LawGrids logoLAWGRIDS.ORG

Annexure URE - II, Standard of Performance Regulations, 2015: ANNEX URE - II

Standard of Performance Regulations, 2015 - Annexure URE - II

Text of annexure URE - II

ANNEX URE - II

ANNEX URE - II REPORTING FORMATS-GUARANTEEDSTANDARDS I. The followingformat shall be used by Licensee for reporting the Performance Levels for Guaranteed Standardson a quarterly basis to the Commission:- GUARANTEED GUARANTEED PREVIOUS COMPLAINTS TOTAL NO OF COMPLAINTS REDRESSED IN THE PENDINC STANDARD STANDARD QUARTER RECEIVED IN COMPLAINTS OUARTER INC I COMP- REFERENCE PARAMETER PENDING THE (NO) WITHIN MORE TOTAL LAINTS NO COMPLAINTS QUARTER STANDARD THAN THE COMPLAINTS (NO) (NO) (NO) TIME STANDARD RE ORES SEO TIME I. Fuse Blown Urban Area out or MCB Rural Area Tripped Remote Area 2. Service Line Urban Area or Snapped from Pole Rural Area . Remote Area 3. Fault in Distribution System 4. HT Main Failure s. Breakdown of underground Cables ['WT III-? 4) 39 6. Distribution Urban Area Transformer Rural Arca failure I Burnt Remote Area . 7. Problem in Grid Substation 8. Failure of Power Transformer 9. Period of Scheduled outages 10. (i). Voltage fluctuations in case fault .is identified to a local ' problem on the Transformer I O.(ii).(a). Voltage fluctuation in case no expansion augmentation of network required I O.(ii).(b). Voltage fluctuations . • in case expansion augmentation of network required 11.(i). Accuracy testing of Meter 11.(ii). Defective I stuck Meter I I .(iii). Burnt Meter 12.(i). Consumer's name change . 12.(ii). Transfer of name to legal heir 12.(iii). Load Reduction 12.(iv). Change of Category 12.(v). Shifting of Meter I Service Line etc. 13. Complaint on Billing • 40 THE GAZETTE OF INDIA : EXTRAORDINARY [PARTIll-SEC. 4) ANNEXURE - Ill 14.(i). Request for Reconnection I 14.(ii). Consumer wanting special reading of meter and upto date Bill Time limit prescribed in Schedule - I will be computed from the time when the complaint is filed with the designated offices of the Licensee or at the Call Centre. 2. The quarterly information regarding the compensation shall be submitted by Licensee to the Commission in the following format for individual complaints where compensation has been paid. I SLNO COMPLAINT DATE OF CONSUMER NAME AND NATIJREOF REFERENCE AMOUNT OF DATE OF NO FILING OF NO ADDRESS COMPLAINT GUARANTEED COMPENSATION PAYMENT OF COMPLAINT OF STANDARD PAID(RS) COMPENSATION CONSUMER I REPORTING FORMATS- OVERALL STANDARDS I. Licensee shall furnish the information with respect to the overall standards every quarter to the Commission in the following format:- OVERALL OVERALL NO.OF TOTAL NO. TOTAL NO. TOTAL NO. NO.OF STANDARDS STANDARD COMPLAINTS OF OF OF COMPLAINTS REFERENCE PARAMETER PENDING AS COMPLAINTS COMPLAINTS COMPLAINTS PENDING AT NO. THE START FILED BY C=(A+B) REDRESSED THE END OF OF THE THE WITHrNTHE THE QUARTER (A) CONSUMERS STIPULATED QUARTER rN THIS TIME QUARIBR(B) I. Normal fuse off Cables 2. Overhead Linc Cable Breakdown including underground Cable Breakdown 3. Distribution Trans former Failures 4. Grid Substation problem including Power Transformer Failure ['WT Ill-? 4] I S. I Period of Scheduled Outages 6. IMeter Complaints 7. Voltage Fluctuation I Complaints 8. I Transformer of Consumers Connection/Services 9. Consumers Bills Complaints 10. Disconnection Reconnection. of Supply 2. The quarterly information regarding faulty meters shall be submitted by Licensee m the following format.- 41 REFERENCE NO. OF FAULTY NO.OF TOTAL NO NO OF METERS NO. OF FAULTYOVERALL METERS AT FAULTY OF FAULTY RECTIFIED/REPLACED METERS STANDARDS THE START OF METERS METERS PENDING AT THE QUARTER ADDED THE END OF DURING THE THE QUARTER OU ARTER 3. The proforma for submission of quarterly report on reliability indices shall be as follows:« SL.NO. MONTH Ni= NUMBERS OF A1 = TOTAL Ni = TOTAL =I; (Ai• Ni) SAIF1=(2)/( I) CONSUMERS OF i'h NUMB?JlQF NUMBER OF FOR ALL I IKV FEEDER AFFECTED SUSTA11'1f:D CONSUMERS FEEDERS FOR EACH INTERRUPTIONS AT IIKV IN EXCLUDING lNTERRUPTION (EACH LQ.NGER LICENSEES AGRICULTURE THANS AREA OF FEEDERS (2) MINUTES) O]:-Ji'h SUPPLY(I) FEEDER FOR THE MONTH ' I N TOTAL 42 THE GAZETTE OF INDIA : EXTRAORDINARY [PARTIll-SEC. 4] SL.NO. MONTI{ Ni• NUMBER OF Bi=TOTAL NI = TOTAL =:[(Bi• Ni) SAID1=(2)/(I) CONSUMERS OF it.II DURATION OF NUMBER OF FORALLIIKV FEEDER AFFECTED SUSTAINE? CONSUMERS FEEDERS FOR EACH INTERRUPTIONS AT llKV IN EXCLUDING INTERRUPTION (EACH LONGER LICENSEES AGRICULTURE THAN$ AREA OF FEEDERS (2) MINUTES) ON i'h SUPPLY (I) FEEDER FOR THE MONTH I N I TOTAL I SL.NO. MONTI{ Ni• NUMBER OF Ci•TOTAL NI = TOTAL =:[(Ci• Ni) MAIFl=(2)/( I) CONSUMERS OF i'h NUMBER OF NUMBER OF FOR ALL I IKV FEEDER AFFECTED MOMENTARY CONSUMERS FEEDERS FOR EACH INTERRUPTIONS AT I lkv IN EXCLUDING INTERRUPTION (EACH LESS LICENSEES AGRICULTURE THAN OR AREA OF FEEDERS (2) EQUAL TO 5 SUPPLY (I) MINUTES ON i'h FEEDER FOR THE MONTH I N TOTAL Printed by the Manager, Government oflndia Press, Ring Road, Mayapuri.New Delhi-110064 and Published by the Controller of Publications, Delhi- I I ()()j4_

Previous and next

All provisions of Standard of Performance Regulations, 2015

Questions people ask

Is annexure URE - II of Standard of Performance Regulations, 2015 still in force?

No repeal of Standard of Performance Regulations, 2015 is recorded.