Form II, Indian Boiler Regulations, 1950.: FORM II
Indian Boiler Regulations, 1950. - Form II
Text of form II
FORM II
FORM II
INSPECTING AUTHORITY'3 CERTIFICATE
OF INSPECTION DURING CONSTRUCTION
[REGULATION 4 (o)]
DESIGNATION OF INSPECTING AUTHORITY
We hereby certify that the type, boilor ; longth, foot
'inches; diameter, feet, inahes; working pressure, lba. built by
Messrs. at under shop
Number was constructed under our aupervinlon and in<ipeotod at various stage*
of construction by the Inapooting Offluor and that the construction nnd workmanship woro fiatia-
faotory and in aooordanoe with the Standard Conditions for tho dosign and oonatruotion of land
boilere under the Indian Boilers Aot, 1923.
The boiler is stamped of the front end plate with our stamp as shown hereunder :—
Mrjkor'tJ Name
Works number Year of Make
Tested to lba. on
W. P. Lbs. Inspeoting Officer's or Inspecting
Authority's Official Stamp,
i-— . • , . . . 1
The boiler on completion was subjected to a w j t e pressure teat of lbs. ; per
•quare inoh in the presence of the Inapooting Offloer on 19 and
•afciufactorily withstood the toat.
Samples of the plaUm, stay, an«lo and rivet, bara uaod in the construction of tho boilera were
tested in the proaonoe of the Tiispofting Offloer nnd werj found to oomply with the test preaoribed
in Ohapton II &V of the Re^uUtionR relating to Standard Conditions fot tho design and conn-
truotion of biiilnrs undur the Indian Boilord A''t, 1923.
We havo aatiafiod ouraolv,)s that the oonstruotion and dimenainns of tho boilur a n flfl shown
in thu maker's, drawing No. aigtwd by ua, and that the partiaulard entered in tho makor'»
oertifloate of manufaoturo in Form III aountor-dgnad by ua, uro oorreot to the best of our know-
I«dge and bolief.
Signature of
inipeoting Authority,
jXUtd : this day of W
8 « . »] THE GAZETTE OP INDIA EXTRAOBDlNAftT