LawGrids logoLAWGRIDS.ORG

Rule 28A, GSR 945 (E) The Railways (Opening for Public Carriage of Passengers) Amendment Rules, 2018.: Use of new types of locomotives or rolling stock by railway administration

GSR 945 (E) The Railways (Opening for Public Carriage of Passengers) Amendment Rules, 2018. - Rule 28A

Text of rule 28A

Use of new types of locomotives or rolling stock by railway administration

28A. Use of new types of locomotives or rolling stock by railway administration—{1) The General Manager of a Government railway may sanction the use of any locomotive or rolling stock already introduced on Indian railway by the Central Government under the provisions of rule 28, on any section or division of railway under his control: Provided that the railway administration other than the Government railway shall require the approval of the Central Government through the Commissioner for use of any locomotive or rolling stock already introduced on Indian railway by the Central Government under the provisions of rule 28, on any section of railway under its control. (2) The proposal for sanction of the General Manager of a Government railway under sub-rule (1) shall be accompanied by— (i) such diagrams as may be necessary to give full particulars of the axle loads, wheel spacing, length over buffers and other principal dimensions of the rolling stock for which sanction is required; (ii) the provisional speed certificate or final speed certificate, as the case may be, issued by the Research, Design and Standards Organisation; (iii) the sanction of the Central Government for introduction of the locomotives or rolling stock or increase in sanctioned maximum speed of existing locomotives or rolling stock under rule 28; (iv) the calculations and stress sheets showing— (a) the conclusions arrived at; (b) the external forces on which the stress calculations are based; (c) the stresses which will be produced in the various bridges over which the proposed rolling stock will run; and (d) the effects which the said rolling stock will have on various structures or tracks as compared with those caused by the rolling stock already in use, or allowed by the existing Government orders: Provided that the calculations and stress sheets under this clause must show as to what allowance has been made for any secondary or deformation stresses in addition to the primary stresses caused by external forces and what relief of stress, if any, has been included; (v) the cost of modification to signalling and telecommunication installations necessitated by the use, if any, of chopper or thyristor control systems; (vi) an approximate estimate of the cost of such improvements in existing structures or track as the use of the proposed rolling stock is likely to render necessary on the concerned railway, whether immediately or in the near future; and (vii) a certificate signed by the Chief Engineer, the Chief Mechanical Engineer and the Chief Electrical Engineer (for electric stock) of the concerned railway in the following proforma, namely:— CERTIFICATE Certified that it 1s safe to run ------------------- (particulars of locomotive or rolling stock proposed to run) not exceeding -------------------- units (in the case of locomotive) coupled together on the section --------- (station) to wannnnen= (station) from ------------(km) to -------(km) of the -------------- Railway at a maximum speed of ---------- --(knVh) against a maximum speed of ------------- (knvh) certified by Research, Design and Standards Organisation, subject to the following speed restrictions and conditions:— (a) Speed restrictions:— [AM wave 3(i)] UR Al UTA : STATA 7 RY) From km to Nature of speed Brief Reason for restriction km restriction No. (b) Special Conditions— Lo. 2... 3... 4... To be signed by— 1. The Chief Mechanical Engineer..... 2. The Chief Engineer...... 3. The Chief Electrical Engineerv..... 4. The Chief Signalling and Telecommunications Engineet..... J. The Chief Operating Manager..... Note 1— The Chief Operating Manager and the Chief Signalling and Telecommunications Engineer should be associated when the increase in the speed of a locomotive or rolling stock is contemplated over the maximum sanctioned speed for a specific category of train (passenger or goods) over a particular section of the railway. Note 2.— Over the railways where both the shop maintenance and open line maintenance of electric locos and electrical multiple unit rolling stock are under the control of the electrical department only, the Chief Electrical Engineer, otherwise the Chief Mechanical Engineer shall also sign. Note 3.— When Motive power with chopper control is to be used, the Chief Electrical Engineer and the Chief Signalling and Telecommunication Engineer shall sign this certifica‘e. (3) The Certificate referred to in clause (vii) of sub-rule (2) shall indicate — (a) clearly that the speed certified does not exceed the limits laid down by the Research, Designs and Standard Organisation; and (b) specifically the maximum number of motive power units proposed to be coupled together for multiple operation. (4) The General Manager of the Government railway shall communicate the sanction to the Commissioner for his information ten days in advance of the actual use of locomotive or rolling stock over the railway. (5) The provisions of this rule shall, mutatis mutandi, apply to every proposal of a railway administration other than Government railway for seeking approval of the Central Government through the Commissioner, for the use of any locomotive or rolling stock already introduced on Indian railway by the Central Government under the provisions of rule 28, on any section of railway under its control.

Previous and next

All provisions of GSR 945 (E) The Railways (Opening for Public Carriage of Passengers) Amendment Rules, 2018.

Questions people ask

Is rule 28A of GSR 945 (E) The Railways (Opening for Public Carriage of Passengers) Amendment Rules, 2018. still in force?

No repeal of GSR 945 (E) The Railways (Opening for Public Carriage of Passengers) Amendment Rules, 2018. is recorded.