Regulation 14, 8.10 Authorizing entities to lay, build, operate or expand natural gas pipelines, Amendment Regulation, 2016: charrer vars feat
8.10 Authorizing entities to lay, build, operate or expand natural gas pipelines, Amendment Regulation, 2016 - Regulation 14
Text of regulation 14
charrer vars feat
14.charrer vars feat — 15.feaTet & fore %* 16. tat
avediah TATT ATA eT AEA(%) | pears areata ae a
(Tat & Hates Grease & few
aN Tel)
Het aed
Sqt ATR T
17 .fesrest atta (Wao)
Algal SAAT
fearet & Se SST TAT Travel & att F pet
18. Hea lS Asay Aas (HIT arra F fora)
19. *stet Hel AR Sl ASA H ares TAU ST Aad Sl Ae AeA aT HT % fear TTT
Rare wedtd & fore Aeca get Aras:
1)feret att A ates et ert Wx HIT ‘0’ Sarat HI (2) fearel Barra a feat Fi wats # Rare wea 30
He| (3) Preah SIRT ated Hel Wah AT Sy CH H Ahh Ser Sealaied F fatdad Alex Aled Reale Hl chs
oft ajodt st featé aoete ea feu we fees & ae Rate afaered Ta wed Ft atta a
10 feat & atax agers Ft ort areal
Ale: HIATT ead = fh Staeredt Rated wore Hraitad Hed VAT aagaH El Aaa S fh Hlaea/qiepat A
AMT Te ATTA AL Tatty HITT Ht Tarey ST YT: AAEM HAT TSI
THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEc. 4]
TS /arer-s. orate Te WWedettedt Fe faatet Pate: fade args
1at- vasittive
1.eodt at ATT
2.0 AT ATT
3.caThte|s | TT MIX (%)
feaeur qa ae (%)
TH 0 ATH Ma (%)
Ma (%)
A.aarey featet & 5.ay
fer Rearé
aa ars are CIT A yeda Pau ae ae aH aera fAfee a et
wethrTat Trae
6.faaea tReet 12. afsra uses
ary sry 13. watts ta Weds che ATS
Loita Frat a (aut) | (evemendtéay | see
ferra/eara aro wrt
TT MT wT
7. Soitta arta het wt
(atiteeqarett)
TT MT wt
aftada wrt
faaa cReaecke ar TT AT
Searac yy
ferra/eara aro Pet Utes
ata ag 14.1 /attt
8a AT wt a Ya ATA
aay ae Are Ft HL
arta
saathrard - fastett
at Sat
aaa 15.2601 ferfa: (a) Feardt zeor
wea aI TE AA MI
aT. Tareas SIT SST TAT
stat THAT
Lar I—ars 4] YR AT USTIA : STATA 5
AT ad a
HAT SATS FT
pet Ca AT (%)
9. fadia ae (@) wrasttet UsthTa FETT
pratt Fst TT a ary
Sart
Ras SST TAT
Sart
eet fetta at THray
10. era fact sacs
11. Ha AT BAT SATS FX (%)
16. le AA Laat (HTT ateea F fered)
17. Rare wedi & fee Hace ger antasta:
(1) That ares A ats eT SII IK; HIAT ‘0’ Sars Hel (2) FrArel warts & 6O feat At sate A Rare vera
amet (3) eam GT alee Festa AT Sy tH h ih Set seated @ fatdad Alex ted ate Ar chs
Ott HIT at Rate arate Sq feu we Peat h aan Rare altered TAT Hes at aba S 10 feat & stax
agers FY ardt afew 1. (4) arte fearé Sa sary ay (42h feast) wH aael Harare arr act itt
TATA LAT HL TET Hel (5) HIST |frferd He fH ga ae at are frareat H ferw wea arHst At Her aes
aoa & oar wetted ariten atast aa FI
18. dle: HIaT ears & fH altered Rattles Gore Hratfad HI GHA Haga Sl Aaa & fe Brrea/ateat F
AMT Te ATTA AT Taelteht HITT Ht Aates A YT: AAMT HAT TEI
TTTat-s./ arex F TeplaH Te argld Ie Arley Rare
WTeq-.-2-
1.aoett eT ATT
2. Wet ae
eat ATA
3.caTSat HT 4 fearee AAT
areas (TAHT AST)
5. are & fer fear 6. ay
7. Ae B.HaT ald | 9. SeeCare Wri te argh sH-sg (VATA VAST)
Te arate TA (oot Wel-CaTat FT | ast an
wat) qat sees fama [Ree | rer ct | agg
cele
THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEc. 4]
*
)
R
A
U
T
A
|
E
ay
a)
"
/*|
9)
|
10.aaeat art
11. tat 12. Teo HS ATH (HIAT STRAT F fore)
STAT %
13.1)fehet ators A Are & fru ars Yea SA I; HIAT ‘O’ Fare He (2) Rare ava Are FT 20 ate aH
Tedd At aT Ahl (3) ate At che wit eearerted a fatead Alex ated HoT Ft Rare aaetts eg feu ww
Treat h arqare Pare StaerSt TAT Hee AT Abe aS 7 feat H tax aaettsS FT oat AST
14, Ale: HIAT eared = Th attra Rares Woret Hala Hed AAT Braga St Meal & fh Hlaea/ Theat
HART Te ATH Sl Tew hl HITT Hl aAsts S YA: AAA HAT TSI
STAT Fest, Ahrag
[Tasraa-I11/4/27a7./419]
are fecoft : yea fattae arate. 340(a) feats 06-05-2008 %& areqe 4 afearra Eu Sf se aaa.
802(4) feats 19/11/2008, at-ar.fA. 769(7) feate 20-10-2009, ara fr. 38(&)
feats 18-01-2010, avar.fa. 480(a) feats 07-06-2010, at.ar.fa. 594 (a) featH 09-07-2010, aT. a.
tiuastarea/wa(ay48 feare 17/02/2014, w. a. fea = ofteredtqcteraerds-2014
feats 08-08-2014, tr. a. wa-Pra/VI/I/207 feat 01-01-2015 aut Hr. TS aa eT aT/ aays-2015
feate 22-05-2015 % areqa a aoa fu TI
Lar I—ars 4] YR AT USTIA : STATA 7
PETROLEUM AND NATURAL GAS REGULATORY BOARD
NOTIFICATION
New Delhi, the 29"" March, 2016
F. No. VKS/DB/03/NGPL.—In exercise of the powers conferred by section 61 of the Petroleum and Natural
Gas Regulatory Board Act, 2006 (19 of 2006), the Petroleum and Natural Gas Regulatory Board hereby makes the
following regulations, namely:—
1. Short title and commencement:
(1) These regulations may be called the Petroleum and Natural Gas Regulatory Board (Authorizing Entities to Lay,
Build, Operate or Expand Natural Gas Pipelines) Amendment Regulations, 2016.
(2) They shall come into force on the date of their publication in the Official Gazette.
In the Petroleum and Natural Gas Regulatory Board (Authorizing Entities to Lay, Build, Operate or Expand Natural
Gas Pipelines) Regulations, 2008,-
(a) in regulation 13, -
(i) for sub-regulation (1), the following shall be substituted, namely:—
“(1) a authorized entity shall provide, on a monthly and quarterly basis, a progress report detailing the
clearances obtained, targets achieved, expenditure incurred, works-in-progress and other relevant information in
the forms at Schedule E as per formats E-1A-NGPL, E-1B-NGPL for quarterly reports and E-2-NGPL for
monthly report.”;
(ii) after sub-regulation (4), the following sub-regulation shall be added, namely:—
“(5) a authorized entity shall designate an official of the entity for submitting data /information to the Board
and intimate the same to the Board. Any change in the designated official shall be communicated to the
Board by the authorized entity within 7 working days.”;
(b) in regulation 14, after sub-regulation (8), the following sub-regulation shall be added, namely:—
“(9) a authorized entity shall continue to submit post commissioning information / data in the forms at
Schedule E as per formats E-1A-NGPL, E-1B-NGPL for quarterly reports and E-2-NGPL for monthly
report’;
(c) for Schedule E, the following shall be substituted, namely:-
“Schedule E
[see regulation 13 (1) and regulation 14 (9)]
A: Quarterly submission of data by authorized entity in the following formats appended here below:-
(i) Format E-1A-NGPL for Quarterly Progress Report on CGD: Physical Parameters
(ii) Format E-1B-NGPL for Quarterly Progress Report on CGD: Financial Parameters
B: Monthly submission of data by authorized entity in the following format appended here below:-
(i) Format E-2-NGPL for Monthly Report on Supply of Natural Gas by Sector
C: The data and information required to be submitted by the entity in the above formats shall be analyzed by the
Board by comparing the —
(i) actual progress made by the entity including commissioning of the project versus the physical and financial
targets, identified in its DFR; and
8 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEc. 4]
(ii) actual volume of natural gas transported in the natural gas pipeline versus the volume committed in the bid.
D. Monitoring of the progress shall be taken up by the Board on a quarterly basis and the notice of deviations and
shortfalls, if any, shall be sent to the entity on an annual basis for a prompt resolution. In case of any delay in
meeting the yearly commitments within the notice period or in case of repeated violations, the entity may face the
consequences specified under regulation 16 of the Petroleum and Natural Gas Regulatory Board (Authorizing
Entities to Lay, Build, Operate or Expand City or Local Natural Gas Pipelines) Regulations, 2008.
E: Entity shall comply with the relevant regulations for affiliate code of conduct.
Note: Board reserves the right to seek any information or data from the entity, as it may deem to be fit, to satisfy
itself to the compliance by the entity.
Appended Formats:
Schedule-E / Format: E-1 A-NGPL Quarterly Progress Report on Natural Gas Pipelines: Physical Parameters
1. Name of Entity
2. Project Name
3. Report for the Quarter ending | 4. Year
5. Natural Gas Pipeline Length 6. Diameter in 7. For Quarter 8. Cumulative (since inception)
(Kilometers) Inches Target® Actual Target Actual
Diameter-1
Diameter-2
Diameter-3 Diameter-4
11.
9. No. of Compressors, intermediate terminals & deliver terminals 10. Compressors Intermediate
Terminals
12. Delivery
Terminals
Till last quarter
Added during quarter
Total at the end of quarter
13. Average Heat Value of Natural Gas (MMBTU per SCM)
14. Project completion status - 15. For Quarter 16. Cumulative
Actual versus approved target (%) Target%* Actual % Target % Actual %
(Not Applicable for already commissioned pipelines)
Main line
Spur line
17. Design Capacity (MMSCMD)
Existing capacity
Added during the quarter
Total at the end of quarter
18. Any other information (Please write in the box)
* Target figures may be given wherever applicable. Quarterly target may be taken as 1/4th of annual target.
19. Important guidelines for submitting the report:
1) In case data is nil for any of the columns; please enter zero '0' (2) Report must be submitted within 30 days from the
close of Quarter. (3) A scanned copy of the report stamped & signed by a person of General Manager or above rank,
duly authorized by Director of the company, should be uploaded within 10 days from date of submitting the report online
as per instructions given for uploading the report.
14. Note: Please note that due to technical reasons, the information sought in columns /rows may have to be rearranged
as required while implementing the online reporting system.
Lar I—ars 4] YR AT USTIA : STATA
Schedule-E / Format: E-1B-NGPL Quarterly Progress Report on Natural Gas Pipelines: Financial Parameters
1. Name of Entity
2. Project Name
Name Share (%)
. . Name Share (%)
3. Ownership Details Name Share (%)
Name Share (%)
4. Report for the Quarter ending 5. Year
All figures to be submitted in Lacs Rupees unless specified otherwise
Capital Investments
6. Fixed Assets 12. Revenue Earned
Opening balance 13. Natural Gas Pipeline Tariff Charged
Direct additions Zone Gas Transported Tariff Total
Prowress from Capital Work-in- (MMBTU) (Rs./MMBTU) | Tariff
Deletions Zone- |
Closing balance Zone-2
7. Capital Work-in-Progress (CWIP) Zone-3
Opening balance Zone-4
Additions Zone-5
Transfer to fixed assets Other income
Deletions / Transfers Total Revenue
Closing balance 14. Profit / Loss
8. Operating Expenses Profit before tax
Cost of goods sold Tax
Utilities - Power and Fuel Profit after tax
Salaries 15. Loans Status: (a) Term Loans
Repair and maintenance Opening balance
Gen. administrative expenses Added
Insurance Repaid
Others Closing balance
Total Operating Expenses Average Interest Rate (%)
9. Financial Expenses (b) Working Capital Loans
Interest on Working capital Opening balance
Interest on term loans Added
Total Financial Expenses Repaid
10. Depreciation Nett change
11. Total Expenses Average Interest Rate (%)
16. Any other information (Please write in the box )
17. Important guidelines for submitting the report:
1) In case data is nil for any of the columns; please enter zero '0' (2) Report must be submitted with in 60 days from the
close of Quarter. (3) A scanned copy of the report stamped & signed by a person of General Manager or above rank,
duly authorized by Director of the company, should be uploaded within 10 days from date of submitting the report online
as per instructions given for uploading the report. (4) Annual report for the year-end (4th Quarter) should be submitted
duly certified by a Chartered Accountant (CA) (5) Please ensure that sum total of figures submitted for four quarters of
the year is equal to the company's audited annual data.
18. Note: Please note that due to technical reasons, the information sought in columns / rows may have to be rearranged
as required while implementing the online reporting system.
10 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEc. 4]
Schedule-E / Format: E-2-
NGPL
Monthly Report on Supply of Natural Gas by Sector
1. Name of Entity
2. Name of Pipeline
3. Length of Pipeline 4. Design Capacity
(MMSCMD)
5. Report for the month of 6. Year
7. Months
8. Total
Natural Gas
Supplied
(MMSCMD)
9. Sector-wise Break up of Natural Gas Supplied (MMSCMD)
Power Fertilizer
City
Gas
PetroChe
m
&
Refineries
Sponge
Iron &
Steel
Others /
Internal
Consumption
April
May
June
July
August
September
October
November
December
January
February
March
10. Cumulative Total
11. Cum. Utilization % 12. Any other information (Please write in the box)
13. Important instructions for submitting report:
1) In case data is nil for any of the columns for the month, please enter zero '0' (2) Report must be submitted by 20th of
the following month by the transporting entity (3) A scanned copy of the signed & stamped report must be uploaded
within 7 days from the date of submitting report online as per instructions given for uploading the report. 14. Note: Please note that due to technical reasons, the information sought in columns / rows may have to be rearranged
as required while implementing the online reporting system.
UPAMANYU CHATTERJEE, Secy.
Footnote: Principal regulations were notified vide GSR 340 (E) dated 06-05-2008 and amended vide:
i)
ii)
iii)
iv)
Vv)
vi)
GSR 802 (E) dated 19-11-2008
GSR 769 (E) dated 20-10-2009
GSR 38 (E) dated 18-01-2010
GSR 480 (E) dated 07-06-2010
GSR 594 (E) dated 09-07-2010
F. No. PNGRB/M (C)/48 dated 17-02-2014
vil) F. No. PNGRB/NGPL/REGULATIONS/AMEND-2014 dated 08/08/2014
vii) F. No. L-MISC/VI/I/2007 dated 01-01-2015
ix) F. No. PNGRB/NGPL/REGULATIONS/AMEND-2015 dated 22-05-2015
[ADVT.-III/4/Exty./419]
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi- 110064
and Published by the Controller of Publications, Delhi- 110054.
Previous and next
Questions people ask
Is regulation 14 of 8.10 Authorizing entities to lay, build, operate or expand natural gas pipelines, Amendment Regulation, 2016 still in force?
No repeal of 8.10 Authorizing entities to lay, build, operate or expand natural gas pipelines, Amendment Regulation, 2016 is recorded.