6[11. Where— Consumption of electrical energy for which separate rates of duty are prescribed; or Consumption of electrical energy which is both dutiable and non-dutiable; is recoided by. one meter, the dutiable energy consumption of different categories shall be assessed in the manner laid down by the Electric Inspector from time to timet(till such time, meters for each category are installed). g12. * • . 11

Previous and next

All provisions of (The Madhya Pradesh) Electricity Duty Rules, 1949.

Questions people ask

Is rule 11 of (The Madhya Pradesh) Electricity Duty Rules, 1949. still in force?

No repeal of (The Madhya Pradesh) Electricity Duty Rules, 1949. is recorded.