LawGrids logoLAWGRIDS.ORG

Form X, Metro Railways General Rules 2013: FORMX

Metro Railways General Rules 2013 - Form X

Text of form X

FORMX

FORMX (See rule 5(1) on POWER SUPPLY INSTALLATION ABSTRACT [PART ll -:;:- SEC. 3(i)] Section: Metro Railway Length: Gauge : mm For 25 kv AC Overhead traction system S.No Type of switching Total Nos. Location and Remarks stations nearest station 1. · Traction sub stations and Feeding Posts (FP) 2. Sectioning and Paralleling Posts (SP) 3. Sub-sectioning and Paralleling Posts (SSP) 4. Booster Transformer stations 5. Auxiliary Sub-stations 6. LT supply Transformer stations For DC Third Rail traction system S.No Type of sub stations Total Nos. location and Remarks nearest station 1. Receiving sub stations 2. Traction sub stations 3. Auxiliary sub stations 4. Track Cabins - = ----- [ :Jf1l II-::'� 3(i)] --------=-

Previous and next

All provisions of Metro Railways General Rules 2013

Questions people ask

Is form X of Metro Railways General Rules 2013 still in force?

No repeal of Metro Railways General Rules 2013 is recorded.