Factory registration number (if already registered ) RJ - 3. Address and contact information: 3a. Full postal address along with pin code and telephone Number of the factory 3b. Full postal address along with pin code for communications (if differ from above) 4. Nature of manufacturing processes: 4a. Date of start of production (for registration) 4b. Manufacturing process carried on in the factory in the last twelve months 4c. Manufacturing process to be carried on in the factory during the next twelve months 4d. Details of product (s)manufactured during the last twelve months 5. Workers employed: 5a. Maximum number of workers proposed to be employed during the year Male Female Total 5b. Maximum number of workers employed during the last twelve months on any day 5c. Number of workers ordinarily employed in the factory 6. Power installed: 6a. Total rated horse power ( installed or to be installed) (attach sanction load and first electricity bill) 6b. Maximum amount of Power (H.P) proposed to be used --------------------------------------------------------------------------------------------------------------- @. Substituted vide notification No. F3(1)legal/F&B/2013/942 dated 31.7.2013 7. Particulars of Factory Manager: 7. Name and address of the person who shall be the Factory Manager (if appointed) of the factory for the purposes of the Act Name Residential address Contact No. (if any) 8. Particulars of Occupier: 8a. Name and address of the occupier (in case of a private firm.) Attach list of partners with complete details, (in case of partnership firm) Name Residential Address Contact No. (if any) 8b. Name and address of the Director in case of a private/ public limited company ( attach list of Director with details) Name Residential Address Contact No. (if any) 8c. Full name and residential address of the Managing Agent in case where a managing agent is appointed by the Central Government / State Government / Local authority as Occupier Name Address Contact No. (if any) 9. Land & Building: 9a. Full name and address of the owner of the premises or building (including the precincts thereof) (referred to in section 93 of the Act) Name Address Contact No. (if any) 9b. Reference number and date of approval of the plans for site, whether for old or new building and for construction or extension of factory by the State Government / Chief Inspector 10. Disposal of wastes and effluents: 10. Reference number and date of approval of the arrangements, if any made for the disposal of trade waste and effluents and the name of the authority granting such approval. 11. Fees Details: 11. Total amount of fees paid Rs. 11a. In case of payment in treasury (Original Challan to be enclosed) Name of Bank & Branch Challan number Date 11b. In case of payment by Demand Draft (Demand Draft shall be in favour of the Chief Inspector of Factories & Boilers, payable at Jaipur ) Name of Bank Demand Draft number Date of Demand Draft 11c. In case of online payment, details thereof 12. NOTE a. In case of any change in the above information, Department shall be informed in writing. b. Seal bearing “ authorized signatory “ shall not be used on any document. Place: Date: Signature of Factory Manager with seal: ______ ( Name) Signature of occupier with seal: ( Name ) VERIFICATION I the above named Occupier do hereby further solemnly affirm that the contents given above are true to the best of my knowledge. Place: __________________ Date: __________________ Signature of Occupier …………………………….……. ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ CHECKLIST NOTE: This application shall be accompanied by the following documents:- 1. This form should be completed in block letters or typed. 2. Every page of the form should be signed by the Occupier. 3. If power proposed is not used at the time of filling up this form, but is introduced later, the fact should be communicated to the Chief Inspector of Factories and Boilers immediately. 4. If any of the persons named against items 7(a) and 7(b) is minor, the fact should be clearly stated along with documents. 5. Any correction made in the Form should be duly signed by the Occupier or the Factory Manager. 6. List of documents to be enclosed : (i) Latest List of partners / Latest List of Directors. (ii) In case of change of Directors submit Form No. 32 of the Companies Act, 1956. (iii) Partnership deed / Memorandum of Articles of Association. (iv) Land ownership documents. (v) RIICO lease deed . (vi) Land use conversion document (in case land is not in RIICO industrial area). (vii) Rent deed / lease deed. (viii) Load sanction copy & First electricity bill for registration. (ix) latest electricity bill for renewal. (x) Photo ID and address proof of the Occupier and the Factory Manager. 7. Every page of the Documents submitted along with the Form should be self attested by the Occupier or the Factory Manager along with date.]

Previous and next

All provisions of Rajasthan Factories Rules,1951

Questions people ask

Is rule 112 of Rajasthan Factories Rules,1951 still in force?

No repeal of Rajasthan Factories Rules,1951 is recorded.