Form V, The Ancient Monuments and Archaeological Sites and Remains (Framing of Heritage Bye-Laws and Other Functions of the Competent Authority) Rules, 2011: FormV
The Ancient Monuments and Archaeological Sites and Remains (Framing of Heritage Bye-Laws and Other Functions of the Competent Authority) Rules, 2011 - Form V
Text of form V
FormV
FormV
(See rule 12 and 13)
Refusal of permission for undertaking construction I recon~truction I repair I
renovation in the regulated area I prohibited area of protected monument or
archaeological site and remains declared as of national importance under the
Ancient Monuments and Archaeological Sites and Remains Act, 1958
To
File No: ........................ . Dated: ......... .
Sir/Madam,
With reference to your application no ............ dated .......... for the grant of
permission for the construction/ reconstruction I repair I renovation in the prohibited I regulated
area of protected monument I archaeological site and remains declared as of national importance,
plot no ................. block no. ................ situated at... ...................................... .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .I am to inform you that the permission has
been refused on the following grounds.
1.
2.
3.
4.
Station:
Date:
Signature ofthe Competent Authority
SEAL
35
36 THE GAZETTE OF INDIA : EXTRAORDINARY
THE FIRST SCHEDULE
[see rule 21 (1)]
(PART II-SEC. 3(i)]
Parameters for Preparation of Site Plan
While preparing a site plan for the protected area, the prohibited and regulated
areas, the following parameters shall be adhered to and incorporated.
(a) Protected Area, protected monument, prohibited area or regulated area
Parameters:
(i)
(ii)
(iii)
(iv)
(v)
(vi)
(vii)
(vii)
(ix)
(x)
(xi)
(xii)
(xiii)
(xiv)
Contouring (I metre interval) is preferably. However, it can vary
depending on the nature of landscape. If it is hilly terrain with
cliffs, then contour intervals can be increased. If the landscape is
plain, then it can be reduced to 0.5 metre;
Fixing of Bench mark and survey points on the ground and map;
Protected area needs to be mapped in such a manner that property
and feature within the area can easily be identified. Therefore the
area shall be required to be grided both on map and ground. Grids
can be of 50 x 50 metres;
Mapping of structures on plan;
Other features like tank, embankment, mud fortification, remnants
of ancient structures etc should be shown;
Roads and pathways;
Garden area;
Trees (with an inventory- tree type,
girth and height);
Telephone Lines
Sewerage Lines
Water supply lines, etc.
Contouring I Relative heights of certain areas
Ground Penetrating · Radar survey determining the buried
archaeological remains.
Any other feature that is required to be incorporated in consultation
with the competent authority;
[ 'WT IJ~<SjUG 3(i) J
THE SECOND SCHEDULE
[See rule 22]
Parameters for Heritage Bye-Jaws :
The heritage bye-laws shall be framed on the basis of the site plan
prepared for each of the prohibited and regulated areas of protected monuments
and the following parameters, namely -
(i)
(ii)
(iii)
(iv)
(v)
(vi)
(vii)
(viii)
(ix)
(x)
(xi)
(xii)
(xiii)
(xiv)
Architectural, historical and archaeological value of the monument;
Sensitivity of the monument (e.g. developmental pressure, urbanization,
population pressure, etc);
Visibility from the protected monument or area and visibility frotn
regulated area;
Land-use to be identified;
Archaeological heritage remains other than protected monument(s);
Cultural landscapes;
Significant natural landscapes that forms part of cultural landscape and
also helps in protecting the monument from environmental pollution;
Usage of open space and constructions;
Traditional, historical and cultural activities;
Skyline as visible from the monument and from regulated areas;
Vernacular architecture;
Developmental plan as available by the local authorities;
Building related parameters-
( a) Height of the construction;
(b) Floor area;
(c) Usage;
(d) Fa<;ade design;
(e) Roof design;
(f) Building material;
(g) Colour;
Visitors facilities and amenities.
[F. No. 1/8/20 I 0-M (Pt.-III R]
GAUTAM SENGUPTA, Director General
--~--·--·
Printed by the Manager, Government of India Press, Ring Road, Mayapuri, New Delhiwll0064
and Published by the Controller of Publications, Delhi· II 0054.
37
Previous and next
Questions people ask
Is form V of the Ancient Monuments and Archaeological Sites and Remains (Framing of Heritage Bye-Laws and Other Functions of the Competent Authority) Rules, 2011 still in force?
No repeal of the Ancient Monuments and Archaeological Sites and Remains (Framing of Heritage Bye-Laws and Other Functions of the Competent Authority) Rules, 2011 is recorded.