Rule 30, Bangalore Metro Railway (General) Rules, 2011: Train Defects
Bangalore Metro Railway (General) Rules, 2011 - Rule 30
Text of rule 30
Train Defects
30. Train Defects.- (1) No train with defective safety equipments, cab signaling, leading cab
controls, interior lighting, brakes or doors shall remain in passenger service and shall
be removed to depot and replaced by a serviceable train at the earliest opportunity.
(2) (i) If traction power is lost on any car bogie, the train need not be withdrawn from
service, if power is lost on more than one car bogie and the reduction in speed causes
delay to following trains, the passengers shall be detrained at the station and the train
worked empty, otherwise, the train may remain in passenger service until it can be
replaced by a serviceable train;
(ii) in the event of a mechanical defect in the traction motor or drive which causes the
wheels to lock, the train shall be stopped immediately and shall not be moved until
clearance has been given by a Rolling Sock Supervisor;
(iii) if a Train operator finds that the train cannot be driven or braked from the leading end
cab, passengers shall be detrained as per the provisions referred in clauses (iv) and
(v) of this sub-rule;
(iv) such an occurrence may usually happen at a station and a terminal in which case the
passengers shall be discharged at the station itself and to dispatch the train to the
depot, the Station Controller shall board the train and act as look out in the leading cab
while the Train Operator drives from the rear cab in Cut outmode, information on
signals and cleared routes shall be passed by cab to cab telephone and train speed
restricted to a maximum of ten kilometer per hour;
(v) in the unlikely event that the defect causes a train to stop between stations, the Traffic
Controller shall arrange another Train Operator or if necessary a Station Controller
competent to drive the train to reach the failed train and drive the train fro_m rear cab in
Cut Out mode with leading cab train operator acting as look out and the information on
signals and cleared routes shall be passed by cab to cab telephone or radio and train
speed restricted to a maximum of ten kilometer per hour.
(3) (i) A failure of the traction control line shall be indicated on the Train Integrated
Management System panel which shall enable the fault to be isolated, in case of
simultaneous failure of redundant equipment, the train shall be rendered inoperative in
consultation with the traffic controller;
(ii) when such failure of the traction control happens on a running line and renders the
train inoperative even by applying appropriate isolations in the Train Integrated
Management system, the Train Operator shall inform the Traffic Controller that his
train is stalled and requires assistance to move and in this case the train shall be dealt
with in accordance with rule 49.
(4) (i) Failure of brakes to apply or to release shall be indicated on the Train Integrated
Management System panel;
28 THE GAZETTE OF INDIA : EXTRAORDINARY [PART Il�SEC. 3(i)]
(ii) if brakes on any car bogie fail to apply, the brake of that bogie shall be isolated
manually and the normal service to be resumed, the train shall be withdrawn from service
after completion of the trip;
(iii) In case of failure of the brakes upto fifty percent of the train, the train shall be worked
at speed of twenty-five Kilometers per hour upto next station and passengers must be
detrained at the next station and the train worked to depot at a speed not exceeding
twenty-five kilometers per hour;
(iv) if brakes fail to apply on more than fifty percent of the bogies, the train shall be
brought to a stop as soon as possible by application of the emergency brake and shall
not proceed until authorised by a Rolling Stock Supervisor;
(v) if brakes fail to release on any car bogie, up to a maximum of fifty percent the brakes
shall be isolated on the affected cars; the brakes released by local control; passengers
shall be detrained at the next station and, the train worked to depot at a speed not
exceeding twenty-five kilometer per hour;
(vi) if brakes fail to release on more than fifty percent of the cars, no attempt shall be made
to move the train until authorised lly a Rolling Stock Supervisor.
(5) (i) If doors on a train are not indic.;t_ed as closed, the train shall not start from a station;
(ii) if doors cannot be closed by hand or there is no obviously open door and the "doors
closed" indication is still not received, passengers shall be detrained and the train shall be
worked empty until it can receive attention from the Rolling Stock maintenance
department;
(iii) if some doors of train do not open at stations but after closing the doors all doors are
indicated as closed, the train may remain in passenger service;
(iv) in peak period, the extended dwell times at stations that could result from some doors
not opening may make it desirable for the train to be withdrawn from service to avoid
delaying the following trains.
(6) Failure of an air conditioning unit shall be indicated on the Train Integrated
Management system panel, although it has no effect on the safe operation of the train,
the Train Operator shall report such failure to Operations Control Centre, so that the
rake receives prompt attention to relieve hardship to passengers.
(7) (i) Failure of main car lighting on one or two cars shall be reported by the Train
Operator to the Operations Control Centre and the train may continue in passenger
service to the end of its trip provided the emergency lighting is working satisfactorily
and at the terminal it shall be withdrawn from service or replaced by a good train;
, .. ,,., ..
T' .. � .. ' ""'' "' ,, .
[ '11'1 II--"&'ls 3(i)] 29
(ii) if all main train lightings fail or main lighting and emergency lighting both fail, on the
same car, passengers shall be detrained at the next station and the rake withdrawn
from service.
Previous and next
All provisions of Bangalore Metro Railway (General) Rules, 2011
Questions people ask
Is rule 30 of Bangalore Metro Railway (General) Rules, 2011 still in force?
No repeal of Bangalore Metro Railway (General) Rules, 2011 is recorded.