Form IX, Bangalore Metro Railway (General) Rules, 2011: FORM IX
Bangalore Metro Railway (General) Rules, 2011 - Form IX
Text of form IX
FORM IX
FORM IX
[See rule 5(1) (i)]
BRIEF PARTICULARS OF TRACTION INSTALLATION
[PART II-SEC. 3(i)]
Section:
Length:
Bangalore Metro Railway
Gauge : 143Smm
Third Rail Equipment:
1. Salient Features ·of the Design specially covering following aspects;
(a) Current carrying capacity of the system
{b) Boundaries like Temperature range
(c) Speed potential
{d) Protection arrangements
(e) Power supply from Grid sub-station (GSS) to Receiving sub0station
{RSS)
(f) Power distribution from Receiving sub-station (RSS) to Traction sub
station (TSS)
(g) DC power feed from Traction sub-station (TSS) to conductor raw
(h) Power distribution system from Receiving sub-s.t�io.n (RSS) to
Auxiliary sub-station (ASS)
(i) Traction SCADA system
0) Earthing and Bonding system
2. Certificate that all warning boards and notices as per statutory
�irements have been provided at specmed locations.
[ 'IT'T IJ-"!li'l6 3(i))
Previous and next
All provisions of Bangalore Metro Railway (General) Rules, 2011
Questions people ask
Is form IX of Bangalore Metro Railway (General) Rules, 2011 still in force?
No repeal of Bangalore Metro Railway (General) Rules, 2011 is recorded.