Form X, Metro Railways General Rules: FORMX
Metro Railways General Rules - Form X
Text of form X
FORMX
FORMX
(See rule 5(1) on
POWER SUPPLY INSTALLATION ABSTRACT
[PART ll
-:;:-
SEC. 3(i)]
Section: Metro Railway
Length: Gauge : mm
For 25 kv AC Overhead traction system
S.No Type of switching Total Nos. Location and Remarks
stations nearest station
1. · Traction sub stations
and Feeding Posts (FP)
2. Sectioning and
Paralleling Posts (SP)
3. Sub-sectioning and
Paralleling Posts (SSP)
4. Booster Transformer
stations
5. Auxiliary Sub-stations
6. LT supply Transformer
stations
For DC Third Rail traction system
S.No Type of sub stations Total Nos. location and Remarks
nearest station
1. Receiving sub stations
2. Traction sub stations
3. Auxiliary sub stations
4. Track Cabins
- = -----
[ :Jf1l II-::'� 3(i)]
--------=-
Previous and next
Questions people ask
Is form X of Metro Railways General Rules still in force?
No repeal of Metro Railways General Rules is recorded.