Regulation 12, Central Electricity Authority (Technical Standards for Connectivity of the Distributed Generation Resources) Regulations, 2013: ~ '3i;d<~tf4~ 31j~-.fl
Central Electricity Authority (Technical Standards for Connectivity of the Distributed Generation Resources) Regulations, 2013 - Regulation 12
Text of regulation 12
~ '3i;d<~tf4~ 31j~-.fl
12. ~ '3i;d<~tf4~ 31j~-.fl. - (1) ~ ~-ti~1Gl'1 ~ t ~ ~ ~ '3(d(~lfitt<:t dlt(fJ,..fl ~
di~fF<t~IDU~~~I
(2) ~ '3,d{c.lf4t<:t ~ if f..lciRtf©a Glr1cfil{l ~ ~~. 31"~:
(efi) ~ -'34cfi(O( {fcTT3TI ~ cS!i'!fi1¼1 ~ ~'
(~) ~Hi-cl I< ~ ~.:.~ '39cfi(Orf cf;r dltW,..fl, 3fR ·
(lf) ~~aft-{ '34cfi(Orj t{'(° ~ ~ffi" ~ .
(3) ~ ~ t{'(' f!ll1fcla '39cfi<oi cf;)"~~~~~ 1.fo:1 <G1~ 6'-l 311~ if f..l+-<iRt~a
~~~~~~. 31"~;-
('li) '3 9 cfi (01 cfiT fq I fl! ,i::1,
(IEf) '39cfi(Oj ~ R4'5!01 ifi~ '3ctt(~lf4t<:t;
(1f) '39cfi(Of t ~~ % ~ '3,dl«l~c:ct;
(1:f)'39cfi(OI ~ 5fi:l1'-'1'1 tfm1;'3,d(~l~M;,
(~)~~&<Ji.
(Sf) ~in: o<t~~, cf;,-~IITT*~~~'lir :i~a<~ifilt<:t, 3-lh:
(~) ~ '11:: '39r.f,,(Qr( ~ ~ B" ~ ~ ~ 'lir '1&1 (~I ~ ,cl I
13. tj~Glr1 ~"CR~ -~ ah sP.llifcll, ~l!ll~TTI ~ aNefr Sll!lifdi, * ~ '39cfi(OI
tf.=tfu;urt~aitt~~I Sl~lifdl ifi"r:rftm:~~. ~fil"Uf:qj~(I '39cfi(lll, m
~ -it,%~~ t ~ -391,iffl ~ t ~ $ 31tt ~ ~ ~<fcfi ~ ~~
~I
~ -~- ~.°ij'ffi
~~~
[Fcl#t 1q1-III/4/arm~/150/13]
• i i
•
["WT III-~ 4]
MINISTRY OF POWER
(Central Electricity Authority)
NOTIFICATION
New Delhi, the 30th September, 2013
7
File No.12/X/STD(CONN)/GM/CEA.-Whereas draft of the Central Electricity Authority
(Technical Standards for Connectivity of the Distributed Generation Resources) Regulations, 2010 was
published on 4
th
April 2012, as required by sub-section (3) of section 177 of the Electricity Act, 2003
(36 of 2003), read with rule 3 of the Electricity (Procedure for Previous Publication) Rules, 2005;
Now, therefore, in exercise of powers conferred by sul:r-section (1) of Section 177 of the Electricity
Act, 2003, the Central Electricity Authority hereby makes the following regulations, namely:-
1.. Short title and commencement - (1) These Regulations may be called the Central Electricity
Authority (Technical Standards for Connectivity of the Distributed Generation Resources) Regulations,
2013.
(2) They shall come into force on the date of their pu~lication in the Official Gazette.
(3) For distributed generation resources already connected to the electricity system on the date of
commencement of these regulations, the generating company and the licensee of the electricity system
to which the generating station is connected shall mutually discuss and agree on the measures·
which car:i be taken to meet the technical standards specified in these regulations within one
hundred and eighty ~ays of the coming into fcrce of these regulations.
2. Definitions - (1) In these regulations -
(a) "Act'' means the Electricity Act, 2003 (No. 36 of 2003);
(b) "applicant" means a generating company or a person seeking connectivity to the electricity
system at voltage level below 33 kV for its distributed generation resource;
(-c) "appropriate licensee" means transmission licensee or the distribution licensee, as the case may
be, to whose ·electricity system the electricity generated from the distributed generation resource
-shall be injected or is betng injected;
(d) "British Standards" ·(BS) means those standards and specifications approved by the British
Standards Institution;
(e) ''distributed generation resource" means a generating station feeding electricity into the electricity
system at voltage level of below 33 kV;
(f) "frequency" means the number of alternating cycles per second expressed in Hertz;
(g) "IEC Standard" means a standard approved by the International Electrotech~ical ~ommission;
(h) "Indian Standards" means standards specified by Bureau of Indian Standards;
(i) "interconnection point" means a point on the electricity system, including a sub-station or a
switchyard, where the interconnection is established between the facility of the applicant and th~
electricity system and where electricity injected into or drawn from the electricity system can be
measured unambiguously for the applicant; ·
(j) "inverter" means a device 1hat changes direct current power into alternating current power;
(k) "protection system" means the equipment by which abnormal conditions in the electricity system
are detected and fault clearance, actuating signals or indications are initiated without the
intervention by the operator;
(I) "Site Responsibility Schedule" (SRS) means a schedule for demarcating the ownership,
responsibility for control, operation and main1enance of the equipment at the interconnection point;
(m) "unintended islandn means a part of the electricity system which remains energised by one or more
distributed generation resource, when such part of the system has been isolated from the remaining
part of the electricity system; and ·
8 THE GAZETTE OF INDIA: EXTRAORDINARY [PART Ill-SEC. 4]
(n) "user" means a generating company whose distributed generation resource is connected to the·
electricity system.
(2) The words and expressions used herein and not defined in these regulations but defined in
the Act shall have the meanings assigned to them in the Act.
3. Applicability of the Regulations - These regulations shall be applicable to all the generating
companies or persons owning distributed generation resource, which are connected to or seeking
connectivity with the electricity system:
Provided that, in case a licensee owning the electricity system to which connection is to be made
also owns the distributed generation re~ource, these regulations shall be applicable mutatis mutandis.
4. General Connectivity Conditions - (1) The applicant shall make a formal request to the
appropriate licensee for connection to electricity .system of the appropriate licensee· or generating
station as the case may be.
(2) The applicant shall be responsible for the planning, design, construction, reliability, protection
and safe operation of its own equipment subject to the regulations for construction, operation,
maintenance and connectivity and other statutory provisions.
(3) The applicant and the user shall furnish data as prescribed by the appropriate licensee in a non~
discriminatory manner.
(4) The applicant and the user shall provide necessary facilities in the distributed generation
resource for communication and storage of data and other parameters as may be stipulated by the
appropriate licensee in a non-discriminatory manner.
(5) The applicant and the user shall coordinate with the appropriate licensee on the issues including
but not limited to protection, safety, and metering.
(6) The appropriate licensee shall carry out the inter-connection study to determine:-
(a) the point of inter-connection, required interconnection facilities and modifications
required on the existing electricity system, if any, to accommodate the
interconnection,
(b) the maximum net capacity of the distributed generation resource at a particular
location for single-phase and three phase generators connected to a shared singl&
phase system or three phase system respectively, based on the capacity and
configuration of the electricity system, and imbalance in the power flows that
distributed generation resource may cause,
(c) likely impact, if any, on the quality of service to consumers connected to the electricity
system and measures to mitigate the same,
(d) additional measures to ensure safety of the equipment and personnel.
(7) Every connection of an applicant's system to the electricity system shall be covered by a
connection agreement between the applicant and appropriate licensee, which shall contain general
and specific technical conditions, applicable to that connection. ·
(8) The appropriate licensee shall inform the concerned State transmission utility within thirty days of
acceptance of application for connectivity of a generating station to electricity system operating at voltage
level below 33 kV. The ·concerned State transmission utility shall in turn inform the State Load
Despatch Centre with details of installed capacity, generator capabilities, connectivity and likely
date of co~missioning or d~te of commercial operation.
5. Standards and Codes of Practice. - (1) The applicant shall follow the industry best practices
and applicable industry standards in respect of the equipment installation and its operation and
maintenance. ·
(2) The equipment including overhead lines and cables shall comply with the relevant Indian
standards issued by Bureau of Indian Standards.
,.
' ·.
[ 'WT IJI-l§1J;s 4 J 9
(3) In case the Bureau of Indian Standards has not issued relevant standard, IEC standard or
British Standards or standard issued by American National Standards Institute (ANSI) or any other
equivalent International Standard shall be followed in that order:
Provided that whenever a standard other than Indian Standard is followed, necessary
corrections or modifications shall be made for nominal system frequency, nominal system voltage,
, ambient temperature, humidity and other conditions prevailing in India before actual adoption of the
said standard.
(4) .The effects of wind, storms, floods, lightning, elevation, temperature extremes, icing,
t contamination, pollution and earthquakes must be considered in the design and operation of the
connected facilities. ·
,
(5) Installation, operation and maintenance of the equipment by the applicant shall conform to the
relevant standards specified by the Central Electricity Authority as and when they come into force.
6. Safety. - The applicant shall comply with the Central Electricity Authority (Measures Relating to
Safety and Electricity Supply) Regulations, 2010 for the proposes of safety under these regulations.
7. Sub-station Grounding. - Sub-station grounding shall be done in accordance with IS 3043, the code
of practice for earthing issued by Bureau of Indian Standards.
8. Metering. - (1) Meters shall be provided as specified in the Central Electricity Authority (Installation
and Operation of Meters) Regulations, 2006 for the purpose of metering under these regulations.
(2) Measurement of hannonic current injection, Direct Current injection and flicker shall be done with
calibrated meters before the oommissioning of the project and once in a year in presence of the
parties concerned and the indicative date for the same shall be mentioned in the connection
agreement:
Provided that in addition to annual measurement, if appropriate licensee or. the generating
company, as the case may be, desires to measure harmonic current injection or Direct Current
injection or flicker, it shall inform the other party in writing and the measurement shall be carried out
within five wo~ing days
,9. Schematic Diagrams. - The applicant and user shall prepare single line schematic diagrams in
respect of its system facility and make the same available to the appropriate licensee.
10. Inspection, Test, Calibration and Maintenance prior to connection. - (1) Before physical
connection, the applicant shall complete all inspections and tests finalised in consultation with the
appropriate licensee or generating station to which his equipment is getting connected.
(2) The applicant shall make available all drawings, specifications and test records of the project
equipment to the appropriate licensee or generating station as the case may be.
11. Standards for distributed generation resources. - Harmonic current injections from a
generating station shall not exceed the limits specified in IEEE 519. .. '
(2) The distributed generating resource shall not inject Direct Current greater than 0.5% of the
full rated output at the interconnection point. r
(3) The distributed generating resource shall not introduce flicker beyond the limits specified in IEC
61000:
Provided 1hat the standards for flicker shall come into effect from 1st April 2014.
(4) Every distributed generating resource shall be equipped with automatic synchronisation device:
Provided that induction generators, except self-excited induction generators, shall not
require a synchronising device:
Provided further that distributed generation resources using inverters shall not be required to
have separate synchronising device, if the same is inherenfly built into the inverter.
(5) For three-phase generators, the circuit breakers shall be three-phase devices with electronic or
electromechanical control.
10 THE GAZETTE OF INDIA: EXTRAORDINARY [PART III-SEC. 4]
(6) Distributed generation resource operating in parallel with electricity system shall be equipped
with the following protective functions to sense abnormal conditions on electricity system and cause
the distributed generation resource to be automatically disconnected from electricity system or to
prevent the distributed generation resource from being connected to electricity system
inappropriately-
( a) over and under voltage trip functions if voltage reaches above 110% or below 80%
respectively with a clearing time upto two seconds; however, appropriate licensee
may prescribe a narrower range of voltage for the purpose.
(b) over and under frequency trip functions, if frequency reaches 50.5 Hz and below
47.5 Hz with a clearing time upto 0.2 seconds; however, appropriate licensee may
prescribe a narrower range of frequency for the purpose.
(c) the distributed generation resource shall cease to energise the circuit to which it is
connected in case of any fault in this circuit.
(d) a voltage and frequen~y sensing and time-delay function to prevent the distributed
generation resource from energising a de-energised circuit and to prevent the
distributed generation resource from reconnecting with electricity system unless
voltage and frequency is within the prescribed limits and are stable for at least sixty
seconds;and
(e) a function to prevent the distributed generation resource from contributing to the
formation of an unintended island, and cease to energise the electricity system
within two seconds of the formation of an unintended Island.
(7) The equipment of the generating station shall meet following requirements, namely:-
(a) circuit breakers or other interrupting equipment shall be suitable for their intended
application with the capability of interrupting the maximum available fault current
expected at their location.
(b) distributed generation resource and associated equipment shall be designed so that
the failure of any single device or component shall not potentially compromise the
safety and reliability of the electricity system.
(c) parallelng-device of distributed generation resource shall be capable of withstanding
, 220°/4 of the nominal voltage at the interconnection point.
{8) Every time the generating station is synchronised to the electricity system, it shall not cause
voltage fluctuatbn greater lhan ± 5% at the point of connection. ·
(9) Aft.er considering the maintenance and safety procedures, the distribution licensee may require
the applicant with a distributed generation resource of capacity exceeding a particular level to
provide a manually operated isolating switch between the distributed generation resource and
the electricity system, which shall meet following requirements:
(a) allow visible verification that separation has been accomplished;
(b) include indicators to clearly show open and closed positions;
(c} be capable of being reached quickly and conveniently twenty four hours a day by
licensee's personnel without requiring clearance from the applicant;
(d) be capable of being locked in the open position;
(e) may not be rated for load break nor may have feature of over-current protection; and
(f) be located at a height of at least 2.44 m above the ground level. ·
(10) Prior to synchronisation of the distributed generation resource for the first time with electricity
system, the applicant and the appropriate licensee shall agree on the protection features and control
diagrams.
11
(1 1) one copy each of the approved drawing and diagrams showing important equipment,
protection and control features shall be signed by representative of the applicant and the licensee
and shall be in possession of the applicant and licensee.
(12) These drawing and diagrams shall be amended as and when any changes are made in the
distributed generatbn resource or interconnection facility.
12. Site Responsibility Schedule. - (1) A Site Responsibility Schedule for every interconnection point
shall be prepared by 1he appropriate licensee.
(2) Following information shall be included in the Site Responsibility Schedule, nameiy:
(a) schedule of electrical apparatus services and supplies;
(b) schedule of telecommunications and measurement apparatus; and
(c) safety rules applicable to each plant and apparatus.
(3) Following information shall also be furnished in the Site Responsibility Schedule for each item of
equipment installed at the connection site, namely:-
(a) the ownership of equipment;
(b) the responsibility for control of equipment;
(c) _the responsibility for maintenance of equipment;
(d) the responsibility for operation of equipment;
(e) the manager of the site;
(f) the responsibility for all matters relating to safety of persons at site; and
(g) the responsibility for all matters relating to safety of equipment at site.
-t'3. Access at Connection Site - The applicant and user shall provide reasonable access and other
required facilities to the appropriate licensee for inspection of the equipment belonging to the
applicant or user, as the case may be, and for maintenance of the equipment, if any, installed by the
appropriate license·e in the premises of the applicant or user, as the· case may be.
M. S. PURI, Secy.
Central Electricity Authority
[ADVT-ll l/4/Exty./150/13J
Printed by the Manager, Govemrnent oflndia Press, Ring Road, Mayapuri, New Delhi-I I 0064
and Published by the Controller of Publications, Delhi-110054.
Previous and next
Questions people ask
Is regulation 12 of Central Electricity Authority (Technical Standards for Connectivity of the Distributed Generation Resources) Regulations, 2013 still in force?
No repeal of Central Electricity Authority (Technical Standards for Connectivity of the Distributed Generation Resources) Regulations, 2013 is recorded.