Regulation 6, Standards of Quality of Service (Digital Addressable Cable TV Systems) Regulations, 2012 (12 of 2012): Communication of technical or operational non-feasibility
Standards of Quality of Service (Digital Addressable Cable TV Systems) Regulations, 2012 (12 of 2012) - Regulation 6
Text of regulation 6
Communication of technical or operational non-feasibility
6. Communication of technical or operational non-feasibility.— In case it is technically or
operationally non-feasible to provide connection, reconnection, shifting of service or supply of
set top box at the location where the services are requested by the applicant, the multi-system
operator or linked local cable operator, as the case may be, shall inform the applicant within two
days of receipt of the application, indicating the reasons as to why it is technically or
operationally not feasible to provide the service sought by the applicant and for the purposes of
this regulation the technical non feasibility includes the following :-
(i) the location where the service is required is not accessible or is accessible at a
cost, which the subscriber is not agreeable to bear;
(ii) the location where the service is required is accessible but it is not technically
feasible to provide the quality of signals to the extent specified in sub-regulation
(2) of regulation 18 of these regulations; and
(iii) the location where the service is required falls outside of the area of operation of
multi-system operator or its linked local cable operator, as the case may be.
Previous and next
Questions people ask
Is regulation 6 of Standards of Quality of Service (Digital Addressable Cable TV Systems) Regulations, 2012 (12 of 2012) still in force?
No repeal of Standards of Quality of Service (Digital Addressable Cable TV Systems) Regulations, 2012 (12 of 2012) is recorded.