Rule 11, (The Madhya Pradesh) Electricity Duty Rules, 1949.: Where
(The Madhya Pradesh) Electricity Duty Rules, 1949. - Rule 11
Text of rule 11
Where
6[11. Where—
Consumption of electrical energy for which separate
rates of duty are prescribed; or
Consumption of electrical energy which is both dutiable
and non-dutiable;
is recoided by. one meter, the dutiable energy consumption of
different categories shall be assessed in the manner laid down by
the Electric Inspector from time to timet(till such time, meters for
each category are installed).
g12.
* •
. 11
Previous and next
All provisions of (The Madhya Pradesh) Electricity Duty Rules, 1949.
Questions people ask
Is rule 11 of (The Madhya Pradesh) Electricity Duty Rules, 1949. still in force?
No repeal of (The Madhya Pradesh) Electricity Duty Rules, 1949. is recorded.