LawGrids logoLAWGRIDS.ORG

Form XIX, Bangalore Metro Railway (General) Rules, 2011: FORM XIX

Bangalore Metro Railway (General) Rules, 2011 - Form XIX

Text of form XIX

FORM XIX

FORM XIX [See rule 27(2)(b)J CERTIFICATE l)?ART II-SEC. 3(i)] Certified that it is safe to use (particulars of the equipment) at the station I on the section of the metro railway with the following precautions. !. ___________ _ 2.___________ _ 3.____ ....,... _______ etc. Director-in-charge of Signal and Telecommunication Note: The application should be scrutinized by the Commissioner who, if satisfied, will communicate his sanction to the metro railway administration, in case he is not fully satisfied, he will give his comments and recommendation for suitable further action. · : ,,·, ·. · ··, Appendix A [See rule 41 (7)) CATECHISM FOR SIGNALING AND INTERLOCKING INSTALLATIONS SIGNALING AND TRAIN CONTROL Have the requirements and recommendations for signaling and train control systems vide Chapter IX these rules and appendix thereto pertaining to Signaling and Train Control systems installed on the section being complied with? A. SIGNAL 1. Do the signals comply with the requirements as laid down in Bangalore Metro Railway General Rules,2011. 1,1 , I • .. • ['11'1 II-- 3(1)] 2. Have the signal posts been placed on the left side of the track of the approaching train to which they refer? If otherwise, for what reason? 3. Are all running signals controlling placed in such a position and at such a height above rail level so they can be clearly seen by the drivers in sufficient time and be readily distinguished by night or by day from subsidiary signals? 4. In case of slotted or controlled signals, can the signals be freely returned to danger by either of the controlling agencies? 5. Are signals not commissioned have their aspects covered and the cover displaying two crossed white bars on a black background, the bars not being less than 30 ems x lOcms? B. POINTS 1. Are the locking of facing points such that the points cannot be or become unlocked while a train is passing over them i.e electrically controlled by track circuits or alternative devices? 2. Are detectors (internal/external) fitted to all facing points and do they Efficiently detect with switches the signals controlling the movement of train over them? 3. Are switches adjusted to come tight against stock rails? Does the insertion of Smm obstruction piece between the switch and stock rails lSOmm from the toe of the switch prevent the points being locked and prevent the relevant signal being taken 'OFF', the giving of which is preceded by the locking of the points? C. STATION CONTROL ROOM 1. Are all signals, points and track circuits electrically/ electronically repeated on the Station Control Panel/Work Station as & where provided? 2. Is the station controller provided with necessary means of stopping the train at his station? 3. Have instructions for working been issued to all staff and included in Metro Railway Working Instructions and are they correct and efficient? 109 HO THE GAZETIE OF INDIA : EXTRAORDrNARY D. TEST IN STATION CONTROL ROOM [PART II --SIT. 3(i)] It is essential that the interlocking of all signals with points rnu�t be so effected as to ensure the following conditions, which may be tested from the Station Control panel or Work station 1. Is it possible to take off conflicting signals at the same time? 2. Is it possible to take off a signal until (a) All points on the running line including overlap are correctly set and the point locked where required? (b) All points, giving access to the running line frorn sidings are set against the running line? E. OPERATION CONTROL CENTRE Are all signals, points and track circuits electrically/electronically repeated on the Operation Control or Work station as and where provided? F. CAB SIGNAL 1. Are the various modes of train control clearly distinguishable on the Driver's Man machine Interface (MMl). 2. Under Cab Signaling System of working, is Automatic Train Protection system able to bring the train to a stop before an obstruction? Appendix B [See rule 41 (7)) A. ADDITIONAL CATECHISM FOR SIGNALING AND TELECOMMUNICATION . 1. Have the requirements and rec.ommendations for signaling and telecommunication installation in accordance with the instructions issued for the installation of Signaling and Telecommunication equipment in 750V DC traction systems as adopted on the section, been complied with? If not, in what respect the arrangements provided fall short of them? "'"" '" '" ['ll'T II-� 3(i)) STATEMENT OF DEVIATION - SIGNALING AND TELECOM SYSTEMS Items Existing Prescribed Deviation/Infringe Remarks Approval/ parameters Parameters ment Sanction (1) (2) (3) (4) (5) (6) SIGNAL POINTS TRACK CIRCUITS CABLES ELECT SIGNALING EQUIPMENT BATIERIES EARTHING MOBILE TRAIN RADIO COMMUNICATIONS GENERAL SAFETY �- [F. No.K-14011/45/2010-Metro] S. K. LOHIA, OSD (Urban Transport) & E. 0. Jt. Secy. Printed by the Manager, Government of India Press, Ring Road, Mayapuri, New Delhi-110064 and Published by the Controller of Publications, Delhi-! 10054. Ill

Previous and next

All provisions of Bangalore Metro Railway (General) Rules, 2011

Questions people ask

Is form XIX of Bangalore Metro Railway (General) Rules, 2011 still in force?

No repeal of Bangalore Metro Railway (General) Rules, 2011 is recorded.