Text of regulation 85

Additional teats before rejection

85. Additional teats before rejection.- Should cither a tensile or a bend te^t fail, two fnrtliei tests of the type which failed may be made on tost piectfl cut fiom the same foiging. If the results obtained Jfiom those retests aro satisfactory, the forgings shall bo accepted, provided that in other respects they fulfil the conditions laid down above for steel forgingh. If these letests do not give satisfactory results the forgings represented may Lc re-heat-treatcd together with the remainder of the tost blocks and presented for furthei testings. in all cases whore final retests do not give satisfactory results, the forgings represented by the test pieces which fail shall be rejected GRNERAL GREY TRON CASTINGS (GRADtt A)

Previous and next

All provisions of Indian Boiler Regulations, 1950

Questions people ask

Is regulation 85 of Indian Boiler Regulations, 1950 still in force?

No repeal of Indian Boiler Regulations, 1950 is recorded.