Annexure URE - II, Standard of Performance Regulations, 2015: ANNEX URE - II
Standard of Performance Regulations, 2015 - Annexure URE - II
Text of annexure URE - II
ANNEX URE - II
ANNEX URE - II
REPORTING FORMATS-GUARANTEEDSTANDARDS
I. The followingformat shall be used by Licensee for reporting the Performance Levels for Guaranteed Standardson a quarterly basis to the Commission:-
GUARANTEED GUARANTEED PREVIOUS COMPLAINTS TOTAL NO OF COMPLAINTS REDRESSED IN THE PENDINC
STANDARD STANDARD QUARTER RECEIVED IN COMPLAINTS OUARTER INC I COMP-
REFERENCE PARAMETER PENDING THE (NO) WITHIN MORE TOTAL LAINTS
NO
COMPLAINTS QUARTER
STANDARD THAN THE COMPLAINTS (NO)
(NO) (NO)
TIME STANDARD RE ORES SEO
TIME
I. Fuse Blown Urban Area
out or MCB
Rural Area
Tripped
Remote Area
2. Service Line Urban Area
or Snapped
from Pole Rural Area
.
Remote Area
3. Fault in
Distribution
System
4. HT Main
Failure
s. Breakdown of
underground
Cables
['WT III-? 4)
39
6. Distribution Urban Area
Transformer
Rural Arca
failure I Burnt
Remote Area
.
7. Problem in
Grid
Substation
8. Failure of
Power
Transformer
9. Period of
Scheduled
outages
10. (i). Voltage
fluctuations
in case fault
.is identified
to a local '
problem on
the
Transformer
I O.(ii).(a). Voltage
fluctuation in
case no
expansion
augmentation
of network
required
I O.(ii).(b). Voltage
fluctuations
. •
in case
expansion
augmentation
of network
required
11.(i). Accuracy
testing of
Meter
11.(ii). Defective I
stuck Meter
I I .(iii). Burnt Meter
12.(i). Consumer's
name change
.
12.(ii). Transfer of
name to legal
heir
12.(iii). Load
Reduction
12.(iv). Change of
Category
12.(v). Shifting of
Meter I
Service Line
etc.
13. Complaint on
Billing
•
40 THE GAZETTE OF INDIA : EXTRAORDINARY [PARTIll-SEC. 4)
ANNEXURE - Ill
14.(i). Request for
Reconnection
I
14.(ii). Consumer
wanting
special
reading of
meter and
upto date Bill
Time limit prescribed in Schedule - I will be computed from the time when the complaint is filed with the
designated offices of the Licensee or at the Call Centre.
2. The quarterly information regarding the compensation shall be submitted by Licensee to the Commission in
the following format for individual complaints where compensation has been paid.
I
SLNO COMPLAINT DATE OF CONSUMER NAME AND NATIJREOF REFERENCE AMOUNT OF DATE OF
NO FILING OF NO ADDRESS COMPLAINT GUARANTEED COMPENSATION PAYMENT OF
COMPLAINT OF STANDARD PAID(RS) COMPENSATION
CONSUMER
I
REPORTING FORMATS- OVERALL STANDARDS
I. Licensee shall furnish the information with respect to the overall standards every quarter to the Commission in the
following format:-
OVERALL OVERALL NO.OF TOTAL NO. TOTAL NO. TOTAL NO. NO.OF
STANDARDS STANDARD COMPLAINTS OF OF OF COMPLAINTS
REFERENCE PARAMETER PENDING AS COMPLAINTS COMPLAINTS COMPLAINTS PENDING AT
NO. THE START FILED BY C=(A+B) REDRESSED THE END OF
OF THE THE WITHrNTHE THE
QUARTER (A) CONSUMERS STIPULATED QUARTER
rN THIS TIME
QUARIBR(B)
I. Normal fuse off
Cables
2. Overhead Linc
Cable Breakdown
including
underground Cable
Breakdown
3. Distribution
Trans former
Failures
4. Grid Substation
problem including
Power Transformer
Failure
['WT Ill-? 4]
I
S. I Period of Scheduled
Outages
6. IMeter Complaints
7. Voltage Fluctuation I
Complaints
8. I Transformer of
Consumers
Connection/Services
9. Consumers Bills
Complaints
10. Disconnection
Reconnection. of
Supply
2. The quarterly information regarding faulty meters shall be submitted by Licensee m the following format.-
41
REFERENCE NO. OF FAULTY NO.OF TOTAL NO NO OF METERS NO. OF FAULTYOVERALL METERS AT FAULTY OF FAULTY RECTIFIED/REPLACED METERS
STANDARDS THE START OF METERS METERS PENDING AT
THE QUARTER ADDED THE END OF
DURING THE THE QUARTER
OU ARTER
3. The proforma for submission of quarterly report on reliability indices shall be as follows:«
SL.NO. MONTH Ni= NUMBERS OF A1 = TOTAL Ni = TOTAL =I; (Ai• Ni) SAIF1=(2)/( I)
CONSUMERS OF i'h NUMB?JlQF NUMBER OF FOR ALL I IKV
FEEDER AFFECTED SUSTA11'1f:D CONSUMERS FEEDERS
FOR EACH INTERRUPTIONS AT IIKV IN EXCLUDING
lNTERRUPTION (EACH LQ.NGER LICENSEES AGRICULTURE
THANS AREA OF FEEDERS (2)
MINUTES) O]:-Ji'h SUPPLY(I)
FEEDER FOR
THE MONTH
'
I
N
TOTAL
42 THE GAZETTE OF INDIA : EXTRAORDINARY [PARTIll-SEC. 4]
SL.NO. MONTI{ Ni• NUMBER OF Bi=TOTAL NI = TOTAL =:[(Bi• Ni) SAID1=(2)/(I)
CONSUMERS OF it.II DURATION OF NUMBER OF FORALLIIKV
FEEDER AFFECTED SUSTAINE? CONSUMERS FEEDERS
FOR EACH INTERRUPTIONS AT llKV IN EXCLUDING
INTERRUPTION (EACH LONGER LICENSEES AGRICULTURE
THAN$ AREA OF FEEDERS (2)
MINUTES) ON i'h SUPPLY (I)
FEEDER FOR
THE MONTH
I
N
I
TOTAL
I SL.NO. MONTI{ Ni• NUMBER OF Ci•TOTAL NI = TOTAL =:[(Ci• Ni) MAIFl=(2)/( I)
CONSUMERS OF i'h NUMBER OF NUMBER OF FOR ALL I IKV
FEEDER AFFECTED MOMENTARY CONSUMERS FEEDERS
FOR EACH INTERRUPTIONS AT I lkv IN EXCLUDING
INTERRUPTION (EACH LESS LICENSEES AGRICULTURE
THAN OR AREA OF FEEDERS (2)
EQUAL TO 5 SUPPLY (I)
MINUTES ON i'h
FEEDER FOR
THE MONTH
I
N
TOTAL
Printed by the Manager, Government oflndia Press, Ring Road, Mayapuri.New Delhi-110064
and Published by the Controller of Publications, Delhi- I I ()()j4_