Form III, Metro Railways General Rules 2013: FORMIII
Metro Railways General Rules 2013 - Form III
Text of form III
FORMIII
FORMIII
[See rule 5{"1) (,C)]
BRIDGE ABSTRACT
Total no of Waterway
spans in lineal
metres
Metro Railway
Gauge:
Loading
standard
for which
designed
[PART II-SEC 3(i))
mm
Remarks
Note: Major bridges are those having a total waterway of 18 lineal metres or upwards or
having a cl�ar opening of 12 lineal metres or upwards. in any o.ne span
Section:
Length:
Type of Cl.ear
Viaduct span in
meters
Previous and next
Questions people ask
Is form III of Metro Railways General Rules 2013 still in force?
No repeal of Metro Railways General Rules 2013 is recorded.