CERTIFICATE FOR SIGNALLING EQUIPMENT
Certified that it is safe to use (particulars of the equipment) at the
section of the metro railway with the following precautions.
·························································•··
station I on the
Head of Signal and Telecommunication Engineering
247
248 THE GAZETTE OF INDIA : EXTRAORDINARY l)?ART II-SEC. 3(i)]
Appendix A
[See rule 41)
CATECHISM FOR SIGNALLING AND INTERLOCKING INSTALLATIONS
1. SIGNALLING AND TRAIN CONTROL
Have the requirements and recommendations for signalling and train control systems
prescribed in Chapter IX of these rules and the technical specifications and relevant national
and international standards, installed in the section, being com plied with?
SIGNAL
1. Do the signals comply with the requirements as laid down in Metro Railway General
Rules, 2012.
2. Have the signal posts been placed on the left side of the track of the approaching
train to which they refer? lf,otherwise, for what reason?
3. Are all running fixed signals controlling trains, placelin such a position ana at such a ·
height above rail level so that these can be clearly seen by the Train Operators in
sufficient time and be readily distinguished by night or by day from subsidiary
signals?
4. In case of slotted or controlled signals, can the signals be freely returned to danger
by either of the controlling agencies?
5. Are fixed signals not commissioned/not in use have their aspects covered and the
cover displays two crossed white bars on a black background, the bars not being less
than 30 cm x 10 cm?
POINTS
1. Is the locking of fa�ing,points such that the points cannot be or become unlocked
while a train is passing over them i.e they are electrically controlled by track circuits
or alternative devices?
2. Are detectors (internal/external) fitted to all facing points and do they efficiently
detect with switches the signals controlling the movement of train over them?
3. Are switches adjusted to come tight against stock rails? Does the insertion of Smm
obstruction piece between the switch and stock rails lSOmm from the toe of the
switch prevent the points being locked and prevent the relevant signal from being
taken 'OFF', the giving of which is preceded by the locking of the points?
·,,i
,_
!;; ·,-·
--
r•
r1 ij �
L:
i,1,
�
j}.
·1-,
;,:;
·1
..
�
�!
j·
11
I
• IFi!
M
[ 11PJ-n-� 3(i) J
STATION CONTROL ROOM
1. Are all signals, points and trac�, circuits electrically/ electronically repeated on the
Station Control Panel/Work Station as & where provided?
2. - Is the ·station controller provided with necessary means of stopping the train at his
station?
3. Have instructions for working been issued to all staff and included in Metro .�ailway
Working Instructions and are they correct and efficient?
TESTS IN STATION CONTROL ROOM
It is essential that the interlocking of all signals with points is so effected as to ensure the
following conditions, which may be tested from the Station Control panel or Work station
J�
1. Is it possible to take off conflicting signals at the sametime?
2. Is it possible to take off a signal until
a) all points on the running line including overlap are correctly set and the facing
point locked where. required?
b) all points, giving access to the running line from sidings are set against the
running line?
OPERATION CONTROL CENTRE
Artrall signals, points and track circuits electrically/electronically repeated on the Operation
Control or Work station as and where provided?
CAB SIGNAL
1.
2.
Are the various modes of train control clearly distinguishable on the Driver's Man
machine Interface (MMI).
Under Cab Signalling System of working, i$ Automatic Train Protection system able to
bring the train to a stop before an obstruction? :�� ;r-- �
249
250 THE GAZETTE OF INDIA : EXTRAORDINARY
AppendixB
(See rule 41)
[PART II-SEC. 3(i)]
2. ADDITIONAL CATECHISM FOR SIGNALING AND TELECOMMUNICATION FOR
ELECTRIFIED SECTIONS
(
Have the requirements and recommendations for signalling and telecommunication
installation in accordance witll the instructions issued for the installation of Signalling and
Telecommunication equipment in 750V DC or 25 KV 50 Hz AC or other traction systems as
adopted on the section, been complied with?
If not, in what respect the arrangements provided fall short of them?
STATEMENT OF DEVIATION - SIGNALING AND TELECOM SYSTEMS
Description Existing Prescribed Deviation/ Remarks Approval/
parameters Parameters Infringement Sanction
SI.GNAL
POINTS
TRACK CIRCUITS \
CABLES
ELECT SIGNALING
EQUIPMENT
BATIERIES
EARTHING
MOBILE TRAIN
RADIO
COMMUNICATIONS
GENERAL SAFETY
{F. No. K-1"4011/14/2012-Metro]
S. K. LOHIA, Officer on Special Duty (UT) & E.O. Jt. Secy.
Printed l,y the Manqer, Government of India Press, Ring Road, Mayapuri, New Delhi-110064
and Published by the Controller of Publicatiom, Dethi-110054.
(,