LawGrids logoLAWGRIDS.ORG

Rule 42, Bangalore Metro Railway (General) Rules, 2011: Station working orders

Bangalore Metro Railway (General) Rules, 2011 - Rule 42

Text of rule 42

Station working orders

42. Station working orders.- (1) In addition to the General rules and special instructions of the Bangalore Metro Railway, each station shall be provided with the Station Working Orders applicable to the station giving details of- (a) the location of equipment and guidelines for their use; (b) the emergency evacuatiqn routes at station and with adjoining block section; (c) the designated entrance for attendance by police, fire and ambulance vehicle; ( d) the designated entry for fire services; and (e) list of medical facilities locally available. (2) Copies of these Station Working Orders shall be issued to each Station Controller who is required to work at the particular station. (3) A copy of these Working Orders shall be kept in a special marked binder in a conspicuous place in the station control room.

Previous and next

All provisions of Bangalore Metro Railway (General) Rules, 2011

Questions people ask

Is rule 42 of Bangalore Metro Railway (General) Rules, 2011 still in force?

No repeal of Bangalore Metro Railway (General) Rules, 2011 is recorded.