Regulation 14, Central Electricity Authority (Grid Standards) Regulations, 2010: Restoration of grid following grid incident and grid disturbance
Central Electricity Authority (Grid Standards) Regulations, 2010 - Regulation 14
Text of regulation 14
Restoration of grid following grid incident and grid disturbance
14. Restoration of grid following grid incident and grid disturbance.- (1)
The Regional Load Despatch Centre, in consultation with Regional Power
Committee, shall develop procedures for enabling restoration and normalisation of
the Grid for inter-State system at the earliest, following grid incident and grid
disturbance of the categories specified in regulation 11.
(2) The State Load Despatch Centre shall also develop procedures accordingly for
restoration of intra-State system.
(3) The restoration procedures shall be reviewed following any addition of
generating station or transmission line or at least once in two years, and revised, if
considered necessary by the Regional Load Despatch Centre and State Load
Despatch Centre, as the case may be.
(4) The procedures specified in sub-regulations (1), (2) and (3) shall be made
available to, and be followed by all concerned Entities, Regional Load Despatch
Centres and State Load Despatch Centres.
Previous and next
← Regulation 13Reporting of grid disturbanceRegulation 15 →Operational Data during normal operation and during grid incidents and grid disturbances
All provisions of Central Electricity Authority (Grid Standards) Regulations, 2010
Questions people ask
Is regulation 14 of Central Electricity Authority (Grid Standards) Regulations, 2010 still in force?
No repeal of Central Electricity Authority (Grid Standards) Regulations, 2010 is recorded.