LawGrids logoLAWGRIDS.ORG

Annexure 1, Indian Railways (Open Lines) General and Subsidiary Rules: ANNEXURE-1

Indian Railways (Open Lines) General and Subsidiary Rules - Annexure 1

Text of annexure 1

ANNEXURE-1

ANNEXURE-1 ENGINEERING LEVEL CROSSING GATE INTERLOCKED WITH GATE SIGNALS. PROVIDED WITH TELEPHONE WITH NORMAL POSITION "OPEN TO ROAD TRAFFIC" (General Instructions are common for all types of Manned Level Crossing Gates) 1. Mode of Operation - Detailed mode of operation for opening and closing the level crossing gate shall be provided in the respective Station Working Rules and Gate Working Instructions incorporating local operational requirements. When level Crossing gate is required to be opened for passage of road traffic, the Gatemanmustfirstopenthegate farthest away from approaching road traffic and thenopen the gate onthesidenearesttheapproachingroad traffic. 2. IntimationtoGatemen- (i) The Station Master/Cabinmaster/Cabinman shall intimate the Gateman through telephone connectedat his end aboutmovementoftrain(s) proceeding towards the level crossing gate. (ii) If the telephone is connected to the station at the receiving end, this advice shall be given by the Station Master/Cabinmaster/Cabin man to the Gateman, as soon as he received Train Entering Sectionadvicefromthedispatching station. (iii) IftheactualrunningtimeofthetrainfromeitherendofthesectionislessthanlOminutes,Station Master/Cabinmaster/Cabin man will convey this advice to the Gateman before obtaining/granting lineclear. (iv) It should be the duty of the Gateman to ensure that the gate is closed in time, so that there is no detentiontothetrainorexcessivedetentiontoroad traffic. 3. Failure of Telephonic Communication - When Telephonic Communication fails or it does not get any response from the Gateman despite 2 or 3 attempts, the following procedure should be adopted: (i) if the telephone fails at the gate connected with the station at the dispatching end, Station Master shall issueacautionordertotheLocoPilotofthedeparting train. (ii) Station Master shall advise the Loco Pilot to whistle continuously and proceed cautiously while approachingthegate. (iii) In case the gate signal is 'ON' he should stop short of the gate signal and follow the procedure laid downunderGR3.73. (iv) In case of an approaching train, the Station Master shall advise the Station Master at the dispatching end, under exchange ofprivate number, that the telephone at the gate has failed. (v) TheStationMasteratthedispatchingendshallthenissueacautionordertotheLocoPilotbefore dispatchingatrainintheblocksectionfromhisend. (vi) Station Master will also advise the Gateman through Gang man/Patrolman/Loco Pilot of the first train thatthetelephonehasbecomedefective. (vii) Station Master should also advice S&T Staff responsible for maintenance of the telephone to rectify the same atthe earliest. (viii) Normal working will be resumed only after S&T staff rectify the telephone and issue reconnection/fitmemoforthesame. 4. FailureofLiftingBarriersorLeafGates- (i) When the gate can not be closed due to failure of lifting barriers or leaf gates, the Gateman shall immediately inform the Station Master on duty under exchange ofprivate number, and ensure thatliftingbarriersorleafgatedonotfoulthetrack 287 Tftfw-V OTRW^I^TOt™ (ii) ^ ^ ^ f ^ ^ ^ t ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ f ^ s t a ^ ^ O T ^ (iii) ttwwM*te^^TO^*tepfte$ki (iv) ^ ^ ^ O T T O ^ f ^ ? j ^ ^ ^ ^ ^ ^ f ^ ^ ^ ^ ^ 3 f t ^ ^ ^ (v) c i^d ^ H Hi^^r^Tcft^gt^r^ragHan^ron^^r i (Vi) ^ I R ^ f ^ T ^ W ? ^ ^ ^ d U l M M d r i ^ ^ ^ ^ ^ ? c ^ t a ^ ^ ^ ^ ^ ^ R ^ ; ^ ^ ^ ^ f ^ i ^ R ; C T ^ - ^ ^ ^ d ^ d ^ T (Vii) T ^ R HI«W ^>Wl4l frd^ ^ IH, ̂ fM^CT t f ^ R / o f t V f e <ft jfor W ^ ^ / T j ^ (Viii) W ^ ^TO jJRT feftCT t ^ R / o ^ f e <fl W ^ ^ T Ttf ̂ : ^ f t o H / f ^ * T T ^ ^ 5. te«fef^$Wq>*nfr^ftq>glcTT- (i) ^ W ^ ^ ^ . f ^ . ^ f ^ ^ c ^ ^ ^ ^ - ^ n f e ^ ^ ^ R f ^ f ^ ^ ^ c f t ^ ^ el^IeT 4>l4>td ^ H W ? / ^ W V ^ R frr ^ M q f o H? CT^ R. ^CTR^-^R <fe ai^i^ci ^ d <^n | (ii) ^ R ^IMId^l^H ^ f t ^ ^ / * f ^ m W^J % eft ̂ ^ / * f ^ W ? / ^ %T # * S (iii) ; ™ ^ k ^ f t ™ <* ite^m ctan ^ ^RRJT ^ ww f ^ i % ^ ^ R ^ 3 i k ™ (iv) ^ ^ ^ ^ ^ f ^ ^ ^ f ^ ^ R ^ ^ ^ ^ ^ ^ f f l m ^ ^ J R ^ ^ R H ^ (v) c t ^ d ^ H H i ^ ^ ^ ^ ^ d U l M m d r i ^ T w m ; ^ ^ ^ (Vi) ^ J R ^ f ^ T ^ W ^ ^ ^ ^ ^ T R ^ ^ ^ ^ ^ ^ ^ ^ f t ^ (vii) ^ ? M w ? ^ ^ f t w . ^ A *ra ^ ' ^ ^Rrtfe' <ft star w ^ ^ / ^ ^ (Viii) TTfT.^ A ^ ^ jJRT ' ^ £ M ^ ' <fl W ^ ^ Ttf ̂ : ^ M / f ^ *Tt ̂ <* ̂ # «IHM<iz||gH^:STRWTlfrTT| (ix) ^ ^ ^ ^ ^ ; T O ^ ^ ^ ^ . ^ A ^ ^ S W R M ™ 3 W R ^ ^ M ^ ^ : ? t a ™ f ^ ^ ^ l 6. ^ ^ f t s r f ^ w ^ ^ f t ^ f t w ^ - (i) ^ W ^ ^ ^ f ^ . ^ f ^ ^ c t a R ^ ^ ' ^ ^ R ^ f e ' ^ ^ ^ R f ^ ^ W ^ c f t ^ ^ el^IeT 4>l4>td ^ H W ? / ^ W ? / ^ *T ^ . M q f o H? m$Z R S ^ M - r e M <fe (ii) ^ ^ ^ ^ ^ R R f tftcT ^ f̂ RTT oTTtmT, 3lk ̂ %4f <fr 3TTWT/JReiM ^ ^ ^ (iii) ^ ^ ^ O T ^ f ^ O T ^ ^ i f c ^ ^ I ^ ^ ^ ? j ^ ^ ^ ^ T i % T O (iv) ^ H H I ^ ^ ^ ^ ^ ^ T O ^ T W ™ ; ^ ^ R T ^ (V) ^ J R ^ f ^ T ^ W ^ ^ ^ ^ ^ T R ^ ^ ^ ^ ^ t a ^ ^ ^ f t ^ 288 Appendix-'A' RULES FOR WORKING LEVEL CROSSING (ii) Heshallimmediatelyfixredbannerflagbydayandredflashinglightbynightonthepostatthat endfirstfromwhichthetrainis approaching and then at the other end. (iii) Gatemanshallsecurethegateagainstroadtrafficbymeansofsafetychainsandpadlocks. (iv) Aftersecuringthegateagainstroadtraffic,Gatemanshallshowgreenhandsignalflagbydayand greenlightbynighttotheLocoPilotoftheapproachingtrain. (v) StationMasterondutyshallissuecautionordertotheLocoPilotofadepartingtrain. (vi) He also advise the Station Master at the dispatching end, under exchange of private number; to similarlyissueacautionordertotheLocoPilotbeforedispatchingatraintheblocksectionfrom his end. (vii) Station Master shall advise maintenance staff responsible for maintaining the lifting barrier/leaf gatesto rectify the same at the earliest. (viii) Normal working will be resumed only after maintenance staff repair the lifting barrier/leaf gates andissuereconnection/fitmemo forthe same. 5. FailureofGatekevwith the gate in closed condition - (i) If the gate key cannot be extracted from the winch, gate signal lever or key transmitter then Gateman must immediately inform the Station Master/Cabinmaster/Cabin man on duty on telephone, under exchange of private number. (ii) If Emergency Key is available at the gate lodge/cabin, Gateman /Cabinmaster/Cabin man /lever man will takeitout from the sealed box by breaking the seal and open the gate for road traffic. (iii) The record of the date and time of breaking the sealed cover of Emergency Key Box shall be recordedandsignedwithreasons. (iv) Thereafter, the gate must be treated as non-interlocked and procedure for reception/dispatch of trains as prescribed for non-interlocked gates, should be adopted. (v) StationMasterondutyshallissuecautionordertotheLocoPilotofadepartingtrain. (vi) He shall also advise the Station Master at the dispatching end, under exchange of private number. to similarly issue a caution order to the Loco Pilot before dispatching a train in the block section fromhisend. (vii) StationMastershalladviseS&Tstaffresponsibleformaintainingthekeytransmittertorepairthe same atthe earliest. (viii) Normal working will be resumed only after S&T staff repair the key transmitter and issue reconnection/fitmemo forthe same. (ix) Afterrectification,theEmergencyKeyshallbereplacedintheEmergencyKeyBoxandresealed by the S&T maintained 6. Failure of the Gate Key with the gate in open condition - (i) Ifthegatekeycannotbeextractedfromwinch,gatesignalleverorkeytransmitterthenGateman must immediately inform the Station Master/Cabinmaster/Cabin man on duty on telephone, underexchangeofprivate number. (ii) Thereafter, the gate must be treated as non-interlocked and procedure for reception/dispatch of trains as prescribed for non-interlocked gates, should be adopted. (iii) The Gateman shall secure the gate against road traffic by means of chains and padlocks and pass trainsonhandsignals. (iv) StationMasterondutyshallissueacautionordertotheLocoPilotofadepartingtrain. (v) He shall also advise the Station Master at the dispatching end, under exchange of private number. to similarly issue a caution order to the Loco Pilot before dispatching a train in the block section fromhisend. 288 Tftfw-V OTRW^I^TOt™ (vii) ^ . ^ a ^ ^ ' ^ 3 > f c r ^ w ^ ^ ^ ^ ^ : ? M w f ^ ^ ^ ^ ^ ^ «IHM«-z|MH^3TH«TlfrTT| 7. m ^ 3 M - (ii) ^ ^ O T ^ f ^ T O ^ ^ / f % ^ f ^ T O ^ ^ ^ 3 ™ ^ ^ ^ ^ ^ (iii) ^ ^ ^ ™ ^ f ^ ? ^ W V ^ W V ^ ^ ^ ^ % T O ^ ? ^ ^ ^ f^IT^TTI (vi) 4>nkci ̂ H H i ^ ^ ^ f t ^ t ^ d U l ^e ie^^qRciTan^ron^^HI (vii) ^ j R ^ f ^ ^ ^ w ^ ^ ^ ^ ^ T O ^ ^ ^ ^ * ^ ^ ^ ^ (viii) ^ R w ? ^ ^ R f t w ^ A ^ ^ ^r -tf sprite? ^ ster w ^ ^ ^ ^ T R * ^ (ix) ^ . ^ a ^ ^ ^ f ^ T O ^ ^ ^ ^ ^ ^ i t o / f ^ ^ ^ ^ ^ ^ 8. W ^ ^ ^ R ^ - (i) *Tft * J * ^ WT5RT ^ ^ T̂ ̂ Rf ^ft f ^ ^t WftcT (W^) ^ ^ ?T OT ^ f M ^ t f ^ / ^ ^ ^ ^ ^ ^ ^ ^ $ ^ W ^ ^ ^ l ^ ^ ^ R ^ ^ (ii) ^ f ^ ^ ^ ^ t ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ s f R ^ f ^ ^ t (iii) ^ f e ^ ^ ^ d ^ l d chisel ^ H H I ^ V ^ F T ^ n ^ / ^ f S F T ^ T ^ ^ ^ ^ ^ t / a r a ^ f ^^^yT^g^ .an^T-y^T^a i^c i ^ d ^ (iv) * 2 - 3 5 W * * * ^ W V ^ W * / * f r T *T 5RT viTCR ^ ftelcIT eft ^ (v) ^ t t r t ^ f e ^ w a i « w ^ i w i M » p # # , ^ (vi) ^ « r e ^ c ^ f o T T ^ « l * l l 4 < ^ l l | (vii) ^ ^ TO ^ f%R^, TOP, ^ P ^T P̂T ̂ 3 ^TT cCT ^ ? H W ? / ^ W * / ^ ^ ^ ^ ^ ^ f ^ ^ t ^ ^ ^ ^ f ^ R t ^ ^ ^ f ^ ^ ^ ^ R r W ^ f f l ^ R ^ ^ ^ R f ^ ^ f ^ ^ ^ ^ i d H i d P d ^ l f f ^ / c ^ ^ ^ ^ ^ f f ^ ^ i ^ R ^ t (viii) ? ^ w ? j R ^ f ^ ^ ? ^ w ^ ^ j r ^ ^ . ; f f l ^ - ^ ^ ; s ^ ^ ^ i % 289 Appendix-'A' RULES FOR WORKING LEVEL CROSSING (vi) StationMastershalladviseS&Tstaffresponsibleformaintainingthekeytransmittertorepairthe same at the earliest. (vii) Normal working will be resumed only after S&T staff repair the key transmitter and issue reconnection/fitmemoforthesame. 7. DefectiveGateSknals- (i) The Gateman shall treat the gate signal as defective and must not take 'Off them under following circumstances - (a) Ifgatesignalscanbetaken'OFF'withoutclosingthegate,or (b) ThekeycanbeeXtractedfromtheoperatingwinchwhenthegateisinopencondition,or (c) Thekeycanbeextractedfromtheleafgateswhenthegateisinopencondition. (ii) If the Gate or the Gate Signal or Warner/Distant Signal becomes defective in 'OFF' Position, the Gateman will make all efforts to put it at'ON position even by cutting signal wires, if necessary. (iii) TheGatemanwillimmediatelyadvisetheStationMaster/Cabinmaster/Cabinmanondutyunder exchange of private number, regarding defective gate signals. (iv) Thereafter, the gate must be treated as non-interlocked and procedure for reception/dispatch as prescribedfornon-interlockedgatesshouldbeadopted. (v) He shall show green hand signal flag by day and green light by night to the passing train after closingthegate. (vi) StationMasterondutywillissueacautionordertotheLocoPilotofadepartingtrain. (vii) He shall also advise the Station Master at the dispatching end, under exchange of private number. to similarly issue a caution order to the Loco Pilot before dispatching a train in the block section fromhisend. (viii)StationMastershall advise S&T staff responsible for maintaining the gate signal to repair thesame atthe earliest. (ix) Normal working will be resumed only after S&T staff rectify the defective gate signal and issue reconnection/fitmemoforthesame. 8. ObstructionattheGate- (i) If the gate is broken by a road vehicle which is fouling the track, or if lifting barrier/leaf gates or anyotherpartofthegatefoulthetrack,orifthereisanyotherobstructionatthegate,theGateman shall immediatelyputbackgatesignalsto'On'Position. (ii) Heshallfixredbannerflagbydayandredflashinglampbynightonpostsprovidedatbothends ofthegateforthispurpose. (iii) Immediately after this, the Gateman shall advice the Station Master/Cabinmaster/Cabin man on dutyregardingthedefects/obstructionsatthegatcunderexchangeofprivatenumber. (iv) If there is no response from the Station Master/Cabinmaster/Cabin man after two or three attempts, he shall first protect the gate and then inform on phone. (v) Gatemanshallthenrushwithdetonatorsandredflagbydayandredflashinghandsignallampby night in the direction of the approaching train and protect the gate as stipulated in General InstructionfordutiesofGatemanunderitemNo. 1.5 (5). (vi) Thereafterheshallprotectthegatefromtheotherdirectionalso. (vii) He shall note down the particulars of the road vehicle, name of the Driver, owner and relay these details to the Station Master/Cabin master/Cabin man who shall not start the train unless he has been assured by the Gateman that the road vehicle or the lifting barriers/leaf gates are not fouling thetrack. (viii) The Station Master shall also inform the Station Master at the dispatching end, under exchange of private number, asking him not to dispatch any train in the block section from his end, until the trackhasbeenclearedofallobstruction. 289 TftftlB-V W l ^ ^ T O t o W V ^ ^ ^ d c ^ K ^ d c f r ^ | | | (X) ^R te d ^ w t, i%^ smw g ^ t, era ^ n w * ^ ^ # <* efntfr TO^ ^r ^ M ; ^ ^ ^ f % ^ r a ^ ^ ^ ^ ^ i t e % T O ^ ^ ^ f ^ i % i f ^ 2 T f % T O q ^ ^ | (xi) ^ ^ mm in TTj i f e ^ ^ irz ̂ r r̂fecr ^ T 3ik ^R te TR ^ I # T ^f t eft ̂ r sro (xii) ^ ^ H I ^ ^ ^ l ^ ^ ^ ^ l ^ ^ f ^ C T t f e R / c ^ ^ ^ W ^ ^ f ^ ^ U l P d ^ U (xiii) ^ t ^ ^ ^ ^ ^ ^ f ^ C T t f ^ / c ^ ^ ^ ^ R ^ ^ ^ : ^ f % ^ / f ^ ^ T T ^ ^ «re# «IHM ^xlMH ^T: ;^R«Ti%^^R^ I 3 R . R T - I I ^ f W W T R W ^ . ^ ? P T «# ^ S ftPRclY «# ^RT SFrFTfftRT. £ o f a ^ («mF*T ^ * t f JRJTC * W 5RT ^TfacT W M W ^ t <* fM W T % |) 2. J t e ^ ^ t ^ ^ - (i) ? ^ w V ^ w V ^ ^ ^ f ^ ^ ^ ^ ^ ^ ^ ^ ^ ^ ™ R w ^ ^ s f R ^ ^ f t ^ ^ f ^ ^ ^ ^ ^ i f ^ ^ ^ (ii) tt^^^3h#^RTO/ii/iW^ir^i (iii) craanwT/^iHftFRerafnpf^ron^i (iv) ^ H H l W ^ W V ^ ^ ^ ^ f ^ ^ ^ ^ f o ^ ^ H I d ; ^ ^ vmni^wiwm^tmK%\ (v) ^ ^ ^H * # S W ^ t. cfT ^ ? H W V * f ^ W ? / ^ *T ^ F # ^ ^ T f % (vi) ^ M ^ ^ ^ ^ ^ ^ T O ^ ^ ^ ^ f ^ ^ t c i T W ^ *raw ̂ f ftwr ^ f ^ f to ^f-^t% 3 ^ ^ - (i) ? ^ ^ R W ^ / W ^ ^ ^ ^ f ^ ^ ^ f ^ ^ ^ f ^ 290 Appendix-'A' RULES FOR WORKING LEVEL CROSSING (ix) After the track has been cleared of all obstructions the Gateman shall inform the Station Master accordinglyunderexchangeofprivatenumber. (x) Station Master shall then issue a caution order to Loco Pilots of all trains to proceed cautiously, andpassthegatesignalat'ON'positionon green hand signal of the Gateman, if the gate is broken. butisclearofanyobstruction. (xi) Gatemanshallsecurethegateagainstroadtrafficbymeansofsafetychainsandpadlockandthere afterexhibitgreenhandsignaUfthegateisnotobstructed. (xii) Station Master shall advise maintenance staff responsible for maintaining the lifting barriers/leaf gatestorepairthesameattheearliest. (xiii) Normal working will be resumed only after maintenance staff rectify the defective lifting barriers/leafgatesandissuereconnection/fitmemoforthesame. 9. Obstruction on the Track near Level Crossing Gate - If there is a rail fracture or obstruction on the track due to falling of a tree, fouling by road vehicle or derailment which is visible to the Gateman, the Gateman and Station Master will adopt the procedure given under item No. 8 above, if the obstruction fouls the Level Crossing Gate, Gateman must keep the gates closed against road traffic till the track is clearedoftheobstruction.

Previous and next

All provisions of Indian Railways (Open Lines) General and Subsidiary Rules

Questions people ask

Is annexure 1 of Indian Railways (Open Lines) General and Subsidiary Rules still in force?

No repeal of Indian Railways (Open Lines) General and Subsidiary Rules is recorded.