LawGrids logoLAWGRIDS.ORG

Rule 89, Rajasthan Factories Rules,1951: Exemption of certain adult workers

Rajasthan Factories Rules,1951 - Rule 89

Text of rule 89

Exemption of certain adult workers

89. Exemption of certain adult workers. — Adult workers engaged in factories specified in column 3 of schedule hereto annexed on the work specified in column 4 of the said schedule shall be exempted from the provisions of the sections specified in column 5 of the said schedule subject to the conditions, if any specified in column 6 of the said schedule. Provided that :— (1) No female adult worker shall be required or allowed to work for more than nine hours on any day except in the case of urgent repairs covered by item (i) of the said schedule and no male adult worker shall be required to allowed to work for more than ten hours on any day. (2) No male adult worker shall be required or allowed to work in any quarter for more than fifty hours over time on weekly limits. (3) Period of work for each male adult worker shall be so arranged that inclusive or his interval rest they shall not spread over more than twelve hours in any day : Provided further that the restrictions imposed by sub-clause (2) & (3) shall not apply in the case of a shift worker engaged in factories specified against serial Nos. 9, 11 to 21, 23 to 34{i), 35(i), 43, 45 and 57(i) of the schedule and allowed to work in the whole or part of the subsequent shift in place of a worker who has failed to report for duty. Sl. No. Section of the Act empowering grant of exemption Class of a factory Nature of exempted work Extent Extent of exemption conditions 1 2 3 4 5 6 1. 64(2)(a) and 64(3) All factories Urgent repairs (Urgent repairs shall mean work to be done to machinery or plant but only so far as may be necessary to avoid serious in-interference with the ordinary working of the undertaking) Sections 51, 52, 54, 56, &61 (a) Unless the Inspector gives permission in writing for reporting otherwise than as herein laid down the employment of persons on urgent repairs, the manager :— (i) Shall send within twenty four hours of the commencement of work on urgent repairs, written notice to the Inspector describing briefly the nature of the urgent repairs and the probable period of their duration, and (ii) Shall send weekly during the continuance of the work on urgent repairs, a statement giving the names of all the persons, who have worked for more than nine hours in any one day or for more than forty-eight hours of the preceding week in a factory. Such statement shall also show total number of hours worked each day of the week. (b) If the Inspector is of opinion that any work being carried on or likely to be carried on in factory as "urgent repairs" is not "urgent repairs" the Inspector shall serve the Manager on order to that effect and the manager shall in respect of such work not allow any worker to work in contravention of the provisions of sections 51, 52, 54, 55, 56 and shall comply with the provision of section 61. 2. 64(2)(b) 64(2)(h) 64(3) All factories other than those on continuous process Works performed by: (i) All workers attending to engines & boilers or generators of gas preparatory to the Sections 51, 52, 55, 56 and 61. (a) Such workers shall be allowed not less than two holidays in each period covered by four consecutive statutory factory holidays and shall not be allowed to work for more than six hours on any of the other two weekly holidays. commencement of regular work (ii) Workers at- tending to mill gearings, starting stopping and maintaining electric motors & connected switch gear. (iii Department boilers. (iv) Workers attending to mechanical or electric lifts (b) The notice required by section 52 shall be delivered to the office of the Inspector showing on which days holidays will be allowed; (c) Intervals for food and rest shall be given to all workers allowed to work on such work. (d) No workers be allowed to work for more than fifty four hours in any one week, and (e) Register or muster roll required to be maintained under section 62 shall show correctly full particulars of periods within which each such worker may be 'required to work. The entries in the register or muster roll shall be up-to date. 3. 64(2) and 64(3) All Factories Work performed by drivers on lighting ventilating and humidifying apparatus. Section 51, 54, 55, 56 and 61 (a) intervals for food and rest shall be given to all such workers. (b) Register or muster roll required to be maintained under Section 62 shall show correctly full Particulars of periods within which each such workers may be required to work. The entries in the register or muster roll shall be up-to-date. 4. 64(2)(b) and 64(3) (i) all factories Work performed on the steam of water pipes or pumps of a factory Section 51, 54, 55, 56 and 61 Register or muster roll required to be maintained under section 62 shall show correctly full particulars of periods within which each such worker may be required to work. The entries in the register or muster roll shall be up-to-date. (ii) Cotton Spinning and Weaving Mills Work involved in cleaning blow room flues. Section 51, 54, and 56. (a) No worker shall be allowed to work for more than fifty one hours in one week. (b) No workers shall be allowed to worked in such manner that the spread over exceeds ten and a half hours except on one day in a week previously notified to the Inspector when it shall not exceed twelve hours. 5. 64(2)(b) Dying and bleaching factories or departments Work performed by kiermen Section 51, 54, and 56 The intervals for food and rest totaling one hours, if working hours exceeds eight and a half in a day or half an hour, in working hours do not exceed eight and half hour shall be given to each worker every day and the register of muster roll maintained in accordance with Section 62 small show correctly the period of work of each worker. 6. 64(2)(b) Cloth printing factories or department of factories carrying on printing sanforizing and mercerizing of cloth. Work in the nature of preparatory or complementary to main operations. Section 51, 54, and 56. -do- 7. 64(2) (b) Cloth printing factories or departments of factories and bleaching, raising, finishing, mercerizing, dyeing, sizing and sanforizing deptt, of the factories. All work Section 55. Workers shall be allowed to work on shift of no longer than eight hours duration. 8. 64(2)(b) All factories other cotton— spinning and weaving mills (a) Work- performed by oilers and (b) Work in mechanic shops, smithies or foundries so far as such work is complementary to the main operations. Section 51, 54 and 56 This exemption shall not apply:- (I) in the case of work performed by oilers, where there workers or the factories in which the work have been exempted from the provisions of section 52 or 55 and (ii) to the work in the mechanic shop, smithy or foundry portion of Engineering Workshop or to a smithy or foundry used solely as such. 9. 64(2)(d) 64(3) and 64(4) Oil Tank Installation Work performed by workers in connection with pumping operations. Section 51,52, 54, 55, 56 and 61 (a) Intervals for food and rest shall be given to all workers allowed to work on such work . (b) A compensatory rest period of at least twenty four consecutive hours shall be given to each worker after the cessation of the pumping operations continuing after 10. p.m. (c) Notice of such pumping operations with the number of workers allowed to work shall be sent to the Inspector as soon as possible after commencement of such work. 10. 64(2)(d) and 64(4) Public electricity supply factories generating electricity in any manner and those engine rooms and boilers departments generating electricity in any manner for their own use employing worker on shifts of not more than eight hours each. Operations and Maintenance of - (i) Prime movers and auxiliaries generators transformers and switch gear; (ii) Boilers and auxiliaries Section 51m 52m 54m 55 and 56 (a) The workers shall be allowed to work on shift of no longer than eight hours duration. (b) In the absence of a workers who has failed to report for duty, a shift worker many be allowed to work the whole or part of a subsequent shift provided that the next shift of the shift provided that the next shift of the workers shall not commence before a period of 16 hours has elapsed after the (Specified) stopping time of the shift to which the worker belongs. (c) No worker shall be allowed to work for more than fifty six hours in any week except that when employed as in condition; (d) Above, he shall not be allowed to work for more than sixty four hours. (e) such workers shall be allowed not less than two holidays in each period covered by four consecutive statutory factory holidays 11. 64(2)(d)&64(4) Electrical receiving stations and subsection or in any factory, the departments of the factory receiving and distributing electrical energy for the use of the factory. Operations and maintenance of transformers and their auxiliaries including receiving and distributing switch gear lighting, arresting, synchronous and other condensers and rotary and static condensers. Section 51, 52, 54, 55 and 56. As in exemption No. 10 12 -do- Factories or department of factories charging electrical accumulators. Operations in connection with charging electrical accumulators. Section 51, 52, 53, 54, 55 and 56. As in exemption No. 10. 13. -do- Distilleries Work on the extraction of sugar from various basis -do- -do- fermentation of sugar juice and distillation of fermented wash 14. 64(2)(d) & 64(4) Sugar factor. Operations beginning with receiving and weightment of cane and ending with bagging of sugar As in exemption No. 13 As in exemption No. 13 15. -do- Chemical factories. All continuous process work. Sections 51, 52, 54, 55 and 56. -do- 15A. -do- Chemical factories. All continuous process work. Section 51, 52, 54, 55 and 56. -do- 16. -do- Rayon and Synthetic Fibre factories The Work viz. Refining, bleaching filtering generation of hydrogen, hydrogenating and deorishing proceses also compression of oxygen and the cylinder filling. -do- -do- 17. 64(2)(d) &64(4) Magnesium chloride factories. The work on cent rating process As in exemption No. 16. As in exemption No. 16. 18. -do- Public pumping and compressor stations. All work. -do- -do- 19. -do- Water supply pumping factories of railway workshops. All works.. -do- -do- 20. -do- Ice Factories. Work of the engine and compressor drivers and assistants and oilersi -do- -do- 21. -do- Carbonic acid gas work. Work of firemen, pump men, plant drivers, oilers and the filing of cylinders. -do- -do- 22. 64(2)(b) Carbonic acid gas work. Work firemen to light lye Section 51, 54 and These exemptions shall be availed of only one day boiler 55 when plant is restarted after closure. 23. 64(2)(d) & 64(4) Carbonic acid gas solidification works. All work except packing blocks. Section 51, 52, 54, 55 and 56 As in exemption 10. 24. -do- Oxygen factories Engine and plant drivers, oilers and filling of cylinders. -do- -do- 25. -do- Coal gas factories and departments. All work in the retorate house an on the water gas plant, work of the male yard labour feeding hoppers and removing coke, work on the syphnoes, boilers station meters and governors. Section 51, 52, 54, 55 and 56. As in examination No. 10. 26. -do- Hydraulic pumping stations. All work. -do- -do- 27. -do- Paper Cardboard and straw board factories working on there hours shift system Work performed by male adults workers on choppers, strainers and washers, reaters. Paper making machines pulping plants, reellers and cutters, kheeders and dig-esters -do- -do- 28. 64(2) & 64(4) Cement factories and asbestos cement factories. All work on continuous process units Section 51, 52, 54, 55 and 56. As in exemptions No, 10 29 -do- Glycerin factories. All continuous process work. -do- -do- 30. -do- Dextrine manufacturing factories. All continuous process work. -do- -do- 31. -do- Acetylene factories. Generation of gas and filling of cylinders -do- -do- 32. -do- Starch factories working in 8 All work except the engineering -do- -do- hours shifts. department and workshops. 33. -do- Potassium chloride factories. Work in the cell room. -do- -do- 34. 64(2)(d) & 64(4) (I) Ferrous & non Ferrous metal factories. All work in furnace Section 51, 52, 54, 55 and 56. As in exemption No. 10. (ii) -do- Hot rolling Section 55 Workers small be allowed to work on shifts not longer than eight hours duration 35. -do- Sodium Potassium bicromate factories. Work on furnace and crystallisers Section 51, 52, 54, 55 and 56. As in exemption No. 10 36. -do- Oil Mills.. All continuous process work. -do- -do- 37 -do- Flours Mills. All work. -do- -do- 38. 64(2)(b) (i) Gur Factories The work performed by workers in crushing Sugar cane Section 51, 52, 54, 55 and 56 As in exemption No. 10 64(2)(b) and 64(3) (ii) Gur Factories All other work except crushing sugar cane. Section 51, 54, 55 and 61. A notice showing the periods of work of the crusher shall be exhibited in the factory and a copy shall be sent to the Inspector. 39. 64(2)(d) Cement Tiles Factories Work on the “curing” tiles Section 51, & 52 (a) No worker shall be allowed to work for more than four hours or any of the weekly holidays. (b) No worker shall be allowed to work on consecutive weekly holidays. (c) No workers shall be allowed to work in excess of limits of weekly hours of work as laid down in Section 51 except during the week when the worker work on a weekly holidays as in (a) above and when his total hours of work may be allowed to exceed the weekly limit laid down in section 51 by the number of hours not exceeding 4, worked on the weekly holidays. 40. 64(2)(c) and 64(3) Salt factories. Work performed by “Baramasees” on Salt Kyars Section 51, 54, 55, 56 and 61 (a) Intervals for food and rest shall be given to all workers allowed to work on such work. (b) Register on muster roll required to be maintained under section 62 shall show correctly full particulars of period withing which each such worker may be required to work; entries in register or muster roll shall be up to date. 41. 64(2)(g) and 64(3) Salt factories All workers Section 52 and 55 No worker shall be allowed to work on consecutive weekly holidays. 42. 64(2) (g) and 64(3) Rice Mills All persons employed in drying, lifting and storing of paddy. Section 52 and 55 No worker shall be allowed to work on consecutive weekly holidays 43. 64(2)(d) and 64(4) Glass Factories All work except packing work in Engineering Department Section 51, 52, 54, 55 and 56. As in Exemption No. 10 44. 64(2) (g) and 64(4) Smelting & Refining factories (I) Work on the reducing furnace Section 55 (a) the workers shall be allowed to work on shift of not longer than eight hours duration. (ii) All continuous process work in Electrolytic refining factories. (b) Intervals for food and rest shall be given to all workers allowed to work on such work 45. 64(2) (d) and 64(4) Rubber Tyre factories All work on curing process Section 51, 54, 55 and 56 (a) The workers shall be allowed to work on shift of not longer than eight hours duration. (b) in the absence of a worker who has failed to report for duty, a shift worker may be allowed to work the whole or part of a subsequent shift worker shall not commence before period of 16 hours has elapsed after the (specified) stopping time of the shift to which the worker belongs. 46. 64(2)(d) Soap factories Work on soap boiling pans and soap dying pans Section 55 Workers shall be allowed to work on shift of not longer than eight hours duration. 47. 64(2)(d) Pottery work (I) Work of fireman on Kilns Section 55 (a) Workers shall be allowed to work on shift of not longer than eight hours duration. (ii) Work on tunnel Kilns Section 52 & 55 (b) No worker shall be allowed to work on consecutive weekly holidays. 48. 64(2)(d) Brick Factories Work of fireman Kilns. Section 55 As in exemptions No. 46 49. 64(2)(d) Plastic Factories Work of Plastic injection machines & Plastic extruding machines Section 55 -do- 50. 64(2)(d) Pharmaceutical Factories All continuance process work. Section 55 -do- 51. -do- All factories Telephone operators. Section 55 The intervals for food and rest totaling one hour if working hours exceed eight and a half in a day or half an hour if working hours does not exceed eight and half hours shall be given to each worker every day and the same noted in the register or muster roll maintained in accordance with section 62. 52. 64(2)(c) News paper printing press (a) All work on daily news paper. Section 51, 54, 55 & 56 (a) No worker shall be allowed to work from more than 56 hours in any week. (b) All work on weekly news paper (b) No overtimes shall be carries on except for two days prior to the 53. 64(2)(I)&64(3) All factories. Loading and unloading of Railway Wagons Lorries and Trucks. Section 51, 52, 54, 55 , 56 & 61. Exemption from section 61 may be availed of provided that every worker at the end of the day's work is supplied with a note showing the total No. of hours of work put in by such worker. 55. 64(2)(d) Cycle manufacturing factories Work in coloring and enamelings section and Semi automatic plating plant Section 55 As in exemptions No. 46 56. 64(2)(d) Chemical product factories Process of manufacturing activated carbon. Section 51, 52, 54, 55 and 56. (a) the Workers shall be allowed to work on Shift of not longer than eight hours duration. (b) No worker shall be allowed to work in such a manner that the spread over exceeds twelve hours in any day and this shall be permissible only in cases when a shift reliever working on continuous process does not attend at the correct time and alternative relief can not be arranged. (c) No worker shall be allowed to work more than fifty six hours in any week except that when employed as in condition (b) above he shall mot b e allowed to work for more than sixty four hours in any week. (d) Such worker shall be allowed not less than two holidays in each period covered by four consecutive statutory holidays. 57. 64(2)(d) & 64(4) Power Cables factories Work on impregnation of paper insulated laid up cables Section 51, 52, 54, 55 & 56. As in exemption No. 10. -do- Work on wire annealing furnace, lead sheating and armoring. Workers shall be allowed to work one shift not longer than eight hours duration. 58. 64(2)(d) Cotton spinning & Weaving Mills Work n hot air sizing machines. Section 55 (i) Workers Shall be allowed to work one shift of not longer than eight hours duration. (ii) Workers shall be given specified rest intervals for food and rest. 59. 64(2)(d)&64(3) All factories Work of automatic equipment engaged in galvanizing anodizing and enameling wire platening packing, hot drop galvanizing and stores relating. Section 51, 52, 54, 55, 56, 56, 58, & 61 The limits of work inclusive of overtime shall not exceed those mentioned in subsection (4) of section 64. 60. 64(2)(k) Any factory, class or description of factories as may be notified by the State Government in the Government in the official Gazette. Work of national importance as may be notified by the State Government in the official Gazette. Section 51, 52, 54, 55 & 56. The limits of work inclusive of overtime shall not exceed those mentioned in subsection (4) of section 64. 61. 64(2)(d) Enameling wire manufacturing factory. Work Enameling wires. Section 51, 54, 55 & 56 (a) The workers shall be allowed to work one shift of not longer than eight hours duration. (b) In the absence of a worker who has failed to report for duty, a shift worker may be allowed to work the whole or part of a subsequent shift provided that the next shift of the shift worker shall not be commence before a period of 16 hours has elapsed after the (specified) stopping time of the shift to which the worker belongs. (c) No worker shall be allowed to work for more than fifty six hours in any one week except that when employed in condition (b) above he shall not be allowed to work for more than sixty four hours in any one week. 62. 64(2)(d) Dairy Plants manufacturing Dairy products like skimmed milk powder, whole milk Powder, baby food, Ghee & butter etc. The work of adult male workers employed in dairy factories other than those engaged in printing and in the manufacturing of containers for milk, cream Ghee's and butter should be deemed to be the nature of referred to in clause (e) of sub-section (2) of section 65 of the Act. Section 51, 52, 54, 55 & 56. 1. No such workers shall be allowed for more than 8 hours on Sunday . 2. No such worker shall be employed for more than 14 consecutive days without holidays of 24 days of 24 consecutive hours. 3. Every such worker shall be given a compensatory holiday in accordance with section 53 of the Act. 4. No exemptions shall be given from the provisions of se3ction 59 to the workers who are exempted from the provisions of section 51, 54, 55 & 56. 63. 64(2) & 64(4) Aluminium and Copper foil manufacturing factories. All continuous process. Section 55 As in exemptions No. 10. The following shall be considered to be urgent repairs:— (a) Repairs to any part of the machinery, plant or structure or a factory which are of such a nature that delay in their execution would involve danger to human life or safety or the stoppage of manufacturing processes. (b) Break down repairs to the motive power, transmission or other essential plant of other factories, collieries, railways, dockyards, harbours, tramways, transport, gas, electrical generating and transmission pumping or similar essential or public utility services carried out in general engineering works and foundries and which are necessary to enable such concerns to maintain their main manufacturing processes production or services during normal working hours. (c) Repairs to deep sea ships and repairs to commercial air crafts done in a factory which are essential to enable such ships, air crafts to leave post at proper time or continue their normal operations in a sea or air worthy condition as the case may be. (d) Repairs in connection with a change of active power from steam to electricity or vice versa, when such work cannot possibly be done without stoppage of the normal manufacturing process. 2. Periodical cleaning not included in the terms "examining" or "repairing".] CHAPTER VII Employment of Young Persons Notice prescribed under sub-section (3) of section 72

Previous and next

All provisions of Rajasthan Factories Rules,1951

Questions people ask

Is rule 89 of Rajasthan Factories Rules,1951 still in force?

No repeal of Rajasthan Factories Rules,1951 is recorded.