Rule 206, Metro Railways General Rules: TIIB GAZETTE OF INDIA:· EXTRAORDINARY (PART �1-
Metro Railways General Rules - Rule 206
Text of rule 206
TIIB GAZETTE OF INDIA:· EXTRAORDINARY (PART �1-
206. TIIB GAZETTE OF INDIA:· EXTRAORDINARY (PART �1-:-SE._,C. _3(i)]
� 31m� � � w � mfr �a1cr1t>il ifir 3fa:mror -� -� l)' � �
� � � mMfiilRAc1 tra � � � �. � mror m4,io1 �
;:,
� � mror� tR)fiffi:r-� �-� :-
1. cR:IT 'Qcf; � � � -cm:tR-fcro1fr �Jicri<'l1 q;)- ik; � � � �
2� cR:IT m ...... mttAa � � � � � �a1cr1<>1 cfif sk; � � � �
cfi) � 3tia.tMq � � � 3?,a,cMq � 3fr � tR mfr
ifiicl_q;)- � � l)' � � cJTm � 3t\t � � � � �.
ctiit q;)- ik;. � cJTm �
li) '81$ga, l)' � m$cri" ����mfr W q:;)° "'tlIT{ m$cri"
��&�cll'm�
QfUelil f:lciiiiUI clii[
cR1r mfr �a1cr1<>1, ciiit 3t\t tc>r tJtr � fac;_.ztc1 4QRJ/$M�1fo\4, � l)' �i11<>1cr1
.) �
fo\4,101 � � mror �- � � cl' 34<>fcU � 4JJ"Q" �; '!cri.CI<{@ � 4JJ"Q" fl
1. cR:IT �<>fJU4l fo\4:101 � � 4&kl4i, 'il'T<>tqj � 1lliicf �frif 3tci<tl'{66
(� tR � � l)' '1ITTt{ fl
2. q,j,6q,.(Oj � � �Jicri<>t � � 3'tfrcri' f<tilifiilc1 �<>fJjj4' ,A.(afU)' �
� � l)' � �<>fJjj4l q;)- M' RJtl" � � �. fi;r1r � fl
('IJllf Il:� 3(i)]
[� 41 afisN]
2.
� �)'if 1l° � .liaflcec1 750cfr g)'.lfr. m 25 c);cfr 50 Qil�s 'Q".lfr. m �
cfitar uun�:in ;l fllc11c1<>1 � i:k(.ffili< 3Qfcb.C t1ffito1Qc1 c); � � .rr �
� f?fa1c1<>1 .3ttl i:k(.ffilF( ttffitolQci � � 3Wffi.3n 3fR' Qlc,,1��,l q;r tm>IGf
� i'Jm .t/
ftlcHDI Pcl<Jctilcf
iRJcicp
fff a1c1til
cfiit
�
q�q�
�
�
ffia1c1<>1
34�(
lc�lli
3fftm
� �tiiJII�
mm�
:SlcRl;:;q
wm
· -
�
�
.. ·- . -
ftl ilt'lcf I �cqfa);qj 3t1cR't�ct/
31 ffi ei Elct �
...
- � - --·
[1i>I. 'B. �-14011/14/2012-�}
�- �- �. �q;rcf 3lf�.��."fil'qq
208 TI-IE GAZETIE OF INDIA : EXTRAORDINARY [PART II-SEC. 3(i))
NOTIFICATION
New Delhi, the 18th April, 20 l3
G.S.R. 247(E).-in ·exercise of the powers conferred by section 22 of the Metro Railways
(Operation and Maintenance) Act, 2002 {60 of 2002), the Central Government
hereby makes the following rules for Opening of Metro Railways in India, except the
metropolitan city of Kolkata, for Public Carriage of Passengers, namely:-
CHAPTER I
PRELIMINARY
1. Short title, commencement and application. - (1) These rules may be called the
Opening ofMetro Railways for Public Carriage of Passengers Rules, 2013.
(2) They shall come into force on the date of their publication in the Official
Gazette. However, these Rules will be applicable to Delhi Metro Rail Corporation
Limited and Bangalore Metro Rail Corporation Limited with effect from 3rd June,
2013.
2. Definitions. -
(1) In these rules, unless the context otherwise requires, -
(al "Act;' means the Metro Railways 'toperation and Maintenance) Act,
2002 (No. 60 of 2002)
(b) "Approved metro railway. standards" means technical. specifications
and standards approved by the Central Government or as specified
0
in.
the relevant national and international codes;
(c) "authorised" means authorized by the metro railway administration;
(d) "bridge engineer" means the Chief Engineer or any other civil engineer
responsible for design and/or construction of bridges or viaducts or
tunnels;
(e) "Chief Executive Officer" means the chief executive of the metro
railway, in-charge of working of that metro railway;
(f) "Commissioner" means the Commissioner of Metro Railway Safety
appointed under section 7;
(g) "Form" means the Form appended to these rules;
(h) "General Rules" means the Metro Railways General Rules, 2013;
(i) "Passenger" means a person travelling on the metro railway with a
valid ticket or pass;
(j) "report" me.ans the report of the Commissioner under section 15;
(k} "Schedule" means a schedule appended to these rules;
L'lfill U:-� 3(i) 1
".' f!,•" '•• >re" .'' •;- •
'
(2)
3.
(2)
(I) "section" means section of the Act:
All other words and expressions used in these rules but not defined shall have
the same meaning as assigned in the Act and the Metro Railways General
Rules, 2013.
CHAPTER II
PREPARATION FOR OPENING OF THE METRO RAILWAY
Opening of the metrof'ailway- (1) The metro railway administration shall
�nsure that the metro railway or a portion thereof to be opened for public
carriage of passengers is as per the approved metro railway standards and
that all administrative formalities are complete.
Where the Chief Executive Officer is of the opinion that the metro railway or
part thereof is required to be opened for public carriage of passengers, he
shall refer the matter to the Commissioner for inspection and report on the
safety of that metro railway.
4. Supply of documents to the Commissioner. -
(1) The Chief Executive Officer shall, while making reference to the
Commissioner for inspection and report on the safety of the. metro railway
under sub-rule (2) of rule 3, furnish all relevant documents to the
commissioner from the following list of documents, namely:
(a) Tabulated details;
(b) Index plan and sections;
(c) Drawings of works;
(d} Certificate by the Chief Executive Officer ;
(e) Certificate/R�port from the independent safety assessor/consultant in
respect of the signalling and train control system that it conforms to
appropriate safety integrity levels as per CENELEC or· equivalent
standard, for safe running of trains;
(f) Approval of the Electrical Inspector to the Government (EIG} in respect
of electrical works and the energisation of the power supply and
traction system;
(g) Oscillation trial and speed test report in respect of new type of rollir:tg
stock, and the joint safety certificate from the heads of disciplines
involved in the project construction, and operation and maintenance
of the metro railway;
(h) Track Standards, Loading Standards and the �chedule of Dimensions,
as a.Pproved by the Central Government for the project;
210 THE GAZETTE OF INDIA : EXTRAORDINARY
(i) List of infringements of moving and fixed dimensions;
!l>ART II-SEC. 3(i)]
U) Safety Management System approv_ed by the Chief Executive Officer;
(k} Working orders to be enforced at the operations control centre� depot
and at each station; and
(I) Administrative note giving s_alient features of the project.
(2) The documents referred to in sub - rule (1) shall indicate the distances from
the same fixed point in kilometers and decimals up to two digits and the fixed
point shall be clearly defined in a note on the .plan and section sheets of the
work documents.
(3) �e datum adopted shall be mean sea level as fixed by the Survey of India
and heights shall be mentioned with reference to the datum in meters and
decimals up to two digits.
(4) The documents referred to in sub-rule (1) shall be signed by the heads of
each technical discipline, except the certificate at (l)(d), which shall be signed
by the chief Executive Officer himself.
(5) The Chief Executive Officer shall furnish such documents to the
Commissioner, as far as possible, one month in advance of the stipulated date
of _inspection� The documents (e) and (f} listed under sub-rule (1), which may
not be available one month in advance, shall be furnished at least one week
before the stipulated date of inspection.
5. Contents of documents.-
(1) Tabulated details which shall consist of important characteristics ofthe metro
railway or a portion thereof to be opened for public carriage of passengers,
and in particular shall include:-
(a) Curve abstract as specified in Form I;
(b) Gradient abstract as specified in Form II;
(c) Bridge abstract as specified in Form Ill;
(d) Viaduct abstract as specified in Form IV;
(e) Important bridges abstract as specified in Form V;
(f) Ballast and permanent way abstract as specified in Forrn!VI;
(g) Stations and station sites as specified in Form VII;
(h) Brief particulars of rolling stock as specified in Form VIII;
(i) Brief particulars of traction installations as specified in Form IX;
(j) Power supply installation abstract as specified in Form X;
(k) Restricted Over Head Equipment clearances abstract as specified in
Form XI;
(I) Electrical crossings over metro railway tracks as specified in Form XII;
'}
� . --···· . ·-· ..
::::::
�� :�;..,;.��<'···· ,, .. .
,
,,._., .. _,_ ·��",...: -- ,··-
. .
,
:�, ll
�(
T.
[.�·.Jl-�·3(i)]
(m)
(n)
Traction ·maintenance depot abstract as specified in Form XIII,
Ventilation, smoke management and fire safety measures in viaducts/
tunnels and stations as specified in Form XIV; and
(o) Signaffing and train control installations as per sample in form XV.
Note: the forms I to XX given after the "Schedule",, ��e iUustrative and are for
guidance only. The contents of the forms wiff be"for the metro railway being
referred to the Commissioner for his inspection and opening.
(2) Index plan and section sheets, completion drawings, etc. shall include,-
(a} Index plan and section sheets as mentioned in the Schedule;
(b} Completion drawings of bridges/viaducts showing details of structure,
spans, loading standards adopted, etc;
(c) Completion drawings of tunnels, If any, showing the location of
ventilation shafts, man refuge and cross passages etc.;
(d) Diagrammatic plan of. station yards showing layout of tracks and
· particulars of turn outs, gradients, signals .and interlocking installed;
and
(e) Implantation diagrams of overhead equipment masts/overhead
current collection system or details of third rail arrangement, as
applicable.
(3) The comments on the following matters, namely;-
(a) Moving ·and fixed dimensions;
(b) Strength of bridges / viaducts;
(c) Brake and communication;
(d) System of working;
(e) Electric traction equipment; and
(f} Type of rolling stock, proposed along with list of restrictions, shall be
contained in the certificate of the Chief Executive Officer in Form XVI.
(4) List of infringe�ents of moving and fixed dimensions shall be prepared as
specified in Form XVII and shall contain full explanations for the infringements
and restrictions or precautions to be adopted because of them and the
reference t<> the authority of· the Central Government under which the
infringement is permitted or allowed.
(5) Working orders to be enforced at each station on the metro f'ailway to be
opened shall be prepared in accordance with the provisions of the Metro
Railway General Rules, 2012 and shall specify any special conditions that are
21)
212 THE GAZEITE OF INDIA : EXTRAORDINARY [PART II-SEC. 3(i)f
required to be met with-and such orders shall include traction power wofking
rules.
CHAPTER Ill
DUTIES OF THE CHIEF EXECUTIVE OFFICER
6. Deviations from approved standards to be notified -
{1) The Chief exe<."Utive Officer shall ensure that the metro rai'lway or a portion
thereof proposed to be opened is operationally fit in every respect before
inspection of Commissioner.
(2) The Chief Executive Officer shall, while making reference under sub-rule (2)
· of rule 3, bring to the notice of the Commissioner any deviation in design,
material and construction of the civil works, electrical, signalling and train-,
control, and telecommunication installations, rolling stock or appliances of
the metro railway, instances in which moving and fixed dimensions have not
been observed, or the bridges, viaduct, tunnels that �re not capable of
carrying the specified or standard loading without exceeding the stresses
specified in relevant Indian Codes/International Codes.
7. Chief Execu_tive Officer to make special arrangements -
(1) The Chief Executive Officer shall make such arrangements as are necessary to
facilitate the inspection of _the metro railway, which is to be inspected for
opening by the Commissioner.
(2) The Chief Executive Officer .shall be responsible to make such special
arrangements as the Commissioner may reasonably require for inspection of
civil structures, permanent-way, rolling stock, - electrical, signalling and train
control, and telecommunication and train control installations on the metro
railway, which is to be opened.
213
·a. 0
•. · ' Supply of information .to the Commissioner ..:.. The Chief Executive Officer shall
supply all the information and give required assistance to the Commissioner, arid
arrange all instruments and apparatus required for taking measurements, testing of
bridges/viaducts, rolling stock, electrical, signalling and train control,
.telecommunication and other installations.
9. Dismantling of any work on request by Commissioner -
(1) The Chief Executive Officer shall on receipt of a request made by the
. .
Commissioner, make arrangements to dismantle any structure on the metro
railway to be opened with a view to make complete examination of the
details or workmanship of the structure, as quickly and completely as
possible.
(2) The Commissioner, while requesting the dismantling of the structure, shall be
responsible to see that such dismantling does not affect the utility or strength·
of the structure, unless dismantling is necessary for it� proper inspection.
10. Chief Executive Officer to accompany the Commissioner during the Inspection -
(1) The Chief Executive Officer will accompany the Commi.ssioner throughout the
inspection.
(2) If, for any unavoidable reason, it is not possible for the Chief Executive Officer
to. accompany the Commissioner, then the Director in-charge of the project
or an official of equivalent rank, authorised by special order issued by the
Chief Executive Officer for the purpose, shall accompany the Commissioner
along with other officials connected with the construction, operation and
maintenance of the project, and shall be present during the entire period of
inspection.
CHAPTER IV
DUTIES OF THE COMMISSIONER
11. Commissioner to make full and complete examination-
(!) On receipt of a reference under sub-rule (2) of rule 3 from �he Chief Executive
Officer, the Commissioner shall, with a view to determining whether it is fit to
· be so opened, inquire into all matters which appear to him relevant for the
safety of public carriage of passengers on that metro railway or part thereof.
(2) The Commissioner shall satisfy himself that,-
(a) the Metro Railway General Rules, 2012 have been applied to the
metro railway or part thereof proposed to be opened;
214
(b) the moving and fixed dimensions, as per the approved Schedule of
Dimensions, have been observed; and
(c) the civil works, permanent-way, electrical, signalling and train control,
telecommunication, rolling stock and other appliances belonging to or
working on the metro railway are designed properly or constructed in
such a manner so as to guard the system against accident and failure,
which may affect the passenger safety.
12. Provisions for handling traffic at stations - The Commissioner shall satisfy himself
that at every station on the part of metro railway proposed to be opened:-
(a) adequate provision has been made for handling of passenger traffic;
(b) arrangements have been made for easy access by road; and
(c) adequate fire-protection and disaster management measures have been
taken along with arrangements for safe evacuation of passengers.
13. Inspection of bridges or vi�ducts - The Commissioner shall satisfy himself that the
bridges or viaducts and other elevated structures on the metro railway proposed to
be opened for public carriage of passengers are so design�d and constructed to
conform to the approved loading standards and that the stress limits are not
exceeded.
14. Procedure for inspection of bridges or viaducts -
(1) For the purpose of rule 13, the Commissioner shall examine at least one
bridge or viaduct of each different ·pattern or type, as the case may be, and
satisfy himself about the adequacy with reference to the safety of:
(a) the general design of the bridge or viaduct;
(b) designs of different parts or portions of the bridge or viaduct;
(c) the construction and erection of the whole structure of the bridge or
viaduct;
(d) steel girder spans and their bedding at art supports; and
(e) type and design of the pre-stressed concrete bridges or viaducts
including their bearings.
(2) If the Commissioner considers it necessary, in addition· to the certificate of a
bridge engineer employed for the purpose, he may call for load deflection
test as specified in Form XVIII and other tests under the loads for which the
bridge is designed .
. ·,
{3) If.the Commissioner is satisfied that the girders have been properly designed
for the work they are intended to perform, then the open-web and plate
girders shall not require to be tested.
F
[
[ '1l1T II-� 3(i)]
15.
(4}
(5)
The Commissioner may test any number of spans and may test a span any
number of times and at any speed as he considers desirable up to. the
maximum permissible speed of the section.
The Commissioner shall satisfy himself that on both sides of the road under
bridges, height gauges of suitable design are provided to ensure that no part
of any road vehicle or its load shall come in contact with the road under
bridge girders. "Danger'' boards for electric traction are also provided on
these height gauges.
Inspection !)f electrical installation -
(1) The Commissioner shall inspect the following for electrical installations on
the metro railway proposed to be opened for the public carriage of
passengers, keeping in view the essentiality of services and safety of
passengers, namely:-
(a) protectron systems of substation;
(b) earthing and bonding of installation;
(c) electromagnetic interferences to ensure that these are within limits;
and
(d) essential services to ensure that these would run in case of major
(e)
break downs.
(i}
(ii}
(iii)
(iv)
(v)
(vi)
(vi.i)
electrical cleara!")ces;
implantation of masts or.third rail and other structures;
caution and danger notice boards for public;
assurance Registers signed by various metro railway staff of
their knowledge of working in electrified traction area;
maintenance facilities and manpower; and
fire fighting measures;
measures provided to control stray current and corrosion of
steel reinforcement of the structures, provision of shrouds in
case of third rail DC traction system;
(f) Any other item, as he may consider fit for safety of passengers.
(2) During inspection particular attention shall be paid to the safety and
operational aspects of the train movements and to see that staff are in
possession of statutory rule books; instruction J>ooks, registers, forms, etc.
and the Operations, Electrical, Permanent Way, Signalling and Train Control,
and Telecommunication staff are fully acquainted with the duties to be
carried out after electric traction is introduced.
215
216 THE GAZEITE OF INDIA : EXTRAORDINARY [PART H-SEc. 3(i)]
16. lnsp.ection of rolling stock - The Commissioner shall inspect the following items of
the rolling stock proposed to be used on the metro railway keeping in view the
safety of travelling public on metro railway system proposed to be opened, namely:-
(a) important systems like traction, braking_etc;
(b) safety items like dead-man handle or vigilance device, door operations, etc;
(c) facilities for evacuation of passengers in case of emergencies;
(d) system of operation and train control;
(e} fire prevention measures;
(f) communication between Train Operator and passengers; an·d
(g) any other item, as he may consider fit for safety of passengers.
17. Inspection of Signalling and telec:om facilities--The Commissioner shall inspect the.
following items of. the signaUing and telecom facilities keeping in view the safety of
travelling public, proposed to be used on metro railway system proposed to be
opened, namely:-
( a} fail-safe features.of the signalling system;
(b} Signitl and Telecommunication installations satisfying the requirements of
electric traction; and
(c} any other item, as he may .consider flt for the safety of the passengers.
18. Inspection of fadlitles for relief of passengers In emergencies -The Commissioner
shall check the following facilities for relief of passengers in case of emergency,
namely:-
(i} in-house facilities and preparedness to combat emergencies;
(ii} communication and arrangements with outside relief agencies;
(iii) availability of competency certificate wi.th metro railway officials connected
with the metro operations; and
(iv) any other item, as he may consider fit for safety of passengers.
CHAPTERV
THE INSPECTION REPORT OF THE COMMISSIONER
19. Contents of report-
(1) The report of the Commissioner shall specify that:-
(a) he has made a careful inspection of the metro railway and the roltiAg
stock that may be used there on;
(b) the moving and fixed dimensions as laid down have not been
infringed, or the condonation of the infringements to the moving at"ld
fixed dimensions has been obtained from the competent authority;
217
(c) the- track structure, strength of bridges/viaducts, tunnels, general
structural character of the civil works, signalltng and train control
system, telecommunication , traction installations and the size of, and
maximum gross load upon the axles of any rolling stock, comply with
the requirements laid down; and
(d) in his opinion, the metro railway can be opened for the public carriage
of passengers without any danger to the public using it.
(2) The ·reports shall be clear and concise and shall deal with all matters which
are required to be considered, particularly whether the metro raih:,ay line is
designed for the specified loading and whether there are instances of
deviation or infringement of moving and fixed dimensions.
20. Documents accompanying'inspection report -The report shall be accompanied by
the following documents, namely:-
(a) Index plan and sections of the metro railway;
(b) Results of the load test of bridges, when asked for by the Commissioner;
(c) 'Documents required for initiation of electric traction;
(d) · Tabulated details in Forms I to XV;
· (e) Certificate by the Chief Executive Officer in Form XVI; and
(f) list ofinfringements of moving and fixed dimension in Form XVII.
21. Submission .of rep.ort to Central Government -In respect of every reference made
to him under sub-rule (2) of rule 3, the Commissioner shall submit his report to the
Central Government.
CHAPTER VI
SANCTION TO ·oPEN METRO RAILWAY FOR PUBLIC CARRIAGE OF PASSENGERS
22. Opening of a metro railway by the Commissioner -
(1) The Commissioner may sanction opening of the metro railway or a portion
thereof, as the case ma.y be, for public carriage of passengers and
introduction of electric traction, subject to such conditions as he may impose
in the interest of the passengers. While giving sanction to the opening of
metro railway, he will forward his inspection report to the Centr�I
Government.
(2) After receiving the sanction, the Chief Executive Officer shall publish the date
of operling of the metro railway or a portion thereof for public carriage of
passengers in the local newspapers in English, Hindi and local languages.
218 TIIEGAZETIF;OFIND�:EXTRAORDrnARY [PART Il�SEC. 3(i)]
23. Sanction to open metro railway - The Central Government may, after considering
the inspection report submitted by the Commissioner under rule 22(1), confirm,
modify or cancel the sanction given by the Commissioner, while exercising powers
under section 14 of the Act.
CHAPTER VII
INTRODUCTION OF NEW TYPE OF ROLLING STOCK
24. Use of new type of rolling stock -
(1) The metro railway administration when it desires to use new type of rolling
st�k different from those already running on a section of the metro railway,
shall apply for sanction for the same to the Central Government through the
Commissioner.
(2) Any modification in the design of car or rolling stock which significantly alters
the system of operation and control on the rolling stock like change in the
braking system, or change in the prindple of traction, shall be considered as a
material modification and shall constitute a change in the type and design of
the rolling �ock.
(3) Any significant modification in . the car or rolling stock affecting the salient
dimensions or suspension system or running gears, and any other
modification which affect the riding quality of the rolling stock, shall also
constitute a change in the type and design of the rolling stock.
(4) For new designs of rolling stock, oscillation and or other trials are required to
be conducted as per the procedure specified by Central Government from
time to time to determine safe speed potential and stability of rolling stock.
This provision shall also apply for increasing the speed of existing rolling stock
by making improvements.
(5) The application under sub-rule (1) shall be accompanied by:-
(a) such diagrams as necessary to give full particulars of the axle loads,
wheel spacing , length over buffers/ couplers and other principal
dimensions of the rolling stock as specified in Form VIII for which
sanction is required.
(b) such calculations and stress sheets showing:
(i) the external forces on which the stress calculations are ?ased;
(ii) the stresses which will be produced in the various
bridges/viaducts on which the proposed rolling stock will run;
�-
['llf1T u-� 3(i)J
(c)
(d)
(iii) the effects which the said rolling stock will have on various
structures and track as compared with those caused by. the
rolling stock already in use, or allowed by the ·existing orders;
and
(iv) the conclusions arrived at;
the calculations stress sheets must show, as to what atl�wance has
been made for any secondary or deformative stresses in addition to
the primary stresses ca.used· by the external forces and what relief of
stress, if any, has been included. The Commissioner may ask for
necessary tests to be carried out on bridges as referred to in sub-rule
(2) of rule 14;
the modification, if any, necessary to signal and telecommunication
installation to ensure electromagn�tic compatibility/electromagnetic
interference compatibility with rolling stock and a certificate that the
same have been carried out;
(e). actual test report of electromagnetic compatibility /electromagnetic
interference measurements with rolling stock and a confirmation that
.
the results are within specified limits and standards;
(f) report of checks on rolling stock to ensure that,. it withstands the
electromagnetic interference from external sources;
(g) oscillation trial report and the speed certificate based on oscillation
trial results;
(h) a safety certificate jointly signed by the heads of Rolling Stock, Civil,
Electrical and Signalling and Telecommunications Engineering, and the
Operations disciplines of the metro railway in the Form XIX.
(6) The proposal sh.all be scrutinized by the Commissioner and the
recommendations thereon shall be submitted to the Central Government for
its ordersL
(7) No new type of rolling stock which causes change in the electromagnetic
compatibility/electromagnetic interference behaviour or stresses exceeding
the design criteria specified and approved by the Central Government for
existing structures or excessive stresses in track shall be ordered unless prior
sanction of the Central Government has been received through the
Commissioner for doing so.
(8) The type of rolling stock alr�ady running on a section of the metro railway
after approval by the Central Government, can be introduced on a new
section of the metro railway with the sanction of the Commissioner.
219
220 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II-SEC. 3(i)]
CHAPTER VIII
ALTERATIONS OR CHANGES IN THE EXISTING METRO RAILWAY
25. Notice of alterations or changes -
(1) Where it is proposed on metro railway or a portion there c.>f which had been
op.ened after inspection, to construct any deviation line, stations, or to make
an addition, alternation or reconstruction materially affecting the character
of any work and such work forms part of, or is directly connected with the
working of the metro railway, th� metro railway administration shall give
. notice to that effect to the Commissioner.
(2) Before any such work, the execution of which may affect the running of trains
. carrying pass�ngers, is taken in hand, the metro railway administration shall
furnish to the Commissioner drawings or particulars on work and any
temporary arrangements necessary for carrying it out, and get his approval.
26. Opening of new or strengthening bridges or viaducts -
(1) No bridge or viaduct shall be reopened to traffic, after strengthening, without
the approval of the Commissioner even though it is able to carry the load
without exceeding the maximum permissible stresses as specified in the
relevant Indian codes/International Codes.
{2} No load shall be imposed on metro railway bridge or viaduct which would
cause in any member thereof stresses greater than those specified in sub-rule
(1) without the sanction of the Commissioner.
(3) Closure of an existing bridge shall require the sanction of the Commissioner.
27. Use of New Type of signalling Equipment-
{1) The metro railway administration, when it desires to use a new type of
signalling equipment, shall apply for sanction to the Commissioner.
(2) · T.he application under sub-rule (1) shall be accompanied by -
(a) a list of the requirements which the equipment fulfils together with
the results of the tests conducted;
(b) a certificate from the head of Signal and Telecommunications
Engineering department in the Form XX;
(c) a sti;ltement giving details of the tests, trials. and verification
conducted by suppliers, metro railway, etc: on the performance of the
equipment;
{d) safety assessment report from an independent safety
assessor/consultant, where applicable;
�r
f,:,;
� k:
;;,·
t -
.,
[ 'IWT II:,_� 3(i)]
(e)
{f)
(g)
(h)
certificate, if any, from the other metro railway where equipment is in
use for passenger carrying services;
the relevant system details as may be necessary to give full particulars
of the principle of operations and safety features incorporated;·
a copy of the instructions jointly approved by the heads of Operations
department and the Signal and Telecommuniqitions Engi,neering
department, to be issued for operation of the equipment by the
operating Staff, including those instructions for working under
abnormal or failure conditions; and
any changes in the Station Working Orders as a result thereof.
28. Alternation or Changes in Electric Traction Eq.uipment and use of New Traction
Equipment-
(1) . The metro rai1way administration when it desires to alter or make changes in
Electric Traction Equipment when it materially affects its design
characteristics and is directly connected with the train operation, such metro
railway administration shall apply for such alteration or change in electric
traction equipment to the Commissioner.
(2) The application under sub-rule (1) shall be accompanied by-
(a) a list of the requirements which the equipment fulfils;
(b) a statement whether the equipment complies with the relevant
Indian specification or International specifications;
{c) a stateR1ent giving details of th� tests, trials and verification
conducted by suppliers, metro railway, etc. ori the performance of
the equipment;
(d) certificate, if any, from the other metro railway where equipment is
in use for passenger carrying services; and
(e) the · relevant system details as may be necessary to give full
particulars of the p_rinciple of operation and safety features
incorporated.
222 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II-SEC. 3(i))
CHAPTER IX
SIGNALLING AND TRAIN CONTROL INSTALLATIONS
29. Signals-
(1) The signals to be provided for controlling the movements of trains on metro
railway shall be, -.
(a) Cab signals;
(b) Fixed line-side signals (where provided); and
(c) Hand signals for shunting purposes.
(2) The signalling and train control system shall be Continuous Automatic Train
Control type and shall permit different modes of train operation depending
upon its design, namely-
(a) automatic mode, where provided;
(b) automatic reversal mode (if provided):
(c) coded manual mode;
(d) run on sight mode, where provided;
(e) restricted manual mode; and
(f) cut-out mode, where provided.
(-3) Under special circumstances and during initial stages, train services on the
metro railway may be run with the approval of the Commissioner under
Approved Special Instructions, by any of the following systems of working;
namely:-.
(a) Automatic Block System;
(b) Absolute Block System.
(4) The requirements of the various modes of train operations given in sub-rule
(2) above shall be in accordance with provisions laid down in Metro Railway
General Rules, 2012 and the approved metro railway standards.
(5) The signalling and train control systems provided on the section shall be
optimum for the planned level of safety and requirement of traffic.
(6) The design of signalling and train control system shall be such as to enable
the driver to easily distinguish between various modes of train operation.
(7) The locations of trains running on the section and aspects of the signals1
where provided and in use and, shall be displayed in the operations control
centre and the relevant station control rooms.
(8) The fixed line-side signals, where provided but not in use, will have specific
indication to that effect.
[ 'JJJ1T II�<§Us 3{i)]
30. Points-
31.
(1) All points on passenger lines shall be power operated.
(2) The point operating mechanism on passenger lines shall be of non-trailable
designs.
(3) Spring points shall not be used.
(4) Moveable crossings and moveable diamond crossings on passenger lines shall
be provided with complete facing point equipment of approved type.
Interlocking -
(1) · The operation of signalling gears shall. be automatic or from a panel or key
board or any other approved means enabling operation of routes and also
individual operation of points and signals.
(2) The apparatus provided for operation of points and signals shall be
interlocked for all passenger running lines.
32. Track Circuits - All passenger running lines shall be equipped with means of
continuous detection like track circuit, axle counters, or ot.her suitable means, to
detect the presence or absence of a vehicle.
33. Sidings -
Sidings shall be arranged in such a manner that shunting operations upon them shall
involve the least possible use of, or obstruction to, running lines.
34. Provision of isolation at stations -
(1) All passenger line shall be isolated from all sidings connected thereto.
(2) Isolation may be accomplished by-
(a) connection to a long line or siding; or
(b) provision of a short dead end siding; or
(c) provision of trap; or
(d} any other authorised means of isolation.
Note: when a trap is provided, the trap switch should be located with the heel of the
switch in rear of the fouling mark and preferably on the straight. The switch should
be in the rail away from the line to be protected.
35. Emergency Communication -
Necessary means of communication, like mobile radio communication, shall be
provided to enable the drivers to contact operation control centre and station
control room in case of emergency.
224 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II-SEC. 3(i)]
36. General-
The standard of safety of signalling and train control system provided shall be in
accordance with the Approved metro railway.standards or recommendations of the
European Committee for Electro technical Standardisation or its equivalent natiqnal
standards/international standards, as the case may be. Necessary measures like
protective devices or design features shall � adopted to safeguard signalling and
train control, and telecommunication installations against the harmful effect of
electromagnetic inference, stray current and earth leakage current, etc. of 25KV AC,
or 750 V DC, or other traction system as adopted on the section.
CHAPTERX
DESIGN AND INSPECTION OF EQUIPMENT FOR ELECTRIC TRACTION
37. Design of Electric Installations-
{!) The design of ail electric installations, namely transmission and distribution
lines, sub-stations, switching station, rigid overhead current collection
system, regulated overhead equipment, third rail DC Traction System etc., as
applicable, shall be according to approved standards laid down by the Central
Government and the Central Electricity Authority Regulation, 2010, or any
other law for the time being in force and wherever any departure from
accepted norms becomes necessary, approval of the Central Government
shall be obtained.
(2) Adequate protective arrangement shall be made to ensure that the public
cannot come in contact with the electric equipment on line within the metro
railway premises.
(3) Suitable protective screens shall be provided where live conductors pass
under or over bridges. Where third rail DC traction is installed shrouds of
suitable design shall be provided over the third rail.
(4) The structures supporting overhead equipment or the third rail, as the case
may be, shall be designed in accordance with the relevant international and
Indian standards. The wind pressure to be adopted shall be generally in
accordance with IS 875-1987 {latest revision). Inside Metro Corridor tunnel,
complete current collection system and its supporting system shall be as per
relevant international/Indian standards and shall be capable of working safely
under air piston effect during train operation.
(5) When the distribution system involves overhead wires carried on steel
structures including bridges and roofs, or third rail on pedestals, and return
circuit via running rails or earth, all such structures, masts and associated
tracks shall be effectively earthed and bonded or other precautions taken to
.}
['WT II-� 3(i)]
ensure that contact with the steel work or other conductive part of the
structure will not be dangerous to the public and the metro railway staff, _or
the access to such areas shall be restricted. In AC and DC traction, bonding
and earthing shall be as per the approved code for bonding and earthing in
respective areas. In case of elevated concrete structures and in the tunnels
(except bored tunnels with precast segment lining) continuous earth bonding
shall b.e provided by earthing the reinforcement of structures and connecting
the same to over-head electrical structures or suitable structure earth cable .
The steel handrails on viaducts, where provided, shall also be earthed.
Earthing arrangements at power supply installations shall strictly conform to
the international standards or Central Electricity Authority Regulation, 2010·
and accepted codes of practices for bonding and earthing for AC and DC
traction. Adequate stray current control system shall be p'rovided �nder DC
traction System to avoid corrosion to steel reinforcement and other metallic
parts of the tunnels and nearby structures. All precautions shall be taken to
avoid Electro-magnetic effect in the environment as per relevant stal')dards I
approved design.
{7) The earthing system for the traction shall conform to requirements of 15-3043
an_d EN-50122 Part 1 and Part 2; as applicable, and the maximum rail
potential shall not exceed specified limits.
(8) Earth wires shaH be provided at appropriate locations as per ENS0122
standards. In complicated areas·, structures may be connected to individual
earthing stations.
(9,) When overhead lines transmitting electric power (other than lines forming
part of the railway traction equipment) have to be carried across metro
railway track, the details of the equipment provided in connection with such
· lin:es; shalt 1,e designed with the object of minimizing danger in the event of
_bre.1ka·ge and in accordance with stipulated regulations for electrical
crossings. These details shaU be approved by the Electrical Inspector to the
Government oflndia.
(10) lightening arrestors of standard or approved types shall be provided
wherever they are necessary.
(U) AU cr:>mJJonents of the equipment which carry live conductors shall be
provided with devices approved by the Electrical Inspector to the
GQvemment to prevent unauthorised pers.ons climbing them. Anti-climbing
devices shall also be provided, wherever necessary on structures carrying
high tensjon equipment within metro railway premises.
(12) Warning notices shall be erected in conspicuous position indicating the
existence of live electrical equipment.
225
226 THE GAZE1TE OF INDIA : EXTRAORDINARY [PART II-SEC. 3(i)J
38. Display of caution boards and notices:
The following caution boards and notices of standard size written in English, Hindi
and local language shall be displayed at the various locations indicated below:-
(a) treatment for Electric shock boards giving instructions 'for treatment of
electric shock at all metro railway station control rooms, car depots, sub
stations, switching stations, offices of maintenance engineers for works,
signals, electrical traction equipment and rolling stock etc.,
(b) -general "caution notices" regarding danger of high voltage traction
equipment for public at various entrances to metro railway stations and for
staff at prominent places;
(c) "750 V or any other voltage DC Caution Boards" or "25 KV AC caution boards"
as - applicable shall be affixed at conspjcuous locations on foot over and road
over bridges, sub-stations, switching stations and track cabins, and caution
boards or stickers on third rail shrouds;
(d) - caution boards at such posts (for signal and telecommunication staff) where·
protective screening has not be provided;
(e)
(f)
(g)
(h)
(i)
O)_
"Caution-Unwired turn-out" boards ahead of all unwired turnouts or cross
over taking off from wired tracks;
' -
"Warning'' boards for neutral sections;
Board for "Switching on" and "Switching Off' of power at neutral sections;
Restricted clearance boards at such identified locations;
· Power Block limit boards; and
Stop boards at termination of over-head electrical equipment in the sections __
to be energized.
39. Protection of private property against inductive effects of AC traction
. In 25 KV AC traction there is a heavy induction _on all metallic structures and
conductors in the vicinity of track. Inductive effects show themselves oi:i any
overhead conductor, such as metallic clothes lines, power lines and the like
belonging· to private parties running parallel and close to the electrified tracks. Wide
publicity shall be given to the effects· of tl,e induction, so that special precautions
may be taken by private parties concerned against the possibility of electric shocks
from conductors running in their premises.
In the case of DC traction, there is possibiiity of corrosion of the :metallic structures
and conductors in the vicinity of viaduct and tunnel due to stray currents. Though
the metro railway shall take protective measures against the stray current effect,
wide pu�licity shall be given so that special precautions may be taken by the parties
concerned against the possibility of corrosion effect of the stray current.
40. Approval of energisation of high tension lines�
{1) Application shall be submitted at least a fortnight before energisation of high
tension lines to the Electrical Inspector of the Government for the metro
railway for the following ; namely -
(a) Formal approval, if not already received, to the design and la.youtof all
high voltage equipment including traction sub-stations, transmission
line, 2SKV /33KV feeders, . switching stations, booster stations, DC
feeder and third rail etc., as applicable;
(b) Approval for energisation of high tension installations mentioned
above including overhead equipment for AC and third rail equipment
for DC traction;
(c) · The application should be accompanied by relevant documents and
certificates as specified in metro railway AC/DC traction manual, or
instructions issued by the Central Government;
(2) On receipt of an application under sub-rule (1), the Electrical Inspector sh�II
scrutinize and inspect the design and installations in respect of the following
namely:-
'227
(a) the layout -and design for receiving sub-stations, traction sub stations
auxiliary sub stations, 25 kV AC overhead equipment or DC traction
third rail and other installations · for compliance· with the Indian .
Electricity Act, 2003 and the rules made there-under and the relevant
lndia_!'l·standards or International standards; and
(b) · inspection of completed installations, either personally or by deputing
his officers for compliance with the safety requirements;
(3) After conducting the inspection under sub-rule(2), the Electrical Inspector
shall convey his approval for the energisation of 25kV/33kVAC feeder lines
,from receiving sub stations, energisation of receiving sub stations, traction
sub stations, auxiliary sub stations, traction sub-stations to feeding posts,
switching stations, booster transformer stations, track cabins and auxiliary·
transformer stations, and 750 V or other different Voltage DC third rail
system and other associated high tension equipment as applicable, subject to
such conditions as he may consider necessary.
41. Procedure for energisation of traction installations -
(1) (a) after obtaining the sanction of the Electrical Inspector to the
Government of India for energisation under rule 40, the sub stations
should be commissioned sufficiently in advance for the energisation of
overhead electrical equipment, or third rail equipment as the case
maybe;
· THE GAZETIE OF INDIA : EXTRAORDINARY [PART II-SEC. '3(i)]
. (b) before energisation of the sub stations, full communication facilities
should be available and power supply authorities should be ready to
give power supply;
(c) on the date on which energisation of overhead equipment or third rail
equipment installations takes place, necessary clearance certificate
should be obtained from the Electrical Construction Officers and
others who had been hitherto working in the sub- station premises
and in the section to the effect that their staff had been withdrawn,
and the sub-station and the section could be energized;
(d) after measurements on the whole installation and check on the
satisfactory operation of all equipment including protective relays, the
traction sub-stations and other installations may be energized.
(e) energisation of overhead electrical equipment and overhead current
collection system shall be progressively undertaken starting with
33kV/25kVAC feeders from the receiving sub-stations to the traction
sub-stations, track cabins, bus bars of the feeding posts followed by
one sub-section after another. In case of third rail DC traction similar
sequence will be followed; and
· (f) before running electric rolling stock, a confirmatory field test to check
the prop·er operation of the protective relays in the traction sub
station shall be conducted.
(2) In addition to giving wide publicity through newspapers and other media, the
Station Control.ler shall warn �II Metro Railway Employees and other persons
working adjacent to track on the station about the danger of 7SOV DC third
rail/25kV AC overhead equipment, or any other traction system used in the
metro railway, and in the case of overhead traction equipment, not allow
them to ride on top ofrolling stock working on the section.
· (3) All relevant documents, certificates and notifications issued under the Metro
railway AC/DC Traction manual, and the Act, along with the approval of
Electrical Inspector for energisation shall form a part of complete documents·
to the Commissioner while making reference to him under sub-rule (2) of rule·
3 for inspection and opening of the metro railway for public carriage of
passengers.
(4) The signal and telecommunication requirements in electrified sections shall
be in accordance with the provision of the approved metro railway signalling
standards.
Note: A catechism dealing with the requirement of signal and telecommunication
installations for DC and AC electrified section are enclosed as Appendix A and B to
these rules.
,..
e•
� r
� ·.
['IWTII�� 3(i)]
1.
SCH EDU.LE
[See rule,5(2) (a)]
INDEX PLAN AND SECTION SHEETS
A set of plans and sections for a metro rai_lway project should consist of:-
(i) Index plan and sections;
(ii) Detailed plans and sections;
(iii) Plans ofstation yards; and
(iv) · Detailed drawings of structures.
'12.9
2. The index plan and section should be drawn to a scale of 0.5 km to a cm horizontal,.
and 1o·meters to a cm vertical, the plan being drawn above the section on the same
sheet.
3. The.index plan should be traced fr':)m topographic survey sheets. The centre line of
the proposed metro line should be indicated by a full red lin·e with position of each
station by a red block and name ofthe station also in red. The radius and degree of
all curves should be figured.
4. The index section sh9uld show the formation level/deck level of elevated structures
by a red line; the gradients should be figured and the height of the formation-/ deck
level above mean ·sea level entered at each change of the gradient. The position, of
each station with its name and distance from the fixed point, position and size of th.e
bridge/viaduct spans shoutd ·be indicated.
S. Throughout each set of plans and sections, the kilometrage shall be re.ckoned from
the same "fixed point" and datum should be mean sea level. Each sheet should be
plotted in the direction of the through kilometrage so that the kilometrage may be
read from left to right.
6. On each sheet should be noted the Aiime of the metro railway, gauge and scale
along with direction of�he magnetic North.
7. The index plan and section and the first· and the last sheets of the set of detailed
plans and sections should be signed and dated by the engineer in charge.
8. Plans of only those station yards, which are having yard lines other than Up/Down
lines, may:be submitted.
9.· Drawing of structures to be submitted should be the completion drawings.
,.
230 THE GAZETIE OF INDIA : EXTRAORDINARY l)?ART II-SEC. 3(i)]
Section;
Length:
Degree of curvature and
radius
/
Total
Previous and next
Questions people ask
Is rule 206 of Metro Railways General Rules still in force?
No repeal of Metro Railways General Rules is recorded.