LIST OF CRITICAL ACTIVITIES
in
Natural Gas Pipelines
*******
Critical Infrastructure/ Activity/ Time period for Implementation plan
. Processes im olementation
Test record for radiography,
ultrasonic test or other
6 months
can be submitted in stages
applicable NDT methods (as within 6 months
carried out before commissioning)
Hydro-test (as carried out before
6 months
can be submitted in stages
commissioning)Report within 6 months
Pipeline cathodic protection record 6 months
can be submitted in stages
within 6 months
Pipeline As-built records 6 months
can be submitted in stages
within 6 months
If the pigging has not been
done for more than 5
Intelligent pigging shall be carried years for sour gas and l 0
out to detect metal loss for the years for sweet gas
pipelines of size NPS of 12 inches 2 years pipeline, then the
and above and length of I 0 Km intelligent pigging shall be
and above. carried out within two
years, otherwise relevant
records shall be submitted.
54 THE GAZEITE OF INDIA · EXTRAORDINARY fP II S 301 ART EC. I
6
HSE Management System
6 months To be implemented (including fire protection system)
Height of the vent shall be
7 minimum 3 meters above working 6 months Increase height of vent
level
Install gas detectors for
Gas detectors shall be installed at SCADA backed up
8 compressor station, gas receiving I year system, elsewhere hand
and delivery terminals held gas detector shall be
provided
Environmental friendly fire
For control room, switch
9 extinguishing flooding system for 2 years
gear and battery room, etc.
closed space. (C02 is acceptable only
for unmanned station)
HAZOP shall be done for all the
HAZOP report to be
10
pipeline facilities l year submitted along ~ith
mitigation plan
Schedule I
Technical Standards and Specifications inciuding Safety Standards
for
Scheduie-IA
Schedule-ID
Schedule-IC
Schedule-ID
Schedule-IE
Schedule-IF
Schedule-IG
Natural Gas Pipelines
MATERIAL AND EQUIPMENT
WELDING
PIPING SYSTEM COMPONENTS AND
FABRICATION DETAIL.S
DESIGN, INSTALLATION AND TESTING
OPERATING AND MAINTENANCE PROCEDURES
CORROSION CONTROL
MISCELLANEOUS
[WTII ~3(i)] 55
Schedule lA
MATERIALS AND EQUIPMENT
MATERIALS AND EQUIPMENTS
All materials and equipments forming a
permanent part of any piping system
constructed according to this standard shall
comply with the design and service
requirements and shall be suitable for the
intended fabrication or construction
methods. For sour gas service
requirements as per Schedule lG shall be
complied with.
MATERIALS FOR USE IN COLD
CLIMATES
Materials to be used in facilities exposed to
low ambient or low operating temperatures
shall have adequate impact properties to
prevent brittle fracture at such low
temperatures.
MATERIAL SPECIFICATIONS
In addition to standards and specification
covered in ASME B31.8, standards · and
specifications listed in Annexure II shall
also be acceptable for manufacturing of
various piping components forming part of
the natural gas pipelines and associated
facilities.
Steel Pipe
Carbon steel line pipe as per Line Pipe
Specification API SL, shall be Seamless,
Electric Arc Welded (EA W) or
Longitudinal I Helical Submerged Arc
Welded (LSAW/HSA W) conforming to
Product Specification Level (PSL 2).
Electric welded pipes manufactures to API
Specification SL shall also meet additional
requirements specified under Annexure III
of this standard
Carbon Equivalent
Maximum limits on Carbon Equivalent
(CE) for steel line pipes shall be as follows:
For pipes having Carbon Content > 0.12%
CE(IJW) = C + Mn + Cr+ Mo + V +
Ni+Cu
6 5 15
CE (IIW) value shall be~ 0.43%.
For pipes having Carbon Content 5'0.12%
CE(Pcm) =C + Si + Mn + Cu + Ni + Cr +
Mo+ .f + 5B
30 20 20 60 20 15
JO
CE (Pcm) value shall be~ 0.2S%.
Mill Hydro Test
Line pipes should be hydrostatically tested
in pipe mill using test pressure that produces
a hoop stress equal to 9S% of SMYS
irrespective of material grade. For new
pipeline, the test pressure shall be held for a
minimum period of 1 S sec.
Notch Toughness
For steel pipes of size NPS 2 and above,
notch toughness shall be specified.
Ductile Iron Pipe
Use of ductile iron pipes is not permitted for
natural gas pipelines.
EQUIPMENT SPECIFICATIONS
Equipment used in natural gas pipelines
manufactured to standards listed in
Annexure II of this standard shall also be
acceptable.
56 THE GAZEITE OF INDIA : EXTRAORDINARY [PART II-SEC. 3ti)]
Schedule lB
WELDING
PREPARATION FOR WELDING
Butt Welds
Notches or laminations on pipe ends are not
permitted and must be removed by cutting
the pipe as a cylinder and re-beveling of
pipe end or by grinding prior to welding.
Re-beveled ends shall be re-examined by
Ultrasonic or magnetic particle methods
if cut section is more than previously
examined length.
Seal Welds
As far as practical seal welding of threaded
joints should be avoided.
QUALIFICATION OF PROCEDURES
AND WELDERS
Requirements for Piping Systems
Operating at Hoop Stresses of 20% or
more of the Specified Minimum Yield
Strength
Welding procedures and welders for
welding of gas pipelines shall be qualified
as per API 1104 and shall include toughness
testing requirements as applicable for the
material to be welded.
Welding procedures and welders, for station
piping shall be qualified as per ASME
Boiler and Pressure Vessel (BPV) Code
Section IX or API 1104.
INSPECTIO:; OF WELDS
Inspection and Tests for Quality Control
of Welds on Piping System intended to
Operate at Hoops ·Stress Levels of 20% or
more of the Specified Minimum Yield
Strength
All Non Destructive Testing (NDT)
including radiographic examination shall be
performed in accordance with the
requirements of API 1104 except that no
root crack shall be permitted.
Regardless of operating hoop stress as well
as location class all carbon steel butt welds
in natural gas pipelines shall be subjected to
I 00% radiographic examination and I or
ultrasonic testing, The weld joints in vent
and drain piping open to atmospheric
pressure need not be radiographed/
ultrasonically tested. Such welds .however
shall be visually examined and root pass of
at least 10% of such welds shall be
examined by Liquid Penetrant Tesing.
All butt welded golden joints (i.e. welds
joints which are not subjected to pressure
te.sting, shall be subjected to 100%
radiography as well as examination by
ultrasonic techniques. Socket welded golden
joins shall be tested by using Liquid
Penetrant Inspection (L°Pl) method or wet
Magnetic Particle Inspection (MPI) method
REP AIR OR REMOVAL OF
DEFECTIVE WELDS IN PIPING
INTENDED TO OPERATE AT HOOP
STRESS LEVELS OF 20% OR MORE
OF THE SPECIFIED MINIMUM
YIELD STRENGTH
Welds having defects shall be removed or
repaired in accordance with API 1104.
Repaired weld areas shall be subjected to
additional radiography or ultrasonic testing
after repair.
[ 'IWTII ~3(i)]
Schedule 1 C
PIPING SYSTEM COMPONENTS AND FABRICATION DETAILS
PIPING SYSTEM COMPONENTS AND
FABRICATION DETAILS
General
In addition to standards and specifications
covered under ASME B 31.8 for various
piping components, piping components
manufactured conforming to standards and
specifications listed under Annexure II of
this standard shall be acceptable.
Valves and Pressure Reducing Devices
Valves having pressure containing
components including body, bonnet, cover,
end flanges etc. made of cast iron or ductile
iron shall not be used
Flanges
Flanges made of cast iron, ductile iron and
non-ferrous materials (brass or bronze) shall
not be used.
4089 Gl/09-8
Flanges and flanged components shall not
be used in buried piping unless entire flange
assembly is encapsulated in water tight and
electrically insulating materials
Bolting
All stud bolts and nuts used in natural gas
pipelines shall meet the design conditions as
per applicable ASTM standards. Cast iron,
brass or bronze materials are not permitted.
Fittings other than Valves and Flanges
Fittings made of cast iron and ductile iron
shall not be used.
Gaskets
Plain and compressed asbestos gaskets shall
not be used.
57
58 THE GAZETTE OF INDIA: EXTRAORDINARY [PART II-SEC. 3(i)]
Schedule lD
DESIGN, INSTALLATION AND TESTING
DESIGN INSTALLATION AND
TESTING
General Provisions
The selection of design for natural gas
pipelines shall be based on. the gas
properties, required flow rate operating
pressure and the environmental conditions'.
All components of the pipeline shall be
designed to be suitable and fit for purpose
throughout the design life.
Cross country pipeline of size less than NPS
4 shall not be used.
Other design Requirements
Necessary calculations shall be carried out
to verify structural integrity and stability of
the pipeline for the combined effect- of
pressure, temperature, bending, soil/pipe
interaction, external loads and other
environmental parameters as applicable,
during all phases of work from installation
to operation. Such calculations shall include
but not limited to the following:
Buoyancy control and stability
analysis for pipeline section to be
installed in areas subjected to
flooding I submergence,
Crossing analysis of major rivers.
Evaluation of potential for earthquake
occurrence along pipeline route and
carrying out requisite seismic analysis
to ensure safety and integrity of the
pipeline system.
Buildings Intended for Human
Occupancy and Location Classes for
Design and Construction
For the purpose of determining number of
buildings for human occupancy and
Location Class, 1 - mile distance shall be
replaced by 1600 m and fractions thereof.
When a cluster of buildings intended for
human occupancy, indicates that a basic
mile ( l 600m) of pipeline should be
identified as location class 2 or location
class 3, may be terminated 200 m from the
nearest building in the cluster on either side
(i.e. at start of cluster and at end of cluster).
The boundary between location class 1 and
location class 2 or location class 3 shall be
at least 200m away from the building
closest to the boundary.
STEEL PIPE
Additional Requirement for Nominal
Wall Thickness
Consideration shall also be given to loading
due to following while selecting nominal
wall thickness t as per ASME B3 l .8 as
appropriate:
Overburden loads
Dynamic and seismic loads
Cyclic and vibratory loads
Internal pressure fluctuations
Geo-technical loads (including slides,
differential settlement of piping, loss
of support, and thermal effect of the
pipeline on soil properties).
Design Factors (f) and Location Classes
All exceptions to basic design factors to be
used in design formula shall be as per Table
1 given herein this standard.
The minimum wall thickness for cross
country pipelines of size NPS 4" and above
shall be 6.4 mm.
Pipelines or Mains on Bridges
[ '1lllT II-~ 3(i)]
Pipelines on railroad and vehicular bridges dedicated bridges shall be designt!d with
should be avoided. Pipeline installed on design factor as indicated in Table 1.
Table 1 - Design Factors for Steel Pipe Construction
Facility Location Class
1 2 3 4
Pipelines [Also See para. 840.2l(b) of
0.72 0.60 0.50 0.40
ASME B31.8]
Crossings of roads, without casing:
(a) Private roads
0.72 0.60 0 .. 50 0.40 (a) Unimproved public roads
0.60 0.60 0.50 0.40
(b) Roads, highways, or public streets,
0.60 .0.50 0.50 0.40
with hard surface
Crossings of roads, with casing:
(a) Private roads
(b) Unimproved public roads 0.72 0.60 0.50 0.40
(c) Roads, highways, or public streets, 0.72 0.60 I 0.50 0.40
with hard surface and Railway 0.72 0.60 0.50 0.40
crossings
Pipelines on bridges 0.60 0.60 0.50 0.40
Parallel Encroachment of pipeline on
roads and railways
(a) Private roads
(b) Unimproved public roads 0.72 0.60 0.50 0.40
(c) Roads, highways, or public streets, 0.72 0.60 0.50 0.40
with hard surface · and Railway 0.60 0.60 0.50 0.40
crossings
River Crossing- open cut LIJ 0.72 0.60 0.50 0.40
Horizontal Direction Drilling (HDD) L'J 0.72 0.60 0.50 0.40
Compressor station piping 0.50 0.50 0.50 0.40
Fabricated assemblies (scraper traps, SV
stations, pressure/flow control and
0.60 0.60 0.50 0.40
metering facilities, etc.) [Al'so See para.
841.121 of ASME B31.8l
Near concentration of people in Location
Classes 1 and 2 C
2J 0.50 0.50 0.50 0.40
Notes:
(1) Higher thickness may be used if required to control stresses or stability during
installation and operation.
(2) Wherever, Table 841.114B is referred in ASME B31 .8 it shall be read as per Table I
of this standard.
59
THE GAZETTE OF INDIA: EXTRAORDINARY [PART 11 -SEC. 3(i)]
LOCATON AND LAYOUT OF
PIPELINE INSTALLATIONS
• Location
Originating, intennediate and tenninal
facilities of pipeline such as Originating
Compressor Station I Originating
Station, Intennediate Compressor
Station, Intemiediate Pigging Station,
Tap-off Station, Metering and
Regulating Stations and Sectionalizing_
Valve Stations etc. should be located
considering following aspects:
I. Functional and pipeline hydraulic
requirements.
II. Environmental consideration based
on Environmental Impact
Assessment (EIA) and Risk
Assessment (RA) study for the
pipeline and stations.
Ill. The HAZOP and risk analysis.
IV. The availability of space for future
augmentation of facilities.
V. Approachability, water table and
flood level and natural drainage.
In addition to above, compressor station
should be located at such clear distances
from adjacent property not under control
of the pipeline owner I operator so as to
minimize the hazard of communication
of fire to the compressor station from
structures on adjacent property.
• Equipment Layout
Following aspects be considered while
establishing station layout.
I. Station equipment and their sizes
II. Utility requirement.
Ill. Flaring I cold venting requirements.
IV. Operation and maintenance
philosophy of station equipment.
V. Requirement of space and access
around the compressor shed I house
and other equipment
VI. High Tension (HT) pole structure,
Transfonners, Breakers and Motor
Control Centre (MCC) etc shall be e
located in non hazardous area.
VII. Over Head power lines shall not be
allowed to pass directly above. the
process piping/equipment area ·and
buildings.
Minimum Inter-distances between various
station facilities and utilities shall be as per
Annexure IV.
• Piping Layout
Station piping may be installed above
ground or buried. Buried piping inside
the tenninal area should have a
minimum cover of 1.0 m from top of
pipe to finished ground level.
At internal stonn water drains a
minimum cover of 300 mm with
additional concrete slab extending at
least 500 mm on either side of pipe edge
shall be provided.
Where buried pipes come above ground,
the anti-corrosion coating on the buried
pipe will continue for a length of at least
300 mm above ground.
Platfonns and crossovers shall be
provided for ease of operation and
maintenance of above ground piping
where required
All the above ground piping should be
properly supported to withstand
operational safety requirements.
PROTECTION OF FACILITIES
Properly laid out roads around various
facilities shall be provided within the
installation area for smooth access of fire
tenders etc. in case of eme.rgency.
Proper industry type boundary masonry wall
at least three (3) mtrs high including 0.6
mtrs barbed wire on top shall be provided
all around the major installation such as
dispatch station, compressor station,
Secfo.;malizing Valve (SV) station and
delivery stations in line with MHA (
Ministry of Home Affairs) guidelines. For
other installations 3.0 m high chain link
fencing including 0.6 m barbed wire on top
can also be provided.
Emergency exit with proper gate shall be
provided in the earmarked zone at all
compressor stations.
Pipeline system should be equipped with
following:
a. Supervisory Control and Data
Acquisition (SCADA) System.
b. Leak detection system with
provision for identification / location
of leak and isolation of affected
section.
c. Communication facilities
d. Emergency Response and Disaster
Management Plan (ERDMP)
SCAD A & TELECOM
REQUIREMENTS
Gas pipeline system should be monitored
and controlled using SCADA or equivalent
monitoring and control system to ensure
effective and reliable control, management
and supervision of the pipeline.
Compressor Stations, Intermediate Pigging
Stations, Dispatch and Receiving Stations,
Sectionalizing Valve stations with remote
operation capabilities as well as Telecom
Repeater Stations including voice
communication facilities/ Cathodic
Protection Stations (in case located
independent of other facilities) should have
suitable field signals' connectivity with the
control system.
Application software modules I functions
should be based on_ the requirement of
pipeline operating company.
Provision shall be made for transmitting the
Pressure, Temperature, Flow measurement
& gas composition data etc. through
SCADA system to Central Gas
Management Systems (as and _when it is
established) pertaining to gas entry , gas exit
and compressor stations. Board shall allow a
suitable time period · to the entities for
implementation of this system
PIPELINE SYSTEM AND
COMPONENT
Utility Piping
All utility piping at Statiqn shall comply
with the requirement of ASME B31_.3.
• Valves
Valves shall be provided for isolating
sections of pipeline I station piping in order
to:
a) Limit the hazard and damage from
accidental discharge from pipeline/
piping;
· b) Facilitate repair and maintenance of
·pipeline I piping facilities and critical
equipments.
Stations Block valves with remote shut off
provision from the control . room shall be
provided at the inlet and outlet of the
compressor station piping to isolate the
pipeline from compressor station facilities
in case of emergency at compressor station
Mainline /Sectionalizing valves shall be
installed on the pipeline for the operation
and maintenance and control · of
emergencies. Spacing between mainline
valves / , sectionalizing valve in various
Location Classes shall not exceed values
given in Table 2.
61
THE GAZETTE OF INDIA: EXTRAORDINARY [PART II-SEC. 3(i)]
Table 2
Maximum
Location Class Distance in Kms ·
1 32
2 24
3 16
4 8
Overhead power lines shall not be allowed
to cross directly over the process area of the
valve station facilities.
The provisions· of remote operation should
be as per the operation and control
philosophy adopted for the pipeline by the
owner/operating company.
Mainline /Sectionalizing valve should
preferably be installed below ground and be
provided with suitable stem extension for
ease of operation.
Sectionalizing block valve in the piggable
section of pipeline shall be full bore type to
allow safe passage of pigs. The bore size
shall conform to API 6D I IS0-14313.
Actuator for the actuated valves may be
selected based on type of valve, availability
of power and project philosophy preferably
operating on the fluid in the pipeline system.
As far as practical, all mainline isolation
valves should be with butt weld ends.
Flanged end valves shall not be used in
buried piping except at the locations where
hot tapping operation is to be carried out for
which, buried valve with flanged ends may
be used to facilitate mounting of hot tapping
machine.
Valve surface shall be applied with suitable
corrosion protection coating.
Sectionalizing Valve (s) station shall have
blow down or vent line connection to
evacuate the isolated pipeline section in case
of an emergency and I or repair. The size of
the connections for blowing down the
mainline line shall be not be less than 1;3rd
of the mainline size.
All joints between the mainline pipe and the
first valve on the branch, including the inlet
to first valve, should be welded joint in
order to restrict possible leakage which
cannot be isolated by the closure of the
valve.
• Pigging Facilities
Main gas pipelines and feeder lines, spur
lines and branch lines of 4" and above size
and length greater than I 0 km shall be
provided with pigging facilities.
Spacing between consecutive pigging
stations shall be determined based on the
diameter of pipeli'ne, nature _of pigging
operation and capability of the pigs. Spacing
in excess of 200 km shall be avoided.
Pigging stations shall be provided with all
weather access road from the nearest road
• Bends
The minimum radius of Cold Field Bend
shall be as per Table 3.
Use of Mitre bends shall not be permitted.
Table 3
Nominal Pipe Minimum Bend
Size (inch) Radius
12 and below 21D
14 to 16 30D
18 and above 40D
Where 'D ' is outside diameter of steel pipe.
The minimum bend radius for hot bends
shall be 3D.
['llflT II-~3(i)]
• Insulating Joints
Insulating joints ,shall be provided to
electrically isolate the !Juried pipeline from
the above ground pipeline and station piping
• Branch Connections
Branch connections of size below NPS 2 are
not recommended in buried pipeline section.
All branch connections from mainline shall
be provided with an isolation valve located
at · a minimum possible distance from the
main pipeline.
Where welded or forged branch connections
are installed in the pipelines designed for
pigging, special branch connections should
be used to ensure that the pig is not
damaged while passing the connection.
Flow tees or guided bar tees should be used
to ensure smooth passage of pigs.
• Flanged or Threaded joints, Bolts,
Nuts, Gasket and other Fittings
Threaded joints shall not be used in
underground sections of cross country
pipelines. Threaded joints may be permitted
in above-ground stations I above ground
section of SV stations, only if a welded
isolation valve is provided before it.
The flanged joint shall be made using eith~r
spiral wound metallic gaskets or metallic
ring type gaskets. Plain asbestos sheet I
reinforced gaskets I CAF gaskets shall not
be used.
• Metering Facilities
Appropriate type of meters shall be installed
at all custody transfer points meeting
requirements of American Gas Association
(AGA) standard as agreed mutually between
buyer and seller. Dry gas filters may be
installed at the upstream of the meters if
required by the manufacturer of meters
• Electrical Installations of Pipeline
Stations
Area Classification of Pipeline Installation,
as basis for Selection t>f Electrical
Equipment for Natural Gas Pipeline Station,
shall follow IS-5572. The specification of
Electrical equipments shall be in line with
IS~ 5571, "Guide for selection of Electrical
Equipment for Hazardous Area".. Fire
protection in Electrical installations shall be
designed as per relevant IS standard as
enclosed in Annexure II.
All electrical equipment, systems, structures
and fencing, etc. shall be suitably earthed in
accordance with IS 3043.
The earthing system shall have an earthing
network grid with required number of
electrodes. All Electrical equipment
operating above 250 volts shall have two
separate and distinct connections to earth
grids. Separate earthing grid shall be
provided for instrument and electrical
power.
Lightening protection shall be provided as
per the requirements of IS:2309. Self
conducting structures having metal
thickness of n:iore than 4.8 mm may not
require lightning protection with aerial rod
and down conductors. They shall, however,
be connected to the earthing system, at least,
at two points at the base in line with
relevant IS standard as enclosed m
Annexure IL
• Instrumentation and Control System
Instrumentation and control system for the
Pipeline system shall in general meet the
requirement of API Standard API-RP-551 to
API-RP-556 "Manual on Installation of
Refinery Instruments and Control Systems.
• Communication
A reliable and dedicated communications
system to interact between various stations
63
=64== ==========T=H=E=G=AZ:::::::E::::::TT:::::::::E::::::O::::F:::::IN::::::D:::::I:::A::::::: :::EX::T:::RA::::::::O:::RD=IN=A:::R:::Y==:::::==:::.:[~pART_II
Previous and next
Questions people ask
Is appendix I of 15. Technical Standards and Specifications including Safety Standards for Natural Gas Pipelines, Regulations, 2009 still in force?
No repeal of 15. Technical Standards and Specifications including Safety Standards for Natural Gas Pipelines, Regulations, 2009 is recorded.