LawGrids logoLAWGRIDS.ORG

Annexure IV, Regulations for the Navy: ANNEX IV

Regulations for the Navy - Annexure IV

Text of annexure IV

ANNEX IV

ANNEX IV Distress signals 1. The following signals, used or exhibited either together or separately, indicate distress and need of assistance; (a) a gun or other explosive signal fired at intervals of about a minute: (b) a continuous sounding with any fog signalling apparatus; (c) rockets or shells, throwing red stars fired one at a time at short intervals; (d) a signal by radiotelegraphy or by any other signalling method consisting of the group…..______………(SOS) in the Morse Code; (e) a signal sent by radiotelephony consisting of the spoken word ‘Mayday’; (f) the International Code Signal of distress indicated by N.C.; (g) a signal consisting of a square flag having above or below it a ball or any thing resembling a ball; (h) flames on the vessel (as from a burning tar barrel, oil barrel, etc.); (i) a rocket parachute flare or a hand flare showing a red light; (j) a smoke signal giving off orange-coloured smoke; (k) slowly and repeatedly raising and lowering arms outstretched to each side; (l) the radiotelegraph alarm signal; (m) the radiotelephone alarm signal; (n) signals transmitted by emergency position-indicating radio becons; 2. The use or exhibition of any of the foregoing signals except for the purpose of indicating distress and need of assistance and the use of other signals which may be confused with any of the above signals is prohibited 3. Attention is drawn to the relevant sections of the International Code of Signals, the Merchant Ship Search and Rescue Manual and the following signals: (a) a piece of orange-coloured canvas with either a black square and circle or other appropriate symbol (for identification from the air). (b) a dye marker. CHAPTER 43 TESTS, TRIALS, SURVEYS AND MAINTENANCE OF MATERIAL Section Regulations I. Hull and General 4301 – 4320 II. Gunnery 4321 – 4325 III. Underwater Weapons 4326 – 4333 IV. Minelaying and Minesweeping Gear 4334 – 4337 V. Engineering 4338 – 4340 VI. Electrical 4341 – 4355 VII. Visual Signalling Equipment 4356 – 4357 VIII. Anchors, Chain Cable, Steel Wire Rope Slings, Rigging, Etc. 4358 – 4362 IX. Cranes and Lifts 4363 – 4362 X. Boats and Floats 4367 – 4370 XI. Articles Under Trial 4371 SECTION I – HULL AND GENERAL 4301. Survey and Examination. Periodic survey and examination are undertaken to assess the condition of all structure and fittings contributing to hull strength and watertight integrity. They form an integral part of the continuous assessment of hull material state. Structure found defective is to be repaired to restore the material state of the ship for a further extensive period in service. Periodic surveys are generally confined to the underwater hull of the vessel. Any specific survey of particular part or fittings in connection with machinery, equipment and system, which is beyond the capacity of ship’s staff, is to be undertaken by dockyard. The Commanding officer is responsible for providing defect list details of all planned and maintenance work on a defect list IN 488. 4302. Long Refits. 100% hull survey of hull structure, fittings and other equipment and systems shall be carried out by refitting authorities during long refit. The work package for the major refit is to be defined in a Refit Planning Document by: - (a) Defect List form IN 296 S. (b) Survey. (c) Alterations and Additions (A’s & A’s) work package approved by Administrative Authority/Naval Headquarters. 4303. Procedures, which Contribute to Successful Survey. (1) The following procedures are to be applied whenever practicable in order to achieve continuity of effective survey throughout the life of the ship. (a) Pre-refit Visit. It is a prerequisite of a successful survey that the optimum information on the overall condition of the ship be obtained before the refit commences. The pre-refit visit by a small Dockyard Planning Team is to include the following investigation, which are allied to an assessment of survey: - (i) Discussions with the ship’s officer on the material state of ship’s structure, main and auxiliary machinery and all the systems. (ii) Scrutiny of records of previous survey carried out by the dockyard. (iii) Where possible, examination of areas covered in the ship’s defect list where known defects have occurred so that the extent of the repair task and work in wake can be determined. (iv) Investigation as far as is practicable in a running ship of area known to be difficult to maintain where conditions are likely to promote deterioration. (v) As far as practical, the pre-refit survey carried out prior to restorative refit should include and count towards as much of the refit survey as possible. (b) Detailed Planning of the Survey Task. Detailed planning and professional and technical involvement at all levels are essential for the satisfactory survey of hull structure and systems. Milestones are to be included in the refit plan, defining the completion of survey and examination. It is essential that the survey be commenced and completed during an early stage of refit to ensure of refit to ensure timely rectification of defects. Particular importance must be paid to hull survey. Completion of under water hull survey is to be planned for the mid docking period and the remainder of the survey by the mid refit stage (c) The inspection and reports on the hull structure and fitting rendered by ship’s staff are to be examined by Dockyard officers when assessing the survey requirement. (d) Use of Non-destructive Technique. Non-destructive technique i.e. the use of an ultrasonic thickness measuring gauge are to be employed wherever practicable for survey of hull. The reading of hull thickness are only to be supplemented by drill testing if this is considered to be essential and is approved by the constructor officer. The results of the examination of the hull are to be recorded on ship’s drawing to supplement the IN 378 information. (e) Location of Ship in Dock. Ships are to be docked on minimum number of blocks commensurate with block loading limitation, taking into account the possibility that the keel may not be straight and also the intention with regards to block removal. On each occasion of docking, opportunity is to be taken to inspect area in the wake of dock blocks, particularly where the dock blocks are closely spaced or where the keel is likely to have been deteriorated. Previous copies of forms IN 379 and IN 378 are to be examined for representative block removal to occur over a succession of docking periods. Vessels are to be docked in a different position from the last docking. (2) General Instruction for Carrying out Survey. (a) The dockyard survey forms a major part of the continuous assessment of the material state of the ships, supplemented by structural system, and machinery examination carried out by ship’s staff. The limit of survey envisaged on each particular type of refit is to be in accordance with the order promulgated by the Chief of the Naval Staff from time to time. It is important that the decision on the critical areas of repair arising from the survey should be at the highest professional level. (b) Dockyard officers are regularly to consult and inform ship’s and Administrative Authority of any findings and decisions on a survey which may affect the ship’s programme and are to conduct a formal mid term refit discussion with the administrative authorities. 4304. Procedure for Reporting Structural Survey. (1) To ensure that the survey is adequately documented, Dockyard officers are to initiate a record of each survey on form IN 378 Part I & Part II and as per order promulgated by the Chief of Naval Staff from time to time. The record is to show completely the compartments and places surveyed and work done on each occasion. The repair carried out on the under water hull should also be indicated in form IN 379. (2) On completion of structural survey a report is to be rendered as stated in sub regulation (1) above and forwarded to the Chief of the Naval Staff within one month of completion of refit. Copies are to be forwarded to Administrative Authority concerned and the Commanding officer of the ship. 4305. Periodic Survey. Periodic hull surveys are to be conducted: - (a) To determine the state of main structural members of the hull, super- structure and important internal structural members. (b) To ensure that rapid/further deterioration of important structures affected by corrosion does not occur or is controlled. (c) To ensure that repairs are carried out to all defective structures. 4306. Types of Hull Structure Survey. (1) Surface Ships. Types of hull survey carried out in each refit is as follows: - (a) Short Refit. Underwater hull to be visually inspected, underwater structure graded ‘critical’ during the precedings refit are to be examined and specific defect if any to be rectified. Cathodic protection system is to be checked and repairs/renewal carried out as required. (b) Normal Refit. Drill test survey or ultrasonic survey is to be conducted on 1/3rd of underwater hull of aircraft carrier, 50% of underwater hull of frigates, tankers, survey vessels, Utility Landing Crafts (LSTs) and depot ships and 100% of underwater hull of remaining ships. The remaining 2/3rd of underwater hull of aircraft carrier and 50% of underwater hull of frigates and above are to be usually inspected; specific defects if any to be rectified. Cathodic protection system is to be checked and repair/renewal to be carried out. (c) Long Refit. Drill test or ultrasonic test is to be carried out for the full underwater hull. Drill test/ultrasonic/visual survey is to be carried out for the remaining structural members as considered necessary by the refitting authority. The Cathodic protection system is to be checked and repair/renewal to be carried out. (2) Submarines. The type of hull survey to be carried out on each refit is as follows: - (a) Short Refit. Critical structure i.e. pressure hull pressure water tight bulkhead plates, ballast tank casing outer hull, ballast tank frames, outer hull dock conning towers, superstructure etc. are to be examined and specific defects be rectified, cathodic protection system is to be examined and repairs/renewal are to be carried out as necessary. Sample survey of following inaccessible areas of pressure hull are to be carried out: - (i) Inaccessible aress around the conning tower. (ii) Areas above water line in the region of diesel engine exhaust. (iii) Free flooding areas. (iv) Torpedo loading hatch. (b) Normal Refit. Ultrasonic survey of pressure hull and external tanks is to be carried out. Specific defect, if any, is to be rectified, cathodic protection system is to be examined and repairs/renewal to be carried out as necessary. (c) Long refit. Ultrasonic survey of complete hull structure is to be carried out and defects, is any, are to be rectified. Cathodic protection system is to be examined and repairs/renewal are to be carried out. (3) Glass Reinforced Plastic (GRP) Ships-Inspection, Testing and Survey Procedure to be followed on each Refit. (a) Visual methods are used predominantly for inspections, testing and survey. Practically all physical testing is destructive and hence its use is limited to occasional samples from large production runs like major repair, construction of boats, domes etc,. (b) Non-destructive physical tests are confined to those of dimensional checks, weight checks, resin hardness determination etc., using devices such as snap gauges, micrometers, scales, portable hardness gauges, etc. (c) Type of defects found by visual inspection and their possible causes are listed below for guidelines. Defects Possible causes (i) Blisters Cure too rapid, mould too hoot, moisture in the resin filler or glass, resin starvation due to re-moulding layup and curing no scaling or weathering coat in case of structure in contact with water. (ii) Pin holes Poor m ould surface, entrapped air, insufficient Pits and Voids. mould pressure, dirty mould. (iii) Sin Monks. (iv) Crazing. Resin rich areas caused by poor glass distribution, impacts prior to proper hardening. (v) Ripples and Wrinkles Partial coming. Cure too rapid, use of old resin improper, use of reinforcement, washing or moving the glass, use of glass which is not compatible with particular type of resin. (vi) Exposed Fibres Glass content too high, poor glass distribution, poor impregnation (vii) Delamination Poor impregnation, glass content too high, improper overlaps, wrong overlap direction with respect to the direction of water flow. (viii) Air pocket. Lay up done by untrained personnel use of low viscous binder or vertical applications, restricted pot life of binder which hardens up prior to proper impregnations and placement of reinforcement. (4) Survey General Procedure. Carry our visual inspection/survey of all compartments including inaccessible areas covering up the shipside, bulkheads, frames, beams, grinders, deck foundations of various equipments and machineries, superstructure both internally and externally, the joint between the superstructure and the deck during refits, Normal Refit (NR) and above. During Short Refit (SR) such survey shall be carried out to the extent possible except machinery foundation since it may not be possible to inspect them. (5) State of Deck/Hull/Bulkhead. Slicing, delamination of reinforcing layers, fittings such as stanchions, bulwork stiffers, etc., are the commonly observed defects. Suspected are to be tested with a light hammer and a dull sound could indicate a defect beneath the top layer. Visible signs of slicing or bulging, unevenness, contour that is not gradual etc. (6) Frames, Girders, Beams. These types of structural members are fabricated separately and are fixed with the hull/deck by means of reinforcing angles. Check to be made to find out whether there is slicing of the angles, the main members or otherwise to be surveyed for intactness and defects such as, crazing, cracks, delamination etc. (7) Hull. To be examined externally and internally when the ship is in dry dock. Any major defects observed and repairs effected are to be recorded in the docking report giving all particulars, such as location, nature of defect repair procedure adopted, details of materials, used etc. with a view that such repairs are examined during the subsequent docking. 4307. Survey of Yard Crafts. (1) Drill test or ultrasonic survey is to be conducted on full underwater hull during every alternate refit (24 months). Visual survey of the underwater hull is to be carried out during the other refit. (2) The Captains of the yard are to initiate an item in the defect list when hull survey by dockyard are due to be carried out. Any proposal to prolong or curtail the period between surveys is to be referred to the Chief of the Naval Staff for consideration. 4308. Renewal of Hull Structure of Ships and Submarines. (1) Surface Ships. (a) All main structural members normally have a corrosion allowance in scantling equal to approximately 25% of the thickness. (b) Structures of surface ships for which the percentage reduction in scantling (K-value) exceeds the following values will require renewal: - (i) 40% and over for minor partitioner, superstructure and intermediate decks (non-strength decks). (ii) 25% and over for shell plates, strength-deck plates, main bulkheads, tank tops, machinery bearers. (iii) 30% and over for internal structure like frames, longitudinals, beams and girders. (2) Submarines. Structure of submarine which requires renewal are as follows. The maximum overall permissible wear compared with design thickness (K- value) is indicated against each structural location: - (a) K=6 = for pressure hull plating and frames, pressure and bulkheads, pressure bulkheads and pressure tank plates. (b) K=15 = for pressure hull watertight bulkhead plates. (c) K=30 = for ballast tank casing plates. (d) K=20 = for outer hull ballast tank frames. (e) K=35 = for outer hull plates (deck ends and conning tower superstructure etc). 4309. Ship’s Staff Survey of Maintenance Hull Structure and Fittings. (1) The commanding officer of the ship is responsible for proper maintenance of ship’s structure and fittings. The Commanding officer should carry out the periodic maintenance routines laid down in hull maintenance schedule and render regularly hull maintenance and defect return on form IN 926 and 927 respectively. (2) In general, all maintenance schedules are based on specific periodicity. (3) Protective Coatings. To ensure that approved paint schemes have been applied to different parts of the ship, it is essential that deteriorated coatings, rust products and contaminators are removed before hand. The extent of removal and renewal is to be determined from inspection of the existing coatings. (4) Cathodic Protection. (a) Ships fitted with Impressed Current Cathodic Protection (ICCP) system should carry out periodic maintenance routines as laid down in Chapter 4 of INBR 372 and orders issued by the Chief of the Naval Staff from time to time. (b) The hull potential and anode current is to be recorded once in a day in the ship’s logbook as per table 1 of Chapter 4 of INBR 372. The data is required to be forwarded to the Chief of Naval Staff with a copy to Administrative Authority, refitting authority and Naval Chemical Metallurgical Laboratory (NCML). (c) In the event, the system fails or hull potential readings are beyond permissible limit, ships staff are to inform Administrative Authority, NCML and Naval Dockyard and to request Naval Dockyard to provide portable handing anodes for use by the ship when alongside. (d) Ships fitted with sacrificial anodes should measure the hull potential regularly and record the same once in a fortnight using an external zinc or silver/silver chloride reference electrode. A logbook is to be maintained to record the hull potential as per order in force. One copy of logbook is to be forwarded to the Chief of the Naval Staff with a copy to Administrative Authority, Naval Dockyard and NCML on monthly basis. (e) Whenever the hull potential reading is found beyond permissible limit specified in Chapter 1 Para 1.13 of INBR 372, the ship’s staff are to inform administrative Authority, NCML and Naval Dockyard and to request Naval Dockyard to provide portable hanging anodes. (f) Precautions. (i) When ICCP system is to be operated with the ship at alongside berth, it should be ensured that all metallic contacts with ship via steel gangway and steel ropes to the jetty are removed. (ii) Ships at alongside berths are to ensure that steel ladders, ship to ship and ship to shore are supported on rubber pads and steel ropes, for securing ships alongside. (iii) Welding operation alongside is likely to effect the ICCP system. During electric welding, it is to be ensured that reverse polarity is avoided. (5) Ship’s Officers Survey Report. In addition to periodical hull maintenance routines of hull structure and fittings, a thorough examination of every part of the structure fittings/machinery/seats affecting strength or watertight sub-division should be carried out by ship’s officers quarterly and a report on the condition of structure/fittings and paint work should be forwarded to the Chief of the Naval Staff with a copy to Administrative Authority and Dockyard Authority. 4310. Inspections and Test & Trials of Hull Structure & Equipment. (10 Air Testing of Compartment. To ensure the essential maintenance of watertight and gas tight integrity, ships structure are to be regularly air tested during normal refits or major refit. The list of compartments, to be air tested is laid down in each ship and submarine maintenance schedule. Complete record of all air testing are to be rendered on form IN 378. (2) Citadel Test. In addition to general air testing of individual compartments a complete citadel test is to be carried out “on completion of normal refit/major refit” in accordance with BR 2170 Vol 2 NBCD Manual Chapter 41. A report of citadel test is to be forwarded to the Chief of the Naval Staff through Administrative Authority. (3) Inspections & test of Life Saving Appliance. Ships staff should carry out all periodical maintenance routines of all life saving appliances i.e. life rafts, life buoys, lifting nets etc. All life rafts and survival packs complete with GRP containers are to be landed in the Dockyard’s Life Raft Repair Cell, for yearly inspection and servicing. (4) Inspections and Test of Lifting Appliance (a) Ships staff to carry out periodical maintenance routines of lifting appliances and associated machinery fittings as laid down in the hull maintenance schedule and orders promulgated by the Chief of the Naval Staff from time to time. (b) All lifting appliances i.e. derrick, davit, crane winches, overhead runways, turn table, chain block, grabe etc. are to be load tested by Dockyard officers on each occasion of normal refit and major refits. The request for such tests by dockyard are to be initiated by ships staff on defect list (c) The interval between test should not exceed 27 months. (5) Heeling Trials. Heeling trials are to be carried out on ships after completion of long refit/modernisation. The Commanding officer should ensure that all necessary precautions as laid down in chapter 41 of ship NBCD Manual (BR 2170) Vol II and orders issued by the Chief of the Naval Staff from time to time are being observed during trials. (6) Insulation Test of Refrigerated Spaces. Test of insulation of all refrigerated spaces are to be carried out in accordance with General Hull Specifications after a major refit. The test period should not exceed 6 years. A trial report on Form D-741A is to be forwarded to the Chief of the Naval Staff through the Administrative Authority. (7) Air-conditioning/Ventilation Trials. Thorough air-conditioning and ventilation trials are essential during long refits/modernisations to ensure that the designed conditions are maintained. The trials should be conducted as per procedure laid down in Section ‘R’ of Air Conditioning General Hand Book INBR 304. The results of the trial are to be tabulated in standard test sheet specified and a comprehensive report to be forwarded to the Chief of the Naval Staff with copies to Administrative Authorities and Commanding officer of the ship. The trial report should comprise of the following: - (a) Fans & performance data. (b) Compartment air quantities (designed and actual temperature and humidity of the compartment. (c) Chilled water quantity and inlet/outlet temperature of each cooler. Note: For submarines, above trials are to be conducted under various regimes of ventilation. Separate record for each regime is to be maintained. (8) Trial of Galleys and Bakeries. Trials of Ships’ galleys which have been modernised are to be carried out in accordance with, Procedure for the Supervision of Ships and Vessels Building by Contract (BR 1921) article 1432. The trial is to consist of operating each piece of equipment and machinery for the minimum time necessary to ascertain that it is fit to be used for its particular purpose. (9) Laundry Trials. Whenever a large modification is effected to the existing plant, a laundry trial under working conditions is to be carried out as laid down in BR 1921 Article 1432. When minor modifications are involved it will be sufficient to test the additional items and associated services to the satisfaction of ship’s officer. (10) Testing of Brows. (a) Brows carried on IN ships are to be normally tested in Naval Docyards. Ships are required to add an item to their defect list to cover the testing of brows as these tests become due during major refits. (b) The test load to be calculated from the formula area of brow in square feet Test load in tons = 14 (c) The test load ios to be evenly distributed over the length of the brow, the brow being supported at its ends in horizontal position. No end restraint is to be imparted to the brows by the supports for steel and aluminium brows. No permanent set should remain after removal of the test load. For wood brows the permanent set should not exceed 6mm per 3-metre length of brow. (11) Return of Weights. The Admiral Superintendent of Dockyard or the Warship Production Superintendent as the case may be will render on form NSO 317 a return of weight of everything on board with other particulars required by the form on the following occasions: - (a) With the officer’s report of the inclining experiment. (b) After any large refit. (c) On commissioning. (d) The Commanding officer shall furnish the information desired by dockyard or NPS authorities which will assist in compilation of the return of weight. When actual weights are not known, they should be carefully estimated. 4311. Cleaning and Painting During Refit. (1) Cleaning and painting of the following is to be carried out by dockyard during refit and the remaining portion is to be cleaned and painted by ship’s staff. (a) Flag Officer’s and Captain’s apartment, wardroom sickbay, and other items in the accepted work package. (b) In submarines the control room,. Torpedo space and living spaces. (c) Paint work damaged by the dockyard in the immediate vicinity of specific items of refitting work carried out by the dockyard. (d) All underwater hull and fitting below the deep waterline. (2) In the vessel undergoing a refit where a care and maintenance party or reserve complement is not attached, the cleaning and painting shall be carried out as may be arranged by the Admiral Superintendent Dockyard. 4312 – 4320 Blank. SECTION II – GUNNERY 4321. Trials of Fitting. (1) The following instructions shall be observed in carrying out trials of the gunnery and associated electrical fittings of IN Ships. (2) Gunnery inspections and acceptance trials in new construction ships and ships refitting, including those in reserve, shall be carried out as indicated in the table below. Detailed orders for inspection and trials and the authorities by whom these are to be carried out will be as prescribed by the Chief of the Naval Staff from time to time. TABLE Authority for Initiating Inspections or Trials Condition of ship Authority for Initiating Inspections or Trials New construction (Contraction Built in India) The Chief of the Naval Staff. New construction (Contraction Built outside India) The Chief of the Naval Staff. New construction (Dockyard Built) Admiral Superintendent of the Dockyard concerned. Refitting or conversion for service, but not Commanding officer through in reserve. Admiral Superintendent Dockyard and Administrative Authority, concerned. Refitting or conversion before being placed Commanding officer if in in reserve. Commission otherwise Admiral Superintendent Dockyard concerned. Refitting or conversion while in reserve. Senior Officer, Reserve Fleet. Refitting or conversion from reserve. Commanding officer through Admiral Superintendent Dockyard and Administrative Authority concerned. (3) Authorities responsible for initiating inspections of trials should give as much notice to conducting authorities as possible. Conducting authorities carry out their inspections and trials on behalf of ship’s officers, and in the case of equipment to be accepted from manufactures, on behalf of the Chief of the Naval Staff. (4) Reports shall be rendered by the authority carrying out the trials as follows:- (a) New Construction Ships and those Undergoing Conversion or Modernisation. To the Chief of the Naval Staff with copies to authorities concerned. (b) Ships Refitting. To Administrative Authority, with copies to authorities concerned. I, however, the equipment reported on has been received from the manufactures, or if decision by the Chief of the Naval Staff is required on any item, reports shall be forwarded jointly to the Chief of the Naval Staff and the Administrative Authority. (c) Gunnery School, Training Establishments and firing Ranges. Such units/firing ranges having equipment which requires inspection or trial, should comply with the provisions of this Regulation in so far they are applicable. 4322. When Ready to Receive Guns. The Captain shall give notice in writing. Through the Administrative Authority or Senior Officer, to the General Manager Naval Armament Stores on every occasion when the ship is ready to receive or land guns, projectiles, cordite, or other heavy armament stores. 4323 – 4325 Blank. SECTION III – UNDERWATER WEAPONS 4326. Underwater Weapon Trials. Detailed orders for the trials will be as promulgated by the Chief of the Naval Staff. 4327. Torpedo Equipment Trials. (1) A torpedo equipment trial of all new vessels, shall be carried out by an officer nominated by the Chief of the Naval Staff, before the vessel leaves the dockyard or the contractor’s works. Abroad this trial shall be arranged for locally. The Commanding officer of the ship shall be associated in all such trials and ensure that the fittings and equipment are satisfactory. This trial is to include a trial of the torpedo control equipment. (2) A similar trial is required after any alterations have been carried out, affecting the torpedo equipment in ship’s refitting, modernising or converting. This trial will be carried out by the Refitting Dockyard. 4328. Torpedo Discharge Trials. (1) Standard torpedo discharge trials shall be carried out by an officer nominated by the Chief of the Naval Staff in all ships having torpedo armament. First of class torpedo discharge trials shall be carried out in the first two ships of a new class after the ship is commissioned. (2) Full speed is required for all discharge trials except those of submarines. 4329. Alignment of Torpedo Sights and Tubes. Alignment of torpedo sights and tubes in ships shall be carried out in ships under construction, and a check alignment in ships and vessels refitting is to be carried out by the Dockyard officer concerned. The necessary arrangements shall be made by the Administrative Authority. Abroad, local arrangements shall be made for check alignment. 4330. Trials of Anti Submarine (AS) Weapons, Anti Torpedo (AT) Devices, and Underwater Detection Equipment. (1) Equipment and sea-trials of underwater detection equipment, anti submarine weapons and anti-torpedo devices of all new vessels shall be carried out by an office nominated by the Chief of the Naval Staff, and of ships refitting, modernising or converting shall be carried out by the dockyard concerned, before the vessel leaves the contractor’s yard or dockyard. The Administrative Authority shall make available specialist officers to the dockyard as necessary. (2) Similar trials are required after any major alterations have been m ade to this equipment. 4331 – 4333. Blank. SECTION IV – MINELAYING AND MINESWEEPING GEAR 4334. Minelaying Equipment Trials. Minelaying equipment trials shall be carried out by an officer nominated by the Chief of the Naval Staff, in all vessels fitted for minelaying, before leaving the contractor’s yard or dockyard on completion, or after a refit win which alterations and additions, or repairs have been made to existing minelaying equipment. Detailed orders will be promulgated by the Chief of the Naval Staff as necessary. 4335. Minelaying Tests. To test the organisation for maintenance, preparation and issue of mines, the Flag or other officer in command of a fleet, or a flotilla, or of an area shall arrange that mines are drawn periodically from every mine depot on his station from which issues to minelayers are normally made and that these are laid under conditions favourable for the detection of any defects and their causes 4336. Minesweeping Equipment Trials. Minesweeping equipment trials shall be carried out by an officer nominated by the Chief of the Naval Staff, in all minesweepers before leaving the contractor’s yard or dockyard on completion. After a refit in which alterations and additions, or repairs, have been made to existing minesweeping equipment, the trials will be carried out by the dockyard concerned. The Administrative Authority shall make available specialist officers to the dockyard as necessary. 4337. Blank. SECTION V – ENGINEERING 4338. Engineering Trials. Full details of Engineering trials are given in the orders issued by the chief of the Naval Staff. 4339. Capstans etc. (1) The Captain will take care that the capstans are turned round, and that both capstan and spindle are properly lubricated once a week; also, that the spindles and deck bushes of the capstans are examined once in a every twelve months, and, also that when capstan bars are shipped they are invariably well secure and swiftered to prevent accidents. (2) Great care shall be taken in the use of patent capstan compressors and controllers which are fitted to ships, and the directions for their use shall be strictly adhered to. (3) In capstans where the capstan head is secured by means of screws or bolts to a disc keyed to the spindle,k the capstan head and the disc shall be parted once in every twelve months, and the bearing surfaces, keys and screws examined for deterioration by rust and any other damage, such as fractured bolts, faulty feather keys,. etc. (4) The bearing surface shall be cleared of any rust and well greased before the capstan head and disc are rejoined. If any repairs are found to be necessary and beyond the capabilities of the ship’s staff they shall be included in the next defect list forwarded for the vessel concerned. 4340. Blank. SECTION VI – ELECTRICAL 4341. Electrical Trials. (1) Scope of electrical equipment has been defined un der sub-regulation 2 of regulation 0606. (2) Scope of electrical trials will be as promulgated by the Chief of the Naval Staff from time to time as applicable to following: - (a) Pre-refit/post refit trials for existing equipment. (b) Pre-installation/post installation trials for new construction ships. (c) Evaluation trials for new induction equipment. 4342. Category of Electrical Trials. (1) Trials to be conducted on completion of refit, modernisation or conversion of a ship in a naval or commercial yard. These trials shall be conducted by agencies nominated by the Chief of the Naval Staff as per the trial directive promulgated. (2) The trials on indigenous new construction ships shall be conducted in two parts viz installation inspection trials and post installation trials. The installation inspection trials shall be carried out by agency nominated and in accordance with the trials directive issued by the Chief of the Naval Staff. The post installation trials shall be conducted as specified in sub-regulation 4342 (1), Chapter 43. (3) For ships being constructed/acquired from abroad installation inspection trials shall be conducted by the agencies nominated by the Chief of the Naval Staff. (4) The post installation trials shall be conducted by the Delivery and Acceptance Trials team in accordance with the ship builders specification and trial directive promulgated by the Chief of the Naval Staff. 4343. Forwarding of Trials Defect Reports. (1) In case of newly constructed ships, or ships which have undergone modernisation, conversion or major repairs or in which a complete electrical system has been installed by the dockyard, the electrical trials are to be carried out in accordance with regulation 4342 (1), (2). The agencies nominated to conduct the trials shall forward the trial reports to the Chief of the Naval Staff under intimation to all concerned agencies. (2) The Captain of the ships mentioned at regulation 4343 (1), through their respective Administrative Authorities, shall report any abnormal electrical defects discovered within three months after completion of installation and trials. The instruction does not apply to defects in design which are dealt with by Form S.316. A copy of the report shall be sent to the superintendent of the building or refitting yard if the work has been carried out in one of Indian Naval Dockyards. The report shall be limited to a statement of facts and a suggested explanation of the causes of each defect. It should not include minor defects which may be looked upon as being normal under working conditions. Such reports shall not be made the subject of correspondence between dockyard and fleet officers, except in special instances in which the Superintendent of the Dockyard concerned may desire further information 4344. Testing and Tuning. (1) Testing and tuning shall be carried out by officers of the yard in conjuction with the appropriate authorities. This should be commenced immediately after the initial installation inspection and completed before final inspection. (2) In new construction ships and submarines, and in the case of repairs, modernisation and conversions of ships and submarines in Naval Dockyards, testing and tuning will be treated as part of the dockyard work. In all cases, the Admiral Superintendent of the Dockyard is responsible for arranging preliminary inspection, final inspection and sea trials. 4345. Sea Trials of Electrical Equipment. (1) Trials shall be carried out at sea to ascertain that all contractor’s or dockyard work has been carried out and that the equipment is working correctly and is in a fit state to be accepted by the acceptance agencies. (2) The Captain is responsible for ensuring that satisfactory sea trials have been carried out before the ship finally leaves the dockyard. 4346. Electrical Equipment Trials inshore Establishments. (1) The testing, tuning, trials and arrangement for acceptance of electrical equipment in shore establishments are the responsibility of Administrative Authorities. (2) The Captains of individual establishments are responsible for test and calibration of electrical equipment. (3) The Administrative Authority shall prepare a final inspection report addressed to the Chief of the Naval Staff, copy to the Captain of the Establishment concerned. 4347. Division of Responsibility between Electrical and User Branches for the Maintenance of Electrical Equipment. (1) The ‘User’ Branch is responsible for: - (a) The overall operational efficiency of all equipment belonging to its departments. (b) Ensuring that all equipment is at the required notice for service. (c) Arranging for daily checks routine and functional tests as laid down in the relevant handbooks which do not require skilled technical knowledge, Such tests are top be continued where possible, when the ships are undergoing a refit. (d) Arranging the sufficient sailors from the departments are made available to the maintenance staff so that periodical inspections, overhauls and skilled repair work can be carried out. (2) The Electrical Branch is responsible for: - (a) Maintaining all electrical equipment in a staff of operational efficiency. (b) Testing and servicing equipment for which skilled technical knowledge is required. This is, where possible, to be continued whilst the ship is undergoing refit. (c) Allocation of priority for maintenance work in conjuction with the user branches. The Captain of the ship is to indicate the priorities in cases where demands of the various ‘Users’ cannot be met within the time available. (3) In cases where the duties of user and the electrical branches overlap, the division of responsibility laid down above should be shared in such a way so as to prevent breakdown and loss of efficiency in equipment and, if either occurs, the speedy restoration of equipment to operational efficiency is to be ensured. (4) The user branches, in consultation with the electrical branch, shall ensure that before a ship is taken in hand for refit, normal checks and ship tests are carried out as laid down in the relevant publications before any defects noted are included in the defect lists. All entries in regard to electrical defects shall be made b y the Electrical officer. 4348 – 4355. Blank. SECTION VII – VISUAL SIGNALLING (VS) EQUIPMENT 4356. VS Inspections. (1) Technical inspection of the work of fitting visual signalling equipment in all ships under construction and in ships undergoing large repairs, will be carried out by officers nominated for the purpose (2) Preliminary VS inspections should be arranged at an early date in the ship’s programme and final VS inspection is to be carried out just prior to the inspection by the Admiral Superintendent of the Dockyard, or the officer nominate by the Chief of the Naval Staff in the case of contract built ships. Reports of all inspections are to be sent to the appropriate authorities. (3) Detailed instructions will be as promulgated by the Chief of them Naval Staff. 4357. Blank. SECTION VIII – ANCHORS, CHAIN CABLE, STEEL WIRE ROPE, SLINGS, RIGGING ETC. 4358. Flukes of Anchors. The arms of all anchors with moveable flukes on board Indian Naval Ships shall be moved and lubricated once a month to prevent their setting fast, see regulation 1603. The anchors which have undergone extensive repair are to be tested in accordance with Article 14, Chapter 5m BR 367 (1) of 1977. 4359. Chain Cables and Associated Equipment. (1) All chain cables are to be surveyed annually at an interval of 12 to 15 months, taking advantage, where possible, of ships refit and maintenance programme. The chain cable shall also be heat treated, retested and examined at an interval of 4 to 6 years in accordance with the procedure laid down by the Chief of the Naval Staff. (2) The tests to be applied to the cables of Indian Fleet Auxiliaries, or other vessels classified in Llyod’s Register of shipping, shall be dealt with in accordance with orders issued by the chief of the Naval Staff. (3) The Senior Officer ordering the survey shall arrange for an experienced blacksmith from the dockyard, or if not available one from a ship present, to assist the surveying officers. (4) The report of survey shall be rendered in duplicate on Form IN 305 and dealt with as follows (a) The original, duly signed and approved, shall be forwarded to the Chief of the Naval Staff. (b) The duplicate shall be inserted in the Captain’s Ship’s Book. (5) If cables are found defective, the steps taken to make them good shall be recorded on Form IN 305. If new cables should be required, a demand on Form IN 936/EDPS 1, for the requisite quantity shall accompany the report, together with a letter explaining the reasons for making the demand. (6) Periodical Examinations of Fittings. Whenever cables are periodically surveyed or tested, the eyeplates, etc, for use with anchors and chain cables will also be thoroughly examined for flaws or defects, and if there is doubt, fire-proofed and tested and the result noted on Form IN 305. The examination of eyeplates, etc., during periodical surveys of cables should be made by the ship’s staff, assistance from the dockyard being obtained if necessary, to remove fittings for fir-proof and test. 4360. Hawsers, Slips, Boar Gear and Associated Equipment. (1) All steel wire hawsers and slips, shackles, stoppers, etc., associated with them, and guard wires and chains, shall be carefully examined and have the necessary steps taken for their preservation at intervals not exceeding six months. The dates and details of these examinations shall be reported when rendering Form IN 305 in accordance with regulation 4359. (2) All slips used for towing and taking in tow, carpenters’ stoppers, chain stoppers, shackles and slips associated with the use of steel wire hawsers shall be tested periodically as laid down for chain cables and gear and the results reported on

Previous and next

All provisions of Regulations for the Navy

Questions people ask

Is annexure IV of Regulations for the Navy still in force?

No repeal of Regulations for the Navy is recorded.