Regulation 10, 20.2 Authorizing Entities to Lay, Build Operate or Expand Petroleum and Petroleum Products Pipelines, Amendment Regulation, 2016: aRatsrt eared fata
20.2 Authorizing Entities to Lay, Build Operate or Expand Petroleum and Petroleum Products Pipelines, Amendment Regulation, 2016 - Regulation 10
Text of regulation 10
aRatsrt eared fata
10. aRatsrt eared fata — areca
SATA STANT ART (%) er" we
(Tact B HAS UsueTSAl & few
ar aet
11, Sane aren (UTA)
HIST SAT
faaret F Stet aT
eo. Wa aS
12. FATALE AMHR (HIT Sta F fers)
* Tet Hel AP] St eT H Stns feu aT aH Vl faTSt aes aS aT Y, foray STE
13. Rote Beqld ch tere Hecagu ALTER:
(1) feet wietd 4 Hips YT SH WH HAT 0” Sat Hel (2) TATeT SATA F 30 feat Al rarer F Rate Veda aE |
(3) Tiearem SRT iltepd Hel Ween UT Sea toh oh oath SRT SETA Ft faterad Alet Aled Rate at tas sie Hot At
Raté aaeits ed fee Te Meat oh STE Role SMCS SAT HA AT ARTS S10 feat ee Stel AT ST ATT
14, Ale: HIT ears ¢ fe SiMteriss PeaieT sore rata kt GAS sraweach Vl Maha @ few aAteres / Gieeal A APT TS
SPIRE Cepttht HR Hl ATS F TA: AACA HUT TS |
Ta S/ wrsg S-1 at atest eters UIST gs UE TeraTet TT UTE
fadia ares
1. bust ar aa | |
2. URASAT FT a
3, Farts frat aM BRR%
a BRR%
a BRR%
a BRR%
5. a9
att aie cre 4 sede fer sre te aah Stere Piles A St
usthret feet
6. Tae Goat 12. asia Uses
FAW Tetras SCTE AT UNIT
Tera TS FT AT
Usttret res SeTfe F SET AOT Ha TA
factor /SETROT 13, at ert
Ht TT ae a Te
4 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEc. 4]
7, Uitte ret aa Hiseeystreth) ot
AAMT wl ST TT
Uae 14. sor eat
frac oftarafeat & fer (a) faerie asot
SETA
Taree (BEATA YW
sia 35 fase S SST aT
8, Sac I forret & GR FRAT
feat fone aret at ATT sit 35
seahrae festeft sit seat HAT SAT FT (%)
act (@) HART GSH RTT
TAT Sk Wea IT MT
GT, Wea TT SST TT
ata Gert
Fy Fact sect
9. fart art HAT SAT ST (%)
PART SAK GST OK SAT
Pale SST Ue SAT 15, FT Ale AMHR (HIT Sta F fers)
10. ea
11. HAs
16. RUE Teale SH fee AecayT APTS:
(1) Fre & fore fone catcta F StienS IT SIM HUT “0? SAT Hal (2) HAST TATA S 60 Feat at state H Rate seq
at (3) Presrr are stferend Her Welln at Soa tH oh cafe sre setae & fate wet ated fare cht chs het ott
at Rate setts eq feu Te exit & SE Rate Sees SAT He AT aS aS 10 feat & tat setts Ft ST
Teal (4) avn Rate Sq BATT as (4ef TaATeT) UH Get PRATHER SRT Het His THT LAT He WTA Hel (5)
HUA Aes Be for SA TS AT AT faafsal FH kere Tet BateHSt St chet TART UT Sh CHET Tiers asap stteaSt oe
SRI |
17. Ae: Hoa ears < fos Stats Raiet sore Hrattadt Hed GAS Slaw Sl Mesa et fea HitHa/ Ghat A APT Ts
SMTA Bal Tae eht HRT St ATS SA: SATA HUT FS
Telfer
Aa —S./ TRAT-S, 2 *
ye UISuess age Ut afer feat
atdieet ~
1. Hot HT ATA
2. ORT GT ATA
3.0 4.48
5, Fag (fencer) 6. Tesigt AAA WATE)
Lar I—ars 4] YR AT USTIA : STATA
7, HTe 8. UISTCTISs Aye BtHs (3) TMACTS TH VATA)
aT aaat
9, Gat aaa Be-saarT
(%)
SIA
ag
St
10. 3a alg SMH (HIT tera H fered)
11. Rote weld ch tere HecagU APE:
(1) feret eters 4 are & fore stias TT SI
Sa Fe (2) Rote aT are HT 20 aS aH Wet AL SAT
ae | (3) Rate Al Khe oie setae g faterad Arex afed HoT Ht hate sages eq feu ne ext & sqaK Kate
SMCTSA SAT A At aKa a 7 feat & flex seats At at afer
12. Ale: HIT ea ¢ fer sttrerss feaifer sont Heater Hed GAS STE Sl Gena e few cAletea/ UAT A APH TS
SMTA Bal Tae eht HRT St ATS SA: SATA HUT FS
say desff, Arras
[ferst.—Ill/4 / sna. / 418]
ure fect : Her fares ALATA, 722(31.) feat 01/09/2010 at aera rard Se F AAT HLA, Cet-e/VI/1/2007 fete
01/01/2015 & Feary a Sariteret Faw AT |
regulations, namely:-
PETROLEUM AND NATURAL GAS REGULATORY BOARD
NOTIFICATION
New Delhi, the 29th March, 2016
F. No. VKS/DB/03/PPL.— In exercise of the powers conferred by section 61 of the Petroleum and Natural Gas
Regulatory Board Act, 2006 (19 of 2006), the Petroleum and Natural Gas Regulatory Board hereby makes the following
6 THE GAZETTE OF INDIA : EXTRAORDINARY [PART II—SEc. 4]
1. Short title and commencement:
(1) These regulations may be called the Petroleum and Natural Gas Regulatory Board (Authorizing Entities to Lay,
Build, Operate or Expand Petroleum and Petroleum Products Pipelines) Amendment Regulations, 2016.
(2) They shall come into force on the date of their publication in the Official Gazette.
2. In the Petroleum and Natural Gas Regulatory Board (Authorizing Entities to Lay, Build, Operate or Expand
Petroleum and Petroleum Products Pipelines) Regulations, 2010, -
(a) in regulation 13, -
(i) for sub-regulation (1), the following shall be substituted, namely:-
“(1) a authorized entity shall provide, on a monthly and quarterly basis, a progress report detailing the
clearances obtained, targets achieved, expenditure incurred, works-in-progress and other relevant information in
the forms at Schedule E as per formats E-1A-PPL, E-1B-PPL for quarterly reports and E-2-PPL for monthly
report.”;
(ii) after sub-regulation (4), the following sub-regulation shall be added, namely:-
“(5) a authorized entity shall designate an official of the entity for submitting data / information to the
Board and intimate the same to the Board. Any change in the designated official shall be communicated to
the Board by the authorized entity within 7 working days.”;
(b) in regulation 14, after sub-regulation (8), the following sub-regulation shall be added, namely:-
“(9) a authorized entity shall continue to submit post commissioning information / data in the forms at
Schedule E as per formats E-1A-PPL, E-1B-PPL for Quarterly reports and E-2-PPL for monthly report.”;
(c) for Schedule E, the following shall be substituted, namely:-
“SCHEDULE E
[see regulation 13 (1) and regulation 14 (9)]
A: Quarterly submission of data by authorized entity in the following formats appended here below:-
(i) Format E-1A-PPL for Quarterly Progress Report on CGD: Physical Parameters
(ii) Format E-1B-PPL for Quarterly Progress Report on CGD: Financial Parameters
B: Monthly submission of data by authorized entity in the following format appended here below:-
(i) Format E-2-PPL for Monthly Report on Petroleum Pipeline Throughput
C: The data and information required to be submitted by the entity in the above formats shall be analyzed by the
Board by comparing the —
(i) actual progress made by the entity including commissioning of the project versus the physical and financial
targets, identified in its DFR; and
(ii) actual volume of petroleum products transported in the petroleum and petroleum products pipeline versus
the volume committed in the bid.
D: Monitoring of the progress shall be taken up by the Board on a quarterly basis and the notice of deviations and
shortfalls, if any, shall be sent to the entity for a prompt resolution. In case of any delay in meeting the yearly
commitments within the notice period or in case of repeated violations, the entity may face the consequences
specified under regulation 16 of the Petroleum and Natural gas Regulatory Board (Authorizing Entities to Lay,
Build, Operate or Expand City or Local Petroleum and Petroleum Products Pipelines) Regulations, 2010.
Appended Formats:
Schedule-E / Format: E-1A-
PPL Quarterly Progress Report on Petroleum Pipelines: Physical Parameters
1. Name of Entity
2. Project Name
Lar I—ars 4] YR AT USTIA : STATA
3. Report for the Quarter
ending
4. Year
7. Quarter 8. Cumulative (since inception)
5. Petroleum Pipeline Length
(Kilometer) Inches
6. Diameter in
Target* Actual Target Actual
Diameter-1
Diameter-2
Diameter-3
Diameter-4
Diameter-5
9. No. of Pumping Stations, Intermediate
terminals & delivery terminals
Target* Actual Target Actual
Pumping Stations
Intermediate Delivery Stations
Delivery Terminals
10. Project completion status - Actual versus
Approved Target (%)
Target%* Actual % Target Actual
(Not Applicable for already commissioned
pipelines)
11. Design Capacity (MMT)
Existing capacity
Added during the quarter
Total at the end of quarter
12. Any other information (Please write in the box )
* Target figures may be given wherever applicable. Quarterly target may be taken as 1/4th of annual target.
13. Important guidelines for submitting the report:
(1) In case data is nil for any of the columns; please enter zero '0' (2) Report must be submitted within 30 days from the
close of Quarter.(3) A scanned copy of the report stamped & signed by a person of General Manager or above rank,
duly authorized by Director of the company, should be uploaded within 10 days from date of submitting the report
online as per instructions given for uploading the report.
14. Note: Please note that due to technical reasons, the information sought in columns / rows may have to be rearranged
as required while implementing the online reporting system.
Schedule-E / Format: E-1B-PPL Quarterly Progress Report on Petroleum Pipelines: Financial Parameters
1. Name of Entity
2. Project Name
Name Share (%)
3. Ownership Details Name Share (%)
Name Share (%)
Name Share (%)
4. Report for the Quarter ending 5. Year
All figures to be submitted in Lacs Rupees unless specified otherwise
Capital Investments
6. Fixed Assets 12. Revenue Earned
Opening balance Transmission of Petroleum Products
Direct additions Other income
Transfer from Capital Work-in-
Progress
Total Revenue
Deletions / Transfers 13. Profit / Loss
Closing balance Profit before tax
7. Capital Work-in-Progress (CWIP) Tax
THE GAZETTE OF INDIA : EXTRAORDINARY [PART III—SEc. 4]
Opening balance Profit after tax
Additions 14. Loans Status
Transfer to fixed assets (a) Term Loans
Deletions / Transfers Opening balance
Closing balance Added during quarter
8. Operating Expenses Repaid during Qtr.
Cost of goods sold Closing balance
Utilities - Power and Fuel Average Interest Rate (%)
Salaries (b) Working Capital Loans
Repair and maintenance Opening balance
Gen. administrative expenses Added
Insurance Repaid
Others Nett change
9. Financial Expenses Average Interest Rate (%)
Interest on Working capital
borrowings
Interest on term loans
15. Any other information (Please write in the box)
10. Depreciation
11. Total Expenses
16. Important guidelines for submitting the report:
(1) In case data is nil for any of the columns; please enter zero '0' (2) Report must be submitted with in 60 days from
the close of Quarter. (3) A scanned copy of the report stamped & signed by a person of General Manager or above
rank, duly authorized by Director of the company, should be uploaded within 10 days from date of submitting the
report online as per instructions given for uploading the report. (4) Annual report for the year-end (4th Quarter) should
be submitted duly certified by a Chartered Accountant (CA) (5) Please ensure that sum total of figures submitted for
four quarters of the year is equal to the company's audited annual data. 17. Note: Please note that due to technical reasons, the information sought in columns / rows may have to be
rearranged as required while implementing the online reporting system.
Schedule-E / Format: E-2-
PPL
Monthly Report on Petroleum Pipeline Throughput
1. Name of Entity
2. Name of Pipeline
3. Month 4. Year
5. Length (Kilometers) 6. Design Capacity (MMT)
7. Months
8. Pipeline Throughput Data (in MMT up to 3 decimals)
Monthly Cumulative
9. Cum. Capacity
Utilization (%)
April
May
June
July
August
September
October
November
December
Lar I—ars 4] YR AT USTIA : STATA 9
January
February
March
10. Any other information (Please write in the box)
11. Important instructions for submitting report:
(1) In case data is nil for any of the columns for the month, please enter zero '0' (2) Report must be submitted by 20th
of the following month (3) A scanned copy of the signed & stamped report must be uploaded within 7 days from the
date of submitting the report online as per instructions given for uploading the report.
12. Note: Please note that due to technical reasons, the information sought in columns / rows may have to be
rearranged as required while implementing the online reporting system.
UPAMANYU CHATTERJEE, Secy.
[ADVT.-III/4/Exty./418]
Footnote: Principal regulations were notified vide G.S.R. 722 (E) dated 01/09/2010 and amended vide F. No. L-
MISC/VI/I/2007 dated 01/01/2015.
Uploaded by Dte. of Printing at Government of India Press, Ring Road, Mayapuri, New Delhi- 110064
and Published by the Controller of Publications, Delhi- 110054.
Previous and next
Questions people ask
Is regulation 10 of 20.2 Authorizing Entities to Lay, Build Operate or Expand Petroleum and Petroleum Products Pipelines, Amendment Regulation, 2016 still in force?
No repeal of 20.2 Authorizing Entities to Lay, Build Operate or Expand Petroleum and Petroleum Products Pipelines, Amendment Regulation, 2016 is recorded.