Text of regulation 116

Deviations

116.Deviations.- (1} The Central Government or the State Government, as the case may. be, by order in writing, allow deviations in respect of matters referred in these regulations except regulation 30. (2)The Electrical Inspector or the inspector of mines may, by. order in writing, · allow deviations in respect of matters referred in regulations 12 to 17, 28, 35(2)(3) and (5), 36(3), 37(i) to (iv), 41(xii), 43, 44(2), 46, 52 to 54, 57 to 61, 65, 72, 74, 78 to 91, 102, 107(6), (8) and (10) and 114 Explanation- Every order allowing the deviations by the Electrical Inspector or the Inspector of Mines under sub-regulation (2) shall be placed before the Central or State Government which may disaUow or revise such deviations. AMARJEET SINGH, Secy. [ADVT IIl/4/l 87G/20 I 0/Exty.] Schedule-I · Safety measures for operation and maintenance of electrical plants [See sub-regulation (3) of regulation (6)] Part I (1) Duration and content of training shall be as specified below:- ---- _, __ ---- (a) Thermal Power Stations.- (i) The minimum duration of the trammg courses for the operating engineers and supervisors (mechanical, electrical and instrumentation) shall be as specified in Table I for coal based, diesel engine based and gas turbine based thermal power plants. The contents of training courses and on job training, along with respective duration, shall be as specified in Part II, Ill, IV, V, VI, VII, VIII and IX of this Schedule, appropriate to the .specialized course in mechanical or electrical or instrumentation Engineering. Trainees should speµd time on observing different functions of Thermal Power Plant along with its operation. After the lecture course is completed the trainees should be taken on visits to a few modem power stations and factories manufacturing turbines, generators, switch gear, instrumentation and auxiliary equipment. The remaining period will be spent on in-plant training where the candidates will be given an opportunity to operate or maintain the machinery by themselves under close supervision of the regular operating staff as well as the training supervisors. Arrangements shall be made for familiarizing the trainees with the operation of power stations through_simulator facilities. • ' • ' [ 'WT m~~ 4 J TABLE I Course Duration for Engineers and Supervisors - flie;~al Power Plants s. Training Course No. I. Common Mechanical, Electrical andinstrumentation Course 2. Common On Job and .Simulator Training for Mechanical, Electrical and Instrumentation 3. Specialized Course for Engineers and Supervisors (a) Mechanical (b) Electrical ( c) Instrumentation 4. Specialized On Job Training for (a) Mechanical (b) Electrical (c) Instrumentation 5. Plant visits and evaluation Coal Base_d Plant 5 Weeks 12 Weeks 6 Weeks 4 Weeks 2.Weeks 4 Weeks 4 Weeks 4 Weeks 3 Weeks Diesel Engine Based Plant 4 Weeks· 4 Weeks. 2 Weeks 4 Weeks 2 Weeks Nil Nil Nil 3 Weeks Gas Turbine Based Plant ... 4½ Weeks 8 Weeks 2½ Weeks 4Weeks 2Weeks 4 Weeks 4 Weeks 4 Weeks. 3 Weeks (ii) The· minimum duration of the training courses for the· Technicians (mechanfoai, electrical and instrumentation trades) to assist the operating engineers and supervisors shall be as specified in Table II for coal based, diesel engine based and gas turbine based thermal power plants. The contents of training courses and on job training, along with respective duration, shall be as specified in Part X, XI, XII, XIII, XIV, XV and XVI of this Schedule, appropriate to the specialized trade of mechanical or electrical or instrumentation Engineering. The lectures may be arranged and trainees may spend time on observation in the power stations so that they get familiarized with different sections of the power statioff After _the lecture course is completed the trainees shall be taken on visits to study a few modem power . stations and factories manufacturing turbines, generators, switch gear, instrumentation and auxiliary equipment. The remaining period will be spent on in-plant training under close super,ision. 3747 Gl/10-33 ----·--------- - 257 258 THE GAZETTE OF INDIA : EXTRAORDINARY [l' ARt ili~Et. 4] TABLE II Course Duratiou for Technicians- Thermal Power Plants -SI. Training Course Coal Based Diesel Gas Turbine No Plant Engine Based Plant Based Plattt I. Common Mechanical, Electrical · 4 Weeks 5 Weeks 4 Weeks and Instrumentation Course for Technicians. 2. Specialised Course for Technicians . (a) Mechanical 2 ½ Weeks 2 Weeks 2 ½ Weeks (b) Electrical 2 ½ Weeks 2 ½ Weeks 2 ½ Weeks ( c) Instrumentation 2 ½ Weeks .2 ½ Weeks 2 ½ Weeks 3. Specialised On Job Training for i echnicians (a} Mechanical 16 Weeks 8 Weeks ' 16 Weeks (b) Electrical 16 Weeks 8 Weeks 16 Weeks (c) Instrumentation 16 Weeks 8 Weeks 16 Weeks 4. Plant visits and evaluation 2 Weeks 2 Weeks 2 Weeks s. (b} Hydro Electric Power Stations.- (i) !he minimum duration of the training courses for the operating engineers and supervisors(Mechanical, Elechical and Instrumentation) shall be as specified in Table III for hydro electric power stations. The contents of training courses and on job training, along with respective duration, shall be as specified in Part XVII, XVIII, XIX and XX of this Schedule, appropriate to the specialized course in mechanical or electrical or instrumentation Engineering. The procedure for familiarization visits and in• plant training shall be similar to that which has been specified in respect of thermal power stations. Arrangement may be made for familiarizing the trainees with operation of Hydro Power Stations through Simulator facilities. TABLE III Course duration for Engineers and Supervisors - hydro power plants Training Course , Duration No l. . Common Mechanical, Electrical and Instrumentation 6 Weeks Course for Engineers and Supervisors. 2. Common On Job and Simulator Training for Mechanical, 7 Weeks Electrical and Instrumentation Engineers and Supervisors. 3. Specialised Comse for Engineers and Supervisors (a) Mechanical 2 ½ Weeks (b) Electrical 4 Weeks (c) Instrumentation , 2 Weeks ----'7 -- ------·------ ----- •• ' , • • ' • ['11'1 III-~. 4] 4. 5. Specialised On Job Training for Engineers and Supervisors (a) Mechanical 3 Weeks (b) Electrical 4 Weeks (c) Instrumentation 4 Weeks Plantvisits and evaluation 2 Weeks (ii) Th<;l minimum duration of the training courses for the technicians (nwchanic<1!, electrical and instrumentation) to assist the operating engineers and supervisors shall be as specified in Table IV for hydro power stations. The cgnt\lnts of tr!\ining courses !\nd on job training, along with respective duflltion, shall \Je <IS specified in Part XXI, XXII, XXIII and XXIV of this Schedule, appropriate to the specialized trade in mechanical or electrical or ins,trumentation Engineering. The procedure for familiarization visits and in­ plant training shall be similar to that which has been specified in respect of th1mnal power stations. TABLE IV Course Duration for Technicians - Hydro Power Plants S.No - Training Course Duration l, Common Mechanical, Electrical and Instrumentation Course for Technicians :l. Common On Job Training for Mechanical, Electrical and Instrumentation for Technicians · 3. Specialised Course for T0ehnicians (a) Mechanical · 4. 5. (b) Electrical ( c) Instrumentation Specialised On Joh Training for Technicians (a) Mechanical (b) Electrical ( c) Instrumentation Plant visits and evaluation 3 Weeks 4 Weeks I ½Weeks 2 Weeks 1 ½ Weeks 4 Weeks 4 Weeks 4 Weeks 2 Weeks ( d) Sub-stations and switch yards of generating stations.- Those who are expected to be engaged in the operation and maintenance of substation associated with the generatiJig station, shall be given a training of duration of not Jess than 2½ months for engineers and supervisors (mechanical, electrical and · instrumentatfon) ~nd I½ m~nths for technicians (mechanical, electrical and instrumentation trades). The minimum duration of the training courses for the operating engineers and supervisors shall be\ as specified in Table V for substations associated with generating stations. The minimum duration of the training courses for the technicians shall be as specified in Table VI. The contents of the training course and on job training, along with respective duration shall be as specified in Part XXV for engineers and supervisors and as specified in Part XXVI ofthis Schedule for tethnicians to the extent of practical job requirement .in sub-station associated with the generating station. This shall be followed by visits and in plant training. Arrangement for Simulator training may also be made. 259 · 260 -· THE GAZETTE OF INDIA: EXTRAORDINARY [PART III-SEC. 4] TABLEV Course duration for Engineers and Supervisors - sub-stations associated with generating stations S.No. Training Course ' Duration I. Common Mechanical, Electrical and Instrumentation 6 Weeks Course for Engineers and Supervisors. 2. Common On Job and Simulator Training for Mechanical, 4 Weeks Electrical and Instrumentation Engineers and Supervisors. 3. Plant visits and evaluation 2 Weeks TABLE VI Course Duration for Technicians - Substations Associated with Generating Stations S.No. Training Course I. Common Mechanical, Electrical and Instrumentation 2½ Weeks Course for Technicians. 2. Common On Job Training,Jndustrial visits and evaluation 3 Weeks (2) Facilities for creation of training institutes.- (a) The Training Institute shall have a regular building, residential and recreation facilities. (b) The Training Institute shall have a full time Principal and adequate number of teaching staff. · ( c) The Training Institute shall have adequate number of classrooms, seminar and conference hall and auditorium, library, computer centre, workshops (mechanical, electrical and basic workshops), laboratories (control and instrumentation, water chemistry and relevant testing and research facilities). The Training Institute shall have facilities for demonstration by static and working models, simulators, training resource unit supported with Appropriate reprographic facilities, Audio-visual training aides, Computer Based Training (CBT) packages, Liquid Crystal Diode (LCD), Slide and Overhead projectors. ( d) The Training Institute shall have a regular lie-up "(ith the Power Stations, Sub-stations, Load Dispatch Centres, transmission and distribution utilities including hot line training centres so as to provide training in the respective fields. · ( e) The Institute shall have facilities to arrange refresher courses for those personnel who have already experience in the operation_ and maintenance of a ·generating stition. The staff of the Training Institute shall be properly qualified and preferably undergone a specialized training course in the art of imparting training. (f) The Institute shall have networking of training facilities with the reputed educational or professional institutes: (g) Assessment forms for Engineers and Supervisors and for Technicians to assist the engineers and supervisors are given at Part XXVII of this Schedule. [ 'WT IIl-'l911's 4 l 11art11 · SYLLABUS FORENGINEERS AND·SUP·ERV:ISORS ENGAGED IN THE OPERATION AND MAINTENANCE()F THECOAL BASED THERMAL POW]?iR PLANTS Common course for Electrical, Mechanical and Instrumentation Item No. 1 I II III IV V Particulars 2 General 'Introduction: (i) World Power Scenario (ii) Growth of Power Industry in India (iii) Generation Scenario in India (iv) Transmission and Distribution Scenario in India (v) Role of Private 'PowerParticipants in India (vi) Organisation/Power Sector set up (vii) Introduction to Indian Standard specifications for Electrical wiring Concept of modern thermal station : ·Power generation from coal, Central Station and utility systems, base 'load and peaking stations, concept of unit system, typical thermal cycles, parameters, :heat rates, fuel :rates, steam rates, typical heat balance ofboiler, turbine and generator. Choice of location oflarge thermal station : Site avaifability, water requirements, .fuel, load centres, transport facilities, air · pollution, topography, choice•ofsize of generating units. Plant layout in large central station including machine arrangements, equipments layout, switchyard and .auxiliary arrangements. Constructional · details and basic principles of large pulverized fuel ·boiler.and auxiliaries (i) Water and steam drums, heaters and .tubes. (ii) Types of furnace and firing arrangement and firing system- Primary, secondary air arrangement, burner arrangement and furnace safeguard supervisory system, burner details. (iii) Economizers, primary, secondary, super heaters, pre heaters and temperatures. (iv) Forced draught, Induced draught, Primary Air exliauster, scanner and igniter air fans, and gas re­ circulation fans, compressors, seal air fan. (v) Types of coal mills, (ball/races, ball .tube, bowl roller) stoker, coal feeders, Gravimetric feeders (Raw coal feeders) Number of Hours 3 3 3 3 2 15 261 ---- --··--· - ---·~-----c:- 262 VI VII · VIII IX (vi) (vii) (viii) (ix) (x) (xi) THE GAZETTE OF )ND!A : EXTRAORDINARY Air preheaters, rotary, tubular and steam air heater Dust extraction plant- electrostatic, mechanical bottom ash system Soot blowers and Station instrument and service compressed air reciprocating and rotary compressors. Feed regulating st<1tion Boiler mountings, ,drum level indicators , safety valves, stop valves, start-up devices, sampling, chemical dosing, continuous blow down, air. vents and drain system, critical piping supports and hangers (xii) Refractories and laggings as used in modern power stations. (xiii) Ash disposal system - Dry bottom, wet bottom- scrapper feed~rs and clinker grinders. Construction and working principles of Turbine and auxiliaries, (i) Principle of operation, heat conversion cycles, types of turbines. (ii) (iii) (iv) (v) (vi) (vii) (viii) Casing steam chests, wheel blading, nozzles, diaphragms, control valves, glands, flanges and HT bolt heating, bearings, governing system. Condenser, vacuum pump, steam ejectors, cirpulating water pumps Lubrication systi!ll pumps, c~ntrifuging !fiachipes, coolers: filters, shaft turBine and lifting g~ar: Main !)ii pump, Jacking 'oil Pl!!llP, Starting oil puiup, AC- DC oil pump, EmergenFY pi! pudip.' . . . . i3oiler fee,! pump, fill .pump· iipg' aµxiliaJY eooling water system', auxiliary stearil system. Low pressure and high pressure fee,! water heaters, decaerators and evaporators, gland steam coolers, drip, air venting and drajp system ' High pressure and low-pressure by-pass systems. Automatic turbine run-up system Various types of valves, traps, their constructional details and application. Cranes, hoists- characteristics and controls Construction and working principles of · alternators and excitation systems : (i) Alternators, cooling arrangements (Hydrogen/air cooling); stator water cooling, Hydrogen sealing system (ii) Main and pilot exciters, voltage regulators, types and characteristic, amplifier and magnetic amplifier, static excitation system, Automatic Voltage . Regulation (AVR). (iii) Method of grounding. Construction and working principles of fuel handling plant equipments : 3 3 2 [PART III-SEC. 4] 10 • [ 'lT'l m-= 4 l (i) Coal Handling Plant ;- Wagon tippler, hoppers, vibratory feeders , screen and conveyor system crushers, magnetic separators and pulleys, dust suppressors, dust extractors, stacker re-claimer, rotary breakers, Merry-Go 0 Round system, (ii) Fuel oil handling plant - Oil storage tanks, unloading station oil pumps and heating arrangement (iii) Coal transportation by ship- Coal transportation by different types of s_hips such as gearless ship, geared ship, self unloading ships, ship loading and unloading equipment ·such as grab type and continuous ship loaders fun-loaders. (iv) Coal washing and blending X Construction and working principles of Ash and slag handling equipments: XI XII XIII Electrostatic precipitators, methods of conveying, pneumatic, · vacuumatic, hydraulic, bucket elevators, conveyors, screw extractor.s, ash slurry pumps, High pressure and low pressure pumps, dry ash collection. Power Environment Interface, • Environmental Management System Water Sources and treatment : (i) Raw water pumping station, domestic, circulating and boiler makeup water treatment, River salinity, local water conditions, water recovery system, their variations in different seasons and effects on power station operations. (ii) Hydrogen generating plant Fuels: (i) (ii) Solid, liquid and gaseous fuels analysis. Coal-types and suitability for different kinds of boilers-alterations in firing methods due to change of coal composition . General understanding of Basic flow diagrams m power stations practice : (i) Coal cycle. (ii) Fuel oil cycle. (iii) Air and gas cycle. (iv) Fly ash and bottom ash/ slag handling arrangements. (v) Condensate and feed heating cycle (from condenser hot well up to economizer). (vi) Water and steam cycle (from economizer to turbine inlet). (vii) Chemical dosing circuit (viii) Circulating water cycle. (ix) Governing oil, turbine oil, generator, Seal oil circuit. (x) Hydrogen filling in generator and hydrogen gland sealing of generator. Bearing cooling system. (xi) Stator water cooling cycle 263 3 3 3 264 XIV xv XVI THE GAZETTE OF INDIA: EXTRAORDINARY Direct and . closed· cooling water circuits, cooling towers - types and characteristics. D.C. and A.C. power supply for auxiliaries,.arrangements of unit and station boards, station lighting and. automatic changeover. Transformers: Main transformers, interconnecting transformers, station/unit transformers, voltage grounding transformers, type of connections, paralleling, tap changing gear. [PART III-SEC. 4] 3 3 4 XVII Outdoor switchyard- single line diagrams bus bars, circuit 4 breakers, · isolators, current transformers, potential transformers, lightning arresters, grounding. XVIII Indoor and outdoor switchgear: Types - bulk oil, minimum 4 oil, air blast, vacuum air breaker, gas breaker constructional and functional details. XIX Working principle basics of Instrumentation and I 2 measurements: Details of measuring instruments for pressure, flow, temperature, level, draught, vibration, eccentricity, conductivity, pH value, differential expansion, xx oxygen analyser, voltage, current, active power, reactive power, frequency, energy, winding temperature. Auto­ controllers, hydrogen purity meter, axial shift indicator and recorder, flue gas analysers, megger - its use for primary detection of faults, data acquisition system, digital distributed control, UPS, Unit co-ordinated· master control. Pre-commissioning/ comm1ss10ning activities-Boiler Hydraulic test, alkali boil out, acid cleaning, TG: Alkali flushing of regenerative system, acid cleaning of a.ii pipe lines. TG on barring gear, Others: Steam blower, rotor valve blasting, steam roller synchronizing Operation, control and supervision (i) General boiler start-up procedure. (ii) Operation of boilers under different loading conditions, soot blowing. (iii) Analysis of feed and boiler water, fuel, flue gas at station laboratory, Power plant chemistry-chemical operating regime and control, steam purity (iv) Banking and preservation of oilers. (v) · Demonstration wherever possible through simulators · of various operating conditions. (vi) Handling of boiler under failure conditions, (such as tripping of turbo-alternator set, high/ low drum levels, flame failure, failure of supply to,auxiliaries) and under emergency conditions such as grid 12 ' ' ' • • • • [ 'WT III-~ 4] XXI XXII failures, tube failures, fire out and furnace explosion ( vii) General start up procedure for high-pressure multi­ cylinder reheat type turbines from cold, warm and hot conditions. (viii) Handling of turbine, generator and auxiliary plant under failure conditions, such as vacuum failure, low feed water, condenser levels, excitation failure, circulating water failure, feed water heater high levels, excessive vibration, water or oil ingress in generator, failure of lubricating, sealing oil circuits and emergency conditions such as grid· failure, black starting. (ix) Alternator-synchronising, loading, parallel operations, MW and MV AR sharing. (x) Operation of vents and drains in boiler and turbine Controls and Protection - Se9.uential operation and interlocks: (i) . Unit protection and interlocks. ( ii) Boiler and auxiliaries. (iii) Turbine and auxiliaries. (iv) Combustion control-pressure, fuel, a1r and feed heating cycle. (v) Feed water and fuel heating cycle controls. (vi) Turbine governing, speed setting, speed droop setting and control circuiis. (vii) (viii) (ix) (x) (xi) (xii) (xiii) (i) (ii) Generator protection - under-voltage, over-voltage, differential reverse power, under-excitation, negative phase sequence, earth fault with types of the· relays used, Back up impedance, frequency relay, pole slipping and over current relays Importance of sequential interlocks. Transformer protection " differential, overload, earth faults, high temperature, buchholz with types of the relays used. LT/HT motor electrical protection- Types of motors and variable speed drive and speed controls. Various types of pumps arid their starting and control. Steam pressure and temperature control Furnace purging. Various types of valves, maps, their constructional details and application Fire-fighting a_nd emulsifier type protection. 21 XXIII · General safety precautions, treatment of electrical or acid or I ½ alkali bum,. permit to work, first aid, protective clothing, safety in movement and storage of materials, switchyard safety. XXIV Indian Boiler Rules, Factory Act, Electricity Act, 2003, 4 Central Electricity Authority (Measures relating to Safety 3747 Gl/10--34 265 266 THE GAZETTE OF IND!A : EXTRAORDINARY and Electric Supply) Regulations, 20 l O and other statutory Regulations concerning Power Stations (General outline), Environmental Pollution Act/Regulations. XXV General plantmaintenance procedure, PERT/CPM methods, 6 Power station records, maintenance planning. [PART Ill-SEC. 4] XXVI Efficiency and environment, plant .performance, generation 12 cost, efficiency monitoring and optimization,. stack emission monitoring and. ambient air quality. Availability Based tariff, CERC notification on-Tariff. ~I 'i1'ersonnel management, • duties and responsibilities, labour laws and !about, welfare. XXVIII ,Broad · Principles of material management and inventory control 2 2 Total I 45 ½ Hours =SWeeks XXIX 0nJob Training: 10 Weeks (le}· Control·.roomdeskoperations·: (i) Pre-start checks, .(iiJ Protection interlocks, (iii) Lightupprocedures and routine checks, (iv) Stopping and emergency .operations of Boiler, Turbine,.Generator and their auxiliaries (v) Electrical operation location and off-site plant location 2. Simulator training/Computer applications in operation and 2 Weeks maintenance of the plant _ ... _ .-s;..,""-- _____ , __ ·._ , • ' • • • ' , ['fill III-1§Ull" 4] ParHII SYLLABUS FOR ENGINEERS AND SUPERVISORS ENGAGED IN THE OPERATION AND,MAINTENANCE OF THE DIESEL ENGINE BASED POWER PLANTS Common course for Electrical, Mechanical and Instrumentation Item No. 1 I Particulars 2 General Introduction: (i) World PowerScenario (ii) Growth.ofPower.Inclnstry in India (iii) Generation Scenarioinfodia (iv) Transmission and Distribution Scenario in India (v) Role of Private Powe!'Participantsinindia ( vi) Organisation/Power Sect@r set up (vii) Introduction to IndianStandard specifications for Electrical wiring Number of Hours 3 3 II Concept of modern Diesel Power Station, Power Generation from 3 Heavy Fuels, Central Station and.,Utility systems, base load and peaking stations, concept of unit systems; he.it rates, heat balance of engines and general principles of Thermodynamics, enthalpy, entropy, etc. III Choice oflocation of large Diesel Station, Site availability,· water 2 requirement, fuel, load centers, transport facilities, air pollution, t~pography, choice of size of generating units. IV Plant layout in large Diesel Station including machine 2 arrangements, equipment layout, and switch yard and ·auxiliary arrangements . V (i) IC Engines, classification, based cm 2 Stroke,4 Stroke, SI, CI, comparisons, difference between CI and SI, classification by cylinder arrangements, engine parts and . materials used, indicated thermal efficiency%, mechanical efficiency %, specific fuel consumption, air fuel ratio, caL value .of fuel, etc. (ii) Air standardcycles, thermodynamic relations, parameters, Camc;,,-cycle, Stirling cycle, Ericsson cycle, Lenoir cycle, Auto cycle, Dual cycle, Diesel cycle, Atkinson cycle, Brayton cycle, fuel air cycles, varibus ·losses,. effect of variables -such as compression ratio, fuel ratio, etc., difference between real cycle and fuel air cycle, etc. (iii) Petroleum fuels, introduction and structures, refining processes and products, •Diesel fuels, octane number, cetane number, calorific value, viscosity, flash point, pour point, sulphur content, ash. content, asphaltens, water and 18 ------------~ -~---- --~-" - •>-,;_...,, __ --- 268 THE GAZETTE OF INDIA : EXTRAORDINARY [PART lll-SEC. 4] VI "'"' ---- -- - sediment content, catalytic fines, problems caused by heavy fuels. (iv) Combustion: - i~ IC engines, air fuel ratio - delay period _ and factors affecting it - Diesel knock , theory and methods of control, observations of burning of gases - cold starting of IC engines and aids. (v) Super charging objects - cycles - methods - effects of supercharging on performance of the engme superchargers - turbo charging and methods (vi) Dual fuel and multifuel engines - combu~don and factors affecting combustion - characteristics of multi fuel engines - suitability of various engines as multi fuel unit - performance of multiple engines. (vii) Engine - friction and lubrication - lubrication principles - bearing lubrication - functions of lubricating system - properties of lube oil -. additives - classification of lube oils, filters - crank case ventilation. (viii) Engine cooling - areas of heat flow - heat transfer - · piston and cylinder temperature - quantity of water required - cooling systems - air cooling, water cooling and comparison, re - cooling of water, radiators , cooling fans, thermostatic control, etc. (ix) Constructional features of engine - crank case - crank· shaft - main and connecting rod bearings - connecting rod - piston, crown and ring·s, cylinder liners, cylinder head - exhaust and inlet valves - fuel injection pump - injectors - cam shaft push rod_s - tappets - rocker arm etc. (x) Performance and Testing of Engines basic measurements - speed - specific lube oil consumption - air consumption - exhaust smoke - emissions - BHP - FHP and IHP measurements, de-rating of engines.etc. (xi) Air pollution - pollutants - Diesel emissions - smoke and control - Diesel odour co):ltrol - comparison of Diesel and other fuel emissions. · Construction and working principles of D.G. plant auxiliaries : 18 (i) Heavy fuel oil handling system: - railway siding, package boiler - transfer pumps - storage tanks, dip measurements,' temperature _and density corrections, shrinkage - heat tracing and controls - measurements of fuel parameters -­ such as viscosity, density, flash point, sulphur content, ash, water content, acidity, calorific value, carbon residue, pour point, fire fighting arrangements in the HFO storage atea. · (ii) HFO Purifiers: - function of HFO centrifuge - purification -"_ clarification - principles of centrifugal pump - component parts of separator and separator plant - layout diagram: of separator plant - sectional view of separator - operating cycle of separator plant - recommended separator_ temperatures - sludge removal , sludge transfer pump. ' ' ' [ 'WI III-<!!!"& 4 l (iii) Common Heavy fuel oil System: - functions of settling tanks, service tanks - heavy fuel transfer pump - · heat tracing of settling and service tanks and temperature control.· (iv) Diesel Handling system: - transportation modes - measurements - storage - fire fighting arr11ngements etc., common diesel oil systems - transfer pump etc. (v) Common Lube . Oil System: , - transportation measurements - storage measurement of lube · oil . characteristics· such as flash point kinematic viscosity - viscosity index, TBN value, insolubles in Hexane and Toluene. (vi) Cooling water Treatment :- Choice of water a~ refrigerant - classification of water - matter present in water - analysis of water for acids, bases and salts - pH value - disadvantages such as incrustation, sediments - galvanic corrosion - battery effect - influence of chlorides and sulphites ·- cavitation, protection methods - plant cooling water system and boiler water treatment methods and systems. (vii) Engine cooling water system and injector cooling water system. Detailed analysis of single fine P&I diagram. (viii) Air Intake System: - oil bath filters - silencer - over speed butter . fly and pressure relief valves - air temperature control methods. Detailed analysis of single line P&I diagram. (ix) Exhaust Gas System: - general flow diagram - recovery boiler. - exhaust gas regulating valves - silencer - expansion joint, etc .. (x) Compressed Air:- classification of compressors - operation of single and multistage compressors - maintenance problems - detailed analysis of P&I diagram of plant common air and unit control air .compressor systems. (xi) Governor: - governor components - basics of hydraulic and mechanical governor - speed droop, governor oil, and introduction to electronic governing - comparison with · mechanical governor - over speed shut down. (xii) Effluent Treatment Plant: - collection pit - decantation pit - sludge pit - buffer pit - decanter unit - deoiler unit ~ fuel recovery - coalescent filter. (xiii) Fuel and lube oil system:-detai)ed analysis of P&I diagram of unit fuel oil system and lube oil system - viscosity regulators. (xiv) Properties of Steam: - formation of steam, definitions connected with steam - steam tables - Mollier diagrams - classifications of boiler - waste heat recovery· - detailed analysis of P&I diagrams of common and unit steam systems. VII Various types of valves, traps, their constructional details and 4 application, cranes hoist characteristics and c,;introls. 269 270 THE GAZETTE OF INDIA : EXTRAORDINARY VIII Construction and worlang principles of alte~ator and excitation systems: · · (i) Alternator, Cooling Arrangements. (ii) Static Excitation Systelli, Automatic voltage regulator. (iii) Method of Grounding, IX D.C and A.C power supply for auxiliaries, arrangement of unit and station switch cubicles, station lighting and auto.matic change over. X Transformers - Main transformers, interconnecting transformers, station/unit transformers, and 11eutral grounding transformers, parallel operation of transformers, on load and offload tap changing gears. . . [PART IIl-'SEC. 4] 4 2 3 XI Outdoor switch yard :- Single line diagrams, bus bars,• circuit 3 breakers, isolators, current and potential transformers, lightning arrestors; , importance of earth mat grounding .. XII Indoor and Outdoor switch gear - 3 Types - bulk oil, _minimum oil, air blast, SF6 , and vacuum circuit breakers, construction and functional details XIII XIV Working principles . and basics of instrumentation and measurements : Details of measuring instruments for pressure, flow, temperature, level, vibration, eccentricity, conductivity, pH values, differehtial expansion, current, voltage, frequency, active and reactive power, energy, megger - its use; multimeter, data acquisition.· system, digital distributed control, UPS, pr6gramlllable logic controller. · Operation, control and supervision : (i) General startup procedure, manual. and automatic starting, change over to heavy fuel · (ii) Operation of engine under different loading conditio,9s. (iii) Engine safety :- Crank case pressure, mist concentration monitor, lube.oil, ultra low pressure and jligh temperature, jacket water high temperature, over speed tripping, common electrical faults, turbo charger, lube oil outlet high temperature, fuel oil · low pressure, jacket water low pressure, engine inlet air high temperature, etc. (iv) Starting and running - in, of the engine after overhaul - precautions . . (v) . Load reduction, normal stopping, and emergency stopping, rinsing·operations. (vi) ·0peratfon and supervision of running DG sets, rinsing. (vii) Operating anomalies - causes and remedies. (viii) Precautions to be taken for restarting engine after long period of immobilization . . (ix) Alternator , synchronizing, loading , parallel operation, MW and MVAR 6 9 ' ' • [ 'WI III-~ 4 J XV Controls and Protection :- Sequential operation and inter locks_:: 6 detailed study of logical -diagrams of PLC, transformer protection - differential, over load, earth fault, oil and winding high temperature, Buchholz relay, etc., LT and HT motor electrical protection, types of motors, variable speed drives and controls, generator protection ~ under and over voltage, differential, reverse -power;under excitation, negative phase sequence, earth 'fault, etc., various types of pumps, their starting and controls, neutral shift relay, etc. - XVI Fire Fighting and emulsifier type of protection. XVII General Safety precautions; treatment ofelectrical or acid or alkali 2 burns, work permits, first aid, protective clothing, safety in movement and storage of materials, switch yard safety. XVIII Indian Boiler Rules, Factory Act, Electricity Act, 2003, Central 4 Electricity Authority (Measures _ relating to Safety and Electric Supply) Regulations, 2010 and other statutory Regulations concerning power stations, Environmental _ Pollution Act/ Regulations. XIX General Plant Maintenance procedure, PERT/CPM methods, 3 power station records; maintenance planning. XX Efficiency and environment, plant performance, generation cost, 9 efficiency monitoring .and optimization, stack emission monitoring and ambient air quality, fuel and lube oil conservation and minimization of auxiliary losses. Availability based tariff, CERC notification on tariff. XXI Personnel management, duties and responsibilities, labour laws _ 3 and labour welfare. XXII 13road Principles of material management and inventory control 2 Total 110 Hours :4 Weeks XXIII On Job Training: (!) Control Room Desk Operations: 2 Weeks (i) Preslar! Checks. (ii) Protection and starting inter locks. (iii) Routine checks such as leakages, pressure, temperatures, levels, operation of air, fuel, lube oil filters, checks for lubl) oil flow in the engine and turbocharger, oil_ seal pressure, checks for rio water, no oil or fuel leaking from decompression cocks, checks for abnormal noise, mist concentration, crank case pressure, starting. air pressure, cylinder temperature after running, bearing temperatures, - 271 m (iv) (v) THEGAZETTEOFIND~:EXTRAORDmARY starting firing sequence. Stopping under emergency conditions of engine, generator and auxiliaries, rinsing operations On site Electrical operation location and off site plant locations. · (vi) Simulator Training/Computer applications in operation and maintenance of the plant. [PARrUI-SEc. 4] 2. To be associated with field maintenance Engineers in. the area 2 Weeks (i) Fuel handling and purifier (ii) Compressor and ETP (iii) JW, LO Seal Pumps and drive, chemical dosing system .(iv) JW, IW level controllers viscosity Regulations (v) Charge air Regulations, cyl. temp.monitor (vi) Engine air modular protection including calibration of inputs and setting of thresholds · (vii) Starting air control equipment and ti.ring sequence. (viii) Steam system level controllers, calibration, press controllers, boiler circulating water pumps, condensate transfer pumps, etc. (ix) NDT and Welding Part IV SYLLABUS FOR ENGINEERS AND SUPERVISORS ENGAGED IN THE OPE.RATION AND MAINTENANCE OF THE COMBINED CYCLE GAS TURBINE BASED POWER PLANTS Common course for Electrical, Mechanical and Instrumentation Item No. Particulars Number of Hours 1 2 I General Introduction: II III IV (i) World Power Scenario (ii) Growth of Power Industry in India (iii) Generation Scenario in India (iv) Transmission and Distribution Scenario in India (v) Role of Private Power Participants in India (vi) Organisation/Power Sector set up (vii) Introduction to Indian Standard specifications for Electrical wiring Concept of Gas Turbine: power generation from petroleum fuels such as naphtha , gas, modular NGL Central Station and utility systems, base load and peaking stations, concept of system, typical . Open and Combined cycles,_parameters, heat rates, fuel rates, steam_ rates, typical h(l!lt balance of gas turbine, waste heat rncovery boiler and turbo generator. · Choice of location of large Gas Power Station: Site availability, water requirements, fuel supply centers, air pollution, topography. Plant layout in large central station including machine arrangements, equipment layout, switchyard and auxiliary arrangements. 3 3 3 3 2 ---- ------------- -- --- • ,,. ' • • V Constructional details and basic principles of gas turbines. VI VII VIII IX X (i) Air filters (ii) Compressors (iii) Furnace chamber (iv) Gas turbine Gas Turbine Air Intake inlet air filtration, Exhaust system and Compressor System, Gas turbine auxiliaries and governing system, Air compressor and Air drawing'system Construction and functional features of steam turbine and auxiliaries, governing system; oil system, control valves · Construction and working principles of Alternators and excitation systems: • · (i) Alternators, cooling arrangements (hydrogen/air cooling), stator water cooling, hydrogen sealing sysJ~m. (ii) Characteristic amplifier and magnetic ·. amplifier, static excitation system, Automatic Voltage Re~lation (AVR) . (iii) Method of grounding. Fu~] handling, storage and supply, fuel characteristic General understanding of Basic flow diagrams in power station practice: (i) Fuel cycle (ii) Air Cycle XI · Direct and closed cooling water circuits, cooling towers, types and XII XIII XIV xv XVI characteristics. · D.C. and A.C. power supply for auxiliaries, arrangements' of-unit. and station boards, station lighting and automatic changeover. Transfonners: Main transfonners, interconnecting transformers, station/unit transformers, voltage grounding transformers, type of connections, paralleling, tap changing gear: Outdoor switchyard, single line diagrams, busbars, circuit breakers; isolators, current transformers, potential · transformers, lightning arresters, grounding. Indoor and outdoor switch gear: Types - bulk oil, minimum oil, air bla.st, SF6 , and vacuum circuit breakers, construction and functional details. Working principle and basics oflnstrumentation and measurements: Details of measuring instruments for pressure, flow, temperature, level,, draught, vibration, eccentricity, conductivity, pH value, differential expansion, oxygen analyzer, current, voltage, active power, reactive power, frequency, energy, winding temperature. Auto-controllers, axial shift indicator and recorder, flue gas 3747 G//10--35 --- ----~- ·------- 12 6 6 6 3 6 2 3 3 3 8 Y/3 --.----:;..,~-· 274 XVll XVIll XIX xx THE GAZETTE OF INDIA : EXTRAORDINARY analyzers, Megger - its use for primary detection of faults, data acquisition system, digital distributed control, UPS, Unit co-ordinated master control. Precommissioning/ Commissioning Activities Operation, control and supervision (i) General gas turbine start-up procedure. (ii) Operation of gas turbine under different loading conditions, (iii) Analysis of water, fuel, at station laboratory. (iv) Demonstration wherever possible through simulators of various operating conditions. · · (v) Handling of gas/steam turbine under failure conditions (such as tripping of turbo-alternator set, failure of supply to auxiliaries) and Uf\der emergency conditions such as grid failures, tube failures, fire out, etc. · _ (vi) <Jenera! start up procedure for highcpressure turbines from cold warm and hot conditions. (vii), Handling of turbine, generator and auxiliary plant under failure conditions, and emergency conditions such as grid failure. (viii} Alternator-synchronizing, loading, parallel operations, MW and MV AR sharing. (ix) Water Treatment and water chemistry, R O System and mesied hed, Boiler meter internal treatment Controls and Protei::tion - Sequential operation and interlocks: (i} · Unit protection and interlocks. (ii) Gas turbine and auxiliaries. (iii) Steam Turbine and auxiliaries. (iv) Comb!lstion control-pressure, fuel, air cycle, (v) Turbine governing, speed setting, speed droop setting _and control circuits. (vi) Generator protection, under;voltage, over-voltage, differential, reverse power, under-excitation, negative phase sequence, earth fault and types of relays used. (vii) Importance of sequential inters locks. (viii) Transformer protection - differential, overload,, earth faults, high temperature, Buchholz and types ofrelays used. (ix) LT/HT motor electrical protection (x) Types of motors and variable speed drive and speed controls, (xi) Various types of pumps and their starting and control. (xii) Steam pressure and temperature control including automatic detection and alarm system for naphtha fuel handling / storage. (xiii) Furnace purging. Fire-fighting equipment and permanent fire fighting appliances including automatic detection. [PARr Il!-Soc. 4] 4 22 18 • ~--~----.~-------------::_-::._-_-.. -----~--------_ --=---=---=---=---=--.-_-_-_-_-_~~-------. -_-~.-. ~--=-_-_-_-__ -_ -.-_-- [ '1l'T IIl-"W6 4 J XXI XXII XXIII XXIV General safety precautions, treatment of electrical or acid/ alkali -­ bum, permit to work, first aid, protective clothing, safety in movement and storage of materials, switchyard safety,safe handling_ of naphtha fuel in transport, storage. and in gas turbines, Indian Boiler Rules, Factory Act, Electricity Act, 2003, Central Electricity Authority (Measures -_ relating to Safety and Electric Supply) Regulations, 2010 and other statutory Regulations concerning .Power Stations (General outline), Environmental Pollution-Act/Regulations. General plant maintenance procedure, PERT/CPM methods, power station records, maintenance planning. Efficiency and environment, plant performance, generation cost, efficiency monitoring and optimization, stack emission monitoring and ambient air quality. Availability Based Tariff, CERC notification on Tariff, Gas Turbine Emission guideGnes and control methods, Non emission target levels, Power output allowance, Heat recovery allowance, emission levels for other contaminants _ · XXV Personnel management, duties and responsibilities, labour laws and labour welfare. XXVI Broad Principles of material management and inventory control 2 4 6 9 2 Total 140 Hours XXVII On Job Training: (I) Control room desk operations: (i) Pre- start checks, (ii) Protection interlocks , (iii) Light up procedures and routine checks, (iv) Stopping and emergency operation _of Boiler , Turbine , (v) Generators 'and their auxiliaries (vi) On site Electrical operation location and off-site plant location 2. Simulator training/Computer application m operation and maintenapbe of the plant :4½ Weeks 7Weeks 1 Week trs 276 --~ THE GAZETTE OF INDIA : EXTRAORDINARY PartV SPECIALISED SYLLABUS FOR ENGINEERS AND SUPERVISORS ENGAGED ON THE MECHANICAL SIDE OF THE COAL BASED· THERMAL POWER PLANTS Item No. 1 I II III IV V Particulars 2 Boiler: Corrosion of boiler and auxiliaries, condenser and feed water heating plant, Scale formation in boiler in relation to wtler conditions. Acid cleaning and preservation of boiler, mechanical removal of deposits, scaffolding methods, quick-erect scaffolding in fum,,ce, ultra-sonic thic~ess survey. High pressure water jet equipment Annual boiler and auxiliaries overhaul- hydraulic test, floating of safety valves, preventive and· breakdown maintenance of boiler auxiliaries, cutting of tubes and welding, ultrasonic testing and stress relieving. Efficient _operation of boilers- intetpretation of gas analysis for proper combustion controls and methods of reducing other losses. Constructional details of hydraulic and other types of couplings, torque converters, servo motor. [PART Ill-SEC. 4] Number of Hours 3 4 6 12 8 3 VI Constructional details of various types of pumps, their drives and 9 automatic starting, air-conditioning. Constructional details of - various types of draught fans, their drives and automatic starting. · Types of wear on fans arid pumps and their effects, detection of unbalance in fans and pumps, instruments for measuring vibrations, vibration analysis and dynamic balancing procedures, noise measurements and control. VII Coal handling plant: 12 (i) Sequential Operation. (ii) Conveyor and conveyor drives. (iii) Tensioning arrangements. (iv) Maintenance of guide rollers/ idlers. (v) _Sway·switches/slip switches. - (vi) Beetle charger for wagon marshalling. (vii) Wagol). tipplers and coal crushers, weighing of coal, different types of weighing bridges and meters, Coal storage problems and prevention of spontaneous combustion. Sampling of coal/British •Standards Specification/ltidian Standards Specification, procedure and proximate analysis. (viii) Belt jointing methods-vulcanising, mechanical clamping, etc. • " [ <!JTf 111-~ 4] VIII IX "!Ra <fi"T ~ : 3rnl'lR"I (ix) Stacker re-claimer. (x) Vibrating feeders, vibrating screens. (xi) Magnetic separators. (xii) Coal· crushers. (i) Working principle and construction of water treatment plant. (ii) Water treatment-hardness, pH value, clarifiers, treatment; phosphate and hydrazine dosing, base exchangers. (iii) DG sets and compressors Annual overhaul and inspection of turbine and auxiliary plant, condenser tube cleaning, maintenance of pumps, lubrication system, recycling of lubricating oil and· selection of lubricant, condenser tube materials- wear and tear and effect of local water conditions, types of failure, detection, preventive maintenance and re-tubing of condensers, Maintenance of LP / HP heaters and de- aerators. 6 9 X 12 (i) Maintenance practice - Rigging and slinging, valve grinding methods, high pressure welding heat insulation methods, pipe work, aligmnents, bearing, scraping and matching practice, radiography and stress relieving methods. Anti-friction bearings and their installation and lubrication . . Non destructive testing and principles, procedures and application. Welding techniques and equipment. (ii) Lubrication principles and their characteristic. ~ 2 ~I ~v xv XVI XVIL XVIII Indian Boiler Regulations and other statutory Regulations. Workshop, types and use of hand tools and tackles, fabrication of spares, repairs and maintenance of mechanical equipments such as · vehicles, tractors, dozers, shunters, cranes and hoists, welding - modem techniques · and their applications iri maintenance of boilers, turbine and associated plant Composition, properties and behavior of Engineering materials used in power stations. Residual life assessment and extension methods Mechanical safety rules and policies Maintenance planning and spares inventory, productivity, cost control. Simulator Training 10 6 6 4 6 60 175 Hours Total =6 Weeks 4 weeks On Job Training: To be associated with field maintenance Engineers in the area of: (i) Pressure parts maintenance (ii) Rotary equipment maintenance (iii) Pumps and dri_ve maintenance (iv) NDT and welding (v) Turbine and auxiliaries maintenance Z/7 278 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III-SEC. 4] Part VI SPECIALISED SYLLABUS FOR ENGINEERS AND SUPERVISORS. ENGAGED ON THE MECHANICAL SWE OF DIESEL ENGINE BASED POWER PLANTS Item No. 1 I. II. III. IV. V. Particulars Number of Hours 2 3 Constructional details of hydraulic and other types of couplings, 2 torque converters - servo motor. Constructional details of various types of pumps, their drives and 5 automatic starting, air conditioning. Constructional details of various types of ventilation fans, and automatic starting, types of wear on fans and pumps and their effects, detection of unbalance in fans and pumps. Instruments for measuring vibrations, vibration analysis. and dynamic balancing procedures, noise measurements and control. Fuel handling plant: Detailed operation and maintenance of fuel 2 stock yard, fuel purifiers, heat tracing, transfer pumps, settling aiid service tank, etc., (i) Water Treatment~ quality of water, dozing of chemicals . - . I for cooling water and boiler water. Study and effects of water quality parameters .. (ii) Compressors. Scheduled Overhaul and inspection of engirie and auxiliaries of the Plant: · (i) Scheduled engine maintenance works required at I 500 hours, 3000 hours, /iOOO hol!rs, 12000 hours and 24000 hours; maintenance procedures of lubricating oil pt.imps, jacket water pump, etc., recycling of lubricating oil and monitoring of lube oil parameters. (ii) Types of failures in the engine, break down maintenance, carrying out hydraulic tests on cylinder heads, exhau~t valves etc., calibration of injectors and fuel oil pumps (iii) Maintenance of Turbocharger, dismantling, checking the bearings, Compressor wheel, turbine shaft and blades, cleaning, measurement of clearances on the compressor as well as on the turbine side, before and after - dismantling. Turbo charger washing !'1ethods. (iv) Routine checking of oil pressure, water pressure, inlet and outlet temperature, operating condition monitoring, types of failures and detection, scheduled maintenance works · 3 15 • • • t '1ilT 111~~ 4) VI VII. VIII. IX X such as bowl cleaning, replacement of clutch shoes, vertical and horizontal bearing, de-sludging operation, starting and stopping of separators. Maintenance practice, valve grinding, lapping, . high pressure welding, heat insulation methods, pipe work and alignments. Motor. and pump coupling alignments, bearing, scraping and matching practice, radiography and stress relieving methods, antifriction bearings and their install.ation and lubrication. Non destructive testing and principles, procedures and· application. Welding techniques and equipments. Replacing of oil seals and bearings, reconditioning of inlet valves, exhaust valve, fuel pumps, etc., maintenance of boiler circulating and condensate transfer pumps, recovery, boiler backwash, etc. Workshop, types and use of hand tools and tackles, fabrication of spares, repairs and maintenance of mechanical equipment such as fork lifts, cranes, hoists, welding ~ modem techniques and their applications. Composition, properties and behavior of Engineering materials used in power stations. Residual life assessment and extension methods. Mechanical safety rules and policies. 9 2 5 6 4 'Il9 m s Maintenance planning and spares inventory, productivity, cost control. 61 Hours Total = 2 Weeks --- ---~--·--·----~- -~.-~--------- ---------·· ·-~------ 280 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III-SEC. 4] Part VII SPECIALIZED SYLLABUS FOR ENGINEERS AND SUPERVISORS ENGAGED ON THE MECHANICAL SIDE OF THE COMBINED CYCLE GAS TURBINE BASED POWER PLANTS Item No. 1 I II III IV V VI VII VIII IX Particulars 2 Waste heat recovery boiler: C~rrosion of boiler and feed water heating plant, scale formation in boiler in relation to water conditions. . Acid cleaning and preservation of boiler, mechanical removal of deposits, auxiliary cooling water system, by pass stack and its features. Constructional details. of hydraulic and other types of couplings, torque converters, servo motor. Constructional details of various types of pumps, their drives and automatic starting, air-conditioning, various types of draught fans, their drives and automatic starting. Types of wear on fans and pumps and their effects,. detection of unbalance in -fans and pumps, instruments for measuring vibrations, vibration analysis and dynamic balancing procedures, noise measurements and control. (i) Water treatment- hardness, pH value, clarifiers, treatment, phosphate and hydrazine dosing, base exchangers. (ii) DG sets and compressors. Power cycle, piping, fittings, valves and thermal insulation, Gas turbine overhaul procedures. Annual overhaul and inspection of turbine and auxiliary· plant, condenser tube cleaning, maintenance of pumps lubrication system, recycling of lubricating oil and selection of lubricant, condenser tube materials- wear and tear and effect of local water conditions, types of failure, detection, preventive maintenance and re-tubing of condensers. Maintenance practice - Rigging and slinging, valve grinding method.s, high pressure welding, heat insulation methods, pipe work, alignments, bearing, scraping and matching practice, radiography .and stress relieving methods. Anti-friction bearings and their instaHation and lubrication .. Non destructive testing and principles, procedures and application. Welding techniques. Alignment methods. Number of Hours 3 6 3 6 3 5 6 6 12 10 . ' • ' • • ['WT III-'-= 4] 3747 Gl/10-36 X XI XII XIII XIV xv Indian Boiler Regulations and other statutory Regulations. _Workshop, types and use of hand tools and tackles, fabricatiC)ll of spares, repairs and maintenance of mechanical equipments such as vehicles, tractors, dozers, shunters, cranes and hoists, welding - modem techniques and their applications in maintenance of boilers, turbines and associated plant. Composition, properties and behavior of Engineering materials used in power stations. Residual life assessment and extension methods/Mechanical safety rules and policies Maintenance planning and spares inventory, productivity, cost control. Total On Job Training: To·be associated with field maintenance Engineers in the area of: (i) (ii) (iii) (iv) (v) (vi) Pressure parts maintenance Rotary equipment maintenance Pumps and drive maintenance NDT and welding . Turbine and auxiliaries maintenance. Steam and Gas turbine maintenance: Inspection of combustion chamber, replacement of liners, air filters, acid and alkaline cleaning of water coolers, NDT, governor bearing inspections, exhaust area inspection, replacement of guide vanes, cleaning of blade cooling passage, maintenance of bleed valves, compressor cleaning . 2 6 2 3 6 76 Hours =2 ½ Weeks 4 weeks 281 THE GAZETTE OF INDIA : EXTRAORDINARY [PART Ill-SEC. 4] Part VIII SPECIALISED SYLLABUS FOR·ENGINEERSAND SUPERVISORS ENGAGED ONTHE ELECTRICAL SIDE OF COAL,DIESEL ENGINE AND GAS TURBINE BASED POWER PLANTS Item No. Particulars 1 2 l. Maintenance and commissioning of generators, excitation system, generator seals, Generator protection- earth fault in rotor and stator, negatfve phase sequence, loss of · excitation, differential protection, back up protection, reverse power protection, under-voltage protection, overload protection, constmctional · details- of the relays. used, method of setting and their testing, and over heating ofrotors. II Motor maintenance Ill Transformer protection - Buchholz relay, over current, differential and·earth fault protection,.types of relays used, their constructfon, _testing and settings. IV Transformer commissioning, di•elcctric strength of oil, insulation resistance, tap changers, filtration of oil, pre­ commissioning testing. Tan•Delta resistivity of oil and preventive maintenance oftransformers, dissolved gas analysis. V Circuit bn;akers, commissioning and maintenance, isolators, dis­ connectors, bus,bar arrangements, charging, synchronising with the grid, disconnecting for repairs, maintenance of switchgear contactors. VI Maintenance of equipments in the outdoor switchyard, current transformers, potential transformers and lightning arrestors, operation and maintenance.' Bus differential protection. VII Thermography monitoring VIII Line protection, fault analysis, bus-bar and local breaker back-up protection (LBB). IX Cables - control cables, layouts of equipments at voltage excee_ding 650V, testing and maintenance. X XI Principle of electronic controls and transistorised circuits. Pneumatic and di-electric transmitters and receivers, servo­ motors. Number of Hours 3 12 4 3 3 4 4 2 4 4. 5 6 • '1:. - --·--------------------------~-- ' • ["IT'Tlll"&1".s4] XII Interlocking, sequential control circuits, details_ of components 7 use9. XIII Calibration and testing of various types of instruments - 8 indicating instruments, measuring instruments, recorders, and analysers. XIV Statutory Electricity Acts and Rules and permit procedure 4 XV Starting and control equipments -of various types of motors, JO station battery-care and · maintenance, trickle charging and extended charging, operation and maintenance of rectifiers and battery chargers, UPS, emergency-power supply. XVI Economic load dispatch, power system control and operation, 8 MVAR-control,. voltage Regulation and frequency . control, capacitors and reactors, islanding schemes, carrier · current equipments, telephones, telernetering. XVII Station Emergency lighting arrangements .. XVIII Simulator Training 30 XIX Total 119 Hours :i.4 Weeks On Joi> Training (Applicable only for Engineers and Supervisors engaged ori Coal and·Gas Turbine based plants): To be associated with field electrical maintenance in the area of: (i) HT/LT lliOtors (ii) Transformer maintenance (iii) AC/DC supply systems, station batteries and DG sets (iv) Generator/ excitation systerns (v) Switchyard / switchgear equipment maintenance ..,.,__ ,. --------------·--------- - 4weeks 283 284 THE GAZETTE OF INDIA : EXTRAORDINARY - [PART Ill-SEC. 4] Part IX SPECIALISED SYLLABUS FOR ENGINEERS AND SUPERVISORS ENGAGED ON THE INSTRUMENTATION SIDE OF COAL, DIESEL ENGINE AND GAS TURBINE BASED POWER PLANTS Item No. Particulars Number of Hours 1 I. II. III IV. V. VI. VII. 2 Working principles, calibration, control_ methods and maintenance aspects of temperature measurement devices: (i) Resistance thermometers, thermocouples - (ii) Recorders, indicators (iii) Transmitters. Working principles, calibration, control methods and maintenance aspects of pressure measurement devices: (i) Diaphragm gauges, Bourdon gauges· (ii) Recorders, indicators (iii) Transmitters. Working principles, calibration, control methods and maintenance aspects of flow measurement devices: (i) Positive, semi-positive, rate and differential pressure flow meters (ii) Recorders and indicators (iii) Transmitters. Working principles, calibration, control methods and maintenance aspects oflevel measurement devices: (i) Dip-sticks, sight glass, pressure gauge bellows / diaphragm, float, buoyancy, gas purge, differential pressure and capacitance type level measurement system (ii) Recorders and indicators (iii) Transmitters: Telemetering and signal conditioning - pneumatic systems, electrical systems, electronic systems and maintenance aspects. Basic electronics - Component familiarisation and various -types of circuits, microprocessors - - Turbovisory, instruments - their basic principles, application and calibration: - (i) · Eccentricity and vibration, its interpretation and measurements, different pick-ups, their location, etc. (ii) Use of vibration instruments and analysis, differential expansion, measurement and interpretation, different pick-ups, their location, etc., overall thermal expansion 3 4 4 4 -4 3 2 6 [ "l]T! III-1sf1!6 4 l VIII. IX X XL XII. XIII. XIV. measurements, · axial shift position measurements, valve position and servo motor position indicators, differential metal temperature measurements, turbine stress evaluators Actuators: Operating principles of pneumatic, hydraulic and electrical actuators and their control mechanisms, maintenance, inspection and testing aspects. Analytical instruments: Theory and working principles- steam/ water analysers, like conductivity, pH, Na, NH3, Hydrazine etc., theory and working principles of combustion monitoring instruments such as CO2, 0 2, etc., interpretation of the above parameters to the operating regimes of the plant. HP/LP bypass and PRDS system: Piping schematic with details of various valves and transmitters, Equipment details - mechanical and electrical, Control philosophy, Pre-commissioning checks and commissioning procedures. Instrument air system: Air Supplier, piping and piping layout, air purification and conditioning, basic theory and working principles of pneumatic transmitters and secondary instruments, theory and working principles of E/P converters and valve positioners . Control and Instrumentation scheme tracing: Instrumentation and control scheme of fuel, air, flue gas, feed water and steam systems including their measurements (i) Furnace Safeguard Supervisory System (FSSS), plant equipment protection and interlock system. (not applicable for DG Plant and Gas Turbine based Plant) (ii) Automatic turbine run-up system (ATRS), analog and digital controllers. (not applicable for DG Plant) Data acquisition system/digital distributed control (DDC), UPS, control room layout 2 4 6 2 9 9 6 Total 65 Hours =2 Weeks XV On Job Training: (Applicable only for Engineers/Supervisors engaged on Coal and GasTurbine based plants) (i) Control system - basic principles, constructional features, calibration, preventive maintenance and 3 weeks 285 286 THE GAZETTE OF INDIA : EXTRAORDINARY trouble shooting of analog control systems, level, flow, pressure and · temperature control systems, component I cards .used in control systems, static and dynamic. timing, control valves and dampers (ii) Data acquisition system. or distributed digital control system - basic principles, constructional features, calibration, preventive maintenance and trouble shooting of digital and analog inputs to DAS and their conditioning, 1/0 and interface, functioning of alarms, monitoring formats and logs, sequence of events PartX [PART III-SEC. 4] 1 week SYLLABUS FORTECHNICIANS ENGAGED INTHE OPERATION AND MAINTENANCE OF THE COAL BASED THERMAL POWER PLANTS Common course for Electrical, Mechanical and Instrumentation Item Particulars No. 1 2 I. II III IV. V. Vl. VII. VIII. Power plant familiarisation Fundamental units and their conversion (mechanical, electrical, thermo-dynamic). Engineering drawing and practice. Fuels and combustion, types of fuels - their properties and testing, requirement of efficient combustion Boiler and boiler house plant and auxiliaries : (i) General description (ii) Arrangement of boilers (iii) Boiler auxiliaries (iv) Boiler instrumentation (v) Fabrication and assembly of different parts .of boiler and' its accessories (vi) High pressure welding in boilers ( vii) Arrangement of pulverised fuel boiler in a modem thermal power station (viii) Operation appreciation (start-up, running and shutdown) Water conditioning, pre-treatment and demineralisation, water chemistry. Ash handling- electrostatic precipitation and mechanical dust collector- functions and description of two types. Turbine and turbine house auxiliaries. (i) Fundamental principle of steam t~rbine (ii) Theory and operation of steam turbine (iii) Governing and protection of turbine (iv) Operation appreciation (start-up, running and shutdown) Numbers of Hours 3 6 2 6 4 16 4 2 12 --.· ---~~-------------------- • • IX. Handling of turbines and boilers under emergency conditions. X. Condenser and vacuum extraction plant : (i) Purpose and function (ii) Construction of surface condenser and.vacuum pumps XI. Regenerative feed water heating, constructional details of low pressure and higb pressure feed water heaters, de-aerators and evaporators. XII. Cooling water systems and cooling towers. XIII. XIV. XV. XVI. XVII. Flow diagrams of basic cycles and scheme tracing : (i) Coal handling. (ii) Steam and condensate (iii) Ash and slag handling (iv) Station services - domestic water, air conditioning, ventilation, lifts (v) Air services, air compressors, switchgear (vi) Bearing cooling, and general service water system (vii) Circulating water system (viii) Feed water and reheating plant (ix) Fuel oil system (Xf' ·station batteries and battery charging equipment (xi) Station lighting, power supply and distribution boards. Mechanical appreciation.- correct use of machines, tools and tackles, gauges, l.its anddearances, tolerances, brazing, soldering and welding, bearings, gears and thread, fasteners Bearings types, installation and removal procedures and maintenance of clearances and tolerances, oil seals types, their applications and clearances. Lubrication and coo.ling principles. Station instrumentation and controls .. XVIII. Fire-fighting installations in thermal power station. ) 4 3 2 16 6 2 2 8 3 XIX. Electric shocks, first aid, acid burn, alkali wounds, chlorine gas 3 poisoning and their treatment. XX. Duties and responsibilities of operators and plant attendants, 2 carrying out instructions, reporting to supervisors, recording and ,eading unusual' occurrences, expected behavior, discipline, sincerity, c)eanliness and love for machines. XXI Personnel. safety equipment, cleanliness, caution and care in I power station working. XXII. How electricity is generated, transmitted and distributed i.e. 2 generator to Consumer service board. 287 288 , 1HE GAZETTE OF INDIA : EXTRAORDINARY [PART III-SEC. 4] XXIII Principle and working of alternating current and direct current generators and their parallel operation. XXIV Principle and working of transformers and their parallel operation 2 1 XXV. Principle and working of alternating current and direct current 2 motors, their spe_ed characteristics, contr?ls. XXVI. Storage battery- principle, construction and charging. 1 XXVII Alternator cooling - different systems of cooling, advantages of. 2 hydrogen cooling over others, hydrogen plant. Total 115 Hours =4 Weeks Part XI SYLLABUS.FOR TECHNICIANS ENGAGED IN THE OPERATION AND MAINTENANCE OF 1HE DIESEL ENGINE BASED POWER PLANTS Common course for Electrical, Mechanical and Instrumentation Item Particulars No. 1 2 I IL III. IV V. Power plant familiarization. Fundamental units .· and their c.onversion and measurement (mechanical, electrical, thermodynamic) Engineering drawing and practice Fuels and combustion, types of fuels - their properties and testing, requirements of efficient combustion. Diesel Engine and Auxiliaries : (i) General description .(ii) Arrangement of engine (iii) Engine auxiliaries (iv) Assembly of different parts of engine and its accessories (v) Engine instrumentation (vi) Operation appreciation (start up, running and.shut down). Number of Hours 3 8 4 6 8 24 VI Water conditioning, pre treatment and demineralization. 6 VII Effluent treatment, plant functions and description, importance 4 of treatment plant. VIII Turbochargers: 6 (i) Fundamental principles of turbocharger·· (ii) Theory and operation of turbocharger (iii) Monitoring and_protection of turbocharger ,. ' ' • ' [<WTIII-=4l IX X XI XII XIII XIV xv XVI XVII XVIII XIX xx XXI XXII Handling of Engine under Emergency conditions. Fuel oil and lube oil separators: (i) Purpose and function (ii) Operation and maintenance of separators Cooling water system and radiators. Flow Diagrams of basic cycles and scheme tracing. (i) (ii) (iii) (iv) (v) (vi) (vii) · (viii) (ix) (x) (xi) (xii) Fuel handling. Fuel oil system (HFO and Diesel oil) Jacket water cooling system Lube oil system Air intake system Engine cooling water system Exhaustgas system Station services, domestic water, air conditioning, ventilation, lifts, etc. Air services, air compressor Steaqi system and heat tracing of fuel pipes Station batteries and battery charging equipments Station lighting, power supply and distribution boards, switch gear. · Mechanical application - correct use · of machines~ tools and tackles, gauges, fits and clearances, tolerances, brazing, soldering and welding bearings, gears and thread, fasteners. Station instrumentation and controls. Fire fighting installation in D.G. power station. Electric shocks, first aid, acid bums, alkali wounds/chlorine gas poisoning and their treatment. Duties and responsibilities of operators and plant attendants in carrying out instructions, reporting to supervisors, recording, reading unusual occurrences, expected behaviour, discipline, sincerity, cleanliness and love for machines. Safety equipment and personal cleanliness, cautions and cares in power station working. How electricity is generated, transmitted and distributed 1.e. _ generator to Consumer service board. Principle and working of alternating current .and direct current generators and their parallel operation Principle and working of transformers and their parallel operation Principle and working of alternating current and direct current motors, their speed characteristics and control. 3747 G//10-37 6 6 2 24 6 8 2 3 3 3 2 2 2 2 289 290 XXIII THE GAZETTE OF INDIA :· EXTRAORDINARY [PART III-SEC. 4] Storage battery- principle, construction, boost charging, charging and importance of DC in DG power plant Part XII 3 140 Hours Total ;:;5 Weeks SYLLABUS FOR TECHNICIANS ENGAGED IN THE OPERATION AND MAINTENANCE OF THE COMBINED CYCLE GAS TURBINE BASED POWER PLANTS Common course for Electrical, Mechanical and Instrumentation Item No. 1 I. II. III. IV. V. VI. VII. VIII. IX. Particulars 2 Gas Power plant familiarization Fundamental units and their conversion (Mechanical, electrical, thermo-dynamic). Engineering drawing and practice. Fuels and combustion types of fuels - their properties and testing, requirement of efficient combustion Gas turbine and WHRB (i) General description. (ii) Arrangement of Gas turbines (iii) WHRB (Waste Heat Recovery Boiler) (iv) Instrumentation and Control system (v) Fabrication and.assembly of different parts of gas turbine and its accessories. (vi) (vii) (viii) High pressure welding . Fuel storage and transport arrangement. Operation appreciation {start-up, running and shutdown) . Water conditioning, pre-treatment and demineralisation. Steam turbine and turbine house auxiliaries. (i) Fundamental principle of steam turbine. (ij) Theory and operation of steam turbine (iii) Arrangement of steam turbine. (iv) Governing and protection of turbine. (v) Operation appreciation (start-up, runnmg and shutdown) Handling of gas turbine, steam turbine and WHRB Condenser and vacuum extraction plant : (i) Purpose and function. (ii) Constructi9n of surface condenser and vacuum pumps Number of Hours 3 8 2 6 4 20 4 12 4 3 ., • X. Cooling water systems and cooling towers. XI. Flow diagrams of basic cycles and scheme tracing ~ (i) Steam and condensate (ii) Station services, domestic water, air conditioning, ventilation, lifts (iii) · Air services, air compressors, switchgear . (iv) Bearing cooling and general service water system. (v) Circulating water system. (vi) Feed water system (vii) Fuel oil system (viii) Station batteries and battery charging equipment (ix) Station lighting, power supply and distribution boards 1 18 XII.· Mechanical appreciation - correct use of machines, tools 6 and tackles, gauges, fits and clearances,. tolerances, brazing, soldering and welding, bearings, gears and thread, fasteners XIII. Station instrumentation and controls. 8 XIV. · Fire-fighting installations in thermal power station. 2 XV. Electric shocks, first aid, acid bum, alkali wounds, chlorine 3 gas poisoning and their treatment. XVI. Duties and responsibilities of operators and plant attendants, 3 carrying out instructions, reporting to supervisors, recording reading unusual occurrences, expected behavior, discipline, sincerity, cleanliness and love for machines. XVII. Safety of personnel and equipment, cleanliness, caution and 3 care in power station working. i ,, XVlll. How electricity is generated, transmitted and distributed i.e. 2 generator to Consumer service board. XIX. · Fundamental units, conversion and measurement of 1· electrical quantities. XX. XXL XXII. Principle and working of alternating current and direct current generators and their parallel operation. Princ;iple and working of transformers and their para11el operation Principle and working of -alternating current and direct current motors, their speed characteristics, controls. XXllL Storage battery- principle, construction and charging. 2 2 2 XXIV. Alternator cooling, different systems of cooling, advantages 2 of hydrogen cooling over others, hydrogen plant. · Total 1 1 9 Hours =4 Wee1's 291 2'12 THE GAZETTE OF INDIA : EXTRAORDINARY Part XIII SPECIALISED SYLLABUS FOR TECHNICIANS ENGAGED ON MECHANICAL SIDE OF THE COAL AND GAS TURBINE BASED POWER PLANTS Item No. 1 I. II. III. IV. V. VI. VII. VIII. IX. X. XI. XII. XIII. XIV. XV. XVI. Particulars. Number of Hours 2 3 Types of bearings, oil seals and their uses. 4 Types of valves, safety.valve, suction valve, delivery valve, non- 15 return valve, bypass valve, drain valve, air release valve, control valve, float operated valve, solenoid operated and pneumatically operated valve and their applications. Efficiency loss in boiler/ turbine cycle 4 Interpretation of instrument reading and accurate logging 2. Marking and measuring, workshop practice, welding and gas 5 cutting, pipe fitting methods Pump maintenance 5 Shaft alignment methods 4 Drives maintenance, keys 4 Insulation types and applications · 2 Mechanical safety 4 Vulcanizing 2 Couplings •- different types- rigid, flexible, magnetic and fluid 3 couplings. Clutches - different types and uses. 2 Maintenance of pneumatic measuring instruII1ents, servomotors, 4 power cylinders and other thermostats, Monistats. Maintenance of instruments, recorders, clocks. 4 Vibrations - general knowledge of their causes, effects, remedies, measurement and balancing. Total 8 72 Hours =2 ½ Weeks XVII. On Job Training in above areas with hands on practicals 16 Weeks [ 'lT'T III-<iiflT.s 4 l Part XIV SPECIALISED SYLLABUS FOR TECHNICIANS ENGAGED ON MECHANICAL SIDE OF THE DIESEL ,ENGINE BASED POWER PLANTS Item No. 1 I II III IV Particulars 2 Types of bearings and their uses. Types of valves, safety valve, suction valve, delivery valve, non - return valve, bypass valve, drain valve, air release valve, control valve, float operated valve, solenoid operated and pneumatically operated valve and their applications. Efficiency computation in Diesel Engine. Interpreting instrument reading and accurate logging. Number of Hours 3 3 5 4 2 V Marking and ibeasuring, workshop practice, welding and gas 4 _ · cutting, pipe fitting methods. · VI Pumps maintenance. 4 VII Shaft alignment methods. 4 VIII Drives maintenance keys 4 IX Insulation types and applications. 2 X Mechanical safety 4 XI Vulcanizing 2 XII Coupling- different types, rigid, flexible, magnetic and fluid 2 couplings. XIII Clutches- different types and uses 2 XIV· Maintenance of pneumatic measuring instruments, servomotors, 4 power cylinders and other thermostats, monostats. XV Maintenance of instruments, recorders, clocks XVI _Vibratio.n - general knowledge of their causes, effects, remedies, measurement and balancing. 4 8 XVII On job Training in above areas with hands on practicals Total 58 Hours =2 Weeks 8 Weeks 293 294 THE GAZETTE OF INDIA : EXTRAORDINARY [PART m~~;;c. 4] Part XV SPECIALISED SYLLABUS FOR TECHNICIANS ENGAGED ON ELECTRICAL SIDE OF THE COAL, DIESEL ENGINE AND GAS TURBINE BASED POWER PLANTS Item No. 1 I. IL III. Particulars 2 Alarm systems - visual and audible. Isolators, circuit breakers and contactors. Earthing and neutral grounding, necessity of, methods for, safety rules while handling electrical equipments. Reading electrical circuit diagrams Number of Hours 3 2 3 4 . IV Motor winding and repairs. · 4 V Maintenance of internal telephones and public address systems. 3 VI Meggering and testing of wiring and cable faults. 3 VII Maintenance of electrical motors. 3 VIII Maintenance of electrical switchgears. 8 IX Fuses- re-wireable type, cartridges type, high rupturing capacity 8 fuse, constructional features of fuse and fuse sockets, knife type high rupturing capacity fuses, use of pullers for insertion and removal, colour code for fuse ratings. X Motor starters and their applications - direct-on-line, star-delta, 5 rotor resistance, contactors and relays XI Meggers, avometers, voltmeters, ammeters, watt meters, energy 6 meters- general information about their use. XII Maintenance of batteries and rectifiers 3 XIII. Maintenance of transformers and tap changers. 6 XIV. Laying and jointing of cables of voltage up to 250 V and exceeding 4 250 V but not e,xceeding 650 V. xv. Panel wiring methods, connections, earthing principles of operation 2 of small distribution tt:ansfonners. XVI Current and potential transformers, purpose, connection and use. 2 XVII Various types of drives. 2 ' ' , . , ·, [ 'WI III-1Ji11TG 4 l XVIII Elementary knowledge of Engineering materials and their properties. XIX Lubrication and cooling system xx On Job Training in above areas with hands on practicals: Total (i) Technicians engaged on coal and gas based Power Plants. 2 4 74 Hours =2 ½ Weeks 16Weeks (ii} Technicians engaged on Diesel engine based Power Plants. 8 Weeks Part XVI SPECIAL!SED SYLLABUS TECHNICIANS ENGAGED ON INSTRUMENTATION SIDE OF THE COAL, DIESEL ENGINE AND GAS TURBINE BASED POWER PLANTS Item No . 1 I II III IV V VI Particulars 2 . ' Pressure gauges - Bourdon•· type gauge, manometer, vacuum - gauge, barometer, principles of operation, absolute pressure, gauge and vacuum prcs1:ure aid th!:ir inter-relationship, calibration. Temperature indicators, mercury thermo.meters, resistance thermometers, thermocouples, pyrometers, gas thermometers . temperature alarm, calibration. Level gauges - different types - level alaITI!, calibration. Flow meters - steam and water, general principles, calibration. Instrument workshop practice - multi meters, megger Electronic circuit diagram study, drilling, sold~ring, use of resistance bridge and workshop potentiometer. Electronics - components, qscilloscope, power supply, signal generator applications, logics and timers. VII Telemetering and signal conditioning, transducers; thresholds, . transmitters and their eaiim:ation. VIII Instrument air control systems IX Actuator maintenance. X Analytical instruments. Number · of Hours· 3 5 4 3 3 6 8 12 2 4 3 XI ---. Furnace safeguard. supervisory instruments, turbovisory 6 instruments. (Not applicable in case of Diesel engine based power plants and gas turbine based-power plants.) 295 296 1HE GAZETTE OF INDIA : EXTRAORDINARY XII Instrument fault finding XIII Familiarisation of data acquisition system / distributed digital control. XIV Power supplies and alarm system XV Safety precautions 2 3 6 1 [PART III-SEC. 4] Total 68 Hours · =2 ½ Weeks XVI On Job Training in above ·areas with hands on practicals (i) Technicians engaged on coal and gas based Power Plants-:' · 16 Weeks (ii) Technicians engaged on Diesel engine based Power Plants. 8Weeks Part.XVII SYLLABUS FOR ENGINEERS AND SUPERVISORS ENGAGED IN THE OPERATION AND MAINTENANCE OF THE HYDRO ELECTRIC POWER PLANTS Common course for Electrical, Mechanical and Instrumentation Item Particulars No. I I II III IV V 2 S}eneral Introduction: (i) World Power Scenario (ii) Growth of Power Industry in India (iii) Generation Scenario in India (iv) Transmission and Distribution Scenario in India (v) Role of Private Power Participants in India (vi) Organisation/ Power Sector set up (vii) Introduction to Indian Standard specifications for Electrical wiring Concept of modem hydro station: Types of stations, their role in th_e power systems, base load, and peaking load, run-off-the river, s(li,rage type ahd pumped storage . power plants, concept of unit, typical surface and underground · hydro power stations. ·. Choice of location of large hydro station: water availability land availability, selection of installed capacity, selection of type of turbine, choice of size of generating units. Hydraulic system, reservoir, storage capacity, operation o( reservoirs, dams and barrages, intake, surge tank, power tunnels/channel, fore bay and penstocks, pressure shaft, tail race and tail race tunnel/channel, protec~on against watef, .hammer and negative pressure in· penstocks arid suction head. Dewatering of water conductor systems. , Plant lay out in hydro stations above 25MW capacity including machine arrangement, equipment, switchyard and auxiliary arrangements. Number of Hours 3 5 3 3 3 3 ------------- ---- ---- .; f_, [ ['WT III-= 4) VI VII Constructional details and working principles of valves - butterfly, spherical, needle etc. (i) Requirements and principle of operation (i'i) Type and selection criteria of valves and their operation and control. · Constructional details and working principles of hydro mechanical equipments. (i) Requirements and principle of operation. (ii) Type and selection criteria of hydro mechanical equipments and their operation and control. VIII . Constructional details and working principles of turbines . and 12 auxiliaries. · (i) Principle of operation, types and characteristics. of turbines (ii) Choice, rating and specifications of turbines (iii) Components of turbines and their design (iv) Type of governors - hydraulic and electronic (v) Guide bearing and shaft seal arrangements IX Working principles, characteristics and operation of auxiliary 9 systems. X (I) Unit Auxiliaries r Oil pressure units HP lubrication system (i) (ii) (iii) (iv) (v) Braking and jacking system Central grease lubrication system (vi) Carbon dust collt;'ctlon system for slip rings, exciters and brake pads. • Cooling water system. (2) Common Auxiliaries (i) EOT cranes and hoists (ii) Ventilation system (iii) Air conditioning system (iv) Compressed air system (v) Drinking water system (vi) Sewerage system (vii) Elevator/lifts (viii) Dewatering and drainage system • (ix) Communication systems Constructional details and working principles of aliernators and · excitation systems. (i) Alternators, characteristics and rating, types of winding, bearing arrangerhept;;, cooling arrangements (ii) Main and pilot exciters, voltage regulators, types··and characteristics, amplifier and magnetic amplifier, static excitation system, Automatic VoltaJ!~ !l-!'~~la~ion (A VR) (iii) Meihocl'io'f groundin_g . . (iv). ctMh~¥itOf- trat{;f&riner iitri't:!ttions •ir·"w Oflb l: ,, - 12 . ~- -~~ •- . XI DC and "Pl..C power supply for auxiliaries, arrangement of unit 5 auxiliary and station service boards, station lighting and automatic changeover. Station batteries and charging methods. Standby and emergency power and lighting systems. 3747 Gl/10-38 297 3 3 298 THE GAZETTE OF INDIA : EXTRAORDINARY . XII Transformers: Main transformers, station/unit transformers, grounding transformers, type of connections, tap changer gear, cooling arrangements, size selection of main transformers, parallel operation and Regulation. [PART Ill-SEC. 4] 5 XIII Out door switchyard, bus bar arrangements, single line .diagram, 3 circuit breakers, isolators, current transformers, potential transformers,- lightning arrestors, wave traps, coupling capacitor, LMU and· three element protection devices, grounding arrangements .. XIV Indoor and· out door switch gear: Types: MCB, bulk oil, minimum oil, air blast, vacuum, SF, breakers, constructional­ functional details and characteristics. xv SF, gas filled EHV switchgear XVI (i) Working principle and basis of instrumentation and · measurements: Detail of measuring instruments · for pressure, flow, temperature, level, vibration, alignment and current, voltage, power, reactive power, frequency, energy, winding temperature, auto controllers, recorder, Megger- its use for primary detection of faults, data acquisition system, digital distributed control, UPS, unit co-ordinate master control. (ii) · Testing of electrical and mechanical testing equipments 12 4 14 XVII Control and protection - sequential operation and interlocks 15 (i) Unit protection and interlocks (ii) Turbine and auxiliaries and vibration monitoring (iii) Turbine governing, speed setting, speed droop setting and control circuits (iv) (v) (vi) (vii) (viii) (ix) (x) (xi) • Generator protection, under voltage, over voltage, differential, reverse power, under excitation, negative phase sequence, earth fault, etc. Different types of protection relays Importance of sequential interlocks Transformer protection- differential, over load, over fluxing, restricted earth fault, high temperature, buchholz protection Types of motors and variable speed drive and ,e,011trol Various types of pumps and their starting ·control ' Annunciation systems On line monitoring devices XVIII Operation control and supervision (i) · General machine start and stop procedure and sequence (ii) Handling of turbine and generator and auxiliaries under failure condition. such as, mechanical ., and electrical auxiliary and governor failure, grid failure and other failure conditions. (iii) Alternator- synchronizing, loading, parallel operation, active and reactive power sharing and frequency controV : 12 ; ' ' • • ' • • • ' [ 'WT Ill-1'.§!Us 4 l XIX (i) Fire safety procedure xx (ii) (iii) Fire protection of generator Fire fighting and emulsifier type protection General safety precautions, treatment of electrical or acid/alkali burns, permit to work, first aid, protective gear/ clothing, safety in movement and storage of materials, safety aspects of switch yard. 5 4 XXI Factory Act, Electricity Act, 2003, Central Electricity Authority I 0 (Measures relating to Safety and Electric Supply) Regulations, 2010, and other statutory Regulations concerning power stations _ (broad outline). XXII Erection, testing and comm1ss10ning of turbine, generator, control and instrumentation, switchyard and auxiliary systems, maintenance procedures, PERT/CPM method, power station records, maintenance planning . .J 12 XXIII Plant performance, generation cost, machine availability and 6 other commercial aspects. XXIV Personnel management, duties and responsibilities, labour laws 4 and labour welfare. XXV Broad principles of material management, procurement 6 XXVI procedure and inventory control. Total 173 Hours · =6 Weeks On job training: (1) Control room desk operation: (i) Pre-start checks (ii) Protection interlocks (iii) Startup procedure and routine checks (iv) Stopping and emergency operation of turbine, generator and. their auxiliaries (v) Operation of generating unit in abnormal · circumstances (vi) Simulator training/computer application for plants 2. Fire fighting and fire safety procedures during emergency. 7Weeks (6 Weeks) (I week) 299 300 THE GAZETTE OF INDIA : EXTRAORDINARY [PART lll-SEC. 4] Part XVIII SPECIALISED SYLLABUS FOR OPERATION AND MAINTENANCE ENGINEERS AND SUPERVISORS ENGAGED ON THE MECHANICAL SIDE OF HYDRO ELECTRIC POWER PLANTS Item No. 1 I Particulars 2 Predictive, pre.ventive and emergent maintenance, types of - failure and detection: (i) Periodical maintenance and inspection of turbine and (ii) (iii) · (iv) (v) (vi) (vii) (viii) auxiliaries Maintenance of p~mps, valves and pipe work Lubrication principles and _their characteristics Purification of lubricating oil and selection Mechanical alignment Static and dynamic balancing of machines Maintenance planning Modem techniques and · their applications m maintenance of turbine and associated auxiliaries. (ix) Cavitation and erosion of under water ·components due to higher abrasive silt laden water. Number of Hours 3 12 II l. Pre-commissioning _ and commissioning tests of hydro 12 mechanical gates and inlet valves - dry and wet 2. Predictive, preventive and emergent maintenance of: (i) Inlet valves (ii) Hydro·mechanical gates (iii) EOT cranes III Predictive, preventive and emergent maintenance of: I 0 (i) Ventilation and air conditioning system (ii) Central grease lubricating unit (iii) Air compressors (iv) Lifts (v) DG sets (vi) Fire fighting equipments · IV Maintenance practices - rigging and slinging, bearing, scraping I 0 and matching, radiography and stress relieving methods, anti- friction bearings and_ their installation and lubrication, non destructive testing and principles, procedure and application. Welding techniques and equipment. V Workshop: Types and use ofhydraulic, pneumatic and hand tools and tackles. Fabrication of spares. Repairs and maintenance of mechanic_al equipments such as vehicles, dozers, cranes . 8 . VI Composition, properties and behavior of Engineering materials 8 used in power stations ' ' ' VII Residual life assessment and life extension methods · VIII Mechanical safety rules and practice IX Spares inventory, produc_tivity, cost control. 6 4 4 Total 74 Hours X On Job Training: To be associated with field maintenance of: (i) Turbine and auxiliaries like governor, shaft seal, inlet valve, etc. (ii) Common auxiliaries such as cooling water system, compressed air, ventilation and air conditioning, fire · fighting, EOT cranes etc. (iii) · Welding and non destructive testing (iv) Work shop procedures Part XIX =2 ½ Weeks 3 weeks SPECIALISED SYLLABUS FOR OPERATION AND MAINTENANCE ENGINEERS AND SUPERVISORS ENGAGED ON THE ELECTRICAL SIDE OF THE HYDRO ELECTRIC POWER PLANT Item Particulars No. I - 2 . ---- ' I. Predictive, preventive and emergent maintenance and inspection of generators, excitation system, generator bearing. Principles of electronic controls and transistorized circuits. Generator protection- earth fault in rotor and st~tor, negative phase sequence, loss of excitation, differential protection, back up protection, reverse power protection, under/over voltage protection, over load protection, dry out of generators. Constructional details of the different types ofrelays and other sensing equipments, method of setting and iheir testing. Wiring details of control panels. Insulating materials and their use. II. Predictive, preventive and emergent maintenance of motors. III. Transformer: preventive maintenance of transformers, dielectric strength -of oil, insulation_ res'istance, tap changers, filtration of oil.- Tan-Delta .resistivity of oil, dissolved gas analysis and other testing of oil IV Transformer: Protection- Buchholz relay protection, over current protection, differential ·protection and earth fault protection, types of relays used, their construction, testing and setting. Commissioning tests. V Circuit breakers' maintenance, isolators, disconnectors, bus bar arrangements, charging, synchronizing with the grid, disconnecting for repairs, maintenance of switchgear contactors. Number of Hours 3 15 4 8 8 8 301 302 VI THE GAZETTE OF INDIA : EXTRAORDINARY Maintenance of equipments in the outdoor and indoor switchyard. Operation and maintenance of current transformers, potential transformers and lighting arrestors. Bus differential protection, etc; LV, HY and EHV cables and their jointing and testing. · I P,\lff Ill-SEC. 4] 8 VII Maintenance of SF, gas filled insulated switch gear. 6 VIII Station auxiliary supply, station battery-care and maintenance, 10 trickle charging and extended charging, operation and maintenance of rectifiers and battery chargers, UPS, emergency power supply, station grounding arrangements. IX Line protection and fault analysis. 4 X PLCC equipments, telemetering, and other latest communication 8 systems like fiber optics, microwave, etc. XI Computerized on-line monitoring of power plant(DRs, Event Logger and SCADA) 4 XII Interlocking sequential control circuits, details of components 7 used. XIII Calibration and testing of vanous types of instruments, I 0 indicating/ measuring instruments, recorders and analyzers, including transducers and RTUs (Remote Transmitting Units) XIV Statutory Electricity Acts and Rules, permit procedure and site 4 safety mies. XV Economic load dispatch, power system control and operation , 10 MY AR-control, voltage Regulation and frequency control, islanding schemes, function of RLDC/SLDC XVI Station emergency lighting arrangements. .2 XVII R&M and residual life assessments and life extension of 4 equipments Total 120 Hours XVIII On Job Trajning: To be associated with field electrical maintena.nce of: (i) Generator and auxiliaries (ii) Common auxiliary systems (iii) Transformer (iv) LT/HT switch gear in power plant and indoor and out door switch yard (v) Control room operation. :4 Weeks 4 weeks ---- ----~-~- ·-- ' ' ' ., ·, • ['ll'l lll-~ 4] Part XX SPECIALISED SYLLABUS FOR OPERATION AND MAINTENANCE ENGINEERS AND SUPERVISORS ENGAGED ON THE . INSTRUMENTATION SIDE OFTHEHYDRO ELECTRIC POWER PLANTS Item No. Particulars Number of Hours 1 L II. III. 2 Working principles, calibration, control methods and maintenance aspects of temperature measurement devices. (i) Resistance thermometers, thermocouples (ii) Recorders, indicators (iii) Transmitters (iv) Transducers .and RTUs. Working principles, calibration, control methods and maintenance aspects of pressure measurement devices (i) Diaphragm gauge, Bourdon gauge (ii) Recorders, indicaters (iii) Transmitters Working principles, calibration, control methods and maintenance aspects of flow measurem~l}t devices: (i) Positive, semi-positive, rate and differential pressure flow meters, (ii) Recorder5 and indicators (iii) Transmitters. 5 4 4 IV. Worklng principles, calibration, control methods and maintenance 4 • aspects oflevel measurement devices : (i) Pressure gauge bellows/diaphrag1I1, float, buoyancy, gas purge, differential pressure and capacitance -type level measurement systems (ii) Recorders and indicators (iii) Transmitters V. Telemetering and signal conditioning • pneum,:,.tic systems, electrical 4 systems, electronic systems and maintenance asp~cts. VI Basic electronics - Component familiarization and various types of 8 circuits, microprocessors VII Turbovisory instruments- their basic principles, application and 12 calibration : alignment and vibration, its interpretation and measurements, different types of pick-ups, their location, etc., use of vibration instruments .and analysis, different pickups, their location,' etc., axial shift position measurements, valve position and servo motor position indicators, differential metal temperature measurements. 3 303 304 VIII IX THE GAZElTE OF INDIA : EXTRAORDINARY Actuators: Operating principles of pneumatic, hydraulic and electrical actuators and their control mechanisms, maintenance, inspection and testing . aspects. Instrument air system: Air Supplier, piping and piping layout. [PART III-SEC. 4) 6 4 · X. Data acquisition systems_. Microprocessor based control system for 11 generating units including governors and. excitation systems. Digital distributed control (DDC); UPS, control room layout Total 62 Hours :2 Weeks XI. On Job training: (1) Control system - basic principles, construction features, 2 weeks · calibration, preventive maintenance and troubie shooting. Analog control systems, level, flow, pressure and temperature control . systems, component/cards used in control systems, static and dynamic timing, control valves and dampers. (2) Data Acquisition System (DAS) or . distributed digital control 2 weeks system - basic principles, construction features, calibration, preventive maintenance and trouble .shooting of digital and analog inputs to DAS and thei~ 'conditioning, I/0 and interface, functioning of alarms, monitoring formats and loi:;s, s_equence of events. ·-• \ --,-, PartXXI SYLLABUS FOR TECHNICIANS ENGAGED IN THE OPERATION AND . MAINTENANCE OF THE HYDRO ELECTRICPOWER PLANTS ,· Common course for Electrical, Mechanical and Instrumentation · Item No. 1 I II III IV V VI Number Particulars of Hours 2 3 Funda:rriental 'ufflts, conversion of and measurmg electrical 2 quantities. · :it: " · How electricity is generated, transmitted and distributeq Le. generator to Consumer service board. Principle and working of alternating current and direct current generators, motors, their speed characteristics, controls. i!J;, Princip\e and ·working of transformers,.- and their parallel operation <!t'):,. 1, >w!, -";!cd(f l!iti~ ftf>.sJ ,,oi~ ,m1iiu!,i",,. !n~Jwnd·. ,,) ,~noJ:;o(brti rmiti20q :0J'.-:iJ1 0V1$2 Power plant familiarization Turbine and auxiliaries: (i) Fundamental principle of turbines and inletvalves (ii) Theory and operation of turbines and inlet valves 2 2 2 6 8 , C • • [ 'WT III-~ 4] VII VIII IX. X. (iii) Governing and protection of turbine (iv) Operating procedures (start-up, running and shutdown) (v) Various types of faults in generators, turbines and auxiliaries -analysis thereof. Generator and auxiliaries: (i) Fundamental principle and working of generators (ii) Excitation system (iii) Automatic voltage regulator (iv) HV, EHV, LT and control cables (v) Generator transformer connection (vi) · Protection of generators (vii) Operating procedures (start up, running and shut down) Engineering drawing and practice Handling of turbines under emergency conditions Power station mechanical auxiliary system- general aspects and · basic flow diagrams, etc. (i) EOT cranes (ii) Hydro mechanical gates (iii) OPU (iv) Central grease lubricating unit (v) HP lubrication system (vi) Carbon dust collection system (vii) Cooling water systems, bearing cooling, generator cooling and transformer cooling (viii) Braking and jacking system (ix) Drainage ~nd dewatering system (x) . Drinking water, air conditioning and ventilation systeni (xi) Air services, air compressors (xii) Lifts 8 6 4 8 XI. Mechanical appreciation - correct use of machines, tools and 6 XII XIII . tackles, gauges, fits and clearances, tolerances, brazing, soldering and welding, bearings, gears and threads, fasteners . Electrical appreciation- correct and Appropriate use of electrical tools like Megger, tong testers, multi-meters, insulation testing equipment, earthing and its importance. Bearings- types, installation and removal procedures and maintenance, clearance :md tolerances, oil seals- types, applications with clearances. 6 2 XIV Lubrication ·and cooling principles. 2 XV Station in~rumentation and controls. 4 XVI Power station electrical auxiliary system - general aspects and 8 basic flow diagrams, etc. (i) Station lighting, power supply and distribution·boards (ii) Station batteries and battery charging system ' 3747 Gl/10-39 -·-···--·------------ 305 • 306 1HE GAZETTE OF INDIA : EXTRAORDINARY (iii) - Unit and station transformers (iv) DG sets and their maintenance XVII El~ctri~ shocks, first aid, acid burn, alkali wounds, Chlorine gas pmsonmg and their treatment. - XVIII Fire fighting installations in hydro power station XIX Personnel safety j;lquipment, cleanliness, caution and care m power station working. Importance of ~arthing. xx Duties and responsibilities of operators and plant attendants . . . ' caff):'mg o~t mstruct10ns, reporting to supervisors, recording r:adm~, visual . occurrence, expected behavior, discipline, smcenty, cleanlmess and love for machines · [PART IIl~EC. 4] 3 2 2 3 Total 86 Hours =3 Weeks XXI On job Training in above.areas with hands on practicals 4 weeks PartXXII SPECIALISED SYLLABUS FOR TECHNICIANS TO BE ENGAGED ON THE MECH,ANICAL SIDE OF THE HYDRO ELECTRIC POWER PLANTS Item - No. 1 I II Particnlars. 2 Operation and general aspects of annual maintenance of turbine and auxiliaries (i) Turbine (ii) Inlet valve (iii) Governing system (iv) Shaft seal Operation and general maintenance of common mechanical auxiliaries: (i) - Pumps and associated pipe work- such as cooling water system, fire fighting system, drainage _ system, dewatering system (ii) _ Air conditioning and ventilation system (iii) Air compressors (iv) -EOT cranes (v) ·Hydro mechanical gates (vi) Turbine and generator bearing (vii) Lifts (viii) Fire fighting . system for power house complex and specifically for equipments like transformers and generators with knowledge of different fire fighting systems. Number ofHoursl 3 6 6 • , ' , _, , • • • • • ' [ 'WI III~<§l1J6 4 l III IV V VI VII VIII IX X XI XII XIII Types of valves- safety valve, suction valve, delivery valve, non­ return valve, bypass valve, drain valve, air release valve, control valve, float operated valve, solenoid operated and pneumatically operated valves and their applications . Interpretation of instrument reading and accurate logging Workshop practice, making of spare parts, welding and gas cutting, pipe fitting methods, introduction to various tools, tackles and practice. Shaft alignment methods. Rubber components, their uses and handling. Maintenance of measuring instruments such as dial gauges, micrometers, vernier calipers etc. Couplings-different types, rigid and flexible coupling. Vibration-general knowledge of the causes, effects, remedies, measurement and balancing. Standard storage ·practices for spares and materials. Mechanical safety. 4 2 4 4 2 4 2 4 2 -, ,. Total 42 Hnurs =11/,Weeks On Job Training in above areas with hands on practical. 4 weeks PartXXIII SPECIALISED SYLLABUS FOR TECHNICIANS TO BE ENGAGED ON THE ELECTRICAL SIDE OF THE HYDRO ELECTRIC POWER PLANTS Item No . 1 I II Particulars 2 Operation and general aspects of annual maintenance of . generators and auxiliaries (i) Generator and its dry out (ii) Excitation system (iii) .. AVR Operation and general maintenance of common electrical auxiliaries (i) Station supply . (ii) Batteries and chargers, DC distribution boards and emergency ligbting system (iii) Motor winding and repairs (iv) Understanding of electrical panel wiring (v) PLCC system (vi) EOT crane Number of Hours 3 8 8 307 308 THE GAZETTE OF INDIA : EXTRAORDINARY III Operation and maintenance of transformers including oil filtration · IV Out door switch yard equipment such as isolators, circuit breakers and contactors, earthing switches, CT, CVT, LA V Indoor switch gear system VI Alarm systems - visual and audible VII Earthing and neutral grounding: .necessity of methods for.safety while handling electrical equipments. Reading electrical circuit diagrams . VIII Maintenance of internal telephones and public address system IX Meggering and testing of electrical equipment, wiring and cables X Maintenance of electrical switchgears XI Fuses-rewirable types, cartridges type, high rupturing capacity fuse, constructional features of fuse and fuse sockets, knife type high rupturing capacity fuses, use of pullers for insertion and removal, colour code for fuse ratings. XII Motor starters and their applications- direct-on-line, star delta, rotor res_istance, contactors and relays XIII Voltmeters, ammeters, watt meters, energy meters, meggers, multimeters, tong testers and general information about their use XIV Laying and jointing of cables of voltage upto 250 V and exceeding 250 V but not exceeding 650 V. XV Panel wiring methods, connections, earthing, and principles of operation of small distribution transformers. XVI Protection relays, current and potential transformers, purposes, · connections and use. XVII Elementary knowledge of electrical Engineering mat"crials and their properties. XVIII Basic knowledge of computers and on line monitoring system [PART III-SEC. 4] 6 3 4 2 4 3 3 6 6 5 6 4 2 2 2 2 XIX Familiarization with supervisory control and data acquisition · 4 system.: Total XX On job Training in above areas with hands on practicals. 80 Hours =3Weeks 4 weeks ['1T'T III-~ 4] PartXXIV SPECIALISED SYLLABUS FOR TECHNICIANS TO BE ENGAGED ON THE INSTRUMENTATION SIDE OF THE HYDRO ELECTRIC POWER PLANTS Item Particulars No. 1 2 I. Familiarization with Supervisory control and data acquisition system II. Power supplies and alarm system III. Power station instruments, their maintenance and testing (i) Event sequence recorder (ii) Disturbance fault recorders (iii) Sequence controllers (iv) Digital relays IV Water flow meters and their application and maintenance . ~, V Pressure gauge: Bourdon type g!luge, barometer principles of operation, absolute pressure, vacuum pressure, maintenance of pressure gauges. Number of Hours 3 4 4 4 2 3 VI Level gauges: Different types of level gauges and their 3 application in power house and calibration VII Temperature indicators: · mercury thermometers, resistance 3 thermometers, thermocouples, their use in power house and calibration VIII Instrument workshop practice: electronic circuit diagram study, 6 multi-meters, Megger, drilling, soldering, use of resistance bridge and workshop potentiometer IX Electronic components, oscilloscope, power supply, signal 8 generator applications, logics and timers X Telemetering and signal conditioning, transducers, thresholds, 8 transmitters and their calibration XI Instrument fault finding 2 XII - Safety precautions Total 48 Hours =1 ½ Weeks XIII On job Training in above areas with hands on practicals. 4 Weeks 309 3IO TilE GAZETTE OF INDIA : EXTRAORDINARY . ' [PART III-SEC. 4] PartXXV SYLLABUS FOR ENGINEERS AND SUPERVISORS ENGAGED IN OPERATION AND MAINTENANCE OF SUB-STATIONS ASSOCIATED WITH THE GENERATING STATIONS Common course for Electrical. Mechanical and Instrumentation Item No. 1 I II III IV V VI VII Particulars 2 General Introduction: (i) World Power Scenario (ii) Growth of Power Industry in India (iii) Generation Scenario in India (iv) Transmission and Distribution Scenario in India (v) Role of Private Power Participants in India (vi) Organisatioii/Power Sector set up (vii) Introduction to Indian Standard specifications for Electrical wiring (viii) Energy conservation Layout and location of 66 kV and higher voltage sub-stations. Main equipments used together with their specifications ·. including gas insulated switching systems Concept of High Voltage DC Transmission Construction of high voltage lines, types of towers, types of insulators and their electrical and mechanical characteristics. High tension feeders, their load carrying capacities. (i) Alternating and direct currents, relation between voltage, current, power, reactive power and common units in use. Power factor, Ohm's Law, resistance, reactance, impedance, percentage impedance. Three phase vectors, phase - displacement between current and voltage (ii) Basic principles of transformation, magnetisation, hysteresis, reluctance, retentivity, electromagnets. Flux density, ampereturns equation for transformation, - reactors, etc. (iii) Two winding, three winding and auto transformers: Grounding transformers, salient features of shell type and core type transformers, hot rolled and cold rolled steel cores, stampings and their assembly. Different vector groups and terminal connection (iv) Transformer fixtures, e.g., Buchholz relay, on-load and off-load tap _changer, breathers, conservators, bushings Number of Hours 3 5 4 6 3 3 3 29 • , , • • ['WI III-~ 4] VIII IX X of different types, thermometers, indicators, alarms . (v) Cooling of transformer and oil, different methods - of cooling, importance of oil filtering and drying-out of transformers, di-electric . strength of oil, different varieties of filters and their comparison, types of radiators· (vi) Transformer tests - failure and causes, maintenance· and· repaIIs (vii) Parallel operation, Regulation, voltage control, tap change, commissioning tests Breakers: (i) Functions of breakers, their action. (ii) Different types of outdoor and indoor breakers, e.g. bulk oil, minimum oil and air blast, SF6- principles and their . applications (iii) Operating mechanism, manual, sprmg, hydraulic pneumatic, motor (iv) Breaker maintenance, failures and their causes, Commissioning procedure Bus bars: (i) Indoor bus bars, their' capacity, forces on theni during short circuit, bus bar mountings and their clearances (ii) Strung ,end tub•ilar tf5,pe bus bars, their current ratings, supports, jumper:;, clearances. (iii) Busbar fittings and connectors (iv) Cables of voltage exceeding 650 V, types, their maintenance and testing Current and potential transformers: (i) Types of current and potential transformers, their working principles, ratings, acc-uracies. (ii) Functions of curreni and potenti,,J transformers. (iii) Failure of current and ·potential tra,,sformers, their causes. 8 6 5 XI Isolators: 5 (i) Tilting and rotating isolators, with and without arcing horns, horizontal center break type, tandem isolators, earthing blades, current rating, breaking a circuit by isolator, interlocking with circuit breaker _ (ii) Maintenance of isolators XII Lightning protection: 3 (i) Simple description of!ightning phenomena, surges and their protection (ii) Construction of lightning arrestors and the principles of their working ( iii) Different types of lightning arrestors and ratings (iv) Earthing and location oflightning arrestors. 311 312 XIII XIV xv . THE GAZETTE OF INDIA : EXTRAORDINARY (v) Codes and Practices for lightning protection Capacitors Control Room: (i) Necessity and function of a control board, types of boards, instruments of the board. (ii) Functions of the various relays and indicators, mimic diagram indicators, annunciator and alarm, characteristics ofrelay testing and setting of relays (iii) Remote control ofbreakers, isolators, tap changers, indicators on the control board. (iv) Control and power cables (v) Metering, concept of tariff, event loggers, disturbance recorders Auxiliary supply: (i) Current and. ampere-hour ratings of batteries, battery. charging equipment, checking of specific gravity of electrolyte, maintenance of batteries (ii) Importance of direct current supply and its functions. (iii) Auxiliary direct current supply (iv) AC distribution board I !'.\RT III- ··SEC. 4J 10 5 XVI Clearances and Compliance of CEA (Measures relating to 5 · Safety and Electricity Supply) Regulations 2010 (i) Minimum clearance between phases and phase to ground for different voltages (ii) CEA(Measures relating to Safety 'and Electric Supply) Regulations, 2010 pertaining to sub-stations. XVII Earthing: 3 (i) Safety earthing and system earthing, the method of earthing e.g., solid earthing, resistance earthing, peterson coil earthing, earthing of lightning· arre·stor, importance and advantages of each type (ii) Different types of earth electrodes, earthing mats, recommended values of earth resistance, measurement of earth resistance XVIII Maintenance: Maintenance of log sheet and other records. The 3 importance of maintenance of good records. XIX Safety: I 0 xx _ (i) Safety procedures and procedures for giving line clear and taking it back. Maintenance of records of line· clear. (ii) First-aid, artificial respiration and sh~ck treatment. (i) Interlocking and sequential operation.?f different equipments. (ii) Protections :- Transformers, lines, reactors, bus bar. 8 ,I • ' • • ['Jl1J III~~ 4] XXI Synchronising, charging and discharging of lines of voltage 3 exceeding 650 V but not exceeding 33 kV. Live line testing. XXIl Calibration and testing of various types of equipment, 4 indicating and measuring equipments, recorders, analysers. XXIII Handling emergency conditions. 3 XXIV Diagnosing troubles in the plant from instruments and 3 annunciation. XXV Thermography monitoring. 4 XXVI Study of carrier system, PLCC 2 XXVII Auxiliary equipments such as compressors, station lighting, 2 etc. X){VTTJ Fire-fighting equipment - their operations, maintenance and refilling, emulsifier, fire wall protections · XXIX Personnel management, duties and responsibilities, labour . welfare and labour laws 3 4 XXX .Power and telecommunication co-ordination cmpmittee 2 (PTCC) guidelines. XXXI Broad • principles of material management and inventory 3 control XXXII Simulator Training -30 XXXIII On Job Training related_ to above areas · XXXIV Industrial visits and evaluation 3747 Gl/10-40 Total 190 Hours =6 Weeks 4 Weeks 2 Weeks 313 ··- ---;:;:,;>· 314 THE GAZETTE OF INDIA : EXTRAORDINARY I P,\/U III~~SEC. 4] Part:XXVI SYLLABUS FOR TECHNICIANS TO ASSIST ENGINEERS AND SUPERVISORS IN OPERATION AND MAINTENANCE OF SUB-ST A TIO NS ASSOCIATED WITH THE GENERATING STATIONS Common course for Electrical. Mechanical and Instrumentation Item Particulars No. 1 2 I General Introduction: II III IV V VI (i) Functions of State Electricity Board/Utility (ii) Introduction to Electricity Act 2003, CEA (Measures relating to Safety and Electric Supply) Regulations, 2010. (iii) Substation: (a) Sub-stations, Selection of site, clearances and control room (b). Sub-stations - 33 kV to 765 kV (c) Selection of voltage level for Sub-station and layouts Equipments: (i) Control/Relay panels and meters (ii) Switch gear, Breakers (iii) Isolators (iv} Cables- types, construction and jointing· (v) Power Capacitors (vi) Lightning arrestors (vii) CT, PT and carrier communication. Transformers (Power and Distribution): (i) Types of transformers and parallel operations (ii) Cooling and drying out of transfom1ers (iii) Testing of transformers (iv) Maintenance of transformers (v) Protection of transformers (vi) Failures of transformers Circuit Breakers, Isolators and Relays: (i) Principle and construction · (ii) Types of circuit breakers . (iii) Maintenance of circuit breakers (iv) Relays - various types and functions (v) .. Maintenance of isolators · Storage Ba_tteries: Need, Function~, Comn1issi6ning and Jv1ab.tenance Cable Jointing: Cables-types, selection, cable trenches, cable routing and laying, cable clamping, jointing and te;~_nination of HT, power and control cables and junction box, etc. Number of Hours 3 6 12 12 12 6 3 • ' Earthing: VII Sub-station earthing, equipment earthing and Consumer earthing and procedure for improving quality of earth resistance Safety and fire fighting VIII (I) Safety IX X XI (i) Basic principle of safety, importance of safety rules and their observation (ii) . List of Safety equipment, their use and niaintenance thereof (iii) Permit procedure (iv) Self permit, Permit.on phone and Procedures to be observed (v), Electric shock and safety. (vi) Causes ·of Accident, Precautions to be taken to avoid accidents while working. (2) Fire fighting: (i) Principle and causes of fire, class of fire i.e., A, B, C. Precautions to be taken to avoid fire (ii) Fire fighting equipments, their type and use, their · periodical maintenance Duties of staff: Duties of staff assisting supervisory and operating staff 'and maintenance of records Human Resource Development: (i) Personal development and motivation (ii) Communication skill and its importance (iii) Attitudinal training On job training, industrial visits and evaluation: (I) Study Visits - after introduction: (i) I st visit : 11 kV and 33 kV sub-station (ii) 2nd visit : 66 kV and 132 kV sub-station (iii) 3'd visit: 220 kV and 400 kV sub-station 2. Study and practicals Total (i) Measurement of current, voltage, power, energy, frequency and power factor (ii) .Testing and connection of over current and earth fault relays - (iii) Study of Buchholz relays (iv) Measurement of earth. resisdvity (v) Meggering of installation and equipments ( vi) Study and maintenance of breathers (vii) Study of "on load tap changer" for transforme1· (viii) Study of line construction materials and hardware (ix) Demonstration of conductor jointing (x) Demonstration ,of cable_jointing, · 3 6 6 9 75 Hours "c2 ½VVeeks 3 Weeks 315 316 THE GAZETTE 01' INDIA : EXTRAORDINARY (xi) Study of various type of power fuses, control fuses, kitkat and horn gaps. · (xii) Use of safety equipments and practicals followed for permit on works (xiii) First aid and fire fighting drills (xiv) Energy conservation Part:XXVII ASSESSMENT FORMS (TRAINING PERFORMANCE) (I) ASSESSMENT FORM FOR ENGINEERS AND SUPERVISORS Name of 1he Trainee ........................ , ........................................... . Period: From ................ , ......... to ......................... (extended period). Working in .•.................................................................. , ........... . Section ..................................................................................... . Department ..................... ; ... , ....................................................... . [PART III-SEC. 4] Item No. Particulars Marks Marks Remarks 1 i II 2 Punctuality and attendance (i) Is he reluctant to continue on overtime (ii) Is he in the habit of taking1eaves at 1he eleven1h hour (iii) Does he insist on compensatory off Intelligence .and grasp: (i) Does he have full knowledge of1he plant and equipment on which he is working and follows 1he instructions given to him and can execute !hem properlf (ii) Is he industrious, hard working and . painstaking (iii) Has he shown any special skill of operation in saving plant and equipment in trouble or emergency allotted given 3 4 5 +(5) -(I) -(1) -(1) +(10) +(5) +(10) Ili Temperament and behaviour: (i) Behaviour with superiors/colleagues and +(5) subordinates (ii) Capacity to take quick and correct decisions (iii) Capacity to handle independent +(5) responsibility +(10) IV Any special qualifications- capacity to execute a +( 10) particular oc difficult job economically, intelligently, resourcefully or with special skill f 'y .Judgment of'the candidate .by taking viva-voce test or by asking questions verbally +(40) Total marks +100 The marks may be given as below:- Excellent Very good Good Average Below average Special Remarks. if any:- . Station Superintendent 91-100% 71-90% 61-7Q% 51-60% Below 51% Section-in-charge (Power Plant) 317 318 THE GAZETTE OF INDIA : EXTRAORDINARY [PART lll-SEC. 4] (II) ASSESSMENT FORM FOR ENGINEERS/SUPERVISORS_· (For use of the Traiining Department) (!) Name oftheTrainee .................... -........... ,, ............................ ' ....... -. : ...... . (2) Date of birth/age (3) Training period : From ............................... (Months) (4) Technical qualification ................ ; ................................. ; . . . . . , .... , .......... . ( 5) Specialisation if any (6) Practicalexperience ..................................................... ~ ..... ; ................. . (7) > Marks secured in periodical tests ( out of! 00): . Test No. Date Written Viva Onjob · .. (8) Percentage of marks secured in all the tests: (9) General Remarks and Recommendations: Director of the Institute Project .• ' (III) ASSESSMENT FORM FOR TECHNICIANS TO ASSIST ENGINEERS AND SUPERVISORS Name of the Trainee .............. "' ......................... · ........................... . Period: From .......................... to ......................... (extended period) . Working in ................................................................................ . Section .................................................................................... .. Department ................................•.... • • • • • • • • • • • • • • • • • • • • • • • • · · · · · • · • • · · · · · · · · · · · Item No. Particulars Marks · Marks Remarks allotted given 1 I 2 3 Punctuality and attendance: (i) Does he attend the duty punctually +( 5) and avoids' absenting without prior intimation. (ii) Is he reluctant to continue on -(!) overtime (iii) Is he in the habit of taking leaves at • the eleventh hour -(1) (iv) Is he even prepared to take leave -(4) without wages {v) Whether he availed'. medical leave -(1) often II InteUigence and grasp: (i) Do&s he have full knovrledge of the +(10) plant and equipment on which he is working and follows the instructions given to him and can execute them · properly (ii) Is he industrious, hard working and painstaking +( 5) (iii) (a) Has he shown any special skill of operation in saving plant ~nd equipment in trouble or emergency . +(lO) OR (b) Has he shown any special skill or innovation in any maintenance job. III Temperament and behaviour: (i) Behaviour with superiors/colkagues (ii) Capacity to take quick and correct decisions by himself or to point out the discrepancies to · superiors promptly while attending plant and equipment. (iii) Capacity to take independent charge as plant attendants (Name of the · plant) +(5) +(5) +(10) 4 5 319 320 THE GAZETTE OF INDIA : EXTRAORDINARY IV Any special qualification8: (i) ls he suitable for any other plant other than the one mentioned above at Ill(iii) (ii) Can he record the readings correctly (iiiJ Is he suitable for any particular skilled maintenance job as an artisan. (iv) Has he specialised in any particular trade such as winder, high pressure - welding, etc. +(IO) V Judgment of the candidate by taking viva- +(40) voce test or by asking questions verbally about power plant and equipment Total marks +100 • The marks may be given as below:- Excellent Very good Good Average Below average Special Remarks if any:- Station Superintendent [PART Ill,-SEC. 4] 91- 100% 71-90% 61-70% 51-60% Below 51% Section-in-charge {Power Pl;ufl) ' ' [ "IT'l IIl-ll!U1l" 4] (IV) ASSESSMENT FORM FOR TECHNICIANS TO ASSIST ENGINEERS AND SUPERVISORS (For use of the Training Department) (!) Name of the Trainee ············································································· (2) Date of birth/age ............................................................................. ~- .. (3) Training period : From ........................ to .............. (Months) (4) Highest technical qualification (5) Specialisation, if any ............. ' ............................................................... . ( 6) Practical experience ······· .. ,, .................................................................. . (7) Marks secured in periodical tests ( out of 100): Test No. ·Date Written Viva On job ' ( 8) Percentage of marks secured in all the tests: (9) General remarks a1;1d recommendations: Director of the Institute 3747 Gl/10-41 321 322 THE GAZETTE OF INDIA : EXTRAOIWINARY ·"-,. '""'t·rn ,,,·.41 Sdt,·dulr-1 I Safety. measures for operation and maintenance of transmission and distribution system (See sub-regulation (3) of regulation (7)) Part I ( I ):J)uration and content of training shall be as specified below: · (i) Engineerv\nd supervisors - The time allocation and various components of , theJraining course. for e_ngineers and supervisors who would be engaged on . operation and maintenance of transmission system shall be as given in Part II of this Schedule. (ii) Technicians -·The time allocation and various· components of the training . course for . .technicians who would assist .· the engineers and supervisors in -·OJ)llrationand-,maintenance bf transmission system shall be as given in Part rn of this Schedule. (iii) Engineers, Supervisors and Technicians - The time alldcation and various . components of the t,raining course for engineers, supervisors and Technicians in operation. and inaintenartce 'of sub-transmission and distribution system shall be .is given in Part IV, Vand VlofthisScedule. . - . (iv) Refresher course O The.duration and contents of the refresher courses shall . be determined jointly by the owner of the said system and training institute. (v) Visits to factories-As part of practical training the trainees may be taken to factories manufacturing , equipments used in .transmission and distribution installations. (vi) Performance of the trainee(s) - The trammg institutes shall group the syliabus in modules for.organising the- training. The pass percentage in each' module for theory and for project work shall be 50% Whereas for on job training and for viva voce it shall be 75%. The sponsor(s) of the trainees may consider the institution of incentives and awards for excellent perfomiance during the training and also for suitable action for sub-standard performance. (2). Creation of the Institute: (i) The existing training institutes established for training of personnel engaged in operation and maintenance of generating stations and substations associated with generating stations can create additional facilities for training in transmission and distribution sys-terns. (ii) Guidelines for such institutes specified under Schedule-I (Item 2) under the heading "Facilities for Creation oftraining institute" shall also be applicable for insfitutes which would impart training in transmission and distribution systems. (3). Assessment fom1s for engineers and supervisors and for Technicians to assist the engineers and supervisors are given at Part XXVII of Schedule I . ' ' • . Part II SYLLABUS FOR ENGINEERS AND SUPERVISORS FOR OPERATION AND MAINTENANCE OF TRANSMISSION SYSTEM Item No. I . I. IL III. Particulars 2 General Introdlictiort: (i) World Power Scenario (ii) Growth of'Powerlndtistry in India ( iii) Generation Scenario' in India (iv) Transmission and•Distribution Scenario in India (v) Roleof Private Power Participants in· India (vi) Organisation/PowerSector setup (vii) Introduction to IndianStandatd specifications for · Electrical wiring (viii) Energy Conversation.· Power Generation: (i) Types•ofgenetatio!Y.'Conventional'and·non-conventional; Thermal Power Plant: components/ equipments and their brief details'and uses, features and characteristics of boiler, turbine, generator, excitatiort;'etc. Brief operational aspects; captive power plartts·• (ii) Hydro PowerPlant componertts/equipments' and their brief details; features and characteristics of turbine generator; excitation; etc. Brief operational aspects (iii) Gas Powet Plant: cortceptof open cycle and combined cycle; components, characteristics of gas turbines, brief operatiohal'i1spects, captive power plants· (iv) Nuclear Pdwer Plant: salient features (v) Non-Conventional Energy : various sources, working prirtoiple;,electricity generation (vi) Co•generation,optimal mix of different types of generation; base load and peak load operation Power Transmission: (I) HVAC and HVDC Transmission System (i) Brief history ofEHVtrartsmiSsion system in India (ii) Tower types A, B, C, D and special towers (iii) Conductors/Earthwire and their accessories, types, configuration, tran·spositlon, selection criteria (iv) InsrJ;.tors and hardware fittings: types, strength, details (v) Right of way, CEA (Measures relating to Safety and Electric Supply) Regulations, 2010 and Acts, statutory clearances frol11jlther agencies, compensation, etc . (vi) Surveying, route aligriment, profiling, tower spotting (vii) Benching and soil classification, soil investigation and soil resistivity measurement. (viii) Tower design and testing, quality checks Number of Hours 3 6 18 30 323 324 c,-C- - ---- - THB GAZETTE OF INDIA : iirTRAORDINARY (ix) Tower erection hardware and\1 accessories, fitting procedures, stringing, clearances, commissioning (x) Operation and Maintenance of Transmission Line : line patrolling, routine checks, filling log books, T & P, thermovision scanning, fault failure analysis, hot line maintenance, case studies (xi) Development of HVDC technology, economics, comparison with HV AC systems, principles of HVDC conversion, HVDC lines, HVDC sub-stations - converters, reactive power considerations, HVDC: system, operntion and control, maintenance; AC and DC harmonics and filtering, protection system, insulation, coordination, emergencies and case studies. (xii) FACTS (Flexible AC Transmission System) !PART 111-SEc. 4] (2) Sub - Stations (765kV/400 kV/220kV/132kV) 75 (i) Types : generation sub-station, grid sub-station, mobile sub-station,· gas insulated sub-station, · HVDC sub- station, indoor/outdoor, etc., general comparison (ii) General arrangement and layout of switchyard, switchi1sg schemes, single line diagram · (iii)Power Transformers and Reactors (a) Types : major components, constructional details, functions (b) Design and selection, specificatiori and rating (c) Bushings, On Load Tar> Changers (OLTC), Buchholz relay, conservator, breather, thermo syphon filter, indicators, etc. · (d) Cooling arrangements - methods of cooling, pumps, fans, radiators, etc. ( e) Transformer tests (t) Introduction to relevant Indian Standards (iv) Switchgears and Introduction to relevant Indian Standard. (a) Circuit Breaker: types (MOCB, ABCB, VCB, SF6 ), constructional details, layout arrangement, connection to bus, design, selection parameters, ratings/ specifications, interlocks and'introduction to relevant Indian Standard (b) Isolator: types (Vertical, Horizontal, Pantography, Breaks, constructional details, Earth · switch, interlocks, design/selection, ratings/specifications ( c). Bus bar types, construction, supports, insulators, conriectors, -- jumpers, safety clearances, design/selection, ratings/specifications (d) CT/CVT/Lightning Arrestor/Lightning Mast: Types, constructional details, use, location, selection/design, ratings/specifications · · (e) Power Line Carrier Communication (PLCC): principle, purpose, types of coupling and choice of components, use and operation of PLCC system, modules of PLCC panels, ratings/specifications [ 'fill Ill- 1'.§l1J,; 4 l (f) Meters, Indicators, and Recorders: types and functional description of all types of meters, indicators and recorders-Voltmeter, Ammeter, Frequency Meter, Wattmeter, Energy meter, Event logger (EL), Disturbance Records,r (DR), Fault Locator (FL), indicators and knowledge of relevant Indian Standard (g) Relays: types, functions, constructional det11ils, selection, ratings/ specifications, testing and setting ofrelays·and knowledge ofrelevant Indian Standard (h) Protection System Philosophy: - types, design, protection schemes, tripping schemes, protection of transformers/reactors, motors, feeders, generator bus, etc. (v) Grounding: types of wounding, earth testing and treatment, earth mat de$lgll, sti:p potential, touch potentials, transfer potentials, neutral gro1mdi11g f!!cfor. (vi)Auxiliary facilities - (a) DG set (b) Fire fighting system - types of fire, extinguishe,, Emulsifier system, deluge system, · fire fighting system for transformer/reactor, oil storage system, control room, office building, etc. ( c) Station Battery System ( d) LT supply ( e) Air Conditioning System (f) Compressed -- Air System (service air ·§ystern, instrument air system) (vii) Control Room: layout, arrangement of equipments/panels, false ceiling and flooring, fire safety measures, Air-conditioning, Uninterrupted Power Supply (UPS), computer and its peripherals, lighting /emergency lighting (viii) Cables: types, control cables, power cables,, layout, -trench/gallery arrangement, cable ratings, selection, and ~<!Pie teTT!lin11fiqn and jointing. (ix)Compensating -de¥ices: s!mP! n:acmr,ip1,1pacitor, series reactor/ capacitor, static var comperisators'(SVC) - (x)Sub-station operation: operational -aspects of i!I! equipments/systems, salient features and parameters, limiting values, control room operation, local/remote operation, operational guidelines/procedures, and synchronisation, grid operation, communication with R,LilC/ SLDC, etc., permit to work, line clear procedure, in~intenimc,; of log books, records , tripping reports, shift procedures, monitoring, duties in:spongipilities pf ~ul;. station staff; interlocks and sequential operation, operational problems, operation under emergency, case studies. (xi) Sub-station Maintenance: (a) Need, philosophy, types- routine, preventive, planned, predictive, break-down, emergency maintenance, comparisons, life expectancy curves 325 -~----~------ --- _-__ , ___ ,-,--------" :c~':-c··- 326 THE GAZETTE OF -INDIA : EXTRAORDINARY (bathtub . curves), tools and tackles, testing instruments, safety devices, sampling equipments, test kits, ,visual checks, condition monitoring techniques, on-line . maintenance, daily/weekly/ monthly/quarteriy/half yearly/annual maintenance of different equipments, planning the maintenance activities, preparation of maintenance estimates, budgeting for control, maintenance records, history (b) spare parts management (c) Transformer and Reactor Maintenance-factors affecting the life of transformer/reactor, types of faults that can occur, reasons for breakdown, visual checks/ inspection/ preliminary testing of various components- oil sampling and testing, oil filtration, Dissolved Gas·. Analysis (DGA), maintenance Schedule, fault rectification, need for major overhaul and methods ( d) Switchgear and Protection Maintenance maintenance of CB, isolator, earthswitch, support insulators, CT/CVT, LA. Lightning Mast (LM), meters/ recorders, PLCC, protective relay maintenance, protection system maintenance ( e) Maintenance of auxiliaries and other systems­ battery and charging · system, DG set, air conditionirig plant, compressed air system, fire fighting system, switchyard - lighting, control room, earth resistance testing, cables, compensating devices. (xii) Erection and commissioning of sub-station, Project Evaluation and Review Technique (PERT), Critical Path Method (CPM), charts, project monitoring, erection, pre­ commissioning checks/tests, commissioning, synchronisation. (xiii) Civil works - surveying, site selection, soil investigation, general layout and architectural drawing, switchyard foundation, cable trench design, oil pit, control room building, DG set building, Fire fighting system and AC systerih design, design and construction of roads, drains, _ water ~upply pipe lines, fencing/compound w~li. 3. Load Dispatch and Communicatron (i) (ii) (iii) (iv) (v) (vi) (vii) Load Dispatch Centres- functions, SLDC/RLDC, NLDC, pre-dispatch, during-dispatch, post dispatch functions .. Supervisory Control and Data Acquisition (SCADA) -System, RTU, front end computers, main computers, visu;il _display units, mimic boanls Energy Management System- functions Lo;id forecasting, · generation scheduling, load management, load shedding Hydro • thermal scheduling Voltage/frequency control Reactive Power Management [PART III-SEC. 4] 18 .-~ ' I 'WT Ill -"&Us 4] IV. V. (viii) Grid Management - problems/solutions (ix) Operational co-operation, import/export of energy. role of tariff in system operation (x) Maintenance, on-line maintenance (xi)· Grid disturbances- case Studies (xii) Software tools Communication System: types- PLCC, microwave. leased lines, fibre optics, satellite, V-SAT Communication. comparison, characteristics, modules, planning criteria. selection criteria, RTUs, modems, baud rate, communication protocols, data exchange, system noise and interference, integrated communication system, O&M of communication system, protocol details, telemetry, tele-control and telc­ protection. Commercial Aspects And Contracts (I) Commercial Aspects . (i) Introduction to commercial aspects of power system/distribution system (ii) Tariff Structure, types, components, methods cif working out, revenue real_ization (iii) Energy accounting, Availability Based Tariff (ABT), inter­ utility tariff, commercial disputes and solutions (iv) Inventory planning and control, bi1! of materials, purchase procedures, standardization and codification of stores (v) Resource mobilisation through bonds/ debentures/shares. ( vi) Cost Engineering, costing and control, estimation, estimates for providing service (LT/HT) connections, street lighting. - (vii) Electricity Rules and Regulations, Enactment (viii) Budget types, budgeting procedure, appropriation, budget control. (ix) Accounting, auditing. (2) Contracts (i) Contract basics, terminology (ii) Qualification- requirement, pre-qualification, bids, evaluation (iii) Notice Inviting Tender (NIT), Notice Inviting Quotation (iv) Preparation of bid documents, tendering/ bidding (v) Bid opening, bid evaluation, award of contract, monitoring of contract. . (vi) Contractual obligations/liquidation, guarantee /warranty ( vii) Vendor - qualification, development (viii) Contractual problems and solutions (ix) Revised cost estimation, justification for cost/time over-run, substitute items . (x) · Handing/taking over procedures, closing of contract (xi) Legal issues of contracts, arbitration Management: (i) Principles of management, leadership, effective 327 24 12 12 328 VL VII. (ii) (iii) (iv) (v) (vi) (vii) THE GAZETTE OF INDIA : EXTRAORDINARY communication, motivation, decision making, strategic management Management Information System Project Management Finance Management Construction Management Materials Management Total Quality Management System Planning and New Technologies: (1) System Planning (i) Introduction to power system planning requirements and methods (ii) Load forecasting and techniques (iii) Load flow studies for planning (iv) · Preparation of feasibility report (FR), Detailed Project Report (DPR) (v) Approval/clearance of projects [l'ARr Ill-SEC. 4] 6 (2) New Technologies: 6 (i) Latest development m transmission system design, material, component, system, tariff, operation, maintenance (ii) Latest developments in distribution system design, components, meters, system, tariff, operation, maintenance (iii) Latest developments in power system, communication, application of computers to power system. · On Job Training: Total 207 Hours = 7 Weeks (I) System Operation (Onjob) 3 Weeks (A) Sub-Station (Generating/Grid/Distribution) (i) Layout, equipment familiarisation (ii) Details, functioning, specification and different parameters of switchyard, control room, auxiliary system equipments (iii) Shift handing/taking over, logging of parameters, routine checks on eqqipments/ systems (iv) Operational aspects of equipments /systems, synchronization, grid operation, charging procedure (v) Line/feeder connections, protection schemes, loading aspects, etc. _(vi) Salient features and operational aspects of HVDC sub­ station. (B) Load Dispatch and Communication (i) · Load Dispatch Centre (NLDC/RLDC/SLDC): set up, functioning (ii) Supervisory Control and Data Acquisition (SC ADA) and Energy Management System (EMS) functioning (iii) Load forecasting '· ,. • • ['ll'I-III-1eflls 4] (iv) Generation scheduling (v) Voltage and frequency control activities (vi) Cpmmunication system operation (vii) System Software ( viii) Shift operation (2) System Maintenance (On job) 3 Weeks (A) Sub-Station Maintenance (i) Visual checks, routine, preventive, planned, break-down maintenance of equipments/system (ii) Transformer, reactor, switchgear, relays, protection system and auxiliary facilities. (iii) Maintenance schedules (iv) Referring log books/history records for maintenance. (v) Testing Lab facilities, testing and commissioning. (vi) Procedure for permit to work/line clear. (vii) Safety devices and practices.• (B) T&D Line/Cable Maintenance (i) Line patrolling, · thermovision scanning, hot spots, hardware replacement procedure, 1' &P. (ii) Emergency Restoration System (ERS) (iii) Hot Line Maintenance. (iv)· Industrial visits and evaluation Part III SYLLABUS FOR TECHNICIANS TO ASSIST ENGINEERS.AND SUPERVISORS IN OPERATION AND MAINTENANCE OF TRANSMISSION SYSTEM Item Particulars Number of Hours No. 1 2 I General introduction: II (i) Functions of State Electricity Board/Utility (ii) Introduction to Electricity Act, 2003, and CEA (Measures relating to Safety and Electric Supply) Regulations, 20 I 0. Substation and Equipments: (i) Substations (a) Sub-stations, selection of site, clearances and control room (b) Sub-stations 33 kV to 765 kV ( c) Selection of voltage level for sub-station and · layouts· (ii) Equipments: , (a) Control/relay panels and meters (b) Switch gear, breakers ( c) Isolators (d) Cables-types, construction and jointing (e).Power capacitors ( f) Lightning arrestors (g) CT, PT and carrier communication. 3747 Gl/10-42 , 3 6 12 330 III IV V VI VII VIII TIIB GAZETTE OF INDIA : EXTRAORDINARY Transformers (Power and Distribution) (i) Types of transformers and parallel operations (ii) Cooling and drying out of transformers (iii) Testing of transformers ·(iv)· Maintenance of transformers (v) Protection of transformers (vi) Failures of transformers Circuit Breakers, Isolators and Relays (i) Principle and construction (ii) Types of circuit breakers (iii) Maintenance of circuit breakers (iv) Relays - various types and functions (v) Maintenance of isolators Storage Batteries: Need, Functions, commissioning and maintenance Earthing: Sub-station earthing, equipment earthing and Consumer earthing and procedure for improving quality of earth resistance Safety and fire fighting (1) Safety (i) Basic principle of safety, importance of safety rules and their observation (ii) List of safety equipment, their use and maintenance thereof (iii) Permit procedure (iv) Self permit, permit on phone and procedures to be observed (v) Electric shock and safety. (vi) Causes of accident, precautions to be taken to avoid accidents while working. (2) .fire fighting: (i) Principle and causes of fire, class of fires, ie., A, B, C. Precautions to be taken to avoid fire (ii) Fire fighting equipments, their type and use, their periodical maintenance ·Transmission and Distribution (Line~Construction and Maintenance) ( 1) Construction (i) Survey of HT, LT Lines and service lines and cables, crossing such as road, railway, river, etc. (ii) Selection of materials and poles for lines and handling of materials (iii) Pole erection, size of pit, concreting, pole alignment, etc. [PART !11-SEC. 4] 12 12 6 3 • 6 18 ' r ['ll'l Ill-~ 4] IX X XI (iv) Types · of stays, their marking, grouting, stay insulator binding, etc. (v) Types of conductors and their parameters such as current carrying capacity, etc.,. cables0types and joints. (vi) Type. of guarding and clearances; anticlimbing devices, danger board, etc. (vii) Erection of transformer DP structure (viii) Patrolling, line meggering and commissioning of power lines (2) Line Maintenance (i) Fuse grading necessity and its benefits (ii) Patrolling, tree ct ,fng and safe clearances (iii)Guarding of Jim,,, clearances and maintenance, attending to breakdowns. (iv)Importance and maintenance , of air-break switch, dropout fuse set, dist. box etc. (v) Pre-monsoon maintenance - necessity and procedure thereof ( vi) Balancing ofload using tong tester (3) Service Connection, theft of energy (i) Types of service connections ( overhead, underground, High Tension/ Low Tension,- Single phase, Three phase) (ii) Point of supply, testing of Consumers' wiring and earthing terminals (iii)Materials required for service connection, fuse grading, underground cable connections (feeder pillar, mini pillar, junction box.) (iv)Theft of energy, preventive measures, unauthorized extensions · (v) Consumer relations and dealing with Consumer problems Duties <if staff Duties of staff, assisting supervisory an operating staff and maintenance ofrecords Human Resource Development (i) Personal development and motivation (ii) Communication skill and its importance (iii)Attitudinal training On Job Training, industrial visits and evaluation: (1) Study Visits - after introduction (i) 1st visit : 11 kV and 33 kV sub-station (ii) 2nd visit : 66 kV _and 132 kV sub-station (iii) 3rd visit : 220 kV and 400 kV sub-station Total 331 6 9 90Hours ;;3 Weeks 3 Weeks _332 THE GAZETTE OF INDIA : EXTRAORDINARY (2) Study and practicals (i) Measurement 0f current, voltage, power, energy, ' frequency and power factor (ii) - Testing and connection ofrelays (iii) Study of Buchholz relays (iv) Measurement of earth resistivity (v) Meggerihg of installation and equipments (vi) Study and maintenance ofbreathers (vii) Study of"on load tap changer" for transformer (viii) Study of!ine construction materials and hardware (ix) Demonstration of conductor jointing (x) Demonstration of cable jointing. (xi) Study of various type of power fuses, control fuses, kitkat and horn gaps. (xii) Use of safety equipments and practicals followed for permit on works (xiii) First aid and fire fighting drills Part IV [PART Ill-SEC. 4] SYLLABUS FOR ENGINEERS ENGAGED IN THE OPERATION AND MAINTENANCE OF SUB-TRANSMISSION AND DISTRIBUTION SYSTEM Item Particulars No. 1 2 I Overview of Power Sector Scenario: _ (i) Growth of Power Industry in India (ii) Organisation/ Power Sector set-up in·India (iii) Electricity Distribution in India (iv) Private Participation in Distribution (v) Distribution Reforms in India. II Regulatory Environment - Rules and Regulations: (i) Electricity Act,2003 - Provisions relating to electricity distribution (ii) Role of Regulatory Commissions (iii) CEA(Measures relating to Safety and Electric Supply) Regulations, 2010 - Relating to electricity distribution. (iv) Energy Conservation Act III Distribution planning and optimization: (i) Philosophy of distribution planning. (ii) Acquaintance with software for distribution planning ~d optiijiisation. (iii) Operation of software. (iv) Data entry fonnats and report generation. (v) Case study. IV Sub-transmission and Distribution Lines: (i) Supports-towers/ poles: · (a) Types and selection criteria (b) Surveying and erection Number of Hours 3 3 3 30 15 r [ "1l'T III--,---1!i"s 4] V VI (ii) Line conductor/ c.ables: (a) Classification (b) Selection criteria ( c) Conductor stringing, jointing/ binding, sagging and tensioning, clipping and jurnpering ( d) Earthing arrangements (iii) Cable - types, selection, cable trenches, cable routing and laying, cable jointing and junction box (iv) Earth wire/ neutral wire, guarding, etc. (v) Selection and fixing of control devices, viz. Gang Operating Switches, fuses, isolators and earthing switches, lightning arrestors, and distribution box, etc. (vi) Installation of service lines. (vii) . Street Lighting- design and layout methods. (viii) Statutory clearances, viz. · Environment and forest, · local bodies, railway and telegraph crossings, river crossings, clearances under CEA (Measures relating to Safety and Electric Supply) Regulations, 2010, Acts. (ix) Line/ cable maintenance including hot line maintenance - line patrolling, inspection'; periodicity, work permit, line clear and authorisation, erection of temporary earth and restoration of supply, maintenance T &P and safety devices, thermo vision scanning, hot spots, etc. Electric Sub-Stations (33 kV and below): (i) Type, site selection , layout and civil Engineering requirements. Bus bar .arrangement, sub-station equipment, viz. transformers, circuit breakers, etc. (ii) (iii) Am\iliary systems, viz. DG set, battery system and fire fighting system, etc. · (iv) Control panel, meters, indicators and recorders and · relays, etc. (v) Erection,_,testing and commissioning of equipments/systems (vi) Earthing of sub-stations equipments and soil testing (vii) Transformer oil and its testing (viii) . Operation and maintenance of all equipments, protective relays and auxiliaries . . Metering Requirements: (i) Type of metering, viz. DT metering, feeder metering and Consumer metering. (ii) · Regulations on installation of meters and technical · standards (iii) Meter types, their settings and operation, testing and sealing. (iv) (v) Selection of meter and metering equipment Familiarity with hardware (CMR!) and software for meter data download, analysis and detection of meter tampering (vi) Role of advanced metering system in controlling commercial losses 333 15 6 334 THE GAZETTE OF INDIA : EXTRAORl'l!NARY [PART HI-SEC. 4] VII Concept of Losses and Loss Reduction Measures: 9 (i) Concept of AT & C losses (ii) Segregation oflosses. (iii) Technical loss reduction measures. (iv) Reactive power management. ( (v) Detection of thefts, tampering, unauthorized loads (vi) Anti-theft measures and case studies (vii) Commercial loss reduction measures. (viii} Penalties under the Act for theft and misuse of power. (ix) Energy audit and accounting. (x) Demand side management. VIII Reliability Issues, Quality of Power Supply, Customer 6 Awareness and Satisfaction: (i) Reliability and quality of power supply and reliability indices. (ii) Causes and cures for breakdowns, tripping and voltage and frequency fluctuation. . ; (iii) Creating customer awareness (iv) Prompt attendance to faults. (v) Overview of the Electricity Supply Codes of Regulatory Commissions. IX IT Intervention: 12 (i) Familiarisation with distribution software packages. and latest software tools and use thereof for billing and revenue realisation, GIS mapping and Consumer indexing, inventory control, keeping track of equipments failure rate, quick fault location, attendance, staff salary, energy accountability and MIS etc. (ii) SCADA- RTU, communication and distribution automation. (Iii) Customer care and call centres. X Rural Electrification: 9 (i) Outsourcing of distribution activities, appointment of franchisees and selfload management by villagers 7 and Gram Panchayats (ii) Maintenance of complaint centres and faultremoval, etc., by village Panchayats etc. (iii) Separation of rural and urban supply system (iv) Fixation of responsibility for energy receipt and supply balance. . ·' (v) Raj1v Gandhi Grameen Vidyutikaran Yojana. (vi) Distributed generation. XJ Project Management: Contracts: 9 (i) Contract basics and terminology (ii) Qualification - requirement; pre-qualification (iii) Bids - Technical and Commercial • ['ll'T.lll-~ 4] (iv) Vendors -qualification, development (v) Notice Inviting Tenders(NIT)/ Notice Inviting Quotations(NIQ) (vi) Preparation of Bid Documents, tendering/ bidding (vii) Bid opening and evaluation, Award of contracts, . monitoring of contracts (viii) Contractual obligations/ liquidation, guarantee/ warranty (ix) Contractual problems and solutions (x) Revision of cost estimates, justification of cost/ time · overruri and substitute items (xi) Handling/taking over procedur~s, closing of contracts (xii) Legal issues of contracts and arbitration (xiii) CVC Guidelines. XII Disaster Management: (i} Instit~1tional set-up for disaster Management (ii) Impact of different types of disasters (iii)Trigger mechanism and warning system (iv)Check list and preparedness to-address disasters. (v) First aid techniques: XIII Electrical Safety Aspects: (i) Basic principles of safety, importance of safety rules and their observance. (ii) List of safety equipment, their use and maintenance thereof. (iii) Permit pro,edure - self permit, permit on phone and procedures to be observed. (iv) Electhc sbx:k, safety and procedure for recovery/ resuscitation. (v) Causes of accide_nts, safe working procedures to av,:>id accidents. (vi) Principle and causes of fire, and precautions. to be taken to avoid fires. XIV Field Visits and on-job training: · (i) Familiarisation with layout of sub-stations and equipments (ii) Operational aspects of equipments/ sy,'.ems and synchronization (iii) Line/ feeder connections, protection schemes, loading aspects, balancing of loads (iv) Planning shift operations. (v) . Maintenance schedules ( vi) Procedures for permit to work/ line clear (vii) Testing lab facilities, testing and commissioning (viii) Maintenance of Log Books/ history records and adherence to the timely recording. (ix) Familiarisation with IT tools. · <Total 3 9 66 195 Hours =6 ½ Weeks 335 336 THE'G,'.\ZETIE 'oF INDIA : EXTRAORDINARY [PART III-SEC. 4] PartV SYLLABUS FOR SUPERVISORS ENGAGED IN THE OPERATION AND MAINTENANCE OF SUB-TRANSMISSION AND DISTRIBUTION SYSTEM Item Particulars No. 1 · 2 I Overview of Power Sector Scenario II (i) Growth of Power Industry in India. (ii) Organisation/ Power Sector set-up in India. (iii) Electricity Distribution in India (iv) Private Participation inDistribution. (v) Distribution Reforms in India. Distribution Planning and Optimisation: · (i) Philosophy of distribution planning. (ii) Acquaintance with software for distribution planning and optimisation. (iii) Operation of software. (iv) Data entry formats and report generation. (v) Case study. Number of Hours 3 3 6 III Sub-transmission and Distribution Lines: 9 . ~,-~- - (i) Supports-towers/ poles (a) Types and selection criteria (b) Surveying and erection (ii) Line Conductor/ Cables - (a) Classification (b) Selection criteria (c) Conductor stringing,jointing/ binding, sagging and tensioning, clipping and jumpering ( d) Earthing arrangements (iii) Cables - types, selection, cable trenches, cable routing · and laying, cable jointing and junction box (iv) Earth wire/ neutral wire, guarding, etc. (v) Selection and fixing of control devices, viz. Gang Operating switches, fuses, isolators and earthing switches, lightning arrestors, and distribution box, etc. (vi) · Installation of service lines. ( vii) StrY.et Lighting - design and layout methods. (viii) Statutory clearances, viz. environment and forest , local bodies, railway and telegraph crossings, river crossings, clearances under Safety and Electric Supply ·Regulations/Acts. (ix) Line/ cable maintenance including hot line maintenance · - line patrolling, inspection, periodicity, work permit, line clear and authorisation, erection of temporary earth and restoration of supply, maintenance T &P and safety devices, Thermo vision scanning, hot spots, etc . " • IV. .~- . . Electric Sub-Stations (33'kV andbefow): (i) Type, site selection; layotitand,civil'.Engineering requirements, (ii) Busbararrangement,,sub•station:;equipmenti••\iiz, transformers, circuit breakers, etc. (iii) Auxiliary.systems, viz,DGSet, battery systemandfire. fighting system, etc. (iv) Control panel, meters, indicators and recorders.and•· relays, etc. (v) Erection, testing and commissioning-of•. equipments/systems (vi) Earthing ofsub•stations equipmentsand•:ooil·testing ( vii) Transformer oil andits testing . (viii)• Operation and maintenance ofallequipmertts, protective. relays and auxiliaries. V . Metering Requirements: 3 (i) Type of metering, viz. DT metering, feeder metering and Consumer metering: (ii) Regulations on installation .. of meters• and technical .. • standards (iii) Meter types; theirsettings.and operation; testing and•• sealing. VI Concept ofLosses and Loss. Reduction Measures: (i) Concept of AT&C losses (ii) Segregation of losses, (iii) Technical'loss,reduction · measures. (iv) Reactive power management. (v) Detection of thefts,. tampering; .. unauthorized.J"oads (vi) Anti-theftmeasures and case studies, ( vii) Commercial loss reduction measures, ·.· (viii) Penalties undertheActfortheft and•nrisuse.of · power . (ix) Energy audit and accounting . . (x) Demand side management. VII Reliability Issues, Quality of Power Supply; Customer Awareness and Satisfaction;. (i) Reliability quality of power supply and reliability indices. . . (ii) Causes and cures for.breakdowns, tripping and voltage · . and frequency fluctuation. (iii) Creating customer awareness (iv) Prompt attendance to faults. (v) Overview of the Electricity Supply.codesofRegulatory Commissions. 6 3 VIII IT Intervention: 6 (i) Familiarisation with distributfonsoftware packages and latest software tools and use thereof for billing and 3747 Gl/10--43 337 -338 THE GAZETTE OF INDIA : EXTRAORDINARY [PART ill-SEC. 4] revenue realisation, GIS mapping and Consumer indexing, Inventory contro 1, keeping track of equipments failure rate, quick faµlt location, attendance, staff salary, Energy accountabiJity and MIS, etc. r ' (ii) SCAD A- RTU, communication and distribution automation. (iii) Customer care and call centres. (iv) Enterprfae resource planning- (a) Maintenance Management (b) Asset Management ( c) Training Management ( d) Financial Accounting (e)Material Management (f) Outage Management (g) Time Management ' IX Rural Ele.ctrification: · 3 (i) Outsourcing of distribution activities, appointment of -J franchisees and selfload management by villagers and Gram Panchayats. · · (ii) Maintenance of complaint centres and fault r\:moyal, etc., by Village Panchayats, etc. (iii) Separation of rural and urban supply system (iv). Fixation ofresponsibility for energy receipt and supply balance. / (v) Rajiv Gandhi Grameen Vidyutikaran Yojana. (vi) Distributed generation. X Project Management: Contracts: 3 (i) Contract basics and terminology (ii) Qualification - requirement, pre-qualification (iii) Bids - technical and commercial (iv) Vendors - qualification, development . (v} Notice Inviting Tenders(NIT}/ Notice Inviting Quotations(NIQ) (vi) Preparation of bid documents, tendering/ bidding ,, (vii) Bid opening and evaluation,. award of contracts, monitoring of contracts (viii) Contractual obligations/ liquidation; guarantee/ warranty (ix) Cohtractµal problems and solutions . . (x) Revision of cost estimates,justification of cost/ time overrun and substitute items (xi) Handling/taking over procedures, closing of contracts (xii) Legal issues of contracts and arbitration (xiii) C\'.C Guidelines. . .. XI Disaster Management: 3 (i) Institutional set-up for disaster management (ii) Impact of .different types of disasters • t • [ "lflT Ill-- 4 l XII XIII (iii) Trigger mechanism and warning system (iv) Check list and preparedness to address disasters. (v) ' First aid techniques. Electrical Safety Aspects: (i) Basic principles of safety, importance of safety rules and their observance . (ii) List of safety equipment, their use and maintenance thereof. (iii) Permit procedure- self permit, permit on phone and procedures to be observed. (iv) Electric shock, safety and procedure for recovery/ resuscitation. (v) Causes of accidents, safe working procedures to avoid accidents. (vi) Principle and causes of fire, and prerimtions to be taken to avoid fires. Field Visits and On-Job Training: (i) Familiarisation with layout of sub-stations and equipments (ii) Operational aspects of equipments/ systems and synchronization (iii) Line/ feeder connections, protection schemes, loading aspects, balancing of loads (iv) Planning shift operations. (v) Maintenance schedules (vi) Procedures for permit to work/ line clear - (vii) Testing lab facilities, testing and commissioning. (viii) Maintenance of Log Books/ history records and adherence to the timely recording. , (ix) Familiarization with IT tools. Total , J 6 60 120 Hours :4 Weeks ---'"-------------'-------------------~ ----- ---- 339 fPARr rn=Sisc'. 41 - . ·--- \ __ --·-·· --- . - . IBlnit'W :SftlLim.llSflm'mEOIINIOldSlENG~lfN· \l!HE<@PERJ\IBIONAND ~NANCE<0F;sm;;~ .. DDfflS,'lllUBIJlllON'S¥STEM . lltem lP.imiculars Number :No. • .2 ii :(l)verview ,of iPower'Sec.torSaen:ario: (i) Growth•ofiPower!lndustry,in 'India. '(ii;) <0rganisation/iPower'Sec.tor set.;up:in :India ... :(iii;) 13leatncity1Bistmbution,inilndia · •tiv) rnrivatelRarticiipation in Distribution. i(¥) · D.istliibution!Reformslin'lndia. 'll •Srib4ransniission:andIDlistributionLines: (i,) 'Slll"l~y,for ilines,atvoltage,qpto250 V, 'lines at·voltage. ,above,650 ¥olts'but iless:tban 33kW:and .for:servic.e 'lines ,and•:caliles,ant1'omssings•sudh ,as road, :railway, ri¥:er,and ,othenpower,anll1tele.com!Jjnes, , (ii) Selection of lline,materials,and,towers/cpdles,and ·safe •handliqg,of<the;same. •(iii) . 'Erectiomof,towershpoles -•size•ofpit,,concreting.and ;pole/to.wenalilµnnent,,etc. · :(iv) Line Gonlluctors--1tNPes, 0selectiomcriteria, '.c.onquctor stringiqg,jriintiqg/lbinding,:Bagging,antt,tensioniqg, . clippingamlliiulllPeDllg:and,earlhiqg,an-angi:meirts. ,tv) Types,dfstl!,yS, ,its1matking,,groutiqg,•stay,instilator, binding, 't!tc.. ,(.vi) 'Cable-rt)!pes,ssele.otion,,c.itllleitrenches,•cable,routing .andllayiqg,<clililejjointillg,anllijunctionlhox,c:etc. 1~vii<) ·wypes,df!guarlling,andcdlearances,,earth·wire/.neutral . ·wire,,anti.1llinibing·devices.and•danger·boards.and·•their · erection. ,fv.iii}Selection • •anll 'fixing •Of ,control oevices, •viz. Gang · 'Operating 'Switches, ffuses, 'Isolators anti ·earthing switches,.ilightning•arrestors,,and,llistributionibox,,etc. (ix) Installation,ofservic.e,lines. (x) Street iligllting -Hayout:inethods. (xi) 'Line-meggi:ring:antl(commissioning•oftlistribrition lines. · •(xii1 Line•patrolling, iinspection; ,periodicity, ·work permit, line ,clear-ant1,authorisation,1treercutting,ano;safe<.dlearances, ,er1:ctionqrlltempomr,y,earth,,attending,to1breakdowns.and :estoratiomdf.suf1ply. · (xiii) 'Maintenance T&P:and:safet,ycllevic.es, ffihermo -vision ·scanniqg,,hcit'spots,,etc. '(xi:v,) \l!forline,maintenance. ,Ill- :Electric:Sub0Stations {33HcV ,andtbelow,): , {i) Type, site:selection, :Jayoutand,cbriliEngineering. •requirements. ,ofllours .3 3 9 9 ! r l {ii} (iii) (iv) (v) (vi) (vii) Bus bar amingement, sub-station equipment, viz. transformers, circuit breakers, isolator, lightning arrestors, CTs, PTs and power capacitors, etc., Types of transformers, their erection and parallel operation, testing, 111aintenanc.e, protection and failure. · Auxiliary systems, viz. DG set, . battery system arid · fire fighting system, etc. - need, functions, commissioning and maintenance. Control panels, meters, indicators, recorders and relays, etc. - operation, maintenance and recording readings, · etc. Control and power cables - types, laying of and jointing. · · Installation , operation and maintenance of all· equipments. (viii) Cooling and drying out of transformers, transformer (ix) (x) (xi) (xii) . oil and its testing. Erection of DP structure for transformer. · High Voltage Distribution System (HVDS} "'- erection and connecting the Consumers. Sub-station earthing, equipment earthing and Consumer's eartliing, and use ofMegger and procedure and materials for improving quality of earth resistance: · Fire fighting equipment, theirtype, use and·periodical · maintenance, indicators and recorders and relays, etc. IV MeteringRequirements: 3 V (i) Type of metering, viz. DT metering, feeder metering and Consumer metering. (ii) Regulations oil installation ofmeters and technical · standards (iii) Meter types, their settings and operation, testing and sealing. (iv) Computerised billing. Concept ofLo§ses and Loss Reduction Measures:_ (i) Concept of AT&Closses. · · (ii) · Detection of thefts, tampering, unauthorized loads. (iii) Anti-theffmeasures and case studies . . VI Reliability issues, Quality of Power Supply, Customer Awareness·andSatisfaction: (i) Introduction to reliability and quality ofpower supply: ·•· (ii) Causes and cures for.breakdowns, tripping and voltage and frequencyfluctuation, (iii) Prompt attention to faults and customer care. 3 3 VII Electrical Safety Aspects: 12 (i) Basic principles of safety, importance of safety 0rules and their observance. 341 342 THE GAZETTE OF INDIA : EXTRAORDINARY (ii)_ List of safety equipment, their use and maintenance - thereof. (iii) Permit procedure- self permit, permit on phone and procedures to be observed. (iv) Electric shock, safety and procedure for recovery/ resuscitation. (v) Causes of accidents, safe working procedures to avoid accidents. (vi) Principle and causes of fire, and precautions to be taken to avoid fires. VIII Rural'Electrification: (i) Separation of rural and urban supply systems. (ii) Rajiv Gandhi Grameen Vidyutikaran Yojana. IX Disaster Management: X (i) Impact of different types of disasters. (ii) Check list and preparedness to address disasters. (iii) First aid techniques. Field Visits and On Job Training: (i) - Familiarisation with layout of sub-stations and equipments. _ (ii) Operational aspects of equipments/ systems and synchronization. (iii) Line/ feeder connections, protection schemes, loading aspects, balancing of loads. (iv) (v) (vi) (vii) (viii) . (ix) (x) _ (xi) (xii) Adherence to shift system. Maintenance schedules. Procedures for permit to work/ line clear. Testing lab facilities, testing and commissioning. Safety aspects and safety drill. · , Hot line maintenance . Maintenance of Log·Books/ history records and adherence to the timely recording. Familiarisation with Tools and Plants (T&PJ. Familiarisation with IT tools. [PART In-----SEC. 4] 3 3 60 Total 108 Hours J{andling of electric supply lines and apparatus · [See sub-regulation (3) of regulation (19)] -Precautions to be observed :4 Weeks Schedule-III (1) Hotline Maintenance train~u personnel only are designated to do work on line. (2) Work permit will be taken from the terminal substations at each end of the line. (3) Work shall be performed with _proper planning and prior understanding and clarity. r (4) Favourable climatic condition for hotline operations is sunny weather. If the weather forecasts rain or thunderstonns work will not begin. (5) Organisation of work shall be discussed among the members and responsibility of each team member fixed. . . (6) Before going to ihe work site all equipment and tools shall be inspected and checke.d for correct operation. (7) Auto re-closure shall be in 'OFF' position for the line at both ends. (8) The work procedure shall be discussed with the team member at the tower location .and the responsibility of each member shall be properly defined. (9) The land in close vicinity to the tower shall be cleared to provide a site area for the required tools. (10) AHcleaned hot sticks, strain carrier and other assemblies shall be kept on the hotline tool rackto avoid ground contact. (1 !) Wear helmet, safety shoes and safety belt shall compulsorily be used. (12) All hot sticks and ladders shall be cleaned and checked for integrity by the hot sticks Tester. (13) All linemen in the hotline team shall be equipped with personal protective equipment during the work. (14) No live-line team members onthe tower and conductor shall wear any metallic chain, wristwatch or ring to avoid any circulating current. (15) The team linemen will wear conductive socks, boots, helmets and hand gloves. The 'hot-end' lineman shall wear complete bare hand suit. ( 16) Tarpaulin sheet should be laid on the work area . . (],]) A light vehicle shall be kept nearby during entire '\YOrk period. Tools normally required for hot line maintenance operation : The following tools confonning to relevant Indian Standard or equivalent specifications shall be used_ in on-line working. ( 1) Wire tongs (2) Wire tongs saddle (3) Tie sticks ( 4) Strain link sticks (5) Roller link sticks ( 6) Suspension link stich (7) Auxiliary anns (8) Strain carrier (9) Gin poles (10) Cum-a-aiong~clamp (1 I) Safety equipment like conductor guards, X-ann guards, insulator covers, hand gloves etc. (12) Hot sticks 343 344 THE GAZETTE OF INDIA : EXTRAORDINARY· [PART JU-SEC .. 4] . . Safe Working Distance : The following safe working distances shall be observed Phase to Phase . Safe Clearance ' kV Meter 11 0.61 . 33 0.71 66 .• 0§1 110 1.02 .. 132 1.07 220 1.52 400 2.13 . . . .·· . Schedule-IV Forms of Inspection Report [See subs regulation (3) of regulation (30)) ... FORMI. . ... (lnstallatfons ofvQltage up to and including.2S0V) Report No. ____ Date•ofinspection_· ____ _ Date of Last inspection _______ _ I. 2. 3. 4. 5. 6. 7. Consumer No. --~--,------- Voltage and system of supply: (i) Volts--·~-~~"'-- (ii) No. of Phases ------,-- tiii) AC/DC~----- Type of wiring Name of the consumer.or owner ------------,--- Address of the consumer or owner ----------~-- Location of the premises-:----------"'--'~~ Particulars of the installations: -----------~.,.. · Number Connected Load in KW ( a) (i) Light Points (ii) Fan Points (iii) Plug Points State type of wiring whether casing capping, lead covered of teak wood batten, concealed conduit, Tough Rubber Sheathed and any other type. · (b) Other equipments ( complete details to be furnished): · (i) (ii) Total connected load in KW ------------- Maximum current demand in Amps -----'--------- (on the basis of total connected load)· (c) Generators details i.e. Make, S. No, KVA rating and Voltage: (i) (ii) , • [ 'II'! Ill-l1!f116 4] · General c·onditions of the installation: SL Regulation No. Nos. 8. ' Regulation- 9. . 12 , Regulation- 13 10. Regulation- 14 11. Regulation- 15 12. Regulation- 16 13. Regulation- 17 14. Regulation- 3_4 - 15. Regulation- 35 3747 Gl/10-44 Requirements i Report (i) Is/Are there any visible sign(s) of Yes/No_ overloading in respect of any apparatus wiring? (ii) Condition of flexible cords, sockets, Satisfactory/Not switches, plug-pins, cut•outs and lamp . Satisfactory holders and such other fittings. (iii) General condition ofwiring. (iv) Whether any unauthorised temporary installation exist? Satisfactory/Not Satisfactory Yes/No (v) State if sockets are controlled by individual Yes/No switches. (vi) Any other defect or condition which may Yes/No be a source of danger. Ifves give details. Give report on condition of service lines, Satisfactory/Not cables, wires, apparatus and sm;h other fittings Satisfactory placed by the supplier or owner of the premises. If not s~.tisfactory give details. · Whether suitable cut-outs provided by the Yes/No supplier at the consumer's premises are within enclosed fire proof receptacle? (i) State if switches are provided on live Yes/No conductors. (ii) State if indication of a permanent nature is Yes/No provided as per Regulation so as to distinguish neutral condm;tor from the live conductor. (iii) Whether a direct line is provided on the Yes/No neutral in the case· of single phase· double pole iron clad switches instead of fuse ? (i) State if earthed terminal is provided by the Yes/No supplier. (ii) Have three pin plugs been provided for Yes/No plug points ? (iii) General visible condition of the earthing · arrangement. Are the live parts in accessible position ? Leakage on premises: Satisfactory/Not Satisfactory Yes/No State insulation resistance between conductors ----- M Ohms and earth in Mega Ohms. (i) State if linked switches of requisite capacity Yes/No are provided near· the point of commencement of supply. · (ii) State if the wiring is divided in suitable Yes/No number of circuits and each such circuit is protected by suitable cut-out. . - 345 346 16. Regulation- 41 . '· 17. Overhead Lines . Date: THE GAZETTE OF INDIA : EXTRAORDINARY · [PART III-SEC. 4] (iii) State if. supply to each motor or apparatus Yes/No is controlled by suitable linked switch. (i) Have the frames of every generator, Yes/No stationary motor and so far as practicable portable motor and the nietallic parts (not · intended as conductors) of all other apparatus used for regulating* or controlling electricity been earthed by two separate and distinct connections with earth? (ii) Is the earth wire free from mechanical damage? (iii) In the case of conduit; or lead covered wiring, has the conduit or lead-cover been efficiently earthed ? (iv) If the consumer has his own earth­ electrode, state if it is properly executed and has been tested. If yes give value of earth resistance. Yes/No Yes/No Yes/No --s---- .Qbms. (i) State if the cons~mer has any overhead Yes/No lines. (ii) Does the overhead line near the premises Yes/No of consumer meets the · requirement of regulation 58, 60. and 61? If not, give details. . (iii). Is, guarding provided for overhead lines Yes/No at road crossings? (iv.) Any other remarks . . Signature of the Inspecting Officer/ Name ------~-- Designation ______ _ File No. -------- Copy forwarded to Chief Electrical Inspector for ......... , ......... .. * Not applicable to isolated wall tubes or to brackets, electroliers, switches, ceiling fans and such other fittings ( other than portable hand lamps and transportable apparatus) unless provided with earth terminal. .. • ' • l ' ['11'1 III-~ 4 J

Previous and next

All provisions of This regulation repealed as on 08.06.2023-- Central Electricity Authority (Measures relating to Safety & Electric Supply) Regulations, 2010

Questions people ask

Is regulation 116 of This regulation repealed as on 08.06.2023-- Central Electricity Authority (Measures relating to Safety & Electric Supply) Regulations, 2010 still in force?

No repeal of This regulation repealed as on 08.06.2023-- Central Electricity Authority (Measures relating to Safety & Electric Supply) Regulations, 2010 is recorded.