Regulation 116, This regulation repealed as on 08.06.2023-- Central Electricity Authority (Measures relating to Safety & Electric Supply) Regulations, 2010: Deviations
This regulation repealed as on 08.06.2023-- Central Electricity Authority (Measures relating to Safety & Electric Supply) Regulations, 2010 - Regulation 116
Text of regulation 116
Deviations
116.Deviations.- (1} The Central Government or the State Government, as the case
may. be, by order in writing, allow deviations in respect of matters referred in
these regulations except regulation 30.
(2)The Electrical Inspector or the inspector of mines may, by. order in writing,
· allow deviations in respect of matters referred in regulations 12 to 17, 28, 35(2)(3)
and (5), 36(3), 37(i) to (iv), 41(xii), 43, 44(2), 46, 52 to 54, 57 to 61, 65, 72, 74, 78
to 91, 102, 107(6), (8) and (10) and 114
Explanation- Every order allowing the deviations by the Electrical Inspector or the
Inspector of Mines under sub-regulation (2) shall be placed before the Central or
State Government which may disaUow or revise such deviations.
AMARJEET SINGH, Secy.
[ADVT IIl/4/l 87G/20 I 0/Exty.]
Schedule-I
· Safety measures for operation and maintenance of electrical plants
[See sub-regulation (3) of regulation (6)]
Part I
(1) Duration and content of training shall be as specified below:-
---- _, __ ----
(a) Thermal Power Stations.- (i) The minimum duration of the trammg
courses for the operating engineers and supervisors (mechanical, electrical and
instrumentation) shall be as specified in Table I for coal based, diesel engine
based and gas turbine based thermal power plants. The contents of training
courses and on job training, along with respective duration, shall be as specified
in Part II, Ill, IV, V, VI, VII, VIII and IX of this Schedule, appropriate to the
.specialized course in mechanical or electrical or instrumentation Engineering.
Trainees should speµd time on observing different functions of Thermal Power
Plant along with its operation. After the lecture course is completed the trainees
should be taken on visits to a few modem power stations and factories
manufacturing turbines, generators, switch gear, instrumentation and auxiliary
equipment. The remaining period will be spent on in-plant training where the
candidates will be given an opportunity to operate or maintain the machinery
by themselves under close supervision of the regular operating staff as well as
the training supervisors. Arrangements shall be made for familiarizing the
trainees with the operation of power stations through_simulator facilities.
•
'
•
'
[ 'WT m~~ 4 J
TABLE I
Course Duration for Engineers and Supervisors - flie;~al Power Plants
s. Training Course
No.
I. Common Mechanical,
Electrical andinstrumentation
Course
2. Common On Job and
.Simulator Training for
Mechanical, Electrical and
Instrumentation
3. Specialized Course for
Engineers and Supervisors
(a) Mechanical
(b) Electrical
( c) Instrumentation
4. Specialized On Job Training
for
(a) Mechanical
(b) Electrical
(c) Instrumentation
5. Plant visits and evaluation
Coal Base_d
Plant
5 Weeks
12 Weeks
6 Weeks
4 Weeks
2.Weeks
4 Weeks
4 Weeks
4 Weeks
3 Weeks
Diesel
Engine
Based Plant
4 Weeks·
4 Weeks.
2 Weeks
4 Weeks
2 Weeks
Nil
Nil
Nil
3 Weeks
Gas Turbine
Based Plant
... 4½ Weeks
8 Weeks
2½ Weeks
4Weeks
2Weeks
4 Weeks
4 Weeks
4 Weeks.
3 Weeks
(ii) The· minimum duration of the training courses for the· Technicians
(mechanfoai, electrical and instrumentation trades) to assist the operating
engineers and supervisors shall be as specified in Table II for coal based, diesel
engine based and gas turbine based thermal power plants. The contents of
training courses and on job training, along with respective duration, shall be as
specified in Part X, XI, XII, XIII, XIV, XV and XVI of this Schedule,
appropriate to the specialized trade of mechanical or electrical or
instrumentation Engineering. The lectures may be arranged and trainees may
spend time on observation in the power stations so that they get familiarized
with different sections of the power statioff After _the lecture course is
completed the trainees shall be taken on visits to study a few modem power
. stations and factories manufacturing turbines, generators, switch gear,
instrumentation and auxiliary equipment. The remaining period will be spent
on in-plant training under close super,ision.
3747 Gl/10-33
----·--------- -
257
258 THE GAZETTE OF INDIA : EXTRAORDINARY [l' ARt ili~Et. 4]
TABLE II
Course Duratiou for Technicians- Thermal Power Plants
-SI. Training Course Coal Based Diesel Gas Turbine
No Plant Engine Based Plant
Based Plattt
I. Common Mechanical, Electrical · 4 Weeks 5 Weeks 4 Weeks
and Instrumentation Course for
Technicians.
2. Specialised Course for
Technicians .
(a) Mechanical 2 ½ Weeks 2 Weeks 2 ½ Weeks
(b) Electrical 2 ½ Weeks 2 ½ Weeks 2 ½ Weeks
( c) Instrumentation 2 ½ Weeks .2 ½ Weeks 2 ½ Weeks
3. Specialised On Job Training for
i echnicians
(a} Mechanical 16 Weeks 8 Weeks ' 16 Weeks
(b) Electrical 16 Weeks 8 Weeks 16 Weeks
(c) Instrumentation 16 Weeks 8 Weeks 16 Weeks
4. Plant visits and evaluation 2 Weeks 2 Weeks 2 Weeks
s.
(b} Hydro Electric Power Stations.- (i) !he minimum duration of the training
courses for the operating engineers and supervisors(Mechanical, Elechical and
Instrumentation) shall be as specified in Table III for hydro electric power
stations. The contents of training courses and on job training, along with
respective duration, shall be as specified in Part XVII, XVIII, XIX and XX of
this Schedule, appropriate to the specialized course in mechanical or electrical
or instrumentation Engineering. The procedure for familiarization visits and in•
plant training shall be similar to that which has been specified in respect of
thermal power stations. Arrangement may be made for familiarizing the
trainees with operation of Hydro Power Stations through Simulator facilities.
TABLE III
Course duration for Engineers and Supervisors - hydro power plants
Training Course , Duration
No
l. . Common Mechanical, Electrical and Instrumentation 6 Weeks
Course for Engineers and Supervisors.
2. Common On Job and Simulator Training for Mechanical, 7 Weeks
Electrical and Instrumentation Engineers and
Supervisors.
3. Specialised Comse for Engineers and Supervisors
(a) Mechanical 2 ½ Weeks
(b) Electrical 4 Weeks
(c) Instrumentation , 2 Weeks
----'7 -- ------·------ -----
••
'
,
•
•
'
•
['11'1 III-~. 4]
4.
5.
Specialised On Job Training for Engineers and
Supervisors
(a) Mechanical 3 Weeks
(b) Electrical 4 Weeks
(c) Instrumentation 4 Weeks
Plantvisits and evaluation 2 Weeks
(ii) Th<;l minimum duration of the training courses for the technicians
(nwchanic<1!, electrical and instrumentation) to assist the operating engineers
and supervisors shall be as specified in Table IV for hydro power stations. The
cgnt\lnts of tr!\ining courses !\nd on job training, along with respective duflltion,
shall \Je <IS specified in Part XXI, XXII, XXIII and XXIV of this Schedule,
appropriate to the specialized trade in mechanical or electrical or
ins,trumentation Engineering. The procedure for familiarization visits and in
plant training shall be similar to that which has been specified in respect of
th1mnal power stations.
TABLE IV
Course Duration for Technicians - Hydro Power Plants
S.No - Training Course Duration
l, Common Mechanical, Electrical and Instrumentation
Course for Technicians
:l. Common On Job Training for Mechanical, Electrical and
Instrumentation for Technicians ·
3. Specialised Course for T0ehnicians
(a) Mechanical ·
4.
5.
(b) Electrical
( c) Instrumentation
Specialised On Joh Training for Technicians
(a) Mechanical
(b) Electrical
( c) Instrumentation
Plant visits and evaluation
3 Weeks
4 Weeks
I ½Weeks
2 Weeks
1 ½ Weeks
4 Weeks
4 Weeks
4 Weeks
2 Weeks
( d) Sub-stations and switch yards of generating stations.- Those who are
expected to be engaged in the operation and maintenance of substation associated
with the generatiJig station, shall be given a training of duration of not Jess than
2½ months for engineers and supervisors (mechanical, electrical and
· instrumentatfon) ~nd I½ m~nths for technicians (mechanical, electrical and
instrumentation trades). The minimum duration of the training courses for the
operating engineers and supervisors shall be\ as specified in Table V for
substations associated with generating stations. The minimum duration of the
training courses for the technicians shall be as specified in Table VI. The contents
of the training course and on job training, along with respective duration shall be
as specified in Part XXV for engineers and supervisors and as specified in Part
XXVI ofthis Schedule for tethnicians to the extent of practical job requirement .in
sub-station associated with the generating station. This shall be followed by visits
and in plant training. Arrangement for Simulator training may also be made.
259 ·
260
-·
THE GAZETTE OF INDIA: EXTRAORDINARY [PART III-SEC. 4]
TABLEV
Course duration for Engineers and Supervisors - sub-stations associated with
generating stations
S.No. Training Course ' Duration
I. Common Mechanical, Electrical and Instrumentation 6 Weeks
Course for Engineers and Supervisors.
2. Common On Job and Simulator Training for Mechanical, 4 Weeks
Electrical and Instrumentation Engineers and Supervisors.
3. Plant visits and evaluation 2 Weeks
TABLE VI
Course Duration for Technicians - Substations Associated with Generating
Stations
S.No. Training Course
I. Common Mechanical, Electrical and Instrumentation 2½ Weeks
Course for Technicians.
2. Common On Job Training,Jndustrial visits and evaluation 3 Weeks
(2) Facilities for creation of training institutes.- (a) The Training Institute shall have a
regular building, residential and recreation facilities.
(b) The Training Institute shall have a full time Principal and adequate number
of teaching staff. ·
( c) The Training Institute shall have adequate number of classrooms, seminar
and conference hall and auditorium, library, computer centre, workshops
(mechanical, electrical and basic workshops), laboratories (control and
instrumentation, water chemistry and relevant testing and research facilities).
The Training Institute shall have facilities for demonstration by static and
working models, simulators, training resource unit supported with Appropriate
reprographic facilities, Audio-visual training aides, Computer Based Training
(CBT) packages, Liquid Crystal Diode (LCD), Slide and Overhead projectors.
( d) The Training Institute shall have a regular lie-up "(ith the Power Stations,
Sub-stations, Load Dispatch Centres, transmission and distribution utilities
including hot line training centres so as to provide training in the respective
fields. ·
( e) The Institute shall have facilities to arrange refresher courses for those
personnel who have already experience in the operation_ and maintenance of a
·generating stition. The staff of the Training Institute shall be properly qualified
and preferably undergone a specialized training course in the art of imparting
training.
(f) The Institute shall have networking of training facilities with the reputed
educational or professional institutes:
(g) Assessment forms for Engineers and Supervisors and for Technicians to
assist the engineers and supervisors are given at Part XXVII of this Schedule.
[ 'WT IIl-'l911's 4 l
11art11 ·
SYLLABUS FORENGINEERS AND·SUP·ERV:ISORS ENGAGED IN THE
OPERATION AND MAINTENANCE()F THECOAL BASED THERMAL
POW]?iR PLANTS
Common course for Electrical, Mechanical and Instrumentation
Item
No.
1
I
II
III
IV
V
Particulars
2
General 'Introduction:
(i) World Power Scenario
(ii) Growth of Power Industry in India
(iii) Generation Scenario in India
(iv) Transmission and Distribution Scenario in India
(v) Role of Private 'PowerParticipants in India
(vi) Organisation/Power Sector set up
(vii) Introduction to Indian Standard specifications for
Electrical wiring
Concept of modern thermal station : ·Power generation from
coal, Central Station and utility systems, base 'load and
peaking stations, concept of unit system, typical thermal
cycles, parameters, :heat rates, fuel :rates, steam rates, typical
heat balance ofboiler, turbine and generator.
Choice of location oflarge thermal station : Site avaifability,
water requirements, .fuel, load centres, transport facilities, air
· pollution, topography, choice•ofsize of generating units.
Plant layout in large central station including machine
arrangements, equipments layout, switchyard and .auxiliary
arrangements.
Constructional · details and basic principles of large
pulverized fuel ·boiler.and auxiliaries
(i) Water and steam drums, heaters and .tubes.
(ii) Types of furnace and firing arrangement and firing
system- Primary, secondary air arrangement, burner
arrangement and furnace safeguard supervisory
system, burner details.
(iii) Economizers, primary, secondary, super heaters, pre
heaters and temperatures.
(iv) Forced draught, Induced draught, Primary Air
exliauster, scanner and igniter air fans, and gas re
circulation fans, compressors, seal air fan.
(v) Types of coal mills, (ball/races, ball .tube, bowl roller)
stoker, coal feeders, Gravimetric feeders (Raw coal
feeders)
Number
of Hours
3
3
3
3
2
15
261
---- --··--· - ---·~-----c:-
262
VI
VII
· VIII
IX
(vi)
(vii)
(viii)
(ix)
(x)
(xi)
THE GAZETTE OF )ND!A : EXTRAORDINARY
Air preheaters, rotary, tubular and steam air heater
Dust extraction plant- electrostatic, mechanical
bottom ash system
Soot blowers
and
Station instrument and service compressed air
reciprocating and rotary compressors.
Feed regulating st<1tion
Boiler mountings, ,drum level indicators , safety
valves, stop valves, start-up devices, sampling,
chemical dosing, continuous blow down, air. vents and
drain system, critical piping supports and hangers
(xii) Refractories and laggings as used in modern power
stations.
(xiii) Ash disposal system - Dry bottom, wet bottom-
scrapper feed~rs and clinker grinders.
Construction and working principles of Turbine and
auxiliaries,
(i) Principle of operation, heat conversion cycles, types
of turbines.
(ii)
(iii)
(iv)
(v)
(vi)
(vii)
(viii)
Casing steam chests, wheel blading, nozzles,
diaphragms, control valves, glands, flanges and HT
bolt heating, bearings, governing system.
Condenser, vacuum pump, steam ejectors,
cirpulating water pumps
Lubrication systi!ll pumps, c~ntrifuging !fiachipes,
coolers: filters, shaft turBine and lifting g~ar: Main
!)ii pump, Jacking 'oil Pl!!llP, Starting oil puiup, AC-
DC oil pump, EmergenFY pi! pudip.' . . . .
i3oiler fee,! pump, fill .pump· iipg' aµxiliaJY eooling
water system', auxiliary stearil system.
Low pressure and high pressure fee,! water heaters,
decaerators and evaporators, gland steam coolers,
drip, air venting and drajp system '
High pressure and low-pressure by-pass systems.
Automatic turbine run-up system
Various types of valves, traps, their constructional details
and application. Cranes, hoists- characteristics and controls
Construction and working principles of · alternators and
excitation systems :
(i) Alternators, cooling arrangements (Hydrogen/air
cooling); stator water cooling, Hydrogen sealing
system
(ii) Main and pilot exciters, voltage regulators, types and
characteristic, amplifier and magnetic amplifier, static
excitation system, Automatic Voltage . Regulation
(AVR).
(iii) Method of grounding.
Construction and working principles of fuel handling plant
equipments :
3
3
2
[PART III-SEC. 4]
10
•
[ 'lT'l m-= 4 l
(i) Coal Handling Plant ;- Wagon tippler, hoppers,
vibratory feeders , screen and conveyor system
crushers, magnetic separators and pulleys, dust
suppressors, dust extractors, stacker re-claimer, rotary
breakers, Merry-Go 0 Round system,
(ii) Fuel oil handling plant - Oil storage tanks, unloading
station oil pumps and heating arrangement
(iii) Coal transportation by ship- Coal transportation by
different types of s_hips such as gearless ship, geared
ship, self unloading ships, ship loading and unloading
equipment ·such as grab type and continuous ship
loaders fun-loaders.
(iv) Coal washing and blending
X Construction and working principles of Ash and slag
handling equipments:
XI
XII
XIII
Electrostatic precipitators, methods of conveying, pneumatic, ·
vacuumatic, hydraulic, bucket elevators, conveyors, screw
extractor.s, ash slurry pumps, High pressure and low pressure
pumps, dry ash collection. Power Environment Interface, •
Environmental Management System
Water Sources and treatment :
(i) Raw water pumping station, domestic, circulating and
boiler makeup water treatment, River salinity, local
water conditions, water recovery system, their
variations in different seasons and effects on
power station operations.
(ii) Hydrogen generating plant
Fuels:
(i)
(ii)
Solid, liquid and gaseous fuels analysis.
Coal-types and suitability for different kinds of
boilers-alterations in firing methods due to change of
coal composition .
General understanding of Basic flow diagrams m power
stations practice :
(i) Coal cycle.
(ii) Fuel oil cycle.
(iii) Air and gas cycle.
(iv) Fly ash and bottom ash/ slag handling arrangements.
(v) Condensate and feed heating cycle (from condenser
hot well up to economizer).
(vi) Water and steam cycle (from economizer to turbine
inlet).
(vii) Chemical dosing circuit
(viii) Circulating water cycle.
(ix) Governing oil, turbine oil, generator, Seal oil circuit.
(x) Hydrogen filling in generator and hydrogen gland
sealing of generator. Bearing cooling system.
(xi) Stator water cooling cycle
263
3
3
3
264
XIV
xv
XVI
THE GAZETTE OF INDIA: EXTRAORDINARY
Direct and . closed· cooling water circuits, cooling towers -
types and characteristics.
D.C. and A.C. power supply for auxiliaries,.arrangements of
unit and station boards, station lighting and. automatic
changeover.
Transformers: Main transformers, interconnecting
transformers, station/unit transformers, voltage grounding
transformers, type of connections, paralleling, tap changing
gear.
[PART III-SEC. 4]
3
3
4
XVII Outdoor switchyard- single line diagrams bus bars, circuit 4
breakers, · isolators, current transformers, potential
transformers, lightning arresters, grounding.
XVIII Indoor and outdoor switchgear: Types - bulk oil, minimum 4
oil, air blast, vacuum air breaker, gas breaker constructional
and functional details.
XIX Working principle basics of Instrumentation and I 2
measurements: Details of measuring instruments for
pressure, flow, temperature, level, draught, vibration,
eccentricity, conductivity, pH value, differential expansion,
xx
oxygen analyser, voltage, current, active power, reactive
power, frequency, energy, winding temperature. Auto
controllers, hydrogen purity meter, axial shift indicator and
recorder, flue gas analysers, megger - its use for primary
detection of faults, data acquisition system, digital
distributed control, UPS, Unit co-ordinated· master control.
Pre-commissioning/ comm1ss10ning activities-Boiler
Hydraulic test, alkali boil out, acid cleaning, TG: Alkali
flushing of regenerative system, acid cleaning of a.ii pipe
lines. TG on barring gear, Others: Steam blower, rotor valve
blasting, steam roller synchronizing
Operation, control and supervision
(i) General boiler start-up procedure.
(ii) Operation of boilers under different loading
conditions, soot blowing.
(iii) Analysis of feed and boiler water, fuel, flue gas at
station laboratory, Power plant chemistry-chemical
operating regime and control, steam purity
(iv) Banking and preservation of oilers.
(v) · Demonstration wherever possible through simulators
· of various operating conditions.
(vi) Handling of boiler under failure conditions, (such as
tripping of turbo-alternator set, high/ low drum levels,
flame failure, failure of supply to,auxiliaries)
and under emergency conditions such as grid
12
'
' '
•
•
•
•
[ 'WT III-~ 4]
XXI
XXII
failures, tube failures, fire out and furnace explosion
( vii) General start up procedure for high-pressure multi
cylinder reheat type turbines from cold, warm and hot
conditions.
(viii) Handling of turbine, generator and auxiliary plant
under failure conditions, such as vacuum failure, low
feed water, condenser levels, excitation failure,
circulating water failure, feed water heater high levels,
excessive vibration, water or oil ingress in generator,
failure of lubricating, sealing oil circuits and
emergency conditions such as grid· failure, black
starting.
(ix) Alternator-synchronising, loading, parallel operations,
MW and MV AR sharing.
(x) Operation of vents and drains in boiler and turbine
Controls and Protection - Se9.uential operation and interlocks:
(i) . Unit protection and interlocks.
( ii) Boiler and auxiliaries.
(iii) Turbine and auxiliaries.
(iv) Combustion control-pressure, fuel, a1r and feed
heating cycle.
(v) Feed water and fuel heating cycle controls.
(vi) Turbine governing, speed setting, speed droop setting
and control circuiis.
(vii)
(viii)
(ix)
(x)
(xi)
(xii)
(xiii)
(i)
(ii)
Generator protection - under-voltage, over-voltage,
differential reverse power, under-excitation, negative
phase sequence, earth fault with types of the· relays
used, Back up impedance, frequency relay, pole
slipping and over current relays
Importance of sequential interlocks.
Transformer protection " differential, overload, earth
faults, high temperature, buchholz with types of the
relays used.
LT/HT motor electrical protection- Types of motors
and variable speed drive and speed controls.
Various types of pumps arid their starting and control.
Steam pressure and temperature control
Furnace purging.
Various types of valves, maps, their constructional
details and application
Fire-fighting a_nd emulsifier type protection.
21
XXIII · General safety precautions, treatment of electrical or acid or I ½
alkali bum,. permit to work, first aid, protective clothing,
safety in movement and storage of materials, switchyard
safety.
XXIV Indian Boiler Rules, Factory Act, Electricity Act, 2003, 4
Central Electricity Authority (Measures relating to Safety
3747 Gl/10--34
265
266 THE GAZETTE OF IND!A : EXTRAORDINARY
and Electric Supply) Regulations, 20 l O and other statutory
Regulations concerning Power Stations (General outline),
Environmental Pollution Act/Regulations.
XXV General plantmaintenance procedure, PERT/CPM methods, 6
Power station records, maintenance planning.
[PART Ill-SEC. 4]
XXVI Efficiency and environment, plant .performance, generation 12
cost, efficiency monitoring and optimization,. stack emission
monitoring and. ambient air quality. Availability Based tariff,
CERC notification on-Tariff.
~I 'i1'ersonnel management, • duties and responsibilities, labour
laws and !about, welfare.
XXVIII ,Broad · Principles of material management and inventory
control
2
2
Total I 45 ½ Hours
=SWeeks
XXIX 0nJob Training: 10 Weeks
(le}· Control·.roomdeskoperations·:
(i) Pre-start checks,
.(iiJ Protection interlocks,
(iii) Lightupprocedures and routine checks,
(iv) Stopping and emergency .operations of Boiler,
Turbine,.Generator and their auxiliaries
(v) Electrical operation location and off-site plant
location
2. Simulator training/Computer applications in operation and 2 Weeks
maintenance of the plant
_ ... _ .-s;..,""-- _____ , __ ·._
,
•
'
•
•
•
'
,
['fill III-1§Ull" 4]
ParHII
SYLLABUS FOR ENGINEERS AND SUPERVISORS ENGAGED IN THE
OPERATION AND,MAINTENANCE OF THE DIESEL ENGINE BASED
POWER PLANTS
Common course for Electrical, Mechanical and Instrumentation
Item
No.
1
I
Particulars
2
General Introduction:
(i) World PowerScenario
(ii) Growth.ofPower.Inclnstry in India
(iii) Generation Scenarioinfodia
(iv) Transmission and Distribution Scenario in India
(v) Role of Private Powe!'Participantsinindia
( vi) Organisation/Power Sect@r set up
(vii) Introduction to IndianStandard specifications for Electrical
wiring
Number
of Hours
3
3
II Concept of modern Diesel Power Station, Power Generation from 3
Heavy Fuels, Central Station and.,Utility systems, base load and
peaking stations, concept of unit systems; he.it rates, heat balance
of engines and general principles of Thermodynamics, enthalpy,
entropy, etc.
III Choice oflocation of large Diesel Station, Site availability,· water 2
requirement, fuel, load centers, transport facilities, air pollution,
t~pography, choice of size of generating units.
IV Plant layout in large Diesel Station including machine 2
arrangements, equipment layout, and switch yard and ·auxiliary
arrangements .
V (i) IC Engines, classification, based cm 2 Stroke,4 Stroke, SI,
CI, comparisons, difference between CI and SI,
classification by cylinder arrangements, engine parts and .
materials used, indicated thermal efficiency%, mechanical
efficiency %, specific fuel consumption, air fuel ratio, caL
value .of fuel, etc.
(ii) Air standardcycles, thermodynamic relations, parameters,
Camc;,,-cycle, Stirling cycle, Ericsson cycle, Lenoir cycle,
Auto cycle, Dual cycle, Diesel cycle, Atkinson cycle,
Brayton cycle, fuel air cycles, varibus ·losses,. effect of
variables -such as compression ratio, fuel ratio, etc.,
difference between real cycle and fuel air cycle, etc.
(iii) Petroleum fuels, introduction and structures, refining
processes and products, •Diesel fuels, octane number,
cetane number, calorific value, viscosity, flash point, pour
point, sulphur content, ash. content, asphaltens, water and
18
------------~ -~---- --~-" - •>-,;_...,, __ ---
268 THE GAZETTE OF INDIA : EXTRAORDINARY [PART lll-SEC. 4]
VI
"'"' ---- -- -
sediment content, catalytic fines, problems caused by
heavy fuels.
(iv) Combustion: - i~ IC engines, air fuel ratio - delay period
_ and factors affecting it - Diesel knock , theory and methods
of control, observations of burning of gases - cold starting
of IC engines and aids.
(v) Super charging objects - cycles - methods - effects of
supercharging on performance of the engme
superchargers - turbo charging and methods
(vi) Dual fuel and multifuel engines - combu~don and factors
affecting combustion - characteristics of multi fuel engines
- suitability of various engines as multi fuel unit -
performance of multiple engines.
(vii) Engine - friction and lubrication - lubrication principles -
bearing lubrication - functions of lubricating system -
properties of lube oil -. additives - classification of lube
oils, filters - crank case ventilation.
(viii) Engine cooling - areas of heat flow - heat transfer - ·
piston and cylinder temperature - quantity of water
required - cooling systems - air cooling, water cooling and
comparison, re - cooling of water, radiators , cooling fans,
thermostatic control, etc.
(ix) Constructional features of engine - crank case - crank·
shaft - main and connecting rod bearings - connecting rod
- piston, crown and ring·s, cylinder liners, cylinder head -
exhaust and inlet valves - fuel injection pump - injectors -
cam shaft push rod_s - tappets - rocker arm etc.
(x) Performance and Testing of Engines basic
measurements - speed - specific lube oil consumption - air
consumption - exhaust smoke - emissions - BHP - FHP
and IHP measurements, de-rating of engines.etc.
(xi) Air pollution - pollutants - Diesel emissions - smoke and
control - Diesel odour co):ltrol - comparison of Diesel and
other fuel emissions. ·
Construction and working principles of D.G. plant auxiliaries : 18
(i) Heavy fuel oil handling system: - railway siding, package
boiler - transfer pumps - storage tanks, dip measurements,'
temperature _and density corrections, shrinkage - heat
tracing and controls - measurements of fuel parameters -
such as viscosity, density, flash point, sulphur content, ash,
water content, acidity, calorific value, carbon residue, pour
point, fire fighting arrangements in the HFO storage atea. ·
(ii) HFO Purifiers: - function of HFO centrifuge - purification
-"_ clarification - principles of centrifugal pump -
component parts of separator and separator plant - layout
diagram: of separator plant - sectional view of separator -
operating cycle of separator plant - recommended
separator_ temperatures - sludge removal , sludge transfer
pump.
'
'
'
[ 'WI III-<!!!"& 4 l
(iii) Common Heavy fuel oil System: - functions of settling
tanks, service tanks - heavy fuel transfer pump - · heat
tracing of settling and service tanks and temperature
control.·
(iv) Diesel Handling system: - transportation modes -
measurements - storage - fire fighting arr11ngements etc.,
common diesel oil systems - transfer pump etc.
(v) Common Lube . Oil System: , - transportation
measurements - storage measurement of lube · oil
. characteristics· such as flash point kinematic viscosity -
viscosity index, TBN value, insolubles in Hexane and
Toluene.
(vi) Cooling water Treatment :- Choice of water a~ refrigerant
- classification of water - matter present in water -
analysis of water for acids, bases and salts - pH value -
disadvantages such as incrustation, sediments - galvanic
corrosion - battery effect - influence of chlorides and
sulphites ·- cavitation, protection methods - plant cooling
water system and boiler water treatment methods and
systems.
(vii) Engine cooling water system and injector cooling water
system. Detailed analysis of single fine P&I diagram.
(viii) Air Intake System: - oil bath filters - silencer - over speed
butter . fly and pressure relief valves - air temperature
control methods. Detailed analysis of single line P&I
diagram.
(ix) Exhaust Gas System: - general flow diagram - recovery
boiler. - exhaust gas regulating valves - silencer -
expansion joint, etc ..
(x) Compressed Air:- classification of compressors - operation
of single and multistage compressors - maintenance
problems - detailed analysis of P&I diagram of plant
common air and unit control air .compressor systems.
(xi) Governor: - governor components - basics of hydraulic
and mechanical governor - speed droop, governor oil, and
introduction to electronic governing - comparison with ·
mechanical governor - over speed shut down.
(xii) Effluent Treatment Plant: - collection pit - decantation pit
- sludge pit - buffer pit - decanter unit - deoiler unit ~ fuel
recovery - coalescent filter.
(xiii) Fuel and lube oil system:-detai)ed analysis of P&I diagram
of unit fuel oil system and lube oil system - viscosity
regulators.
(xiv) Properties of Steam: - formation of steam, definitions
connected with steam - steam tables - Mollier diagrams -
classifications of boiler - waste heat recovery· - detailed
analysis of P&I diagrams of common and unit steam
systems.
VII Various types of valves, traps, their constructional details and 4
application, cranes hoist characteristics and c,;introls.
269
270 THE GAZETTE OF INDIA : EXTRAORDINARY
VIII Construction and worlang principles of alte~ator and excitation
systems: · ·
(i) Alternator, Cooling Arrangements.
(ii) Static Excitation Systelli, Automatic voltage regulator.
(iii) Method of Grounding,
IX D.C and A.C power supply for auxiliaries, arrangement of unit and
station switch cubicles, station lighting and auto.matic change over.
X Transformers -
Main transformers, interconnecting transformers, station/unit
transformers, and 11eutral grounding transformers, parallel
operation of transformers, on load and offload tap changing gears.
. .
[PART IIl-'SEC. 4]
4
2
3
XI Outdoor switch yard :- Single line diagrams, bus bars,• circuit 3
breakers, isolators, current and potential transformers, lightning
arrestors; , importance of earth mat grounding ..
XII Indoor and Outdoor switch gear - 3
Types - bulk oil, _minimum oil, air blast, SF6 , and vacuum circuit
breakers, construction and functional details
XIII
XIV
Working principles . and basics of instrumentation and
measurements :
Details of measuring instruments for pressure, flow, temperature,
level, vibration, eccentricity, conductivity, pH values, differehtial
expansion, current, voltage, frequency, active and reactive power,
energy, megger - its use; multimeter, data acquisition.· system,
digital distributed control, UPS, pr6gramlllable logic controller. ·
Operation, control and supervision :
(i) General startup procedure, manual. and automatic starting,
change over to heavy fuel ·
(ii) Operation of engine under different loading conditio,9s.
(iii) Engine safety :- Crank case pressure, mist concentration
monitor, lube.oil, ultra low pressure and jligh temperature,
jacket water high temperature, over speed tripping,
common electrical faults, turbo charger, lube oil outlet high
temperature, fuel oil · low pressure, jacket water low
pressure, engine inlet air high temperature, etc.
(iv) Starting and running - in, of the engine after overhaul -
precautions .
. (v) . Load reduction, normal stopping, and emergency stopping,
rinsing·operations.
(vi) ·0peratfon and supervision of running DG sets, rinsing.
(vii) Operating anomalies - causes and remedies.
(viii) Precautions to be taken for restarting engine after long
period of immobilization .
. (ix) Alternator , synchronizing, loading , parallel operation,
MW and MVAR
6
9
'
'
•
[ 'WI III-~ 4 J
XV Controls and Protection :- Sequential operation and inter locks_:: 6
detailed study of logical -diagrams of PLC, transformer protection
- differential, over load, earth fault, oil and winding high
temperature, Buchholz relay, etc., LT and HT motor electrical
protection, types of motors, variable speed drives and controls,
generator protection ~ under and over voltage, differential, reverse
-power;under excitation, negative phase sequence, earth 'fault, etc.,
various types of pumps, their starting and controls, neutral shift
relay, etc. -
XVI Fire Fighting and emulsifier type of protection.
XVII General Safety precautions; treatment ofelectrical or acid or alkali 2
burns, work permits, first aid, protective clothing, safety in
movement and storage of materials, switch yard safety.
XVIII Indian Boiler Rules, Factory Act, Electricity Act, 2003, Central 4
Electricity Authority (Measures _ relating to Safety and Electric
Supply) Regulations, 2010 and other statutory Regulations
concerning power stations, Environmental _ Pollution Act/
Regulations.
XIX General Plant Maintenance procedure, PERT/CPM methods, 3
power station records; maintenance planning.
XX Efficiency and environment, plant performance, generation cost, 9
efficiency monitoring .and optimization, stack emission monitoring
and ambient air quality, fuel and lube oil conservation and
minimization of auxiliary losses. Availability based tariff, CERC
notification on tariff.
XXI Personnel management, duties and responsibilities, labour laws _ 3
and labour welfare.
XXII 13road Principles of material management and inventory control 2
Total 110 Hours
:4 Weeks
XXIII On Job Training:
(!) Control Room Desk Operations: 2 Weeks
(i) Preslar! Checks.
(ii) Protection and starting inter locks.
(iii) Routine checks such as leakages, pressure, temperatures,
levels, operation of air, fuel, lube oil filters, checks for
lubl) oil flow in the engine and turbocharger, oil_ seal
pressure, checks for rio water, no oil or fuel leaking from
decompression cocks, checks for abnormal noise, mist
concentration, crank case pressure, starting. air pressure,
cylinder temperature after running, bearing temperatures, -
271
m
(iv)
(v)
THEGAZETTEOFIND~:EXTRAORDmARY
starting firing sequence.
Stopping under emergency conditions of engine,
generator and auxiliaries, rinsing operations
On site Electrical operation location and off site plant
locations. ·
(vi) Simulator Training/Computer applications in operation
and maintenance of the plant.
[PARrUI-SEc. 4]
2. To be associated with field maintenance Engineers in. the area 2 Weeks
(i) Fuel handling and purifier
(ii) Compressor and ETP
(iii) JW, LO Seal Pumps and drive, chemical dosing system
.(iv) JW, IW level controllers viscosity Regulations
(v) Charge air Regulations, cyl. temp.monitor
(vi) Engine air modular protection including calibration of
inputs and setting of thresholds ·
(vii) Starting air control equipment and ti.ring sequence.
(viii) Steam system level controllers, calibration, press
controllers, boiler circulating water pumps, condensate
transfer pumps, etc.
(ix) NDT and Welding
Part IV
SYLLABUS FOR ENGINEERS AND SUPERVISORS ENGAGED IN THE
OPE.RATION AND MAINTENANCE OF THE COMBINED CYCLE GAS
TURBINE BASED POWER PLANTS
Common course for Electrical, Mechanical and Instrumentation
Item No. Particulars Number of
Hours
1 2
I General Introduction:
II
III
IV
(i) World Power Scenario
(ii) Growth of Power Industry in India
(iii) Generation Scenario in India
(iv) Transmission and Distribution Scenario in India
(v) Role of Private Power Participants in India
(vi) Organisation/Power Sector set up
(vii) Introduction to Indian Standard specifications for Electrical
wiring
Concept of Gas Turbine: power generation from petroleum fuels
such as naphtha , gas, modular NGL Central Station and utility
systems, base load and peaking stations, concept of system, typical
. Open and Combined cycles,_parameters, heat rates, fuel rates, steam_
rates, typical h(l!lt balance of gas turbine, waste heat rncovery boiler
and turbo generator. ·
Choice of location of large Gas Power Station: Site availability,
water requirements, fuel supply centers, air pollution, topography.
Plant layout in large central station including machine arrangements,
equipment layout, switchyard and auxiliary arrangements.
3
3
3
3
2
---- ------------- -- ---
•
,,.
'
•
•
V Constructional details and basic principles of gas turbines.
VI
VII
VIII
IX
X
(i) Air filters
(ii) Compressors
(iii) Furnace chamber
(iv) Gas turbine
Gas Turbine Air Intake inlet air filtration, Exhaust system and
Compressor System, Gas turbine auxiliaries and governing system,
Air compressor and Air drawing'system
Construction and functional features of steam turbine and
auxiliaries, governing system; oil system, control valves ·
Construction and working principles of Alternators and excitation
systems: • ·
(i) Alternators, cooling arrangements (hydrogen/air cooling),
stator water cooling, hydrogen sealing sysJ~m.
(ii) Characteristic amplifier and magnetic ·. amplifier, static
excitation system, Automatic Voltage Re~lation (AVR) .
(iii) Method of grounding.
Fu~] handling, storage and supply, fuel characteristic
General understanding of Basic flow diagrams in power station
practice:
(i) Fuel cycle
(ii) Air Cycle
XI · Direct and closed cooling water circuits, cooling towers, types and
XII
XIII
XIV
xv
XVI
characteristics. ·
D.C. and A.C. power supply for auxiliaries, arrangements' of-unit.
and station boards, station lighting and automatic changeover.
Transfonners: Main transfonners, interconnecting transformers,
station/unit transformers, voltage grounding transformers, type of
connections, paralleling, tap changing gear:
Outdoor switchyard, single line diagrams, busbars, circuit breakers;
isolators, current transformers, potential · transformers, lightning
arresters, grounding.
Indoor and outdoor switch gear: Types - bulk oil, minimum oil, air
bla.st, SF6 , and vacuum circuit breakers, construction and functional
details.
Working principle and basics oflnstrumentation and measurements:
Details of measuring instruments for pressure, flow, temperature,
level,, draught, vibration, eccentricity, conductivity, pH value,
differential expansion, oxygen analyzer, current, voltage, active
power, reactive power, frequency, energy, winding temperature.
Auto-controllers, axial shift indicator and recorder, flue gas
3747 G//10--35
--- ----~- ·-------
12
6
6
6
3
6
2
3
3
3
8
Y/3
--.----:;..,~-·
274
XVll
XVIll
XIX
xx
THE GAZETTE OF INDIA : EXTRAORDINARY
analyzers, Megger - its use for primary detection of faults, data
acquisition system, digital distributed control, UPS, Unit
co-ordinated master control.
Precommissioning/ Commissioning Activities
Operation, control and supervision
(i) General gas turbine start-up procedure.
(ii) Operation of gas turbine under different loading conditions,
(iii) Analysis of water, fuel, at station laboratory.
(iv) Demonstration wherever possible through simulators of
various operating conditions. · ·
(v) Handling of gas/steam turbine under failure conditions (such
as tripping of turbo-alternator set, failure of supply to
auxiliaries) and Uf\der emergency conditions such as grid
failures, tube failures, fire out, etc. · _
(vi) <Jenera! start up procedure for highcpressure turbines from
cold warm and hot conditions.
(vii), Handling of turbine, generator and auxiliary plant under
failure conditions, and emergency conditions such as grid
failure.
(viii} Alternator-synchronizing, loading, parallel operations, MW
and MV AR sharing.
(ix) Water Treatment and water chemistry, R O System and
mesied hed, Boiler meter internal treatment
Controls and Protei::tion - Sequential operation and interlocks:
(i} · Unit protection and interlocks.
(ii) Gas turbine and auxiliaries.
(iii) Steam Turbine and auxiliaries.
(iv) Comb!lstion control-pressure, fuel, air cycle,
(v) Turbine governing, speed setting, speed droop setting _and
control circuits.
(vi) Generator protection, under;voltage, over-voltage,
differential, reverse power, under-excitation, negative phase
sequence, earth fault and types of relays used.
(vii) Importance of sequential inters locks.
(viii) Transformer protection - differential, overload,, earth faults,
high temperature, Buchholz and types ofrelays used.
(ix) LT/HT motor electrical protection
(x) Types of motors and variable speed drive and speed controls,
(xi) Various types of pumps and their starting and control.
(xii) Steam pressure and temperature control including automatic
detection and alarm system for naphtha fuel handling /
storage.
(xiii) Furnace purging.
Fire-fighting equipment and permanent fire fighting appliances
including automatic detection.
[PARr Il!-Soc. 4]
4
22
18
•
~--~----.~-------------::_-::._-_-.. -----~--------_ --=---=---=---=---=--.-_-_-_-_-_~~-------. -_-~.-. ~--=-_-_-_-__ -_ -.-_--
[ '1l'T IIl-"W6 4 J
XXI
XXII
XXIII
XXIV
General safety precautions, treatment of electrical or acid/ alkali -
bum, permit to work, first aid, protective clothing, safety in
movement and storage of materials, switchyard safety,safe handling_
of naphtha fuel in transport, storage. and in gas turbines,
Indian Boiler Rules, Factory Act, Electricity Act, 2003, Central
Electricity Authority (Measures -_ relating to Safety and Electric
Supply) Regulations, 2010 and other statutory Regulations
concerning .Power Stations (General outline), Environmental
Pollution-Act/Regulations.
General plant maintenance procedure, PERT/CPM methods, power
station records, maintenance planning.
Efficiency and environment, plant performance, generation cost,
efficiency monitoring and optimization, stack emission monitoring
and ambient air quality. Availability Based Tariff, CERC
notification on Tariff, Gas Turbine Emission guideGnes and control
methods, Non emission target levels, Power output allowance, Heat
recovery allowance, emission levels for other contaminants _ ·
XXV Personnel management, duties and responsibilities, labour laws and
labour welfare.
XXVI Broad Principles of material management and inventory control
2
4
6
9
2
Total 140 Hours
XXVII On Job Training:
(I) Control room desk operations:
(i) Pre- start checks,
(ii) Protection interlocks ,
(iii) Light up procedures and routine checks,
(iv) Stopping and emergency operation _of Boiler , Turbine ,
(v) Generators 'and their auxiliaries
(vi) On site Electrical operation location and off-site plant
location
2. Simulator training/Computer application m operation and
maintenapbe of the plant
:4½ Weeks
7Weeks
1 Week
trs
276
--~
THE GAZETTE OF INDIA : EXTRAORDINARY
PartV
SPECIALISED SYLLABUS FOR ENGINEERS AND SUPERVISORS
ENGAGED ON THE MECHANICAL SIDE OF THE COAL BASED·
THERMAL POWER PLANTS
Item
No.
1
I
II
III
IV
V
Particulars
2
Boiler:
Corrosion of boiler and auxiliaries, condenser and feed water
heating plant, Scale formation in boiler in relation to wtler
conditions.
Acid cleaning and preservation of boiler, mechanical removal of
deposits, scaffolding methods, quick-erect scaffolding in fum,,ce,
ultra-sonic thic~ess survey. High pressure water jet equipment
Annual boiler and auxiliaries overhaul- hydraulic test, floating of
safety valves, preventive and· breakdown maintenance of boiler
auxiliaries, cutting of tubes and welding, ultrasonic testing and
stress relieving.
Efficient _operation of boilers- intetpretation of gas analysis for
proper combustion controls and methods of reducing other losses.
Constructional details of hydraulic and other types of couplings,
torque converters, servo motor.
[PART Ill-SEC. 4]
Number
of Hours
3
4
6
12
8
3
VI Constructional details of various types of pumps, their drives and 9
automatic starting, air-conditioning. Constructional details of -
various types of draught fans, their drives and automatic starting. ·
Types of wear on fans arid pumps and their effects, detection of
unbalance in fans and pumps, instruments for measuring
vibrations, vibration analysis and dynamic balancing procedures,
noise measurements and control.
VII Coal handling plant: 12
(i) Sequential Operation.
(ii) Conveyor and conveyor drives.
(iii) Tensioning arrangements.
(iv) Maintenance of guide rollers/ idlers.
(v) _Sway·switches/slip switches.
- (vi) Beetle charger for wagon marshalling.
(vii) Wagol). tipplers and coal crushers, weighing of coal,
different types of weighing bridges and meters, Coal storage
problems and prevention of spontaneous combustion.
Sampling of coal/British •Standards Specification/ltidian
Standards Specification, procedure and proximate analysis.
(viii) Belt jointing methods-vulcanising, mechanical clamping, etc.
•
"
[ <!JTf 111-~ 4]
VIII
IX
"!Ra <fi"T ~ : 3rnl'lR"I
(ix) Stacker re-claimer.
(x) Vibrating feeders, vibrating screens.
(xi) Magnetic separators.
(xii) Coal· crushers.
(i) Working principle and construction of water treatment plant.
(ii) Water treatment-hardness, pH value, clarifiers, treatment;
phosphate and hydrazine dosing, base exchangers.
(iii) DG sets and compressors
Annual overhaul and inspection of turbine and auxiliary plant,
condenser tube cleaning, maintenance of pumps, lubrication
system, recycling of lubricating oil and· selection of lubricant,
condenser tube materials- wear and tear and effect of local water
conditions, types of failure, detection, preventive maintenance and
re-tubing of condensers, Maintenance of LP / HP heaters and de-
aerators.
6
9
X 12
(i) Maintenance practice - Rigging and slinging, valve
grinding methods, high pressure welding heat insulation
methods, pipe work, aligmnents, bearing, scraping and
matching practice, radiography and stress relieving methods.
Anti-friction bearings and their installation and lubrication .
. Non destructive testing and principles, procedures and
application. Welding techniques and equipment.
(ii) Lubrication principles and their characteristic.
~ 2
~I
~v
xv
XVI
XVIL
XVIII
Indian Boiler Regulations and other statutory Regulations.
Workshop, types and use of hand tools and tackles, fabrication of
spares, repairs and maintenance of mechanical equipments such as ·
vehicles, tractors, dozers, shunters, cranes and hoists, welding -
modem techniques · and their applications iri maintenance of
boilers, turbine and associated plant
Composition, properties and behavior of Engineering materials
used in power stations.
Residual life assessment and extension methods
Mechanical safety rules and policies
Maintenance planning and spares inventory, productivity, cost
control.
Simulator Training
10
6
6
4
6
60
175 Hours
Total =6 Weeks
4 weeks
On Job Training:
To be associated with field maintenance Engineers in the area of:
(i) Pressure parts maintenance
(ii) Rotary equipment maintenance
(iii) Pumps and dri_ve maintenance
(iv) NDT and welding
(v) Turbine and auxiliaries maintenance
Z/7
278 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III-SEC. 4]
Part VI
SPECIALISED SYLLABUS FOR ENGINEERS AND SUPERVISORS.
ENGAGED ON THE MECHANICAL SWE OF DIESEL ENGINE BASED
POWER PLANTS
Item
No.
1
I.
II.
III.
IV.
V.
Particulars Number
of Hours
2 3
Constructional details of hydraulic and other types of couplings, 2
torque converters - servo motor.
Constructional details of various types of pumps, their drives and 5
automatic starting, air conditioning. Constructional details of
various types of ventilation fans, and automatic starting, types of
wear on fans and pumps and their effects, detection of unbalance
in fans and pumps. Instruments for measuring vibrations,
vibration analysis. and dynamic balancing procedures, noise
measurements and control.
Fuel handling plant: Detailed operation and maintenance of fuel 2
stock yard, fuel purifiers, heat tracing, transfer pumps, settling
aiid service tank, etc.,
(i) Water Treatment~ quality of water, dozing of chemicals
. - . I
for cooling water and boiler water. Study and effects of
water quality parameters ..
(ii) Compressors.
Scheduled Overhaul and inspection of engirie and auxiliaries of
the Plant: ·
(i) Scheduled engine maintenance works required at I 500
hours, 3000 hours, /iOOO hol!rs, 12000 hours and 24000
hours; maintenance procedures of lubricating oil pt.imps,
jacket water pump, etc., recycling of lubricating oil and
monitoring of lube oil parameters.
(ii) Types of failures in the engine, break down maintenance,
carrying out hydraulic tests on cylinder heads, exhau~t
valves etc., calibration of injectors and fuel oil pumps
(iii) Maintenance of Turbocharger, dismantling, checking the
bearings, Compressor wheel, turbine shaft and blades,
cleaning, measurement of clearances on the compressor
as well as on the turbine side, before and after -
dismantling. Turbo charger washing !'1ethods.
(iv) Routine checking of oil pressure, water pressure, inlet and
outlet temperature, operating condition monitoring, types
of failures and detection, scheduled maintenance works ·
3
15
•
•
•
t '1ilT 111~~ 4)
VI
VII.
VIII.
IX
X
such as bowl cleaning, replacement of clutch shoes,
vertical and horizontal bearing, de-sludging operation,
starting and stopping of separators.
Maintenance practice, valve grinding, lapping, . high pressure
welding, heat insulation methods, pipe work and alignments.
Motor. and pump coupling alignments, bearing, scraping and
matching practice, radiography and stress relieving methods,
antifriction bearings and their install.ation and lubrication. Non
destructive testing and principles, procedures and· application.
Welding techniques and equipments. Replacing of oil seals and
bearings, reconditioning of inlet valves, exhaust valve, fuel
pumps, etc., maintenance of boiler circulating and condensate
transfer pumps, recovery, boiler backwash, etc.
Workshop, types and use of hand tools and tackles, fabrication of
spares, repairs and maintenance of mechanical equipment such
as fork lifts, cranes, hoists, welding ~ modem techniques and
their applications.
Composition, properties and behavior of Engineering materials
used in power stations.
Residual life assessment and extension methods.
Mechanical safety rules and policies.
9
2
5
6
4
'Il9
m s
Maintenance planning and spares inventory, productivity, cost
control. 61 Hours
Total = 2 Weeks
--- ---~--·--·----~- -~.-~--------- ---------·· ·-~------
280 THE GAZETTE OF INDIA : EXTRAORDINARY [PART III-SEC. 4]
Part VII
SPECIALIZED SYLLABUS FOR ENGINEERS AND SUPERVISORS
ENGAGED ON THE MECHANICAL SIDE OF THE COMBINED CYCLE GAS
TURBINE BASED POWER PLANTS
Item No.
1
I
II
III
IV
V
VI
VII
VIII
IX
Particulars
2
Waste heat recovery boiler:
C~rrosion of boiler and feed water heating plant, scale
formation in boiler in relation to water conditions.
. Acid cleaning and preservation of boiler, mechanical removal
of deposits, auxiliary cooling water system, by pass stack and
its features.
Constructional details. of hydraulic and other types of
couplings, torque converters, servo motor.
Constructional details of various types of pumps, their drives
and automatic starting, air-conditioning, various types of
draught fans, their drives and automatic starting.
Types of wear on fans and pumps and their effects,. detection
of unbalance in -fans and pumps, instruments for measuring
vibrations, vibration analysis and dynamic balancing
procedures, noise measurements and control.
(i) Water treatment- hardness, pH value, clarifiers,
treatment, phosphate and hydrazine dosing, base
exchangers.
(ii) DG sets and compressors.
Power cycle, piping, fittings, valves and thermal insulation,
Gas turbine overhaul procedures.
Annual overhaul and inspection of turbine and auxiliary· plant,
condenser tube cleaning, maintenance of pumps lubrication
system, recycling of lubricating oil and selection of lubricant,
condenser tube materials- wear and tear and effect of local
water conditions, types of failure, detection, preventive
maintenance and re-tubing of condensers.
Maintenance practice - Rigging and slinging, valve grinding
method.s, high pressure welding, heat insulation methods, pipe
work, alignments, bearing, scraping and matching practice,
radiography .and stress relieving methods. Anti-friction
bearings and their instaHation and lubrication .. Non destructive
testing and principles, procedures and application. Welding
techniques. Alignment methods.
Number
of Hours
3
6
3
6
3
5
6
6
12
10
.
'
•
'
•
•
['WT III-'-= 4]
3747 Gl/10-36
X
XI
XII
XIII
XIV
xv
Indian Boiler Regulations and other statutory Regulations.
_Workshop, types and use of hand tools and tackles, fabricatiC)ll
of spares, repairs and maintenance of mechanical equipments
such as vehicles, tractors, dozers, shunters, cranes and hoists,
welding - modem techniques and their applications in
maintenance of boilers, turbines and associated plant.
Composition, properties and behavior of Engineering materials
used in power stations.
Residual life assessment and extension methods/Mechanical
safety rules and policies
Maintenance planning and spares inventory, productivity, cost
control.
Total
On Job Training:
To·be associated with field maintenance Engineers in the area
of:
(i)
(ii)
(iii)
(iv)
(v)
(vi)
Pressure parts maintenance
Rotary equipment maintenance
Pumps and drive maintenance
NDT and welding .
Turbine and auxiliaries maintenance.
Steam and Gas turbine maintenance: Inspection of
combustion chamber, replacement of liners, air filters,
acid and alkaline cleaning of water coolers, NDT,
governor bearing inspections, exhaust area inspection,
replacement of guide vanes, cleaning of blade cooling
passage, maintenance of bleed valves, compressor
cleaning .
2
6
2
3
6
76 Hours
=2 ½ Weeks
4 weeks
281
THE GAZETTE OF INDIA : EXTRAORDINARY [PART Ill-SEC. 4]
Part VIII
SPECIALISED SYLLABUS FOR·ENGINEERSAND SUPERVISORS
ENGAGED ONTHE ELECTRICAL SIDE OF COAL,DIESEL ENGINE AND
GAS TURBINE BASED POWER PLANTS
Item
No.
Particulars
1 2
l. Maintenance and commissioning of generators, excitation
system, generator seals, Generator protection- earth fault in rotor
and stator, negatfve phase sequence, loss of · excitation,
differential protection, back up protection, reverse power
protection, under-voltage protection, overload protection,
constmctional · details- of the relays. used, method of setting and
their testing, and over heating ofrotors.
II Motor maintenance
Ill Transformer protection - Buchholz relay, over current,
differential and·earth fault protection,.types of relays used, their
constructfon, _testing and settings.
IV Transformer commissioning, di•elcctric strength of oil,
insulation resistance, tap changers, filtration of oil, pre
commissioning testing. Tan•Delta resistivity of oil and
preventive maintenance oftransformers, dissolved gas analysis.
V Circuit bn;akers, commissioning and maintenance, isolators, dis
connectors, bus,bar arrangements, charging, synchronising with
the grid, disconnecting for repairs, maintenance of switchgear
contactors.
VI Maintenance of equipments in the outdoor switchyard, current
transformers, potential transformers and lightning arrestors,
operation and maintenance.' Bus differential protection.
VII Thermography monitoring
VIII Line protection, fault analysis, bus-bar and local breaker back-up
protection (LBB).
IX Cables - control cables, layouts of equipments at voltage
excee_ding 650V, testing and maintenance.
X
XI
Principle of electronic controls and transistorised circuits.
Pneumatic and di-electric transmitters and receivers, servo
motors.
Number
of Hours
3
12
4
3
3
4
4
2
4
4.
5
6
•
'1:.
- --·--------------------------~--
'
•
["IT'Tlll"&1".s4]
XII Interlocking, sequential control circuits, details_ of components 7
use9.
XIII Calibration and testing of various types of instruments - 8
indicating instruments, measuring instruments, recorders, and
analysers.
XIV Statutory Electricity Acts and Rules and permit procedure 4
XV Starting and control equipments -of various types of motors, JO
station battery-care and · maintenance, trickle charging and
extended charging, operation and maintenance of rectifiers and
battery chargers, UPS, emergency-power supply.
XVI Economic load dispatch, power system control and operation, 8
MVAR-control,. voltage Regulation and frequency . control,
capacitors and reactors, islanding schemes, carrier · current
equipments, telephones, telernetering.
XVII Station Emergency lighting arrangements ..
XVIII Simulator Training 30
XIX
Total 119 Hours
:i.4 Weeks
On Joi> Training (Applicable only for Engineers and Supervisors
engaged ori Coal and·Gas Turbine based plants):
To be associated with field electrical maintenance in the area of:
(i) HT/LT lliOtors
(ii) Transformer maintenance
(iii) AC/DC supply systems, station batteries and DG sets
(iv) Generator/ excitation systerns
(v) Switchyard / switchgear equipment maintenance
..,.,__ ,.
--------------·--------- -
4weeks
283
284 THE GAZETTE OF INDIA : EXTRAORDINARY - [PART Ill-SEC. 4]
Part IX
SPECIALISED SYLLABUS FOR ENGINEERS AND SUPERVISORS
ENGAGED ON THE INSTRUMENTATION SIDE OF COAL, DIESEL
ENGINE AND GAS TURBINE BASED POWER PLANTS
Item
No.
Particulars Number
of Hours
1
I.
II.
III
IV.
V.
VI.
VII.
2
Working principles, calibration, control_ methods and
maintenance aspects of temperature measurement devices:
(i) Resistance thermometers, thermocouples -
(ii) Recorders, indicators
(iii) Transmitters.
Working principles, calibration, control methods and
maintenance aspects of pressure measurement devices:
(i) Diaphragm gauges, Bourdon gauges·
(ii) Recorders, indicators
(iii) Transmitters.
Working principles, calibration, control methods and
maintenance aspects of flow measurement devices:
(i) Positive, semi-positive, rate and differential pressure
flow meters
(ii) Recorders and indicators
(iii) Transmitters.
Working principles, calibration, control methods and
maintenance aspects oflevel measurement devices:
(i) Dip-sticks, sight glass, pressure gauge bellows /
diaphragm, float, buoyancy, gas purge, differential
pressure and capacitance type level measurement
system
(ii) Recorders and indicators
(iii) Transmitters:
Telemetering and signal conditioning - pneumatic systems,
electrical systems, electronic systems and maintenance
aspects.
Basic electronics - Component familiarisation and various
-types of circuits, microprocessors - -
Turbovisory, instruments - their basic principles, application
and calibration: -
(i) · Eccentricity and vibration, its interpretation and
measurements, different pick-ups, their location, etc.
(ii) Use of vibration instruments and analysis, differential
expansion, measurement and interpretation, different
pick-ups, their location, etc., overall thermal expansion
3
4
4
4
-4
3
2
6
[ "l]T! III-1sf1!6 4 l
VIII.
IX
X
XL
XII.
XIII.
XIV.
measurements, · axial shift position measurements,
valve position and servo motor position indicators,
differential metal temperature measurements, turbine
stress evaluators
Actuators:
Operating principles of pneumatic, hydraulic and electrical
actuators and their control mechanisms, maintenance,
inspection and testing aspects.
Analytical instruments:
Theory and working principles- steam/ water analysers, like
conductivity, pH, Na, NH3, Hydrazine etc., theory and
working principles of combustion monitoring instruments
such as CO2, 0 2, etc., interpretation of the above parameters
to the operating regimes of the plant.
HP/LP bypass and PRDS system:
Piping schematic with details of various valves and
transmitters, Equipment details - mechanical and electrical,
Control philosophy, Pre-commissioning checks and
commissioning procedures.
Instrument air system:
Air Supplier, piping and piping layout, air purification and
conditioning, basic theory and working principles of
pneumatic transmitters and secondary instruments, theory
and working principles of E/P converters and valve
positioners
. Control and Instrumentation scheme tracing:
Instrumentation and control scheme of fuel, air, flue gas,
feed water and steam systems including their measurements
(i) Furnace Safeguard Supervisory System (FSSS), plant
equipment protection and interlock system. (not
applicable for DG Plant and Gas Turbine based Plant)
(ii) Automatic turbine run-up system (ATRS), analog and
digital controllers. (not applicable for DG Plant)
Data acquisition system/digital distributed control (DDC),
UPS, control room layout
2
4
6
2
9
9
6
Total 65 Hours
=2 Weeks
XV On Job Training:
(Applicable only for Engineers/Supervisors engaged on Coal
and GasTurbine based plants)
(i) Control system - basic principles, constructional
features, calibration, preventive maintenance and
3 weeks
285
286 THE GAZETTE OF INDIA : EXTRAORDINARY
trouble shooting of analog control systems, level,
flow, pressure and · temperature control systems,
component I cards .used in control systems, static and
dynamic. timing, control valves and dampers
(ii) Data acquisition system. or distributed digital control
system - basic principles, constructional features,
calibration, preventive maintenance and trouble
shooting of digital and analog inputs to DAS and their
conditioning, 1/0 and interface, functioning of alarms,
monitoring formats and logs, sequence of events
PartX
[PART III-SEC. 4]
1 week
SYLLABUS FORTECHNICIANS ENGAGED INTHE OPERATION AND
MAINTENANCE OF THE COAL BASED THERMAL POWER PLANTS
Common course for Electrical, Mechanical and Instrumentation
Item Particulars
No.
1 2
I.
II
III
IV.
V.
Vl.
VII.
VIII.
Power plant familiarisation
Fundamental units and their conversion (mechanical, electrical,
thermo-dynamic).
Engineering drawing and practice.
Fuels and combustion, types of fuels - their properties and
testing, requirement of efficient combustion
Boiler and boiler house plant and auxiliaries :
(i) General description
(ii) Arrangement of boilers
(iii) Boiler auxiliaries
(iv) Boiler instrumentation
(v) Fabrication and assembly of different parts .of boiler and'
its accessories
(vi) High pressure welding in boilers
( vii) Arrangement of pulverised fuel boiler in a modem
thermal power station
(viii) Operation appreciation (start-up, running and shutdown)
Water conditioning, pre-treatment and demineralisation, water
chemistry.
Ash handling- electrostatic precipitation and mechanical dust
collector- functions and description of two types.
Turbine and turbine house auxiliaries.
(i) Fundamental principle of steam t~rbine
(ii) Theory and operation of steam turbine
(iii) Governing and protection of turbine
(iv) Operation appreciation (start-up, running and shutdown)
Numbers
of Hours
3
6
2
6
4
16
4
2
12
--.· ---~~--------------------
•
•
IX. Handling of turbines and boilers under emergency conditions.
X. Condenser and vacuum extraction plant :
(i) Purpose and function
(ii) Construction of surface condenser and.vacuum pumps
XI. Regenerative feed water heating, constructional details of low
pressure and higb pressure feed water heaters, de-aerators and
evaporators.
XII. Cooling water systems and cooling towers.
XIII.
XIV.
XV.
XVI.
XVII.
Flow diagrams of basic cycles and scheme tracing :
(i) Coal handling.
(ii) Steam and condensate
(iii) Ash and slag handling
(iv) Station services - domestic water, air conditioning,
ventilation, lifts
(v) Air services, air compressors, switchgear
(vi) Bearing cooling, and general service water system
(vii) Circulating water system
(viii) Feed water and reheating plant
(ix) Fuel oil system
(Xf' ·station batteries and battery charging equipment
(xi) Station lighting, power supply and distribution boards.
Mechanical appreciation.- correct use of machines, tools and
tackles, gauges, l.its anddearances, tolerances, brazing,
soldering and welding, bearings, gears and thread, fasteners
Bearings types, installation and removal procedures and
maintenance of clearances and tolerances, oil seals types, their
applications and clearances.
Lubrication and coo.ling principles.
Station instrumentation and controls ..
XVIII. Fire-fighting installations in thermal power station.
)
4
3
2
16
6
2
2
8
3
XIX. Electric shocks, first aid, acid burn, alkali wounds, chlorine gas 3
poisoning and their treatment.
XX. Duties and responsibilities of operators and plant attendants, 2
carrying out instructions, reporting to supervisors, recording
and ,eading unusual' occurrences, expected behavior, discipline,
sincerity, c)eanliness and love for machines.
XXI Personnel. safety equipment, cleanliness, caution and care in I
power station working.
XXII. How electricity is generated, transmitted and distributed i.e. 2
generator to Consumer service board.
287
288 , 1HE GAZETTE OF INDIA : EXTRAORDINARY [PART III-SEC. 4]
XXIII Principle and working of alternating current and direct current
generators and their parallel operation.
XXIV Principle and working of transformers and their parallel
operation
2
1
XXV. Principle and working of alternating current and direct current 2
motors, their spe_ed characteristics, contr?ls.
XXVI. Storage battery- principle, construction and charging. 1
XXVII Alternator cooling - different systems of cooling, advantages of. 2
hydrogen cooling over others, hydrogen plant.
Total 115 Hours
=4 Weeks
Part XI
SYLLABUS.FOR TECHNICIANS ENGAGED IN THE OPERATION AND
MAINTENANCE OF 1HE DIESEL ENGINE BASED POWER PLANTS
Common course for Electrical, Mechanical and Instrumentation
Item Particulars
No.
1 2
I
IL
III.
IV
V.
Power plant familiarization.
Fundamental units .· and their c.onversion and measurement
(mechanical, electrical, thermodynamic)
Engineering drawing and practice
Fuels and combustion, types of fuels - their properties and
testing, requirements of efficient combustion.
Diesel Engine and Auxiliaries :
(i) General description
.(ii) Arrangement of engine
(iii) Engine auxiliaries
(iv) Assembly of different parts of engine and its accessories
(v) Engine instrumentation
(vi) Operation appreciation (start up, running and.shut down).
Number
of Hours
3
8
4
6
8
24
VI Water conditioning, pre treatment and demineralization. 6
VII Effluent treatment, plant functions and description, importance 4
of treatment plant.
VIII Turbochargers: 6
(i) Fundamental principles of turbocharger··
(ii) Theory and operation of turbocharger
(iii) Monitoring and_protection of turbocharger
,.
'
'
•
'
[<WTIII-=4l
IX
X
XI
XII
XIII
XIV
xv
XVI
XVII
XVIII
XIX
xx
XXI
XXII
Handling of Engine under Emergency conditions.
Fuel oil and lube oil separators:
(i) Purpose and function
(ii) Operation and maintenance of separators
Cooling water system and radiators.
Flow Diagrams of basic cycles and scheme tracing.
(i)
(ii)
(iii)
(iv)
(v)
(vi)
(vii)
· (viii)
(ix)
(x)
(xi)
(xii)
Fuel handling.
Fuel oil system (HFO and Diesel oil)
Jacket water cooling system
Lube oil system
Air intake system
Engine cooling water system
Exhaustgas system
Station services, domestic water, air conditioning,
ventilation, lifts, etc.
Air services, air compressor
Steaqi system and heat tracing of fuel pipes
Station batteries and battery charging equipments
Station lighting, power supply and distribution boards,
switch gear. ·
Mechanical application - correct use · of machines~ tools and
tackles, gauges, fits and clearances, tolerances, brazing,
soldering and welding bearings, gears and thread, fasteners.
Station instrumentation and controls.
Fire fighting installation in D.G. power station.
Electric shocks, first aid, acid bums, alkali wounds/chlorine gas
poisoning and their treatment.
Duties and responsibilities of operators and plant attendants in
carrying out instructions, reporting to supervisors, recording,
reading unusual occurrences, expected behaviour, discipline,
sincerity, cleanliness and love for machines.
Safety equipment and personal cleanliness, cautions and cares in
power station working.
How electricity is generated, transmitted and distributed 1.e.
_ generator to Consumer service board.
Principle and working of alternating current .and direct current
generators and their parallel operation
Principle and working of transformers and their parallel
operation
Principle and working of alternating current and direct current
motors, their speed characteristics and control.
3747 G//10-37
6
6
2
24
6
8
2
3
3
3
2
2
2
2
289
290
XXIII
THE GAZETTE OF INDIA :· EXTRAORDINARY [PART III-SEC. 4]
Storage battery- principle, construction, boost charging,
charging and importance of DC in DG power plant
Part XII
3
140 Hours
Total ;:;5 Weeks
SYLLABUS FOR TECHNICIANS ENGAGED IN THE OPERATION AND
MAINTENANCE OF THE COMBINED CYCLE GAS TURBINE BASED
POWER PLANTS
Common course for Electrical, Mechanical and Instrumentation
Item
No.
1
I.
II.
III.
IV.
V.
VI.
VII.
VIII.
IX.
Particulars
2
Gas Power plant familiarization
Fundamental units and their conversion (Mechanical,
electrical, thermo-dynamic).
Engineering drawing and practice.
Fuels and combustion types of fuels - their properties and
testing, requirement of efficient combustion
Gas turbine and WHRB
(i) General description.
(ii) Arrangement of Gas turbines
(iii) WHRB (Waste Heat Recovery Boiler)
(iv) Instrumentation and Control system
(v) Fabrication and.assembly of different parts of gas
turbine and its accessories.
(vi)
(vii)
(viii)
High pressure welding .
Fuel storage and transport arrangement.
Operation appreciation {start-up, running and
shutdown)
. Water conditioning, pre-treatment and demineralisation.
Steam turbine and turbine house auxiliaries.
(i) Fundamental principle of steam turbine.
(ij) Theory and operation of steam turbine
(iii) Arrangement of steam turbine.
(iv) Governing and protection of turbine.
(v) Operation appreciation (start-up, runnmg and
shutdown)
Handling of gas turbine, steam turbine and WHRB
Condenser and vacuum extraction plant :
(i) Purpose and function.
(ii) Constructi9n of surface condenser and vacuum pumps
Number
of Hours
3
8
2
6
4
20
4
12
4
3
.,
•
X. Cooling water systems and cooling towers.
XI. Flow diagrams of basic cycles and scheme tracing ~
(i) Steam and condensate
(ii) Station services, domestic water, air conditioning,
ventilation, lifts
(iii) · Air services, air compressors, switchgear .
(iv) Bearing cooling and general service water system.
(v) Circulating water system.
(vi) Feed water system
(vii) Fuel oil system
(viii) Station batteries and battery charging equipment
(ix) Station lighting, power supply and distribution
boards
1
18
XII.· Mechanical appreciation - correct use of machines, tools 6
and tackles, gauges, fits and clearances,. tolerances, brazing,
soldering and welding, bearings, gears and thread, fasteners
XIII. Station instrumentation and controls. 8
XIV. · Fire-fighting installations in thermal power station. 2
XV. Electric shocks, first aid, acid bum, alkali wounds, chlorine 3
gas poisoning and their treatment.
XVI. Duties and responsibilities of operators and plant attendants, 3
carrying out instructions, reporting to supervisors, recording
reading unusual occurrences, expected behavior, discipline,
sincerity, cleanliness and love for machines.
XVII. Safety of personnel and equipment, cleanliness, caution and 3
care in power station working.
i ,,
XVlll. How electricity is generated, transmitted and distributed i.e. 2
generator to Consumer service board.
XIX. · Fundamental units, conversion and measurement of 1·
electrical quantities.
XX.
XXL
XXII.
Principle and working of alternating current and direct
current generators and their parallel operation.
Princ;iple and working of transformers and their para11el
operation
Principle and working of -alternating current and direct
current motors, their speed characteristics, controls.
XXllL Storage battery- principle, construction and charging.
2
2
2
XXIV. Alternator cooling, different systems of cooling, advantages 2
of hydrogen cooling over others, hydrogen plant. ·
Total 1 1 9 Hours
=4 Wee1's
291
2'12 THE GAZETTE OF INDIA : EXTRAORDINARY
Part XIII
SPECIALISED SYLLABUS FOR TECHNICIANS ENGAGED ON
MECHANICAL SIDE OF THE COAL AND GAS TURBINE BASED POWER
PLANTS
Item
No.
1
I.
II.
III.
IV.
V.
VI.
VII.
VIII.
IX.
X.
XI.
XII.
XIII.
XIV.
XV.
XVI.
Particulars. Number
of Hours
2 3
Types of bearings, oil seals and their uses. 4
Types of valves, safety.valve, suction valve, delivery valve, non- 15
return valve, bypass valve, drain valve, air release valve, control
valve, float operated valve, solenoid operated and pneumatically
operated valve and their applications.
Efficiency loss in boiler/ turbine cycle 4
Interpretation of instrument reading and accurate logging 2.
Marking and measuring, workshop practice, welding and gas 5
cutting, pipe fitting methods
Pump maintenance 5
Shaft alignment methods 4
Drives maintenance, keys 4
Insulation types and applications · 2
Mechanical safety 4
Vulcanizing 2
Couplings •- different types- rigid, flexible, magnetic and fluid 3
couplings.
Clutches - different types and uses. 2
Maintenance of pneumatic measuring instruII1ents, servomotors, 4
power cylinders and other thermostats, Monistats.
Maintenance of instruments, recorders, clocks. 4
Vibrations - general knowledge of their causes, effects,
remedies, measurement and balancing.
Total
8
72 Hours
=2 ½ Weeks
XVII. On Job Training in above areas with hands on practicals 16 Weeks
[ 'lT'T III-<iiflT.s 4 l
Part XIV
SPECIALISED SYLLABUS FOR TECHNICIANS ENGAGED ON
MECHANICAL SIDE OF THE DIESEL ,ENGINE BASED POWER PLANTS
Item
No.
1
I
II
III
IV
Particulars
2
Types of bearings and their uses.
Types of valves, safety valve, suction valve, delivery valve, non -
return valve, bypass valve, drain valve, air release valve, control
valve, float operated valve, solenoid operated and pneumatically
operated valve and their applications.
Efficiency computation in Diesel Engine.
Interpreting instrument reading and accurate logging.
Number
of Hours
3
3
5
4
2
V Marking and ibeasuring, workshop practice, welding and gas 4 _
· cutting, pipe fitting methods.
· VI Pumps maintenance. 4
VII Shaft alignment methods. 4
VIII Drives maintenance keys 4
IX Insulation types and applications. 2
X Mechanical safety 4
XI Vulcanizing 2
XII Coupling- different types, rigid, flexible, magnetic and fluid 2
couplings.
XIII Clutches- different types and uses 2
XIV· Maintenance of pneumatic measuring instruments, servomotors, 4
power cylinders and other thermostats, monostats.
XV Maintenance of instruments, recorders, clocks
XVI _Vibratio.n - general knowledge of their causes, effects, remedies,
measurement and balancing.
4
8
XVII On job Training in above areas with hands on practicals
Total 58 Hours
=2 Weeks
8 Weeks
293
294 THE GAZETTE OF INDIA : EXTRAORDINARY [PART m~~;;c. 4]
Part XV
SPECIALISED SYLLABUS FOR TECHNICIANS ENGAGED ON
ELECTRICAL SIDE OF THE COAL, DIESEL ENGINE AND GAS TURBINE
BASED POWER PLANTS
Item
No.
1
I.
IL
III.
Particulars
2
Alarm systems - visual and audible.
Isolators, circuit breakers and contactors.
Earthing and neutral grounding, necessity of, methods for, safety
rules while handling electrical equipments. Reading electrical
circuit diagrams
Number
of Hours
3
2
3
4
. IV Motor winding and repairs. · 4
V Maintenance of internal telephones and public address systems. 3
VI Meggering and testing of wiring and cable faults. 3
VII Maintenance of electrical motors. 3
VIII Maintenance of electrical switchgears. 8
IX Fuses- re-wireable type, cartridges type, high rupturing capacity 8
fuse, constructional features of fuse and fuse sockets, knife type
high rupturing capacity fuses, use of pullers for insertion and
removal, colour code for fuse ratings.
X Motor starters and their applications - direct-on-line, star-delta, 5
rotor resistance, contactors and relays
XI Meggers, avometers, voltmeters, ammeters, watt meters, energy 6
meters- general information about their use.
XII Maintenance of batteries and rectifiers 3
XIII. Maintenance of transformers and tap changers. 6
XIV. Laying and jointing of cables of voltage up to 250 V and exceeding 4
250 V but not e,xceeding 650 V.
xv. Panel wiring methods, connections, earthing principles of operation 2
of small distribution tt:ansfonners.
XVI Current and potential transformers, purpose, connection and use. 2
XVII Various types of drives. 2
'
'
,
. ,
·,
[ 'WI III-1Ji11TG 4 l
XVIII Elementary knowledge of Engineering materials and their
properties.
XIX Lubrication and cooling system
xx On Job Training in above areas with hands on practicals:
Total
(i) Technicians engaged on coal and gas based Power Plants.
2
4
74 Hours
=2 ½ Weeks
16Weeks
(ii} Technicians engaged on Diesel engine based Power Plants. 8 Weeks
Part XVI
SPECIAL!SED SYLLABUS TECHNICIANS ENGAGED ON
INSTRUMENTATION SIDE OF THE COAL, DIESEL ENGINE AND GAS
TURBINE BASED POWER PLANTS
Item
No .
1
I
II
III
IV
V
VI
Particulars
2
. ' Pressure gauges - Bourdon•· type gauge, manometer, vacuum -
gauge, barometer, principles of operation, absolute pressure, gauge
and vacuum prcs1:ure aid th!:ir inter-relationship, calibration.
Temperature indicators, mercury thermo.meters, resistance
thermometers, thermocouples, pyrometers, gas thermometers
. temperature alarm, calibration.
Level gauges - different types - level alaITI!, calibration.
Flow meters - steam and water, general principles, calibration.
Instrument workshop practice - multi meters, megger
Electronic circuit diagram study, drilling, sold~ring, use of
resistance bridge and workshop potentiometer.
Electronics - components, qscilloscope, power supply, signal
generator applications, logics and timers.
VII Telemetering and signal conditioning, transducers; thresholds, .
transmitters and their eaiim:ation.
VIII Instrument air control systems
IX Actuator maintenance.
X Analytical instruments.
Number
· of Hours·
3
5
4
3
3
6
8
12
2
4
3
XI ---. Furnace safeguard. supervisory instruments, turbovisory 6
instruments. (Not applicable in case of Diesel engine based power
plants and gas turbine based-power plants.)
295
296 1HE GAZETTE OF INDIA : EXTRAORDINARY
XII Instrument fault finding
XIII Familiarisation of data acquisition system / distributed digital
control.
XIV Power supplies and alarm system
XV Safety precautions
2
3
6
1
[PART III-SEC. 4]
Total 68 Hours
· =2 ½ Weeks
XVI On Job Training in above ·areas with hands on practicals
(i) Technicians engaged on coal and gas based Power Plants-:' · 16 Weeks
(ii) Technicians engaged on Diesel engine based Power Plants. 8Weeks
Part.XVII
SYLLABUS FOR ENGINEERS AND SUPERVISORS ENGAGED IN THE
OPERATION AND MAINTENANCE OF THE HYDRO ELECTRIC POWER
PLANTS
Common course for Electrical, Mechanical and Instrumentation
Item Particulars
No.
I
I
II
III
IV
V
2
S}eneral Introduction:
(i) World Power Scenario
(ii) Growth of Power Industry in India
(iii) Generation Scenario in India
(iv) Transmission and Distribution Scenario in India
(v) Role of Private Power Participants in India
(vi) Organisation/ Power Sector set up
(vii) Introduction to Indian Standard specifications for
Electrical wiring
Concept of modem hydro station:
Types of stations, their role in th_e power systems, base load, and
peaking load, run-off-the river, s(li,rage type ahd pumped storage .
power plants, concept of unit, typical surface and underground ·
hydro power stations. ·.
Choice of location of large hydro station: water availability land
availability, selection of installed capacity, selection of type of
turbine, choice of size of generating units.
Hydraulic system, reservoir, storage capacity, operation o(
reservoirs, dams and barrages, intake, surge tank, power
tunnels/channel, fore bay and penstocks, pressure shaft, tail race
and tail race tunnel/channel, protec~on against watef, .hammer
and negative pressure in· penstocks arid suction head. Dewatering
of water conductor systems. ,
Plant lay out in hydro stations above 25MW capacity including
machine arrangement, equipment, switchyard and auxiliary
arrangements.
Number
of Hours
3
5
3
3
3
3
------------- ---- ----
.;
f_,
[
['WT III-= 4)
VI
VII
Constructional details and working principles of valves -
butterfly, spherical, needle etc.
(i) Requirements and principle of operation
(i'i) Type and selection criteria of valves and their operation
and control. ·
Constructional details and working principles of hydro
mechanical equipments.
(i) Requirements and principle of operation.
(ii) Type and selection criteria of hydro mechanical
equipments and their operation and control.
VIII . Constructional details and working principles of turbines . and 12
auxiliaries. ·
(i) Principle of operation, types and characteristics. of turbines
(ii) Choice, rating and specifications of turbines
(iii) Components of turbines and their design
(iv) Type of governors - hydraulic and electronic
(v) Guide bearing and shaft seal arrangements
IX Working principles, characteristics and operation of auxiliary 9
systems.
X
(I) Unit Auxiliaries
r
Oil pressure units
HP lubrication system
(i)
(ii)
(iii)
(iv)
(v)
Braking and jacking system
Central grease lubrication system
(vi)
Carbon dust collt;'ctlon system for slip rings, exciters
and brake pads. •
Cooling water system.
(2) Common Auxiliaries
(i) EOT cranes and hoists
(ii) Ventilation system
(iii) Air conditioning system
(iv) Compressed air system
(v) Drinking water system
(vi) Sewerage system
(vii) Elevator/lifts
(viii) Dewatering and drainage system
• (ix) Communication systems
Constructional details and working principles of aliernators and
· excitation systems.
(i) Alternators, characteristics and rating, types of winding,
bearing arrangerhept;;, cooling arrangements
(ii) Main and pilot exciters, voltage regulators, types··and characteristics,
amplifier and magnetic amplifier, static excitation system, Automatic
VoltaJ!~ !l-!'~~la~ion (A VR)
(iii) Meihocl'io'f groundin_g . .
(iv). ctMh~¥itOf- trat{;f&riner iitri't:!ttions
•ir·"w Oflb l: ,, -
12
. ~- -~~ •- .
XI DC and "Pl..C power supply for auxiliaries, arrangement of unit 5
auxiliary and station service boards, station lighting and automatic
changeover. Station batteries and charging methods. Standby
and emergency power and lighting systems.
3747 Gl/10-38
297
3
3
298 THE GAZETTE OF INDIA : EXTRAORDINARY
. XII Transformers: Main transformers, station/unit transformers,
grounding transformers, type of connections, tap changer gear,
cooling arrangements, size selection of main transformers, parallel
operation and Regulation.
[PART Ill-SEC. 4]
5
XIII Out door switchyard, bus bar arrangements, single line .diagram, 3
circuit breakers, isolators, current transformers, potential
transformers,- lightning arrestors, wave traps, coupling capacitor,
LMU and· three element protection devices, grounding
arrangements ..
XIV Indoor and· out door switch gear: Types: MCB, bulk oil,
minimum oil, air blast, vacuum, SF, breakers, constructional
functional details and characteristics.
xv SF, gas filled EHV switchgear
XVI (i) Working principle and basis of instrumentation and
· measurements: Detail of measuring instruments · for
pressure, flow, temperature, level, vibration, alignment
and current, voltage, power, reactive power, frequency,
energy, winding temperature, auto controllers, recorder,
Megger- its use for primary detection of faults, data
acquisition system, digital distributed control, UPS, unit
co-ordinate master control.
(ii) · Testing of electrical and mechanical testing equipments
12
4
14
XVII Control and protection - sequential operation and interlocks 15
(i) Unit protection and interlocks
(ii) Turbine and auxiliaries and vibration monitoring
(iii) Turbine governing, speed setting, speed droop setting and
control circuits
(iv)
(v)
(vi)
(vii)
(viii)
(ix)
(x)
(xi) •
Generator protection, under voltage, over voltage,
differential, reverse power, under excitation, negative
phase sequence, earth fault, etc.
Different types of protection relays
Importance of sequential interlocks
Transformer protection- differential, over load, over
fluxing, restricted earth fault, high temperature, buchholz
protection
Types of motors and variable speed drive and ,e,011trol
Various types of pumps and their starting ·control '
Annunciation systems
On line monitoring devices
XVIII Operation control and supervision
(i) · General machine start and stop procedure and sequence
(ii) Handling of turbine and generator and auxiliaries under
failure condition. such as, mechanical ., and electrical
auxiliary and governor failure, grid failure and other
failure conditions.
(iii) Alternator- synchronizing, loading, parallel operation,
active and reactive power sharing and frequency controV
:
12
;
'
'
•
•
'
•
•
•
'
[ 'WT Ill-1'.§!Us 4 l
XIX (i) Fire safety procedure
xx
(ii)
(iii)
Fire protection of generator
Fire fighting and emulsifier type protection
General safety precautions, treatment of electrical or acid/alkali
burns, permit to work, first aid, protective gear/ clothing, safety
in movement and storage of materials, safety aspects of
switch yard.
5
4
XXI Factory Act, Electricity Act, 2003, Central Electricity Authority I 0
(Measures relating to Safety and Electric Supply) Regulations,
2010, and other statutory Regulations concerning power stations
_ (broad outline).
XXII Erection, testing and comm1ss10ning of turbine, generator,
control and instrumentation, switchyard and auxiliary systems,
maintenance procedures, PERT/CPM method, power station
records, maintenance planning .
.J
12
XXIII Plant performance, generation cost, machine availability and 6
other commercial aspects.
XXIV Personnel management, duties and responsibilities, labour laws 4
and labour welfare.
XXV Broad principles of material management, procurement 6
XXVI
procedure and inventory control.
Total 173 Hours
· =6 Weeks
On job training:
(1) Control room desk operation:
(i) Pre-start checks
(ii) Protection interlocks
(iii) Startup procedure and routine checks
(iv) Stopping and emergency operation of turbine,
generator and. their auxiliaries
(v) Operation of generating unit in abnormal ·
circumstances
(vi) Simulator training/computer application for plants
2. Fire fighting and fire safety procedures during emergency.
7Weeks
(6 Weeks)
(I week)
299
300 THE GAZETTE OF INDIA : EXTRAORDINARY [PART lll-SEC. 4]
Part XVIII
SPECIALISED SYLLABUS FOR OPERATION AND MAINTENANCE
ENGINEERS AND SUPERVISORS ENGAGED ON THE MECHANICAL SIDE
OF HYDRO ELECTRIC POWER PLANTS
Item
No.
1
I
Particulars
2
Predictive, pre.ventive and emergent maintenance, types of
- failure and detection:
(i) Periodical maintenance and inspection of turbine and
(ii)
(iii)
· (iv)
(v)
(vi)
(vii)
(viii)
auxiliaries
Maintenance of p~mps, valves and pipe work
Lubrication principles and _their characteristics
Purification of lubricating oil and selection
Mechanical alignment
Static and dynamic balancing of machines
Maintenance planning
Modem techniques and · their applications m
maintenance of turbine and associated auxiliaries.
(ix) Cavitation and erosion of under water ·components due
to higher abrasive silt laden water.
Number
of Hours
3
12
II l. Pre-commissioning _ and commissioning tests of hydro 12
mechanical gates and inlet valves - dry and wet
2. Predictive, preventive and emergent maintenance of:
(i) Inlet valves
(ii) Hydro·mechanical gates
(iii) EOT cranes
III Predictive, preventive and emergent maintenance of: I 0
(i) Ventilation and air conditioning system
(ii) Central grease lubricating unit
(iii) Air compressors
(iv) Lifts
(v) DG sets
(vi) Fire fighting equipments
· IV Maintenance practices - rigging and slinging, bearing, scraping I 0
and matching, radiography and stress relieving methods, anti-
friction bearings and_ their installation and lubrication, non
destructive testing and principles, procedure and application.
Welding techniques and equipment.
V Workshop: Types and use ofhydraulic, pneumatic and hand
tools and tackles. Fabrication of spares. Repairs and
maintenance of mechanic_al equipments such as vehicles,
dozers, cranes .
8
. VI Composition, properties and behavior of Engineering materials 8
used in power stations
'
'
'
VII Residual life assessment and life extension methods ·
VIII Mechanical safety rules and practice
IX Spares inventory, produc_tivity, cost control.
6
4
4
Total 74 Hours
X On Job Training:
To be associated with field maintenance of:
(i) Turbine and auxiliaries like governor, shaft seal, inlet
valve, etc.
(ii) Common auxiliaries such as cooling water system,
compressed air, ventilation and air conditioning, fire
· fighting, EOT cranes etc.
(iii) · Welding and non destructive testing
(iv) Work shop procedures
Part XIX
=2 ½ Weeks
3 weeks
SPECIALISED SYLLABUS FOR OPERATION AND MAINTENANCE
ENGINEERS AND SUPERVISORS ENGAGED ON THE ELECTRICAL SIDE
OF THE HYDRO ELECTRIC POWER PLANT
Item Particulars
No.
I - 2
. ---- ' I. Predictive, preventive and emergent maintenance and inspection
of generators, excitation system, generator bearing. Principles
of electronic controls and transistorized circuits. Generator
protection- earth fault in rotor and st~tor, negative phase
sequence, loss of excitation, differential protection, back up
protection, reverse power protection, under/over voltage
protection, over load protection, dry out of generators.
Constructional details of the different types ofrelays and other
sensing equipments, method of setting and iheir testing. Wiring
details of control panels. Insulating materials and their use.
II. Predictive, preventive and emergent maintenance of motors.
III. Transformer: preventive maintenance of transformers, dielectric
strength -of oil, insulation_ res'istance, tap changers, filtration of
oil.- Tan-Delta .resistivity of oil, dissolved gas analysis and other
testing of oil
IV Transformer: Protection- Buchholz relay protection, over current
protection, differential ·protection and earth fault protection,
types of relays used, their construction, testing and setting.
Commissioning tests.
V Circuit breakers' maintenance, isolators, disconnectors, bus bar
arrangements, charging, synchronizing with the grid,
disconnecting for repairs, maintenance of switchgear contactors.
Number
of Hours
3
15
4
8
8
8
301
302
VI
THE GAZETTE OF INDIA : EXTRAORDINARY
Maintenance of equipments in the outdoor and indoor
switchyard. Operation and maintenance of current transformers,
potential transformers and lighting arrestors. Bus differential
protection, etc; LV, HY and EHV cables and their jointing and
testing. ·
I P,\lff Ill-SEC. 4]
8
VII Maintenance of SF, gas filled insulated switch gear. 6
VIII Station auxiliary supply, station battery-care and maintenance, 10
trickle charging and extended charging, operation and
maintenance of rectifiers and battery chargers, UPS, emergency
power supply, station grounding arrangements.
IX Line protection and fault analysis. 4
X PLCC equipments, telemetering, and other latest communication 8
systems like fiber optics, microwave, etc.
XI Computerized on-line monitoring of power plant(DRs, Event
Logger and SCADA)
4
XII Interlocking sequential control circuits, details of components 7
used.
XIII Calibration and testing of vanous types of instruments, I 0
indicating/ measuring instruments, recorders and analyzers,
including transducers and RTUs (Remote Transmitting Units)
XIV Statutory Electricity Acts and Rules, permit procedure and site 4
safety mies.
XV Economic load dispatch, power system control and operation , 10
MY AR-control, voltage Regulation and frequency control,
islanding schemes, function of RLDC/SLDC
XVI Station emergency lighting arrangements. .2
XVII R&M and residual life assessments and life extension of 4
equipments
Total 120 Hours
XVIII On Job Trajning:
To be associated with field electrical maintena.nce of:
(i) Generator and auxiliaries
(ii) Common auxiliary systems
(iii) Transformer
(iv) LT/HT switch gear in power plant and indoor and out door
switch yard
(v) Control room operation.
:4 Weeks
4 weeks
---- ----~-~- ·--
'
'
'
.,
·,
•
['ll'l lll-~ 4]
Part XX
SPECIALISED SYLLABUS FOR OPERATION AND MAINTENANCE
ENGINEERS AND SUPERVISORS ENGAGED ON THE .
INSTRUMENTATION SIDE OFTHEHYDRO ELECTRIC POWER PLANTS
Item
No.
Particulars Number
of Hours
1
L
II.
III.
2
Working principles, calibration, control methods and maintenance
aspects of temperature measurement devices.
(i) Resistance thermometers, thermocouples
(ii) Recorders, indicators
(iii) Transmitters
(iv) Transducers .and RTUs.
Working principles, calibration, control methods and maintenance
aspects of pressure measurement devices
(i) Diaphragm gauge, Bourdon gauge
(ii) Recorders, indicaters
(iii) Transmitters
Working principles, calibration, control methods and maintenance
aspects of flow measurem~l}t devices:
(i) Positive, semi-positive, rate and differential pressure flow
meters,
(ii) Recorder5 and indicators
(iii) Transmitters.
5
4
4
IV. Worklng principles, calibration, control methods and maintenance 4 •
aspects oflevel measurement devices :
(i) Pressure gauge bellows/diaphrag1I1, float, buoyancy, gas
purge, differential pressure and capacitance -type level
measurement systems
(ii) Recorders and indicators
(iii) Transmitters
V. Telemetering and signal conditioning • pneum,:,.tic systems, electrical 4
systems, electronic systems and maintenance asp~cts.
VI Basic electronics - Component familiarization and various types of 8
circuits, microprocessors
VII Turbovisory instruments- their basic principles, application and 12
calibration : alignment and vibration, its interpretation and
measurements, different types of pick-ups, their location, etc., use
of vibration instruments .and analysis, different pickups, their
location,' etc., axial shift position measurements, valve position and
servo motor position indicators, differential metal temperature
measurements.
3
303
304
VIII
IX
THE GAZElTE OF INDIA : EXTRAORDINARY
Actuators:
Operating principles of pneumatic, hydraulic and electrical actuators
and their control mechanisms, maintenance, inspection and testing .
aspects.
Instrument air system:
Air Supplier, piping and piping layout.
[PART III-SEC. 4)
6
4
· X. Data acquisition systems_. Microprocessor based control system for 11
generating units including governors and. excitation systems. Digital
distributed control (DDC); UPS, control room layout
Total 62 Hours
:2 Weeks
XI. On Job training:
(1) Control system - basic principles, construction features, 2 weeks ·
calibration, preventive maintenance and troubie shooting. Analog
control systems, level, flow, pressure and temperature control .
systems, component/cards used in control systems, static and
dynamic timing, control valves and dampers.
(2) Data Acquisition System (DAS) or . distributed digital control 2 weeks
system - basic principles, construction features, calibration,
preventive maintenance and trouble .shooting of digital and analog
inputs to DAS and thei~ 'conditioning, I/0 and interface, functioning
of alarms, monitoring formats and loi:;s, s_equence of events.
·-• \ --,-,
PartXXI
SYLLABUS FOR TECHNICIANS ENGAGED IN THE OPERATION AND
. MAINTENANCE OF THE HYDRO ELECTRICPOWER PLANTS
,·
Common course for Electrical, Mechanical and Instrumentation
· Item
No.
1
I
II
III
IV
V
VI
Number
Particulars of Hours
2 3
Funda:rriental 'ufflts, conversion of and measurmg electrical 2
quantities. · :it: " ·
How electricity is generated, transmitted and distributeq Le.
generator to Consumer service board.
Principle and working of alternating current and direct current
generators, motors, their speed characteristics, controls.
i!J;,
Princip\e and ·working of transformers,.- and their parallel
operation <!t'):,. 1, >w!, -";!cd(f l!iti~ ftf>.sJ ,,oi~ ,m1iiu!,i",,.
!n~Jwnd·. ,,) ,~noJ:;o(brti rmiti20q :0J'.-:iJ1 0V1$2
Power plant familiarization
Turbine and auxiliaries:
(i) Fundamental principle of turbines and inletvalves
(ii) Theory and operation of turbines and inlet valves
2
2
2
6
8
,
C
•
•
[ 'WT III-~ 4]
VII
VIII
IX.
X.
(iii) Governing and protection of turbine
(iv) Operating procedures (start-up, running and shutdown)
(v) Various types of faults in generators, turbines and
auxiliaries -analysis thereof.
Generator and auxiliaries:
(i) Fundamental principle and working of generators
(ii) Excitation system
(iii) Automatic voltage regulator
(iv) HV, EHV, LT and control cables
(v) Generator transformer connection
(vi) · Protection of generators
(vii) Operating procedures (start up, running and shut down)
Engineering drawing and practice
Handling of turbines under emergency conditions
Power station mechanical auxiliary system- general aspects and
· basic flow diagrams, etc.
(i) EOT cranes
(ii) Hydro mechanical gates
(iii) OPU
(iv) Central grease lubricating unit
(v) HP lubrication system
(vi) Carbon dust collection system
(vii) Cooling water systems, bearing cooling, generator cooling
and transformer cooling
(viii) Braking and jacking system
(ix) Drainage ~nd dewatering system
(x) . Drinking water, air conditioning and ventilation systeni
(xi) Air services, air compressors
(xii) Lifts
8
6
4
8
XI. Mechanical appreciation - correct use of machines, tools and 6
XII
XIII
. tackles, gauges, fits and clearances, tolerances, brazing,
soldering and welding, bearings, gears and threads, fasteners .
Electrical appreciation- correct and Appropriate use of electrical
tools like Megger, tong testers, multi-meters, insulation testing
equipment, earthing and its importance.
Bearings- types, installation and removal procedures and
maintenance, clearance :md tolerances, oil seals- types,
applications with clearances.
6
2
XIV Lubrication ·and cooling principles. 2
XV Station in~rumentation and controls. 4
XVI Power station electrical auxiliary system - general aspects and 8
basic flow diagrams, etc.
(i) Station lighting, power supply and distribution·boards
(ii) Station batteries and battery charging system
'
3747 Gl/10-39
-·-···--·------------
305
•
306 1HE GAZETTE OF INDIA : EXTRAORDINARY
(iii) - Unit and station transformers
(iv) DG sets and their maintenance
XVII El~ctri~ shocks, first aid, acid burn, alkali wounds, Chlorine gas
pmsonmg and their treatment. -
XVIII Fire fighting installations in hydro power station
XIX Personnel safety j;lquipment, cleanliness, caution and care m
power station working. Importance of ~arthing.
xx Duties and responsibilities of operators and plant attendants
. . . '
caff):'mg o~t mstruct10ns, reporting to supervisors, recording
r:adm~, visual . occurrence, expected behavior, discipline,
smcenty, cleanlmess and love for machines ·
[PART IIl~EC. 4]
3
2
2
3
Total 86 Hours
=3 Weeks
XXI On job Training in above.areas with hands on practicals 4 weeks
PartXXII
SPECIALISED SYLLABUS FOR TECHNICIANS TO BE ENGAGED ON THE
MECH,ANICAL SIDE OF THE HYDRO ELECTRIC POWER PLANTS
Item
- No.
1
I
II
Particnlars.
2
Operation and general aspects of annual maintenance of turbine
and auxiliaries
(i) Turbine
(ii) Inlet valve
(iii) Governing system
(iv) Shaft seal
Operation and general maintenance of common mechanical
auxiliaries:
(i) - Pumps and associated pipe work- such as cooling water
system, fire fighting system, drainage _ system, dewatering
system
(ii) _ Air conditioning and ventilation system
(iii) Air compressors
(iv) -EOT cranes
(v) ·Hydro mechanical gates
(vi) Turbine and generator bearing
(vii) Lifts
(viii) Fire fighting . system for power house complex and
specifically for equipments like transformers and generators
with knowledge of different fire fighting systems.
Number
ofHoursl
3
6
6
• ,
'
,
_,
,
•
•
•
•
•
'
[ 'WI III~<§l1J6 4 l
III
IV
V
VI
VII
VIII
IX
X
XI
XII
XIII
Types of valves- safety valve, suction valve, delivery valve, non
return valve, bypass valve, drain valve, air release valve, control
valve, float operated valve, solenoid operated and pneumatically
operated valves and their applications .
Interpretation of instrument reading and accurate logging
Workshop practice, making of spare parts, welding and gas cutting,
pipe fitting methods, introduction to various tools, tackles and
practice.
Shaft alignment methods.
Rubber components, their uses and handling.
Maintenance of measuring instruments such as dial gauges,
micrometers, vernier calipers etc.
Couplings-different types, rigid and flexible coupling.
Vibration-general knowledge of the causes, effects, remedies,
measurement and balancing.
Standard storage ·practices for spares and materials.
Mechanical safety.
4
2
4
4
2
4
2
4
2
-, ,.
Total 42 Hnurs
=11/,Weeks
On Job Training in above areas with hands on practical. 4 weeks
PartXXIII
SPECIALISED SYLLABUS FOR TECHNICIANS TO BE ENGAGED ON THE
ELECTRICAL SIDE OF THE HYDRO ELECTRIC POWER PLANTS
Item
No .
1
I
II
Particulars
2
Operation and general aspects of annual maintenance of
. generators and auxiliaries
(i) Generator and its dry out
(ii) Excitation system
(iii) .. AVR
Operation and general maintenance of common electrical
auxiliaries
(i) Station supply
. (ii) Batteries and chargers, DC distribution boards and
emergency ligbting system
(iii) Motor winding and repairs
(iv) Understanding of electrical panel wiring
(v) PLCC system
(vi) EOT crane
Number
of Hours
3
8
8
307
308 THE GAZETTE OF INDIA : EXTRAORDINARY
III Operation and maintenance of transformers including oil
filtration ·
IV Out door switch yard equipment such as isolators, circuit
breakers and contactors, earthing switches, CT, CVT, LA
V Indoor switch gear system
VI Alarm systems - visual and audible
VII Earthing and neutral grounding: .necessity of methods for.safety
while handling electrical equipments. Reading electrical circuit
diagrams
. VIII Maintenance of internal telephones and public address system
IX Meggering and testing of electrical equipment, wiring and cables
X Maintenance of electrical switchgears
XI Fuses-rewirable types, cartridges type, high rupturing capacity
fuse, constructional features of fuse and fuse sockets, knife type
high rupturing capacity fuses, use of pullers for insertion and
removal, colour code for fuse ratings.
XII Motor starters and their applications- direct-on-line, star delta,
rotor res_istance, contactors and relays
XIII Voltmeters, ammeters, watt meters, energy meters, meggers,
multimeters, tong testers and general information about their use
XIV Laying and jointing of cables of voltage upto 250 V and
exceeding 250 V but not exceeding 650 V.
XV Panel wiring methods, connections, earthing, and principles of
operation of small distribution transformers.
XVI Protection relays, current and potential transformers, purposes,
· connections and use.
XVII Elementary knowledge of electrical Engineering mat"crials and
their properties.
XVIII Basic knowledge of computers and on line monitoring system
[PART III-SEC. 4]
6
3
4
2
4
3
3
6
6
5
6
4
2
2
2
2
XIX Familiarization with supervisory control and data acquisition · 4
system.:
Total
XX On job Training in above areas with hands on practicals.
80 Hours
=3Weeks
4 weeks
['1T'T III-~ 4]
PartXXIV
SPECIALISED SYLLABUS FOR TECHNICIANS TO BE ENGAGED ON THE
INSTRUMENTATION SIDE OF THE HYDRO ELECTRIC POWER PLANTS
Item Particulars
No.
1 2
I. Familiarization with Supervisory control and data acquisition
system
II. Power supplies and alarm system
III. Power station instruments, their maintenance and testing
(i) Event sequence recorder
(ii) Disturbance fault recorders
(iii) Sequence controllers
(iv) Digital relays
IV Water flow meters and their application and maintenance
. ~,
V Pressure gauge: Bourdon type g!luge, barometer principles of
operation, absolute pressure, vacuum pressure, maintenance of
pressure gauges.
Number
of Hours
3
4
4
4
2
3
VI Level gauges: Different types of level gauges and their 3
application in power house and calibration
VII Temperature indicators: · mercury thermometers, resistance 3
thermometers, thermocouples, their use in power house and
calibration
VIII Instrument workshop practice: electronic circuit diagram study, 6
multi-meters, Megger, drilling, soldering, use of resistance
bridge and workshop potentiometer
IX Electronic components, oscilloscope, power supply, signal 8
generator applications, logics and timers
X Telemetering and signal conditioning, transducers, thresholds, 8
transmitters and their calibration
XI Instrument fault finding 2
XII - Safety precautions
Total 48 Hours
=1 ½ Weeks
XIII On job Training in above areas with hands on practicals. 4 Weeks
309
3IO TilE GAZETTE OF INDIA : EXTRAORDINARY
. '
[PART III-SEC. 4]
PartXXV
SYLLABUS FOR ENGINEERS AND SUPERVISORS ENGAGED IN
OPERATION AND MAINTENANCE OF SUB-STATIONS ASSOCIATED
WITH THE GENERATING STATIONS
Common course for Electrical. Mechanical and Instrumentation
Item
No.
1
I
II
III
IV
V
VI
VII
Particulars
2
General Introduction:
(i) World Power Scenario
(ii) Growth of Power Industry in India
(iii) Generation Scenario in India
(iv) Transmission and Distribution Scenario in India
(v) Role of Private Power Participants in India
(vi) Organisatioii/Power Sector set up
(vii) Introduction to Indian Standard specifications for
Electrical wiring
(viii) Energy conservation
Layout and location of 66 kV and higher voltage sub-stations.
Main equipments used together with their specifications ·.
including gas insulated switching systems
Concept of High Voltage DC Transmission
Construction of high voltage lines, types of towers, types of
insulators and their electrical and mechanical characteristics.
High tension feeders, their load carrying capacities.
(i) Alternating and direct currents, relation between voltage,
current, power, reactive power and common units in use.
Power factor, Ohm's Law, resistance, reactance,
impedance, percentage impedance. Three phase vectors,
phase - displacement between current and voltage
(ii) Basic principles of transformation, magnetisation,
hysteresis, reluctance, retentivity, electromagnets. Flux
density, ampereturns equation for transformation,
- reactors, etc.
(iii) Two winding, three winding and auto transformers:
Grounding transformers, salient features of shell type
and core type transformers, hot rolled and cold rolled
steel cores, stampings and their assembly. Different
vector groups and terminal connection
(iv) Transformer fixtures, e.g., Buchholz relay, on-load and
off-load tap _changer, breathers, conservators, bushings
Number
of Hours
3
5
4
6
3
3
3
29
•
,
,
•
•
['WI III-~ 4]
VIII
IX
X
of different types, thermometers, indicators, alarms .
(v) Cooling of transformer and oil, different methods - of
cooling, importance of oil filtering and drying-out of
transformers, di-electric . strength of oil, different
varieties of filters and their comparison, types of
radiators·
(vi) Transformer tests - failure and causes, maintenance· and·
repaIIs
(vii) Parallel operation, Regulation, voltage control, tap
change, commissioning tests
Breakers:
(i) Functions of breakers, their action.
(ii) Different types of outdoor and indoor breakers, e.g. bulk
oil, minimum oil and air blast, SF6- principles and their .
applications
(iii) Operating mechanism, manual, sprmg, hydraulic
pneumatic, motor
(iv) Breaker maintenance, failures and their causes,
Commissioning procedure
Bus bars:
(i) Indoor bus bars, their' capacity, forces on theni during
short circuit, bus bar mountings and their clearances
(ii) Strung ,end tub•ilar tf5,pe bus bars, their current ratings,
supports, jumper:;, clearances.
(iii) Busbar fittings and connectors
(iv) Cables of voltage exceeding 650 V, types, their
maintenance and testing
Current and potential transformers:
(i) Types of current and potential transformers, their
working principles, ratings, acc-uracies.
(ii) Functions of curreni and potenti,,J transformers.
(iii) Failure of current and ·potential tra,,sformers, their
causes.
8
6
5
XI Isolators: 5
(i) Tilting and rotating isolators, with and without arcing
horns, horizontal center break type, tandem isolators,
earthing blades, current rating, breaking a circuit by
isolator, interlocking with circuit breaker
_ (ii) Maintenance of isolators
XII Lightning protection: 3
(i) Simple description of!ightning phenomena, surges and
their protection
(ii) Construction of lightning arrestors and the principles of
their working
( iii) Different types of lightning arrestors and ratings
(iv) Earthing and location oflightning arrestors.
311
312
XIII
XIV
xv
. THE GAZETTE OF INDIA : EXTRAORDINARY
(v) Codes and Practices for lightning protection
Capacitors
Control Room:
(i) Necessity and function of a control board, types of
boards, instruments of the board.
(ii) Functions of the various relays and indicators, mimic
diagram indicators, annunciator and alarm,
characteristics ofrelay testing and setting of relays
(iii) Remote control ofbreakers, isolators, tap changers,
indicators on the control board.
(iv) Control and power cables
(v) Metering, concept of tariff, event loggers, disturbance
recorders
Auxiliary supply:
(i) Current and. ampere-hour ratings of batteries, battery.
charging equipment, checking of specific gravity of
electrolyte, maintenance of batteries
(ii) Importance of direct current supply and its functions.
(iii) Auxiliary direct current supply
(iv) AC distribution board
I !'.\RT III- ··SEC. 4J
10
5
XVI Clearances and Compliance of CEA (Measures relating to 5 ·
Safety and Electricity Supply) Regulations 2010
(i) Minimum clearance between phases and phase to ground
for different voltages
(ii) CEA(Measures relating to Safety 'and Electric Supply)
Regulations, 2010 pertaining to sub-stations.
XVII Earthing: 3
(i) Safety earthing and system earthing, the method of
earthing e.g., solid earthing, resistance earthing, peterson
coil earthing, earthing of lightning· arre·stor, importance
and advantages of each type
(ii) Different types of earth electrodes, earthing mats,
recommended values of earth resistance, measurement of
earth resistance
XVIII Maintenance: Maintenance of log sheet and other records. The 3
importance of maintenance of good records.
XIX Safety: I 0
xx
_ (i) Safety procedures and procedures for giving line clear
and taking it back. Maintenance of records of line· clear.
(ii) First-aid, artificial respiration and sh~ck treatment.
(i) Interlocking and sequential operation.?f different
equipments.
(ii) Protections :- Transformers, lines, reactors, bus bar.
8
,I
•
'
•
•
['Jl1J III~~ 4]
XXI Synchronising, charging and discharging of lines of voltage 3
exceeding 650 V but not exceeding 33 kV. Live line testing.
XXIl Calibration and testing of various types of equipment, 4
indicating and measuring equipments, recorders, analysers.
XXIII Handling emergency conditions. 3
XXIV Diagnosing troubles in the plant from instruments and 3
annunciation.
XXV Thermography monitoring. 4
XXVI Study of carrier system, PLCC 2
XXVII Auxiliary equipments such as compressors, station lighting, 2
etc.
X){VTTJ Fire-fighting equipment - their operations, maintenance and
refilling, emulsifier, fire wall protections ·
XXIX Personnel management, duties and responsibilities, labour .
welfare and labour laws
3
4
XXX .Power and telecommunication co-ordination cmpmittee 2
(PTCC) guidelines.
XXXI Broad • principles of material management and inventory 3
control
XXXII Simulator Training -30
XXXIII On Job Training related_ to above areas ·
XXXIV Industrial visits and evaluation
3747 Gl/10-40
Total 190 Hours
=6 Weeks
4 Weeks
2 Weeks
313
··- ---;:;:,;>·
314 THE GAZETTE OF INDIA : EXTRAORDINARY I P,\/U III~~SEC. 4]
Part:XXVI
SYLLABUS FOR TECHNICIANS TO ASSIST ENGINEERS AND
SUPERVISORS IN OPERATION AND MAINTENANCE OF SUB-ST A TIO NS
ASSOCIATED WITH THE GENERATING STATIONS
Common course for Electrical. Mechanical and Instrumentation
Item Particulars
No.
1 2
I General Introduction:
II
III
IV
V
VI
(i) Functions of State Electricity Board/Utility
(ii) Introduction to Electricity Act 2003, CEA (Measures
relating to Safety and Electric Supply) Regulations, 2010.
(iii) Substation:
(a) Sub-stations, Selection of site, clearances and control
room
(b). Sub-stations - 33 kV to 765 kV
(c) Selection of voltage level for Sub-station and layouts
Equipments:
(i) Control/Relay panels and meters
(ii) Switch gear, Breakers
(iii) Isolators
(iv} Cables- types, construction and jointing·
(v) Power Capacitors
(vi) Lightning arrestors
(vii) CT, PT and carrier communication.
Transformers (Power and Distribution):
(i) Types of transformers and parallel operations
(ii) Cooling and drying out of transfom1ers
(iii) Testing of transformers
(iv) Maintenance of transformers
(v) Protection of transformers
(vi) Failures of transformers
Circuit Breakers, Isolators and Relays:
(i) Principle and construction ·
(ii) Types of circuit breakers .
(iii) Maintenance of circuit breakers
(iv) Relays - various types and functions
(v) .. Maintenance of isolators
· Storage Ba_tteries:
Need, Function~, Comn1issi6ning and Jv1ab.tenance
Cable Jointing:
Cables-types, selection, cable trenches, cable routing and laying,
cable clamping, jointing and te;~_nination of HT, power and
control cables and junction box, etc.
Number
of Hours
3
6
12
12
12
6
3
•
'
Earthing:
VII Sub-station earthing, equipment earthing and Consumer earthing
and procedure for improving quality of earth resistance
Safety and fire fighting
VIII (I) Safety
IX
X
XI
(i) Basic principle of safety, importance of safety rules and
their observation
(ii) . List of Safety equipment, their use and niaintenance thereof
(iii) Permit procedure
(iv) Self permit, Permit.on phone and Procedures to be observed
(v), Electric shock and safety.
(vi) Causes ·of Accident, Precautions to be taken to avoid
accidents while working.
(2) Fire fighting:
(i) Principle and causes of fire, class of fire i.e., A, B, C.
Precautions to be taken to avoid fire
(ii) Fire fighting equipments, their type and use, their ·
periodical maintenance
Duties of staff:
Duties of staff assisting supervisory and operating staff 'and
maintenance of records
Human Resource Development:
(i) Personal development and motivation
(ii) Communication skill and its importance
(iii) Attitudinal training
On job training, industrial visits and evaluation:
(I) Study Visits - after introduction:
(i) I st visit : 11 kV and 33 kV sub-station
(ii) 2nd visit : 66 kV and 132 kV sub-station
(iii) 3'd visit: 220 kV and 400 kV sub-station
2. Study and practicals
Total
(i) Measurement of current, voltage, power, energy, frequency
and power factor
(ii) .Testing and connection of over current and earth fault relays
- (iii) Study of Buchholz relays
(iv) Measurement of earth. resisdvity
(v) Meggering of installation and equipments
( vi) Study and maintenance of breathers
(vii) Study of "on load tap changer" for transforme1·
(viii) Study of line construction materials and hardware
(ix) Demonstration of conductor jointing
(x) Demonstration ,of cable_jointing, ·
3
6
6
9
75 Hours
"c2 ½VVeeks
3 Weeks
315
316 THE GAZETTE 01' INDIA : EXTRAORDINARY
(xi) Study of various type of power fuses, control fuses, kitkat
and horn gaps. ·
(xii) Use of safety equipments and practicals followed for permit
on works
(xiii) First aid and fire fighting drills
(xiv) Energy conservation
Part:XXVII
ASSESSMENT FORMS (TRAINING PERFORMANCE)
(I) ASSESSMENT FORM FOR ENGINEERS AND SUPERVISORS
Name of 1he Trainee ........................ , ........................................... .
Period: From ................ , ......... to ......................... (extended period).
Working in .•.................................................................. , ........... .
Section ..................................................................................... .
Department ..................... ; ... , ....................................................... .
[PART III-SEC. 4]
Item
No.
Particulars Marks Marks Remarks
1
i
II
2
Punctuality and attendance
(i) Is he reluctant to continue on overtime
(ii) Is he in the habit of taking1eaves at 1he
eleven1h hour
(iii) Does he insist on compensatory off
Intelligence .and grasp:
(i) Does he have full knowledge of1he plant
and equipment on which he is working and
follows 1he instructions given to him and
can execute !hem properlf
(ii) Is he industrious, hard working and
. painstaking
(iii) Has he shown any special skill of operation
in saving plant and equipment in trouble or
emergency
allotted given
3 4 5
+(5)
-(I)
-(1)
-(1)
+(10)
+(5)
+(10)
Ili Temperament and behaviour:
(i) Behaviour with superiors/colleagues and +(5)
subordinates
(ii) Capacity to take quick and correct decisions
(iii) Capacity to handle independent +(5)
responsibility
+(10)
IV Any special qualifications- capacity to execute a +( 10)
particular oc difficult job economically,
intelligently, resourcefully or with special skill
f
'y .Judgment of'the candidate .by taking viva-voce
test or by asking questions verbally
+(40)
Total marks +100
The marks may be given as below:-
Excellent
Very good
Good
Average
Below average
Special Remarks. if any:- .
Station Superintendent
91-100%
71-90%
61-7Q%
51-60%
Below 51%
Section-in-charge
(Power Plant)
317
318 THE GAZETTE OF INDIA : EXTRAORDINARY [PART lll-SEC. 4]
(II) ASSESSMENT FORM FOR ENGINEERS/SUPERVISORS_·
(For use of the Traiining Department)
(!) Name oftheTrainee
.................... -........... ,, ............................ ' ....... -. : ...... .
(2) Date of birth/age
(3) Training period : From ............................... (Months)
(4) Technical qualification
................ ; ................................. ; . . . . . , .... , .......... .
( 5) Specialisation if any
(6) Practicalexperience
..................................................... ~ ..... ; ................. .
(7) > Marks secured in periodical tests ( out of! 00):
.
Test No. Date Written Viva Onjob
· ..
(8) Percentage of marks secured in all the tests:
(9) General Remarks and Recommendations:
Director of the Institute
Project
.•
'
(III) ASSESSMENT FORM FOR TECHNICIANS TO ASSIST ENGINEERS
AND SUPERVISORS
Name of the Trainee .............. "' ......................... · ........................... .
Period: From .......................... to ......................... (extended period) .
Working in ................................................................................ .
Section .................................................................................... ..
Department ................................•.... • • • • • • • • • • • • • • • • • • • • • • • • · · · · · • · • • · · · · · · · · · · ·
Item
No.
Particulars Marks · Marks Remarks
allotted given
1
I
2 3
Punctuality and attendance:
(i) Does he attend the duty punctually +( 5)
and avoids' absenting without prior
intimation.
(ii) Is he reluctant to continue on -(!)
overtime
(iii) Is he in the habit of taking leaves at •
the eleventh hour -(1)
(iv) Is he even prepared to take leave -(4)
without wages
{v) Whether he availed'. medical leave -(1)
often
II InteUigence and grasp:
(i) Do&s he have full knovrledge of the +(10)
plant and equipment on which he is
working and follows the instructions
given to him and can execute them
· properly
(ii) Is he industrious, hard working and
painstaking +( 5)
(iii) (a) Has he shown any special skill
of operation in saving plant ~nd
equipment in trouble or emergency . +(lO)
OR
(b) Has he shown any special skill or
innovation in any maintenance job.
III Temperament and behaviour:
(i) Behaviour with superiors/colkagues
(ii) Capacity to take quick and correct
decisions by himself or to point out
the discrepancies to · superiors
promptly while attending plant and
equipment.
(iii) Capacity to take independent charge
as plant attendants (Name of the
· plant)
+(5)
+(5)
+(10)
4 5
319
320 THE GAZETTE OF INDIA : EXTRAORDINARY
IV Any special qualification8:
(i) ls he suitable for any other plant
other than the one mentioned above
at Ill(iii)
(ii) Can he record the readings correctly
(iiiJ Is he suitable for any particular
skilled maintenance job as an
artisan.
(iv) Has he specialised in any particular
trade such as winder, high pressure
- welding, etc.
+(IO)
V Judgment of the candidate by taking viva- +(40)
voce test or by asking questions verbally
about power plant and equipment
Total marks +100 •
The marks may be given as below:-
Excellent
Very good
Good
Average
Below average
Special Remarks if any:-
Station Superintendent
[PART Ill,-SEC. 4]
91- 100%
71-90%
61-70%
51-60%
Below 51%
Section-in-charge
{Power Pl;ufl)
'
'
[ "IT'l IIl-ll!U1l" 4]
(IV) ASSESSMENT FORM FOR TECHNICIANS TO ASSIST ENGINEERS
AND SUPERVISORS
(For use of the Training Department)
(!) Name of the Trainee
·············································································
(2) Date of birth/age
............................................................................. ~- ..
(3) Training period : From ........................ to .............. (Months)
(4) Highest technical qualification
(5) Specialisation, if any
............. ' ............................................................... .
( 6) Practical experience
······· .. ,, .................................................................. .
(7) Marks secured in periodical tests ( out of 100):
Test No. ·Date Written Viva On job
'
( 8) Percentage of marks secured in all the tests:
(9) General remarks a1;1d recommendations:
Director of the Institute
3747 Gl/10-41
321
322 THE GAZETTE OF INDIA : EXTRAOIWINARY
·"-,.
'""'t·rn ,,,·.41
Sdt,·dulr-1 I
Safety. measures for operation and maintenance of transmission and distribution
system
(See sub-regulation (3) of regulation (7))
Part I
( I ):J)uration and content of training shall be as specified below:
· (i) Engineerv\nd supervisors - The time allocation and various components of
, theJraining course. for e_ngineers and supervisors who would be engaged on
. operation and maintenance of transmission system shall be as given in Part II of
this Schedule.
(ii) Technicians -·The time allocation and various· components of the training
. course for . .technicians who would assist .· the engineers and supervisors in
-·OJ)llrationand-,maintenance bf transmission system shall be as given in Part rn
of this Schedule.
(iii) Engineers, Supervisors and Technicians - The time alldcation and various
. components of the t,raining course for engineers, supervisors and Technicians in
operation. and inaintenartce 'of sub-transmission and distribution system shall be
.is given in Part IV, Vand VlofthisScedule. .
- .
(iv) Refresher course O The.duration and contents of the refresher courses shall
. be determined jointly by the owner of the said system and training institute.
(v) Visits to factories-As part of practical training the trainees may be taken to
factories manufacturing , equipments used in .transmission and distribution
installations.
(vi) Performance of the trainee(s) - The trammg institutes shall group the
syliabus in modules for.organising the- training. The pass percentage in each'
module for theory and for project work shall be 50% Whereas for on job
training and for viva voce it shall be 75%. The sponsor(s) of the trainees may
consider the institution of incentives and awards for excellent perfomiance
during the training and also for suitable action for sub-standard performance.
(2). Creation of the Institute:
(i) The existing training institutes established for training of personnel engaged
in operation and maintenance of generating stations and substations associated
with generating stations can create additional facilities for training in
transmission and distribution sys-terns.
(ii) Guidelines for such institutes specified under Schedule-I (Item 2) under the
heading "Facilities for Creation oftraining institute" shall also be applicable for
insfitutes which would impart training in transmission and distribution systems.
(3). Assessment fom1s for engineers and supervisors and for Technicians to assist the
engineers and supervisors are given at Part XXVII of Schedule I .
'
'
•
.
Part II
SYLLABUS FOR ENGINEERS AND SUPERVISORS FOR OPERATION AND
MAINTENANCE OF TRANSMISSION SYSTEM
Item
No.
I .
I.
IL
III.
Particulars
2
General Introdlictiort:
(i) World Power Scenario
(ii) Growth of'Powerlndtistry in India
( iii) Generation Scenario' in India
(iv) Transmission and•Distribution Scenario in India
(v) Roleof Private Power Participants in· India
(vi) Organisation/PowerSector setup
(vii) Introduction to IndianStandatd specifications for ·
Electrical wiring
(viii) Energy Conversation.·
Power Generation:
(i) Types•ofgenetatio!Y.'Conventional'and·non-conventional;
Thermal Power Plant: components/ equipments and their
brief details'and uses, features and characteristics of boiler,
turbine, generator, excitatiort;'etc. Brief operational
aspects; captive power plartts·•
(ii) Hydro PowerPlant componertts/equipments' and their
brief details; features and characteristics of turbine
generator; excitation; etc. Brief operational aspects
(iii) Gas Powet Plant: cortceptof open cycle and combined
cycle; components, characteristics of gas turbines, brief
operatiohal'i1spects, captive power plants·
(iv) Nuclear Pdwer Plant: salient features
(v) Non-Conventional Energy : various sources, working
prirtoiple;,electricity generation
(vi) Co•generation,optimal mix of different types of
generation; base load and peak load operation
Power Transmission:
(I) HVAC and HVDC Transmission System
(i) Brief history ofEHVtrartsmiSsion system in India
(ii) Tower types A, B, C, D and special towers
(iii) Conductors/Earthwire and their accessories, types,
configuration, tran·spositlon, selection criteria
(iv) InsrJ;.tors and hardware fittings: types, strength, details
(v) Right of way, CEA (Measures relating to Safety and
Electric Supply) Regulations, 2010 and Acts, statutory
clearances frol11jlther agencies, compensation, etc .
(vi) Surveying, route aligriment, profiling, tower spotting
(vii) Benching and soil classification, soil investigation and soil
resistivity measurement.
(viii) Tower design and testing, quality checks
Number
of Hours
3
6
18
30
323
324
c,-C- - ---- -
THB GAZETTE OF INDIA : iirTRAORDINARY
(ix) Tower erection hardware and\1 accessories, fitting
procedures, stringing, clearances, commissioning
(x) Operation and Maintenance of Transmission Line : line
patrolling, routine checks, filling log books, T & P,
thermovision scanning, fault failure analysis, hot line
maintenance, case studies
(xi) Development of HVDC technology, economics,
comparison with HV AC systems, principles of HVDC
conversion, HVDC lines, HVDC sub-stations - converters,
reactive power considerations, HVDC: system, operntion
and control, maintenance; AC and DC harmonics and
filtering, protection system, insulation, coordination,
emergencies and case studies.
(xii) FACTS (Flexible AC Transmission System)
!PART 111-SEc. 4]
(2) Sub - Stations (765kV/400 kV/220kV/132kV) 75
(i) Types : generation sub-station, grid sub-station, mobile
sub-station,· gas insulated sub-station, · HVDC sub-
station, indoor/outdoor, etc., general comparison
(ii) General arrangement and layout of switchyard, switchi1sg
schemes, single line diagram ·
(iii)Power Transformers and Reactors
(a) Types : major components, constructional details,
functions
(b) Design and selection, specificatiori and rating
(c) Bushings, On Load Tar> Changers (OLTC),
Buchholz relay, conservator, breather, thermo
syphon filter, indicators, etc. ·
(d) Cooling arrangements - methods of cooling, pumps,
fans, radiators, etc.
( e) Transformer tests
(t) Introduction to relevant Indian Standards
(iv) Switchgears and Introduction to relevant Indian
Standard.
(a) Circuit Breaker: types (MOCB, ABCB, VCB, SF6 ),
constructional details, layout arrangement,
connection to bus, design, selection parameters,
ratings/ specifications, interlocks and'introduction to
relevant Indian Standard
(b) Isolator: types (Vertical, Horizontal, Pantography,
Breaks, constructional details, Earth · switch,
interlocks, design/selection, ratings/specifications
( c). Bus bar types, construction, supports, insulators,
conriectors, -- jumpers, safety clearances,
design/selection, ratings/specifications
(d) CT/CVT/Lightning Arrestor/Lightning Mast: Types,
constructional details, use, location, selection/design,
ratings/specifications · ·
(e) Power Line Carrier Communication (PLCC):
principle, purpose, types of coupling and choice of
components, use and operation of PLCC system,
modules of PLCC panels, ratings/specifications
[ 'fill Ill- 1'.§l1J,; 4 l
(f) Meters, Indicators, and Recorders: types and
functional description of all types of meters,
indicators and recorders-Voltmeter, Ammeter,
Frequency Meter, Wattmeter, Energy meter, Event
logger (EL), Disturbance Records,r (DR), Fault
Locator (FL), indicators and knowledge of relevant
Indian Standard
(g) Relays: types, functions, constructional det11ils,
selection, ratings/ specifications, testing and setting
ofrelays·and knowledge ofrelevant Indian Standard
(h) Protection System Philosophy: - types, design,
protection schemes, tripping schemes, protection of
transformers/reactors, motors, feeders, generator
bus, etc.
(v) Grounding: types of wounding, earth testing and
treatment, earth mat de$lgll, sti:p potential, touch
potentials, transfer potentials, neutral gro1mdi11g f!!cfor.
(vi)Auxiliary facilities -
(a) DG set
(b) Fire fighting system - types of fire, extinguishe,,
Emulsifier system, deluge system, · fire fighting
system for transformer/reactor, oil storage system,
control room, office building, etc.
( c) Station Battery System
( d) LT supply
( e) Air Conditioning System
(f) Compressed -- Air System (service air ·§ystern,
instrument air system)
(vii) Control Room: layout, arrangement of
equipments/panels, false ceiling and flooring, fire
safety measures, Air-conditioning, Uninterrupted Power
Supply (UPS), computer and its peripherals, lighting
/emergency lighting
(viii) Cables: types, control cables, power cables,, layout,
-trench/gallery arrangement, cable ratings, selection, and
~<!Pie teTT!lin11fiqn and jointing.
(ix)Compensating -de¥ices: s!mP! n:acmr,ip1,1pacitor, series
reactor/ capacitor, static var comperisators'(SVC) -
(x)Sub-station operation: operational -aspects of i!I!
equipments/systems, salient features and parameters,
limiting values, control room operation, local/remote
operation, operational guidelines/procedures, and
synchronisation, grid operation, communication with
R,LilC/ SLDC, etc., permit to work, line clear procedure,
in~intenimc,; of log books, records , tripping reports, shift
procedures, monitoring, duties in:spongipilities pf ~ul;.
station staff; interlocks and sequential operation,
operational problems, operation under emergency, case
studies.
(xi) Sub-station Maintenance:
(a) Need, philosophy, types- routine, preventive,
planned, predictive, break-down, emergency
maintenance, comparisons, life expectancy curves
325
-~----~------ --- _-__ , ___ ,-,--------" :c~':-c··-
326 THE GAZETTE OF -INDIA : EXTRAORDINARY
(bathtub . curves), tools and tackles, testing
instruments, safety devices, sampling equipments,
test kits, ,visual checks, condition monitoring
techniques, on-line . maintenance, daily/weekly/
monthly/quarteriy/half yearly/annual maintenance of
different equipments, planning the maintenance
activities, preparation of maintenance estimates,
budgeting for control, maintenance records, history
(b) spare parts management
(c) Transformer and Reactor Maintenance-factors
affecting the life of transformer/reactor, types of
faults that can occur, reasons for breakdown, visual
checks/ inspection/ preliminary testing of various
components- oil sampling and testing, oil filtration,
Dissolved Gas·. Analysis (DGA), maintenance
Schedule, fault rectification, need for major overhaul
and methods
( d) Switchgear and Protection Maintenance
maintenance of CB, isolator, earthswitch, support
insulators, CT/CVT, LA. Lightning Mast (LM),
meters/ recorders, PLCC, protective relay
maintenance, protection system maintenance
( e) Maintenance of auxiliaries and other systems
battery and charging · system, DG set, air
conditionirig plant, compressed air system, fire
fighting system, switchyard - lighting, control room,
earth resistance testing, cables, compensating
devices.
(xii) Erection and commissioning of sub-station, Project
Evaluation and Review Technique (PERT), Critical Path
Method (CPM), charts, project monitoring, erection, pre
commissioning checks/tests, commissioning,
synchronisation.
(xiii) Civil works - surveying, site selection, soil
investigation, general layout and architectural drawing,
switchyard foundation, cable trench design, oil pit,
control room building, DG set building, Fire fighting
system and AC systerih design, design and construction
of roads, drains, _ water ~upply pipe lines,
fencing/compound w~li.
3. Load Dispatch and Communicatron
(i)
(ii)
(iii)
(iv)
(v)
(vi)
(vii)
Load Dispatch Centres- functions, SLDC/RLDC, NLDC,
pre-dispatch, during-dispatch, post dispatch functions
.. Supervisory Control and Data Acquisition (SCADA)
-System, RTU, front end computers, main computers,
visu;il _display units, mimic boanls
Energy Management System- functions
Lo;id forecasting, · generation scheduling, load
management, load shedding
Hydro • thermal scheduling
Voltage/frequency control
Reactive Power Management
[PART III-SEC. 4]
18
.-~
'
I 'WT Ill -"&Us 4]
IV.
V.
(viii) Grid Management - problems/solutions
(ix) Operational co-operation, import/export of energy. role of
tariff in system operation
(x) Maintenance, on-line maintenance
(xi)· Grid disturbances- case Studies
(xii) Software tools
Communication System: types- PLCC, microwave. leased
lines, fibre optics, satellite, V-SAT Communication.
comparison, characteristics, modules, planning criteria.
selection criteria, RTUs, modems, baud rate, communication
protocols, data exchange, system noise and interference,
integrated communication system, O&M of communication
system, protocol details, telemetry, tele-control and telc
protection.
Commercial Aspects And Contracts
(I) Commercial Aspects
. (i) Introduction to commercial aspects of power
system/distribution system
(ii) Tariff Structure, types, components, methods cif working
out, revenue real_ization
(iii) Energy accounting, Availability Based Tariff (ABT), inter
utility tariff, commercial disputes and solutions
(iv) Inventory planning and control, bi1! of materials, purchase
procedures, standardization and codification of stores
(v) Resource mobilisation through bonds/ debentures/shares.
( vi) Cost Engineering, costing and control, estimation,
estimates for providing service (LT/HT) connections,
street lighting. -
(vii) Electricity Rules and Regulations, Enactment
(viii) Budget types, budgeting procedure, appropriation, budget
control.
(ix) Accounting, auditing.
(2) Contracts
(i) Contract basics, terminology
(ii) Qualification- requirement, pre-qualification, bids,
evaluation
(iii) Notice Inviting Tender (NIT), Notice Inviting
Quotation
(iv) Preparation of bid documents, tendering/ bidding
(v) Bid opening, bid evaluation, award of contract,
monitoring of contract.
. (vi) Contractual obligations/liquidation, guarantee
/warranty
( vii) Vendor - qualification, development
(viii) Contractual problems and solutions
(ix) Revised cost estimation, justification for cost/time
over-run, substitute items .
(x) · Handing/taking over procedures, closing of contract
(xi) Legal issues of contracts, arbitration
Management:
(i) Principles of management, leadership, effective
327
24
12
12
328
VL
VII.
(ii)
(iii)
(iv)
(v)
(vi)
(vii)
THE GAZETTE OF INDIA : EXTRAORDINARY
communication, motivation, decision making, strategic
management
Management Information System
Project Management
Finance Management
Construction Management
Materials Management
Total Quality Management
System Planning and New Technologies:
(1) System Planning
(i) Introduction to power system planning requirements and
methods
(ii) Load forecasting and techniques
(iii) Load flow studies for planning
(iv) · Preparation of feasibility report (FR), Detailed Project
Report (DPR)
(v) Approval/clearance of projects
[l'ARr Ill-SEC. 4]
6
(2) New Technologies: 6
(i) Latest development m transmission system design,
material, component, system, tariff, operation,
maintenance
(ii) Latest developments in distribution system design,
components, meters, system, tariff, operation,
maintenance
(iii) Latest developments in power system, communication,
application of computers to power system. ·
On Job Training:
Total 207 Hours
= 7 Weeks
(I) System Operation (Onjob) 3 Weeks
(A) Sub-Station (Generating/Grid/Distribution)
(i) Layout, equipment familiarisation
(ii) Details, functioning, specification and different
parameters of switchyard, control room, auxiliary
system equipments
(iii) Shift handing/taking over, logging of parameters,
routine checks on eqqipments/ systems
(iv) Operational aspects of equipments /systems,
synchronization, grid operation, charging procedure
(v) Line/feeder connections, protection schemes, loading
aspects, etc.
_(vi) Salient features and operational aspects of HVDC sub
station.
(B) Load Dispatch and Communication
(i) · Load Dispatch Centre (NLDC/RLDC/SLDC): set up,
functioning
(ii) Supervisory Control and Data Acquisition (SC ADA)
and Energy Management System (EMS) functioning
(iii) Load forecasting
'·
,.
•
•
['ll'I-III-1eflls 4]
(iv) Generation scheduling
(v) Voltage and frequency control activities
(vi) Cpmmunication system operation
(vii) System Software
( viii) Shift operation
(2) System Maintenance (On job) 3 Weeks
(A) Sub-Station Maintenance
(i) Visual checks, routine, preventive, planned, break-down
maintenance of equipments/system
(ii) Transformer, reactor, switchgear, relays, protection
system and auxiliary facilities.
(iii) Maintenance schedules
(iv) Referring log books/history records for maintenance.
(v) Testing Lab facilities, testing and commissioning.
(vi) Procedure for permit to work/line clear.
(vii) Safety devices and practices.•
(B) T&D Line/Cable Maintenance
(i) Line patrolling, · thermovision scanning, hot spots,
hardware replacement procedure, 1' &P.
(ii) Emergency Restoration System (ERS)
(iii) Hot Line Maintenance.
(iv)· Industrial visits and evaluation
Part III
SYLLABUS FOR TECHNICIANS TO ASSIST ENGINEERS.AND
SUPERVISORS IN OPERATION AND MAINTENANCE OF TRANSMISSION
SYSTEM
Item Particulars Number
of Hours No.
1 2
I General introduction:
II
(i) Functions of State Electricity Board/Utility
(ii) Introduction to Electricity Act, 2003, and CEA
(Measures relating to Safety and Electric Supply)
Regulations, 20 I 0.
Substation and Equipments:
(i) Substations
(a) Sub-stations, selection of site, clearances and control
room
(b) Sub-stations 33 kV to 765 kV
( c) Selection of voltage level for sub-station and
· layouts·
(ii) Equipments: ,
(a) Control/relay panels and meters
(b) Switch gear, breakers
( c) Isolators
(d) Cables-types, construction and jointing
(e).Power capacitors
( f) Lightning arrestors
(g) CT, PT and carrier communication.
3747 Gl/10-42 ,
3
6
12
330
III
IV
V
VI
VII
VIII
TIIB GAZETTE OF INDIA : EXTRAORDINARY
Transformers (Power and Distribution)
(i) Types of transformers and parallel operations
(ii) Cooling and drying out of transformers
(iii) Testing of transformers
·(iv)· Maintenance of transformers
(v) Protection of transformers
(vi) Failures of transformers
Circuit Breakers, Isolators and Relays
(i) Principle and construction
(ii) Types of circuit breakers
(iii) Maintenance of circuit breakers
(iv) Relays - various types and functions
(v) Maintenance of isolators
Storage Batteries:
Need, Functions, commissioning and maintenance
Earthing:
Sub-station earthing, equipment earthing and Consumer
earthing and procedure for improving quality of earth
resistance
Safety and fire fighting
(1) Safety
(i) Basic principle of safety, importance of safety rules
and their observation
(ii) List of safety equipment, their use and maintenance
thereof
(iii) Permit procedure
(iv) Self permit, permit on phone and procedures to be
observed
(v) Electric shock and safety.
(vi) Causes of accident, precautions to be taken to avoid
accidents while working.
(2) .fire fighting:
(i) Principle and causes of fire, class of fires, ie., A, B,
C. Precautions to be taken to avoid fire
(ii) Fire fighting equipments, their type and use, their
periodical maintenance
·Transmission and Distribution (Line~Construction and
Maintenance)
( 1) Construction
(i) Survey of HT, LT Lines and service lines and
cables, crossing such as road, railway, river, etc.
(ii) Selection of materials and poles for lines and
handling of materials
(iii) Pole erection, size of pit, concreting, pole
alignment, etc.
[PART !11-SEC. 4]
12
12
6
3 •
6
18
'
r
['ll'l Ill-~ 4]
IX
X
XI
(iv) Types · of stays, their marking, grouting, stay
insulator binding, etc.
(v) Types of conductors and their parameters such as
current carrying capacity, etc.,. cables0types and
joints.
(vi) Type. of guarding and clearances; anticlimbing
devices, danger board, etc.
(vii) Erection of transformer DP structure
(viii) Patrolling, line meggering and commissioning of
power lines
(2) Line Maintenance
(i) Fuse grading necessity and its benefits
(ii) Patrolling, tree ct ,fng and safe clearances
(iii)Guarding of Jim,,, clearances and maintenance,
attending to breakdowns.
(iv)Importance and maintenance , of air-break switch,
dropout fuse set, dist. box etc.
(v) Pre-monsoon maintenance - necessity and procedure
thereof
( vi) Balancing ofload using tong tester
(3) Service Connection, theft of energy
(i) Types of service connections ( overhead,
underground, High Tension/ Low Tension,- Single
phase, Three phase)
(ii) Point of supply, testing of Consumers' wiring and
earthing terminals
(iii)Materials required for service connection, fuse
grading, underground cable connections (feeder
pillar, mini pillar, junction box.)
(iv)Theft of energy, preventive measures, unauthorized
extensions ·
(v) Consumer relations and dealing with Consumer
problems
Duties <if staff
Duties of staff, assisting supervisory an operating staff
and maintenance ofrecords
Human Resource Development
(i) Personal development and motivation
(ii) Communication skill and its importance
(iii)Attitudinal training
On Job Training, industrial visits and evaluation:
(1) Study Visits - after introduction
(i) 1st visit : 11 kV and 33 kV sub-station
(ii) 2nd visit : 66 kV _and 132 kV sub-station
(iii) 3rd visit : 220 kV and 400 kV sub-station
Total
331
6
9
90Hours
;;3 Weeks
3 Weeks
_332 THE GAZETTE OF INDIA : EXTRAORDINARY
(2) Study and practicals
(i) Measurement 0f current, voltage, power, energy, '
frequency and power factor
(ii) - Testing and connection ofrelays
(iii) Study of Buchholz relays
(iv) Measurement of earth resistivity
(v) Meggerihg of installation and equipments
(vi) Study and maintenance ofbreathers
(vii) Study of"on load tap changer" for transformer
(viii) Study of!ine construction materials and hardware
(ix) Demonstration of conductor jointing
(x) Demonstration of cable jointing.
(xi) Study of various type of power fuses, control fuses,
kitkat and horn gaps.
(xii) Use of safety equipments and practicals followed
for permit on works
(xiii) First aid and fire fighting drills
Part IV
[PART Ill-SEC. 4]
SYLLABUS FOR ENGINEERS ENGAGED IN THE OPERATION AND
MAINTENANCE OF SUB-TRANSMISSION AND DISTRIBUTION SYSTEM
Item Particulars
No.
1 2
I Overview of Power Sector Scenario:
_ (i) Growth of Power Industry in India
(ii) Organisation/ Power Sector set-up in·India
(iii) Electricity Distribution in India
(iv) Private Participation in Distribution
(v) Distribution Reforms in India.
II Regulatory Environment - Rules and Regulations:
(i) Electricity Act,2003 - Provisions relating to electricity
distribution
(ii) Role of Regulatory Commissions
(iii) CEA(Measures relating to Safety and Electric
Supply) Regulations, 2010 - Relating to electricity
distribution.
(iv) Energy Conservation Act
III Distribution planning and optimization:
(i) Philosophy of distribution planning.
(ii) Acquaintance with software for distribution planning
~d optiijiisation.
(iii) Operation of software.
(iv) Data entry fonnats and report generation.
(v) Case study.
IV Sub-transmission and Distribution Lines:
(i) Supports-towers/ poles:
· (a) Types and selection criteria
(b) Surveying and erection
Number
of Hours
3
3
3
30
15
r
[ "1l'T III--,---1!i"s 4]
V
VI
(ii) Line conductor/ c.ables:
(a) Classification
(b) Selection criteria
( c) Conductor stringing, jointing/ binding, sagging and
tensioning, clipping and jurnpering
( d) Earthing arrangements
(iii) Cable - types, selection, cable trenches, cable routing
and laying, cable jointing and junction box
(iv) Earth wire/ neutral wire, guarding, etc.
(v) Selection and fixing of control devices, viz. Gang
Operating Switches, fuses, isolators and earthing
switches, lightning arrestors, and distribution box, etc.
(vi) Installation of service lines.
(vii) . Street Lighting- design and layout methods.
(viii) Statutory clearances, viz. · Environment and forest, ·
local bodies, railway and telegraph crossings, river
crossings, clearances under CEA (Measures relating to
Safety and Electric Supply) Regulations, 2010, Acts.
(ix) Line/ cable maintenance including hot line
maintenance - line patrolling, inspection'; periodicity,
work permit, line clear and authorisation, erection of
temporary earth and restoration of supply, maintenance
T &P and safety devices, thermo vision scanning, hot
spots, etc.
Electric Sub-Stations (33 kV and below):
(i) Type, site selection , layout and civil Engineering
requirements.
Bus bar .arrangement, sub-station equipment, viz.
transformers, circuit breakers, etc.
(ii)
(iii) Am\iliary systems, viz. DG set, battery system and
fire fighting system, etc. ·
(iv) Control panel, meters, indicators and recorders and ·
relays, etc.
(v) Erection,_,testing and commissioning of
equipments/systems
(vi) Earthing of sub-stations equipments and soil testing
(vii) Transformer oil and its testing
(viii) . Operation and maintenance of all equipments,
protective relays and auxiliaries .
. Metering Requirements:
(i) Type of metering, viz. DT metering, feeder metering
and Consumer metering.
(ii) · Regulations on installation of meters and technical
· standards
(iii) Meter types, their settings and operation, testing and
sealing.
(iv)
(v)
Selection of meter and metering equipment
Familiarity with hardware (CMR!) and software for
meter data download, analysis and detection of meter
tampering
(vi) Role of advanced metering system in controlling
commercial losses
333
15
6
334 THE GAZETTE OF INDIA : EXTRAORl'l!NARY [PART HI-SEC. 4]
VII Concept of Losses and Loss Reduction Measures: 9
(i) Concept of AT & C losses
(ii) Segregation oflosses.
(iii) Technical loss reduction measures.
(iv) Reactive power management. (
(v) Detection of thefts, tampering, unauthorized loads
(vi) Anti-theft measures and case studies
(vii) Commercial loss reduction measures.
(viii} Penalties under the Act for theft and misuse of
power.
(ix) Energy audit and accounting.
(x) Demand side management.
VIII Reliability Issues, Quality of Power Supply, Customer 6
Awareness and Satisfaction:
(i) Reliability and quality of power supply and
reliability indices.
(ii) Causes and cures for breakdowns, tripping and
voltage and frequency fluctuation. . ;
(iii) Creating customer awareness
(iv) Prompt attendance to faults.
(v) Overview of the Electricity Supply Codes of
Regulatory Commissions.
IX IT Intervention: 12
(i) Familiarisation with distribution software
packages. and latest software tools and use thereof for
billing and revenue realisation, GIS mapping and
Consumer indexing, inventory control, keeping track
of equipments failure rate, quick fault location,
attendance, staff salary, energy accountability and
MIS etc.
(ii) SCADA- RTU, communication and distribution
automation.
(Iii) Customer care and call centres.
X Rural Electrification: 9
(i) Outsourcing of distribution activities, appointment of
franchisees and selfload management by villagers
7
and Gram Panchayats
(ii) Maintenance of complaint centres and faultremoval,
etc., by village Panchayats etc.
(iii) Separation of rural and urban supply system
(iv) Fixation of responsibility for energy receipt and
supply balance. .
·' (v) Raj1v Gandhi Grameen Vidyutikaran Yojana.
(vi) Distributed generation.
XJ Project Management: Contracts: 9
(i) Contract basics and terminology
(ii) Qualification - requirement; pre-qualification
(iii) Bids - Technical and Commercial
•
['ll'T.lll-~ 4]
(iv) Vendors -qualification, development
(v) Notice Inviting Tenders(NIT)/ Notice Inviting
Quotations(NIQ)
(vi) Preparation of Bid Documents, tendering/ bidding
(vii) Bid opening and evaluation, Award of contracts, .
monitoring of contracts
(viii) Contractual obligations/ liquidation, guarantee/
warranty
(ix) Contractual problems and solutions
(x) Revision of cost estimates, justification of cost/ time
· overruri and substitute items
(xi) Handling/taking over procedur~s, closing of contracts
(xii) Legal issues of contracts and arbitration
(xiii) CVC Guidelines.
XII Disaster Management:
(i} Instit~1tional set-up for disaster Management
(ii) Impact of different types of disasters
(iii)Trigger mechanism and warning system
(iv)Check list and preparedness to-address disasters.
(v) First aid techniques:
XIII Electrical Safety Aspects:
(i) Basic principles of safety, importance of safety rules
and their observance.
(ii) List of safety equipment, their use and maintenance
thereof.
(iii) Permit pro,edure - self permit, permit on phone and
procedures to be observed.
(iv) Electhc sbx:k, safety and procedure for recovery/
resuscitation.
(v) Causes of accide_nts, safe working procedures to
av,:>id accidents.
(vi) Principle and causes of fire, and precautions. to be
taken to avoid fires.
XIV Field Visits and on-job training: ·
(i) Familiarisation with layout of sub-stations and
equipments
(ii) Operational aspects of equipments/ sy,'.ems and
synchronization
(iii) Line/ feeder connections, protection schemes, loading
aspects, balancing of loads
(iv) Planning shift operations.
(v) . Maintenance schedules
( vi) Procedures for permit to work/ line clear
(vii) Testing lab facilities, testing and commissioning
(viii) Maintenance of Log Books/ history records and
adherence to the timely recording.
(ix) Familiarisation with IT tools.
· <Total
3
9
66
195 Hours
=6 ½ Weeks
335
336 THE'G,'.\ZETIE 'oF INDIA : EXTRAORDINARY [PART III-SEC. 4]
PartV
SYLLABUS FOR SUPERVISORS ENGAGED IN THE OPERATION AND
MAINTENANCE OF SUB-TRANSMISSION AND DISTRIBUTION SYSTEM
Item Particulars
No.
1 · 2
I Overview of Power Sector Scenario
II
(i) Growth of Power Industry in India.
(ii) Organisation/ Power Sector set-up in India.
(iii) Electricity Distribution in India
(iv) Private Participation inDistribution.
(v) Distribution Reforms in India.
Distribution Planning and Optimisation: ·
(i) Philosophy of distribution planning.
(ii) Acquaintance with software for distribution planning and
optimisation.
(iii) Operation of software.
(iv) Data entry formats and report generation.
(v) Case study.
Number of
Hours
3
3
6
III Sub-transmission and Distribution Lines: 9
. ~,-~- -
(i) Supports-towers/ poles
(a) Types and selection criteria
(b) Surveying and erection
(ii) Line Conductor/ Cables -
(a) Classification
(b) Selection criteria
(c) Conductor stringing,jointing/ binding, sagging and
tensioning, clipping and jumpering
( d) Earthing arrangements
(iii) Cables - types, selection, cable trenches, cable routing
· and laying, cable jointing and junction box
(iv) Earth wire/ neutral wire, guarding, etc.
(v) Selection and fixing of control devices, viz. Gang
Operating switches, fuses, isolators and earthing
switches, lightning arrestors, and distribution box, etc.
(vi) · Installation of service lines.
( vii) StrY.et Lighting - design and layout methods.
(viii) Statutory clearances, viz. environment and forest ,
local bodies, railway and telegraph crossings, river
crossings, clearances under Safety and Electric Supply
·Regulations/Acts.
(ix) Line/ cable maintenance including hot line maintenance
· - line patrolling, inspection, periodicity, work permit,
line clear and authorisation, erection of temporary earth
and restoration of supply, maintenance T &P and safety
devices, Thermo vision scanning, hot spots, etc .
"
•
IV.
.~- . .
Electric Sub-Stations (33'kV andbefow):
(i) Type, site selection; layotitand,civil'.Engineering
requirements,
(ii) Busbararrangement,,sub•station:;equipmenti••\iiz,
transformers, circuit breakers, etc.
(iii) Auxiliary.systems, viz,DGSet, battery systemandfire.
fighting system, etc.
(iv) Control panel, meters, indicators and recorders.and•·
relays, etc.
(v) Erection, testing and commissioning-of•.
equipments/systems
(vi) Earthing ofsub•stations equipmentsand•:ooil·testing
( vii) Transformer oil andits testing .
(viii)• Operation and maintenance ofallequipmertts, protective.
relays and auxiliaries.
V . Metering Requirements: 3
(i) Type of metering, viz. DT metering, feeder metering and
Consumer metering:
(ii) Regulations on installation .. of meters• and technical .. •
standards
(iii) Meter types; theirsettings.and operation; testing and••
sealing.
VI Concept ofLosses and Loss. Reduction Measures:
(i) Concept of AT&C losses
(ii) Segregation of losses,
(iii) Technical'loss,reduction · measures.
(iv) Reactive power management.
(v) Detection of thefts,. tampering; .. unauthorized.J"oads
(vi) Anti-theftmeasures and case studies,
( vii) Commercial loss reduction measures, ·.·
(viii) Penalties undertheActfortheft and•nrisuse.of ·
power .
(ix) Energy audit and accounting .
. (x) Demand side management.
VII Reliability Issues, Quality of Power Supply; Customer
Awareness and Satisfaction;.
(i) Reliability quality of power supply and reliability
indices. . .
(ii) Causes and cures for.breakdowns, tripping and voltage ·
. and frequency fluctuation.
(iii) Creating customer awareness
(iv) Prompt attendance to faults.
(v) Overview of the Electricity Supply.codesofRegulatory
Commissions.
6
3
VIII IT Intervention: 6
(i) Familiarisation with distributfonsoftware packages and
latest software tools and use thereof for billing and
3747 Gl/10--43
337
-338 THE GAZETTE OF INDIA : EXTRAORDINARY [PART ill-SEC. 4]
revenue realisation, GIS mapping and Consumer
indexing, Inventory contro 1, keeping track of
equipments failure rate, quick faµlt location,
attendance, staff salary, Energy accountabiJity and
MIS, etc. r
'
(ii) SCAD A- RTU, communication and distribution
automation.
(iii) Customer care and call centres.
(iv) Enterprfae resource planning-
(a) Maintenance Management
(b) Asset Management
( c) Training Management
( d) Financial Accounting
(e)Material Management
(f) Outage Management
(g) Time Management '
IX Rural Ele.ctrification: · 3
(i) Outsourcing of distribution activities, appointment of -J
franchisees and selfload management by villagers and
Gram Panchayats. · ·
(ii) Maintenance of complaint centres and fault r\:moyal,
etc., by Village Panchayats, etc.
(iii) Separation of rural and urban supply system
(iv). Fixation ofresponsibility for energy receipt and supply
balance. /
(v) Rajiv Gandhi Grameen Vidyutikaran Yojana.
(vi) Distributed generation.
X Project Management: Contracts: 3
(i) Contract basics and terminology
(ii) Qualification - requirement, pre-qualification
(iii) Bids - technical and commercial
(iv) Vendors - qualification, development
. (v} Notice Inviting Tenders(NIT}/ Notice Inviting
Quotations(NIQ)
(vi) Preparation of bid documents, tendering/ bidding ,,
(vii) Bid opening and evaluation,. award of contracts,
monitoring of contracts
(viii) Contractual obligations/ liquidation; guarantee/ warranty
(ix) Cohtractµal problems and solutions . .
(x) Revision of cost estimates,justification of cost/ time
overrun and substitute items
(xi) Handling/taking over procedures, closing of contracts
(xii) Legal issues of contracts and arbitration
(xiii) C\'.C Guidelines. . ..
XI Disaster Management: 3
(i) Institutional set-up for disaster management
(ii) Impact of .different types of disasters
•
t
•
[ "lflT Ill-- 4 l
XII
XIII
(iii) Trigger mechanism and warning system
(iv) Check list and preparedness to address disasters.
(v) ' First aid techniques.
Electrical Safety Aspects:
(i) Basic principles of safety, importance of safety rules
and their observance .
(ii) List of safety equipment, their use and maintenance
thereof.
(iii) Permit procedure- self permit, permit on phone and
procedures to be observed.
(iv) Electric shock, safety and procedure for recovery/
resuscitation.
(v) Causes of accidents, safe working procedures to avoid
accidents.
(vi) Principle and causes of fire, and prerimtions to be taken
to avoid fires.
Field Visits and On-Job Training:
(i) Familiarisation with layout of sub-stations and
equipments
(ii) Operational aspects of equipments/ systems and
synchronization
(iii) Line/ feeder connections, protection schemes, loading
aspects, balancing of loads
(iv) Planning shift operations.
(v) Maintenance schedules
(vi) Procedures for permit to work/ line clear -
(vii) Testing lab facilities, testing and commissioning.
(viii) Maintenance of Log Books/ history records and
adherence to the timely recording.
, (ix) Familiarization with IT tools.
Total ,
J 6
60
120 Hours
:4 Weeks
---'"-------------'-------------------~ ----- ----
339
fPARr rn=Sisc'. 41
- . ·--- \ __ --·-·· --- . -
. IBlnit'W
:SftlLim.llSflm'mEOIINIOldSlENG~lfN· \l!HE<@PERJ\IBIONAND
~NANCE<0F;sm;;~ .. DDfflS,'lllUBIJlllON'S¥STEM .
lltem lP.imiculars Number
:No.
• .2
ii :(l)verview ,of iPower'Sec.torSaen:ario:
(i) Growth•ofiPower!lndustry,in 'India.
'(ii;) <0rganisation/iPower'Sec.tor set.;up:in :India ...
:(iii;) 13leatncity1Bistmbution,inilndia ·
•tiv) rnrivatelRarticiipation in Distribution.
i(¥) · D.istliibution!Reformslin'lndia.
'll •Srib4ransniission:andIDlistributionLines:
(i,) 'Slll"l~y,for ilines,atvoltage,qpto250 V, 'lines at·voltage.
,above,650 ¥olts'but iless:tban 33kW:and .for:servic.e 'lines
,and•:caliles,ant1'omssings•sudh ,as road, :railway, ri¥:er,and
,othenpower,anll1tele.com!Jjnes, ,
(ii) Selection of lline,materials,and,towers/cpdles,and ·safe
•handliqg,of<the;same.
•(iii) . 'Erectiomof,towershpoles -•size•ofpit,,concreting.and
;pole/to.wenalilµnnent,,etc. ·
:(iv) Line Gonlluctors--1tNPes, 0selectiomcriteria, '.c.onquctor
stringiqg,jriintiqg/lbinding,:Bagging,antt,tensioniqg,
. clippingamlliiulllPeDllg:and,earlhiqg,an-angi:meirts.
,tv) Types,dfstl!,yS, ,its1matking,,groutiqg,•stay,instilator,
binding, 't!tc..
,(.vi) 'Cable-rt)!pes,ssele.otion,,c.itllleitrenches,•cable,routing
.andllayiqg,<clililejjointillg,anllijunctionlhox,c:etc.
1~vii<) ·wypes,df!guarlling,andcdlearances,,earth·wire/.neutral .
·wire,,anti.1llinibing·devices.and•danger·boards.and·•their
· erection.
,fv.iii}Selection • •anll 'fixing •Of ,control oevices, •viz. Gang
· 'Operating 'Switches, ffuses, 'Isolators anti ·earthing
switches,.ilightning•arrestors,,and,llistributionibox,,etc.
(ix) Installation,ofservic.e,lines.
(x) Street iligllting -Hayout:inethods.
(xi) 'Line-meggi:ring:antl(commissioning•oftlistribrition lines. ·
•(xii1 Line•patrolling, iinspection; ,periodicity, ·work permit, line
,clear-ant1,authorisation,1treercutting,ano;safe<.dlearances,
,er1:ctionqrlltempomr,y,earth,,attending,to1breakdowns.and
:estoratiomdf.suf1ply. ·
(xiii) 'Maintenance T&P:and:safet,ycllevic.es, ffihermo -vision
·scanniqg,,hcit'spots,,etc.
'(xi:v,) \l!forline,maintenance.
,Ill- :Electric:Sub0Stations {33HcV ,andtbelow,):
, {i) Type, site:selection, :Jayoutand,cbriliEngineering.
•requirements.
,ofllours
.3
3
9
9
!
r
l
{ii}
(iii)
(iv)
(v)
(vi)
(vii)
Bus bar amingement, sub-station equipment, viz.
transformers, circuit breakers, isolator, lightning
arrestors, CTs, PTs and power capacitors, etc.,
Types of transformers, their erection and parallel
operation, testing, 111aintenanc.e, protection and failure. ·
Auxiliary systems, viz. DG set, . battery system arid ·
fire fighting system, etc. - need, functions,
commissioning and maintenance.
Control panels, meters, indicators, recorders and relays,
etc. - operation, maintenance and recording readings, ·
etc.
Control and power cables - types, laying of and
jointing. · ·
Installation , operation and maintenance of all·
equipments.
(viii) Cooling and drying out of transformers, transformer
(ix)
(x)
(xi)
(xii)
. oil and its testing.
Erection of DP structure for transformer. ·
High Voltage Distribution System (HVDS} "'- erection
and connecting the Consumers.
Sub-station earthing, equipment earthing and
Consumer's eartliing, and use ofMegger and procedure
and materials for improving quality of earth resistance: ·
Fire fighting equipment, theirtype, use and·periodical ·
maintenance, indicators and recorders and relays, etc.
IV MeteringRequirements: 3
V
(i) Type of metering, viz. DT metering, feeder metering
and Consumer metering.
(ii) Regulations oil installation ofmeters and technical ·
standards
(iii) Meter types, their settings and operation, testing and
sealing.
(iv) Computerised billing.
Concept ofLo§ses and Loss Reduction Measures:_
(i) Concept of AT&Closses. · ·
(ii) · Detection of thefts, tampering, unauthorized loads.
(iii) Anti-theffmeasures and case studies .
. VI Reliability issues, Quality of Power Supply, Customer
Awareness·andSatisfaction:
(i) Introduction to reliability and quality ofpower supply: ·•·
(ii) Causes and cures for.breakdowns, tripping and voltage
and frequencyfluctuation,
(iii) Prompt attention to faults and customer care.
3
3
VII Electrical Safety Aspects: 12
(i) Basic principles of safety, importance of safety 0rules
and their observance.
341
342 THE GAZETTE OF INDIA : EXTRAORDINARY
(ii)_ List of safety equipment, their use and maintenance -
thereof.
(iii) Permit procedure- self permit, permit on phone and
procedures to be observed.
(iv) Electric shock, safety and procedure for recovery/
resuscitation.
(v) Causes of accidents, safe working procedures to avoid
accidents.
(vi) Principle and causes of fire, and precautions to be taken
to avoid fires.
VIII Rural'Electrification:
(i) Separation of rural and urban supply systems.
(ii) Rajiv Gandhi Grameen Vidyutikaran Yojana.
IX Disaster Management:
X
(i) Impact of different types of disasters.
(ii) Check list and preparedness to address disasters.
(iii) First aid techniques.
Field Visits and On Job Training:
(i) - Familiarisation with layout of sub-stations and
equipments. _
(ii) Operational aspects of equipments/ systems and
synchronization.
(iii) Line/ feeder connections, protection schemes, loading
aspects, balancing of loads.
(iv)
(v)
(vi)
(vii)
(viii)
. (ix)
(x)
_ (xi)
(xii)
Adherence to shift system.
Maintenance schedules.
Procedures for permit to work/ line clear.
Testing lab facilities, testing and commissioning.
Safety aspects and safety drill. · ,
Hot line maintenance .
Maintenance of Log·Books/ history records and
adherence to the timely recording.
Familiarisation with Tools and Plants (T&PJ.
Familiarisation with IT tools.
[PART In-----SEC. 4]
3
3
60
Total 108 Hours
J{andling of electric supply lines and apparatus ·
[See sub-regulation (3) of regulation (19)]
-Precautions to be observed
:4 Weeks
Schedule-III
(1) Hotline Maintenance train~u personnel only are designated to do work on line.
(2) Work permit will be taken from the terminal substations at each end of the line.
(3) Work shall be performed with _proper planning and prior understanding and
clarity.
r
(4) Favourable climatic condition for hotline operations is sunny weather. If the
weather forecasts rain or thunderstonns work will not begin.
(5) Organisation of work shall be discussed among the members and responsibility
of each team member fixed. . .
(6) Before going to ihe work site all equipment and tools shall be inspected and
checke.d for correct operation.
(7) Auto re-closure shall be in 'OFF' position for the line at both ends.
(8) The work procedure shall be discussed with the team member at the tower
location .and the responsibility of each member shall be properly defined.
(9) The land in close vicinity to the tower shall be cleared to provide a site area for
the required tools.
(10) AHcleaned hot sticks, strain carrier and other assemblies shall be kept on the
hotline tool rackto avoid ground contact.
(1 !) Wear helmet, safety shoes and safety belt shall compulsorily be used.
(12) All hot sticks and ladders shall be cleaned and checked for integrity by the hot
sticks Tester.
(13) All linemen in the hotline team shall be equipped with personal protective
equipment during the work.
(14) No live-line team members onthe tower and conductor shall wear any metallic
chain, wristwatch or ring to avoid any circulating current.
(15) The team linemen will wear conductive socks, boots, helmets and hand gloves.
The 'hot-end' lineman shall wear complete bare hand suit.
( 16) Tarpaulin sheet should be laid on the work area .
. (],]) A light vehicle shall be kept nearby during entire '\YOrk period.
Tools normally required for hot line maintenance operation :
The following tools confonning to relevant Indian Standard or equivalent specifications
shall be used_ in on-line working.
( 1) Wire tongs
(2) Wire tongs saddle
(3) Tie sticks
( 4) Strain link sticks
(5) Roller link sticks
( 6) Suspension link stich
(7) Auxiliary anns
(8) Strain carrier
(9) Gin poles
(10) Cum-a-aiong~clamp
(1 I) Safety equipment like conductor guards, X-ann guards, insulator covers, hand
gloves etc.
(12) Hot sticks
343
344 THE GAZETTE OF INDIA : EXTRAORDINARY· [PART JU-SEC .. 4]
.
. Safe Working Distance :
The following safe working distances shall be observed
Phase to Phase . Safe Clearance
'
kV Meter
11 0.61 .
33 0.71
66 .• 0§1
110 1.02 ..
132 1.07
220 1.52
400 2.13
. . . .·· .
Schedule-IV
Forms of Inspection Report
[See subs regulation (3) of regulation (30))
... FORMI. . ...
(lnstallatfons ofvQltage up to and including.2S0V)
Report No. ____ Date•ofinspection_· ____ _
Date of Last inspection _______ _
I.
2.
3.
4.
5.
6.
7.
Consumer No. --~--,-------
Voltage and system of supply:
(i) Volts--·~-~~"'--
(ii) No. of Phases ------,--
tiii) AC/DC~-----
Type of wiring
Name of the consumer.or owner ------------,---
Address of the consumer or owner ----------~--
Location of the premises-:----------"'--'~~
Particulars of the installations: -----------~.,..
· Number Connected Load in KW
( a) (i) Light Points
(ii) Fan Points
(iii) Plug Points
State type of wiring whether casing capping, lead covered of teak wood batten,
concealed conduit, Tough Rubber Sheathed and any other type. ·
(b) Other equipments ( complete details to be furnished): ·
(i)
(ii)
Total connected load in KW -------------
Maximum current demand in Amps
-----'---------
(on the basis of total connected load)·
(c) Generators details i.e. Make, S. No, KVA rating and Voltage:
(i)
(ii)
,
•
[ 'II'! Ill-l1!f116 4]
· General c·onditions of the installation:
SL Regulation
No. Nos.
8. ' Regulation-
9.
.
12 ,
Regulation-
13
10. Regulation-
14
11. Regulation-
15
12. Regulation-
16
13. Regulation-
17
14. Regulation-
3_4 -
15. Regulation-
35
3747 Gl/10-44
Requirements i Report
(i) Is/Are there any visible sign(s) of Yes/No_
overloading in respect of any apparatus
wiring?
(ii) Condition of flexible cords, sockets, Satisfactory/Not
switches, plug-pins, cut•outs and lamp . Satisfactory
holders and such other fittings.
(iii) General condition ofwiring.
(iv) Whether any unauthorised temporary
installation exist?
Satisfactory/Not
Satisfactory
Yes/No
(v) State if sockets are controlled by individual Yes/No
switches.
(vi) Any other defect or condition which may Yes/No
be a source of danger. Ifves give details.
Give report on condition of service lines, Satisfactory/Not
cables, wires, apparatus and sm;h other fittings Satisfactory
placed by the supplier or owner of the
premises. If not s~.tisfactory give details.
· Whether suitable cut-outs provided by the Yes/No
supplier at the consumer's premises are within
enclosed fire proof receptacle?
(i) State if switches are provided on live Yes/No
conductors.
(ii) State if indication of a permanent nature is Yes/No
provided as per Regulation so as to
distinguish neutral condm;tor from the live
conductor.
(iii) Whether a direct line is provided on the Yes/No
neutral in the case· of single phase· double
pole iron clad switches instead of fuse ?
(i) State if earthed terminal is provided by the Yes/No
supplier.
(ii) Have three pin plugs been provided for Yes/No
plug points ?
(iii) General visible condition of the earthing
· arrangement.
Are the live parts in accessible position ?
Leakage on premises:
Satisfactory/Not
Satisfactory
Yes/No
State insulation resistance between conductors ----- M Ohms
and earth in Mega Ohms.
(i) State if linked switches of requisite capacity Yes/No
are provided near· the point of
commencement of supply. ·
(ii) State if the wiring is divided in suitable Yes/No
number of circuits and each such circuit is
protected by suitable cut-out. .
-
345
346
16. Regulation-
41
. '·
17. Overhead
Lines
.
Date:
THE GAZETTE OF INDIA : EXTRAORDINARY · [PART III-SEC. 4]
(iii) State if. supply to each motor or apparatus Yes/No
is controlled by suitable linked switch.
(i) Have the frames of every generator, Yes/No
stationary motor and so far as practicable
portable motor and the nietallic parts (not ·
intended as conductors) of all other
apparatus used for regulating* or
controlling electricity been earthed by two
separate and distinct connections with
earth?
(ii) Is the earth wire free from mechanical
damage?
(iii) In the case of conduit; or lead covered
wiring, has the conduit or lead-cover been
efficiently earthed ?
(iv) If the consumer has his own earth
electrode, state if it is properly executed
and has been tested. If yes give value of
earth resistance.
Yes/No
Yes/No
Yes/No
--s---- .Qbms.
(i) State if the cons~mer has any overhead Yes/No
lines.
(ii) Does the overhead line near the premises Yes/No
of consumer meets the · requirement of
regulation 58, 60. and 61? If not, give
details. .
(iii). Is, guarding provided for overhead lines Yes/No
at road crossings?
(iv.) Any other remarks .
.
Signature of the Inspecting Officer/
Name ------~--
Designation ______ _
File No. --------
Copy forwarded to Chief Electrical Inspector for ......... , ......... ..
* Not applicable to isolated wall tubes or to brackets, electroliers, switches, ceiling fans
and such other fittings ( other than portable hand lamps and transportable apparatus)
unless provided with earth terminal.
..
•
'
•
l
'
['11'1 III-~ 4 J
Previous and next
Questions people ask
Is regulation 116 of This regulation repealed as on 08.06.2023-- Central Electricity Authority (Measures relating to Safety & Electric Supply) Regulations, 2010 still in force?
No repeal of This regulation repealed as on 08.06.2023-- Central Electricity Authority (Measures relating to Safety & Electric Supply) Regulations, 2010 is recorded.